Original source · versioned page text
Compiled Reference Documents - MCU25/0091 (As Published)
Very large file (15.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
Wingara Hills Pty Ltd
Table of Contents
1.0 INTRODUCTION ...................................................................................................................... 1
2.0 PROPOSED DEVELOPMENT ................................................................................................. 1
3.0 SITE DESCRIPTION ................................................................................................................ 1
4.0 METHOD OF INVESTIGATION ............................................................................................... 3
4.1 Walkover Survey and Subsurface Investigation ....................................................................... 3
4.2 Fieldwork .................................................................................................................................. 3
4.3 Geotechnical laboratory testing ................................................................................................ 4
5.0 RESULTS OF INVESTIGATION .............................................................................................. 4
5.1 Published Geological Information ............................................................................................. 4
5.2 Subsurface conditions .............................................................................................................. 5
5.3 Topography ............................................................................................................................... 5
5.4 Surface Drainage ...................................................................................................................... 6
5.5 Vegetation ................................................................................................................................. 6
5.6 Buildings, Other Structures, etc. ............................................................................................... 6
6.0 ASSESSMENT OF LAND STABILITY ..................................................................................... 6
6.1 Existing Conditions ................................................................................................................... 6
6.2 Stability Risk Assessment ........................................................................................................ 7
7.0 DEVELOPMENT IMPACTS & MITIGATION MEASURES....................................................... 8
7.1 Earthworks ................................................................................................................................ 8
7.1.1 Site Preparation & Trafficability ................................................................................................ 8
7.1.2 Excavations .............................................................................................................................. 8
7.1.3 Batter Slopes ............................................................................................................................ 8
7.1.4 Erosion Protection .................................................................................................................... 9
7.2 Retaining Structures ................................................................................................................. 9
7.3 Footings .................................................................................................................................... 9
7.3.1 Site Classification ................................................................................................................... 10
7.3.2 High Level Footings and Piers ................................................................................................ 10
7.4 Drainage ................................................................................................................................. 11
7.5 General Foundation Maintenance .......................................................................................... 11
8.0 WASTEWATER TREATMENT AND DISPOSAL ................................................................... 12
8.1 Wastewater Flow Design Allowance ...................................................................................... 12
8.2 Terrain-Soil Assessment ........................................................................................................ 12
8.3 Recommendations .................................................................................................................. 12
8.3.1 System Construction............................................................................................................... 13
9.0 SUMMARY AND CONCLUSIONS ......................................................................................... 14
10.0 LIMITATIONS ......................................................................................................................... 14
J002915-001-R-Rev0 i
Document Set ID: 24031832
Version: 1, Version Date: 14/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.