Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2016-03-07 General Committee - Item 1 - Draft Waste Reduction and Recycling Plan - ATTACHMENT 1

of 45

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Phase 2: Encourage voluntary uptake of the garden waste (3 bin system) collection service (Jul
2016 – Jan 2017).

      Raise awareness and education levels about the benefits and correct use of the garden
       waste bin
      Encourage voluntary uptake of garden waste bin.
      Conduct garden waste audit to determine reach required and the level of existing services.
      Reduce the amount of garden waste sent to landfill.
      Reduce the level of contaminants in the garden waste bin.
      Reinforce key messages from Phase 1.

Phase 3: Prepare Community for mandatory three-bin system of waste collection
including the garden waste bin in Oct 2017 (Feb - Oct 2017).

      Community education and awareness campaign about garden waste
      Communicate bin audit results and explain why they demonstrate a need for mandatory
       garden waste collection and to do it properly without contamination.
      Communicate the long term cost savings to Noosa ratepayers.
      Develop and implement reward and recognition program for excellent recycling and garden
       waste performance.
      Reinforce key messages from phases 1 & 2

Phase 4: Manage and promote the correct and effective use of the garden waste (3 bin system).
(Nov 2017 – Mar 2018).
    Communicate the results of bin audits highlighting reduction of waste being sent to landfill.
    Accelerate reward and recognition programs for recycling and garden waste bin use
       excellence.
    Reinforce key messages from phases 1-3.

Actions for 2018-2024 will be developed in the future and build upon the previous 4 phases.




Waste Reduction & Recycling Plan - Page 18
Log in to download the original file

2016-03-07 General Committee - Item 1 - Draft Waste Reduction and Recycling Plan - ATTACHMENT 1(PDF, 4MB).pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.