Decision Notice - Approved by Delegation of Authority - DBW25 0062 (As Published) · DBW25/0062
16. At the completion of the development works certification must be submitted to Council from
a qualified person* which certifies that the development has been constructed in accordance
with the recommendations contained in the site specific Geotechnical Report and that the
development has a minimum factor of safety against landslip of 1.5 in the long term.
*(Refer to advisory Note)
Earthworks and Retaining Walls
17. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council. All
earthworks must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Damage to Services and Assets
18. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
5. REFERENCE DOCUMENTS
Doc No. Rev. Document Name Date
- S24- Stormwater Management Report prepared by Westera 17 April 2025
198 Partners Pty Ltd
- PG- Preliminary Geotechnical Investigation and Slope Stability December
12709 Assessment prepared by Pacific Geotech Consulting 2024
Geotechnical Engineers
A0.106 7 Demolition Site Plan prepared by Myers Architecture 26.02.2026
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
PLANNING
General Advisory Notes
1. Council has undertaken an audit check of the drawings in relations to the proposed works. A
detailed check of the calculations and drawings has not been undertaken. The RPEQ bears
full responsibility for all aspects of the engineering design. Council reserves the right to
require further amendments and/or additions at a later date should design errors become
apparent.
2. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Page 4 of 7
Document Set ID: 24601581
Version: 4, Version Date: 17/03/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority - DBW25 0062 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 156 KB (small file)
- File type
No other editions are linked here.