Skip to the record
Accept no imitations.

Council archive · source document

08/0774 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.774

of 15

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

{Suns nshine Coast area Applications Involving Land_ —
Regional Council Development & Land Use Sections

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

4. APPLICATION.FORMS ea Fe, eS
1.1. Form’ PartaA
1.1.1 Ensure that the form is fully completed and is a current version.

 

 

 

 

1.1.2. In the case of an MCU or Op Works below the. high-water mark, owner's consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.

1.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by
signatory) or Company Seal required.

1.2 Form1 Part B-R Supporting Information
4.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached. [7]
@ 4.1.2.1. Ensure that each of Forms B-R which are attached are fully completed. [Al

  

so

we

   

2. ‘DAS. ASSESSMENT CHECKLIST:: eR peal Poesy
2.1. Ensure that relevant sections have been checked and/or completed with regard to referrals
2.2 Ensure correct parts of Form 1 are provided where required (ie most common are Part J for
Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works) , Al

   

‘ENVIRONMENTALLY RELEVANT ACTIVITIES” ue Be Ba
3.1. Ensure that Part G is completed if EPA referral is required. :

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Environmental Health for fees)
8

4," FORM2' REQUEST’TO‘CHANGE APPROVA

4.1 Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records.

If over multiple properties on one or more sites, consent of Body Corporate is required.

 

 

 

 

 

  

 

 

 

‘PLANS a et a at NEN a tg
5.1. Ensure that generally at least 6 sets of the Plan of Development (5 for Reconf iguration and Operational k
Works) accompany the application. In addition ensure that each set is complete.

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is _
unbound.

‘SUPPORTING:INFORMATION
6.1 Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration | _
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. - _
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3. Additionally an electronic version is preferred where possible for ease of electronic record keeping -
7.1 Ensure that the application fee, as determined from the Council’s adopted scale of fees,
accompanies the application or has been paid. 4

    

 

 

 

 

 

   

 

 

 

 

 

   

 

 

 

 

 

e Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational
Work if Jetty or if including Landscaping.

* Land Development Lot Reconfiguration applications and Operational Work not including ‘Landscaping

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

IC g: anduse\administrative processes\application checklist.doc

YY

 
Full text of the other 14 pages

Page 2

 

   

DAS ‘REFERRAL AGENCIES.T fais)
Pléase-réfer é ] S|

   
 
  

ogee a

 

 

 

Department of Main Roads (Concurrence or Advice)

e State Controlled Road

 

Dept Natural Resources & Water

« Acid sulphate soils (Advice)
e Clearing of native vegetation on freehold land (Concurrence)

 

Environmental Protection Agency (Concurrence)

« Environmentatly Relevant Activity (for non-devolved Council as EPA)
e Contaminated land
: = Environmental Management/Contaminated Land Register
= UXO
= Land recently used as a ‘notifiable activity’
« Industrial land changed to sensitive uses (eg school)
* Coastal related development.
« Koala habitat
« Wetlands (Advice only)

 

 

 

Queensland Transport (Concurrence)
e —. Railway
. Public Passenger Transport

 

Energex or other responsible entity (Advice)
° Electricity Easements/Substations

 

OUM (Concurrence)
. SEQ Regional plan

 

 

VARIOUS
e Conservation estate (Advice)

 

 

“OTHER STATE AGENCIES + TRIGGERS...

 

 

 

  
 

“OWNER’S:‘CONSENT (State land)

 

 

 

Department of Natural Resources and Mines

EPA

 

 

 

For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.

NSC g:Manduse\administrative processes\application checklist.doc

 

 

 

 

Page 3

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
a “a

 
  

     
 

Part A

Common details

 

 

 

 

 

Company/organisation name (if applicable) [Pite-t Pty Ltd tfa Noosa Jetty Builders |

 

 

Individual applicantContact person (If there is more than one applicant, provide additional applicant details on an attachment to this form)

@ Title [Ms | First name lemma Lastname Reed

Postal address [Po Box 299, Noosaville. QLD 4566

Contact telephone number [07 5474 3480 Mobile phone number ‘10408 137 526

 

 

 

 

 

 

 

 

 

Facsimile number 07 §474 3480 e-mail address [email protected]

 

 

 

 

 

etas of the premises fe. Tie land an Which the development fs proposed = 72410 thengce at tte end of tre fora)
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A Ifthe application is for a mobite and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.

