Original source · versioned page text
Attachment C - Stormwater report
Attached to the e-mail MCU14/0039 Response to information request Stormwater & Riparian reports email 2 of 3.
In addition to the reduced nutrient loads now being applied at the site, the operators have the ability
to remove the nutrient rich irrigation water from the greenhouse. Irrigation can be halted, and the
runoff pumped back to the holding tank. Fresh water can then be used to flush the growbags and again
pumped back to a holding tank. This can be undertaken within a period of approximately 3 – 4 hours
and therefore allows the operators to extract the nutrient rich runoff in the event of a major flood
event.
Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive Page 9
D’VINERIPE
R003370
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.