 

 

 

 

 

 

 

[4
OR
TableB Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
@ () [[] Street address / lot on plan for the premises (Appropriate for most applications inctuding building applications): OF

(ii) BR] Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty, .
Pontoon ete) ote: Loton plan details may be obtained from title documents, a Rate’ notice, or from the focal government.)

 

   
 
  

Loti on plan description 7 =

 

 

 

 

 

 

 

 

 

Sunshine Coast Regional Council

[1
AND/OR

TabteC Coordinates and/or a map of the premises (Appropriate for developmentin remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc}

 

 

 

 

 

 

 

1 CJ Scvass
(CD weses

[J Other -

 

 

 

 

 

 

 

 

 

 

2. Identity if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one ar more of these characteristics - - complete only if applicable)

Page 4

 

INTEGRATED PLANNING ACT 1997 Part A,-Version.3.1,.3-March.2008.

 

Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
, Name of water body, watercourse or aquifer (if known)

 

[1 [Noosa Waters Canal

 

Table E Complete if the premises are on Strategic Port Land under the Transport infrastructure Act 1994

 

 

Lot on plan description for strategic port land Port Authority for the tot
[1

 

Table F Complete if the premises are in tidal water

 

Name of local goverment for the tidal area (if applicable) Name of port authority for the tidal area (#f applicable)

 

 

 

{1

 

 

3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)

 

Total area of premises

 

1,025.00 (X) m? [_J hectares (Tick applicable unit)

 

 

 

 

 

(Existing se of the premises
4. — Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)

 

td
5. _ Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overtand flow, water etc)?
No O Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application

 

\Proposal details |
6. _ Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)

 

Timber Jetty

 

 

 

7. Does the poposal include new buildings or operational work (including any services) on the premises?
(No XM Yes- Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application

 

[Resource entitlement (f applicable) - further information is provided in the advice section at the end of the form

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land {leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)

No - Goto 0 Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.

 

{Cwner's consent (f applicable) - futher information is provided in the advice section at the end of the form

9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport infrastructure @ Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.

 

 

 

 

Premises Owner's name/s Details of the premises owned . * Date consent
Table H and postal address (sieet address or lot on plan description) Owners signature was obtained

.M.SOHNSONW [42
1 J. d 48 Saltwater Ave, Noosaville. QLD 4566 25/03/2008

. yt ~VA"

. } =
ie v ;

2 |M. JOHNSO CI 9 Saltwater Ave, Noosaville. QLD 4566 2 25/03/2008

 

 

 

 

 

 

 

: a

* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consertt must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. {f the owner is a compariy;s12Z. ofthe Corporations Act 2001 (Cweaith) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the {PA website .

Page 5

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

Portable Long Service Leave (LOL) levy (pleable Tor ea ang GnO COULTON Work ilued Over S00!

 

10. The Portable Long Service Leave Levy (PLSL} is not applicable to this application if any of the following apply: ( Tick box if applicable)

11.

1] the application seeks a preliminary approval only;

C the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3A (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);

all costs, that-relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(C1 the work is being carried out under an owner-builder permif issued under the Queensland Building Services Authority Act 1991 -

Complete and submit a QLeave Notification and Payment Form {no payment required if ‘owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.

{s payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?

No - End of Part A

[1s Yes - Answer 072 below

 

@ OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)

 

 

Receiving officer’ : Refe
Fee ($)| { Goo | Date received 2|<]es Seen e . (3 Sree, numbers o8l77y

 

 

 

 

 

 

 

 

 

At

 

 

nw @e_ NOTIEICATION OF-ENGAGEMENT. OF PRIVATE CERTIFIER >...

  

 

 

‘ouncil. | have been engaged as the private certifier for the building work referred to in this application.

 

 

 

 

 

 

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT

te Ps

(for completion by assessment manager or private certifier if applicable)

S ‘ : OF of Daté reveipied -]-" 5
form sighted by”
‘assessments:

manager. °

  
 

  

ee ES

         
 

4 ee a
nome,

 

 

 

 

 

 

 

 

[1

 

Privacy Statement

The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected wil be retained as required by the Public Records Act 2002.

 

Advice for completing Part A

 

General advice

Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not property made. :

The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.

 

 

Applicant details

If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 " Part A, Version 3.1, 3 March 2008

 

 

Details of the premises

The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other

structure is situated on the land). The term ‘land! is also defined to include the estate in, on, over or under the land,

Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete

Table A. ‘

The premises may be identified in a number of ways —

© Street address and lot on plan are most common and will apply to most applications.

Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large fot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and fatitude and other
(specified) datum such as Zone Reference or GS84 may be provided.

The definition of ‘water body and ‘watercourse’ can vary from Act to Act.

StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand.

StrategicPortl_andis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 14 (Development on

strategic port land) and the Queensland Transport (Ports) website.

“Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic

port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water

mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Loca! Goverment Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port tand is within the jurisdiction of the relevant port authority, while the Environmental Protection

Agency generally has jurisdiction for a focal government tidal area. However, the IPA gives local governments jurisdiction for assessing and

deciding applications for prescribed tidal works within the local govemment tidal area, and the planning scheme may be applied to that

assessment (to the extent provided for in the code for prescribed tidal work).

 

Resource entitlement

Section 3.2.1 (5) of the IPA requires evidence of resource entitement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.1(10)(a)(ii) states-an application cannot be taken to be properly made without the required evidence.

For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as property made.
For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark. . :

 

Owner’s consent

Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995; or work on rail corridor tand defined under the Transport Infrastructure Act 1994,
Evidence of this consent may need to be provided before the application will be accepted as property made by the Assessment Manager, during
the processes of the application or in the event of an appeat about the outcome of the application.

‘Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant ata rent).

Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation retates to the development application for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.

 

 

Portable Long Service Leave (PLSL) Levy

The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueenstand.
The-PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction industry
(Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.

The Building and Construction industry (Portable Long Service Leave) Act 1997 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy tobe paid before a development permit may
be issued.

The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from anyQueenstandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www. gleave.qld.gov.au. For further information contact QLeave (Tet 1800 803 481 Web:

www. gleave,qid.gov.au )

 

 

Page 7

PILE-IT Pty Ltd

 

Trading as :
Noosa Jetty Builders
LETTER ABN: 55099036736
No: 0001 / BSA: 1111115
DATE:25/03/2008

FROM: Noosa Jetty Builders .

PO Box 299 Phone: (07) 5474 3480

Noosaville Fax: (07) 5474 3480

QLD, 4566 Mobile: 0408 137 526

   
 

It May Concern,
» give Pile-It Pty Ltd t/a
Noosa/eétty Builders permission to Submit an application for prescribed title works on:
my behalf.

Address: £0 © Coo Rog Ch RO

 

 

: Cooney . Post Code: &@¢6 3
Phone: Tuy boil ___ Mobile: O¢(727 FR 2a /

Email:

 

 
 
 

Yours Sincerely,

Page 8

INTEGRATED PLANNING ACT 4997 Part E, Version 3.1, 3 March 2008.

Building &/or operational works assessable
against a planning scheme

 

1. Nature of work that requires assessment against a planning scheme:

 

 

(J Building work - Complete TableA [X] Operational work - Complete Table B
Table B
eS (i) Whatis the nature of the operational work?
(1 Roadworks Stormwater (L) Water infrastructure [J Sewerage infrastructure
(J Landscaping (J Earthworks {[] Drainage Works C1 Signage
Oo Clearing vegetation under the planning scheme Other - Specify below
Jetty

 

 

 

ii) What type of approval is being sought? (VOTE: if you have indicated muttiple operational works in question {]) above and your answers to this
pel que yo
question would be different for different operational work; it may be more appropriate to provide these details in an attachment to this form)

[JX] Development Permit [7 Preliminary approval (C] Both (Specify below)

{iii)_ ts the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
EXJNo [1] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot) :

KXNo =] Yes - Complete Table Ba)

 

 

 

 

2, What is the dollar value of this operational work? (ie. the total value inctuding GST, materials and abor) |$ 12000

 

 

  
 

3. Confirm that the following mandatory information accompanies this application

 

aa

  
 

 

 

 

 

 

 

 

 

 

Plans, andspecifications if applicable, showing the nature and location of the proposed works finciuding the

extent of any cut and fil) (XJ Confirmed _ | over the counter
OFFICE USE ONLY

Date Received Reference Numbers [-

 

 

 

 

~ Advice for completing Part E

General advice
° Part A must also be completed for all IDAS development applications.
The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

 

 

 

na

 

Page 9

  
 

 

INTEGRATED PLANNING ACT 1997 ° _ IDAS Assessment Checklist; Version 21-2,31-March-2008.
aT

Form 1 Development Application

IDAS

Assessment Checklist

 

 

yeh BF oa . < - POT te ap hee pi we ete, “et : Waren .
DAS Development Application Form Tis the approved form for all development applications under the Imegrated Planning Act
. 1997 1PA). Form 1i is made up of Various Parts. :

Part: (Conon eexails) of Form t mustbe completed for. all applications. “The relevance of other Partsof Form 1 depénas on:
sf , the nature of the application. ; . on, :

a
Form + also includes the! IDAS Assessment Checklist, which i is, used to assist in determining State assessment nt and referral
a ",  Feqjuirements, and the Parts of Form’t relevant i to the application.” 7 . ven

e “Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be
' rome for al development applications except th those proposed on. land in an urban development area, or for building work:
requiring assessment against the Building Act 1975 only. ~

|. For more information about development applications on and in an urban development area, refer to Www, eww a.qid.gov.au.
. . ,, For more advice about building applications refer to Part B of the IDAS Apptication Form, ;

  

 

 

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.

 

For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - Complete Section 1 of this

 

 

 

checklist
Does the application seek approval to materially change use of the premises? Ces {RIN
ifyes - complete Section 2 of this checklist °
Does the application seek approval to reconfigure a lot? , Ces (RIN
if yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government. o
Does the application seek approval to out operational work?

joe: pp pp carry out op & Yes |LINo

if yes - complete Section 4 of this checklist
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? :

. ; . OYes |KINo
e@ if yes - complete Section 5 of this checklist

Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?
if yes - complete Section 6 of this checklist. OCYes |KINo

 

 

 

Does the application seek approval to carry out building work requiring assessment against a local government planning

scheme? Yes |(No
if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government.

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. DYes |&KINo
Assessment is by a building certifier .

 

 

 

 

 

 

 

 

Ex 7 Section 1 must be completed forall ‘applications that require. completion of the IDAS Assessment Checitist,
es = — - i rs a Konic

 

    

11 Answer both A and B below.
A |s any part of the proposal intended to be carried out on a Queensland Heritage place under the Queensland Heritage Act

1992?
No-GotoB  [_] Yes

Page 10

\ | ere

— pO nen

a INTEGRATED PLANNING ACT 1997 : . IDAS. Assessment Checklist, Version 21.2, 31 March 2008

" B Does the proposal involve development, other than development mentioned in the integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered
in a Local Heritage Register under Part 7B of the Queensland Heritage Act 1992?

 

 

& No - Goto. Q1.2 oO Yes - (Complete Form 1, Part C;} This application requires assessment by the relevant local government against the IDAS
Code in the Queensiand Heritage Regutation 2003. if the development involves building work and the local
government is not the Assessment Manager for the application, the focal government has. | jurisdiction as Cancutrence
Agency.

IPA, schedule 8, part |, table 5, item 2A, schedufe 9, tables |, 2, 3, 4 & 5; IP Regutation, schedute 2, table 1, tema 114: IPA, section 1.3.8 (Definitions for terms used in development);
Queensland Heritage Requiation 2003, scherkule 2 (IDAS Code).

 

   

 

1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
. No-Gotoa?3 [] Yes

" "
\ IPA, schedule 8, part 1, table 5, Rem 1; IP Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, item 2 (wild river area}; Water Act 2000,
section 966C; Wild Rivers Act 2605, section 43A

i \ERUIRORMAENTATLY RELEVANT ACTIVITY: WILD RIERAREAS ET
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

e {X] No-Gotoai4 [[] Yes
IPA, schedule 8, part 1, table 2, item 1; IPA, schedule 8 past 1, lable 5, items 3 and 4: IP Reguiation, schedule 2, table 2, items 1 and 23; Environmental Protection Act 1994, section
TAA (wild river area); Wild Rivers Act 2005, section 43A; relevant wild river declaration; Wild Rivers Code, .

WITHIN THE LIMES OF APORT oS

 

 

 

 

 

 

 

  

 

 

41.4 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
DX] No - Goto ans
OYerr- ae
. Peegulaton schedule 2, table 2, ilems 15 and 16
# a an
v {DECLARED:FI FISH! PHABITAT, AREA Yo weit wet ae
i ae
- 15 Does any part of the premises ises adjoin a declared fish habitat area under the Fisheries Act 1997
- DX] No - Gotoaré 4. B -
(Yes - if answers to questions in other sections of this checKfist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2, table 2, item 26
[COMMUNITY INFRASTRUCTURE® 2° wi th ait

 

pt: 6 Sen Is S any part of the premises designated for community infrastructure?

cae) + . --
a! BI No. Goto.Q.? a

f
2

 

    

 

2 SL ee
17 Does the proposal involve te estabishnienit or expansion of a waste water disposal system?

[EX] No -Endof section? [_] Yes
IP Regulation, schedule 2, table 3, tem $

 

 

 

 

44 Is any of the proposed operational work assessable under a planning scheme?
[FI No- Go to 94.2 Yes - (Complete Forin 1, Part E) Answer Qs4.1.1 - 4.1.7 below.

Page 11

Ss

7
i

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22, 31 March 2008
BTATE.CONTROELED ROAD, «, ae oe ee
4.1.1 1s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?

{] No

(71 Yes
If no, is the proposed operational work for filling or excavating listed in /ntegrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?

[IX] No -Gotoas1.2
oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

 

 

 

eS il .

IP Regulation, schedule 2, table 3, item 3; P Regulation, schedule 2, table 3, item 1{b} ‘

 

  

 

442 Is any of the operational work proposed in a local government area listed*! in State Planning Policy 2/02: Planing and Managing
Development Involving Acid Sulfate Soils

- : Ed No -Gotoas13 + ()Yes © &

: . . ot
‘nouns Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumelt, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloala, Déuglas, “.
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,

 

 

” Redoliffe, Redand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday . ea,
a, a
@ IP Regulation, schedule 2, table 3, item 4; State Planning Policy 2/02: Planning and Managing Development involving Acid Sutfate Soils, section 3.6 . hy
[EASEMENTSAND SUBSTATIONS. ee ee =e Eee

 

“413 Is any of the proposed operational work for filling or excavation?
EX] No -Gotoas14

0 Yes . .

oo JP Regulation, schedule 2, table 3 item 10{a); IP Regulation, schedule 2, table 3, item 10(b)

 

bed
4.1.4 |s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that‘Act?

DX] No -Gotoas15 [] Yes
IP Regutation, schedule 2, table 3, item 17
eT
PUBLIC PASSENGER TRANSPORT Par Be he ge eins iia 1 .
4.1.5 1s any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the

 

   

specified threshold?
DX} No-Gotca416 [[] Yes- This application must be referred to QueenstandTransport (QT) as Concurrence;Agency.
e@ {P Regulation, schedule 2, table 3, item 14
pecs aaa ener

 

            

Sy Fue

[RAILWAY SAFETY.AND EFFICIENCY icy. oe

4.1.6 — \s any of the proposed operational work listed in schedule 13D of the hn integrated Planning Regulation 1998 and does it exceed the
specified threshold?
DX No-Got0a4.17 | [7 Yes - This application must be referred to QueensiandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 15

IKOALA CONSERVATION: « :
4.1.7 |s any part of the premises in a koala conservation area or koala sustainability area?
No -Gotoaa2 [_] Yes
JP Regulation, schedule 2, table 3, tem 19

 

ker ek ee

   

 

 

 

 

Page 12

%

ph

INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 21.2, 31 March 2008

 

 

 

 

42 Is y of the proposed operational work associated with reconfiguring a fot and the reconfiguration is also assessable?
X] No -Gotoas3 [_] Yes

IPA, schedule 8, part 1, lable 4, Rem 2; IP Regulation, schedule 1, part 2, lable 5, item I{c)
Wild Rivers code (Note: the code does not currently contain agplicable provisions for residential, industrial or commercial development inside a designated urban

area)

 

 

WEGETATION CLEARING; KOAEA CONSERVATION: 4

43 Is any of the proposed operational work for the ceating of fative vegetation to which the 2 Vegetation Management Act 1999
applies?

(KI No -Gétoasa [[] Yes . :

IPA, schedule 8 part 1, table 4, items 1A-1G; IP Regulation, schedule 2, fable 2, item 5 (vegetation clearing), IP Reguiation, schedule 2, te 2, item 34 (koala 4
conservation); IP Regulation, schedute 1, part 3, table 4, item (vegetation clearing/wild river area); Vegetation Management Act 1999, section 22A {vegetation
Clearing/wild river area); Wild Rivers Act 2005, sections 31F and 43A

 

{IAKING OR INTERFERING WITH WATER: WILD RIVERAREA., =
FAKING OR INTERE rR An

   

AN
44 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or, *,,
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under a
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
[K] No -Gotoass oO Yes - Answer {a} and (b) below
IPA, schedule 8, pari 7, table 4, tems 3(a); IP Regulation, schedule 2, table 2, item 8: IP Regulation, schedule 1, part 3. table 4, tems 3 and 3A; Water Act 2000, section 956A (wild nver
area): Wild Rivers Act 2005, section 43A; relevant mid river declaration; Wild Rivers Code

45 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water}?
No Goto Q46 oO Yes - (Complete Farm 1, Part K,} This application requires assessment by the Department of Natural Resources and Water
{NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

(PA, schedule 8, part 1, table 4, item 3{b); IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Wild Rivers code (Note: the code does not currently contain applicable provisions for taking ar interfering with artesian water)

46 ts any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
” BQ] No -Gotoas7 [[] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, item 3ic}{): IP Regulation, schedule 2, table 2, item 8 IP Regulaton, schedule 1. past 3, table 4, item 3; Water Act 2000, section 966A (vald river area):
Wild Rivers Act 2005, section 434; relevant wild river declaration: Wild Rivers Code,

47 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water}?
PX) No -Gotoass [[] Yes

IPA, schedule 8, part 1, table 4, tem 3{c}{ii); iP Regulation, schedule 2, tabte 2, item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000, section 966A {wild river area}(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does not curently contain applicable provisions for sub artesian water)

48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water}?
[EX] No -Gotoas9 [7] Yes - Answer both (a) and (b) below

IPA, schedtite 8, part 1, table 4, tams 3{c)G} and 3{d); IP Regulation, schedule 2, table 2, tem 9: IP Regulation, schedule 1, part 3, table 4, tem 3A; Water Act 2000, sectinn 966B (wil
fiver aren}: relevant vatd tiver deciaration; Wild Rivets Coda.

49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [J No O Yes
(ii) To increase the storage capacity of a referable dam by more than 10% No 0 Yes

If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRWis not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 4; iP Regulation, schedule 2, table 2 item 10

{DAL WORK: WILD RIVER AREA

 

   

4.10 ts any of the proposed operational work tidal work, other than excluded work defined under the IPA?
BX] No -Gotoasi7 [7] Yes - Answer a) and (b) below

Page 13

 

ON

\

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
IPA, schedute 8 part 7, table 4, item 5; IP Regulation, schedule 2, table 2, items 8 12 14 and 17; IP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995, section 104A {wild river area)

(COASTAL MANAGEMENT DISTRICT: WILD RIVER AREA ¥ 22"

 

 

 

 

411 ts any of the operational work proposed to be carried out within a coastal management district?

[XJ No -Gotoasi2 [[] Yes

IPA, schedule &, part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12 and 14; IP Regulation, schedute 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995 Act 1995, section 104A {veld river area); Wild Rivers Act 2005, section 43A

[WATERWAY BARRIER WORKS; WILD RIVER AREA ae "
412 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?

EK] No -Got0.a4.13 (Yes .

JPA, schedule 8, part 1, table 4, tem 6; IPA, schedule 8, pait 2, table 4, item 2; Fisheries Regutation 1995 5113A (sell-assessable codes): IP Reytdation, schedule 2, table 2, tem 28: If
Regutation, schedule 1, part 3, table 4, item 6; Fisheries Act 1994, section 76D {wild river area); Wild Rivers Act 2005, section 43A,

  

 

 

    

 

     

DECLARED FISH HABITAT AREA; WILD RIVER AREA
4.13 {s any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
[IX] No - Goto. 04.14

(Yes

JPA, schedute 8, part 1, table 4, item 7; IPA, schedule 8, part 2, table 4, item 3; Fisheries Regulation 1995 113A (self-assessable codes}; IP Regulation, schedule 2, table 2, item 2h IP
Regulation, schedule 1, part 3, table 4, tem 7; Wild Rivers Act 2008, sections 434; Fisheries Act, section 76DC (wild river area}.

a4

 

 

 

 

[REMOVAL DESTRUCTION OR DAMAGE OF AMARINE PLANT; WILDRIVERAREA So

4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?

EX] No -Gotoasis ((] Yes

JPA, schertule 8, patt 1, table 4, item 8; IPA, schedule & part 2, table 4, ita 4; Fisheries Regulation 1995 s113A (sell-assessable codes): IP Regutation, schedule 2, lable 2. item 29; IP
Regulation ‘schedule 1, part 3, table 4, item 8: Fisherles Act 1994, section 76DB (wild river area); Wild Rivers Act 2005, section 43A; relevant wild river declaration; Wild Rivers Code.

WILD RIVER AREA . a iar meee ~— ee ee

4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?

BX No -cotoasie (_] Yes
JPA, schedule 8, part 1, table 4, item 10; IP Regulation, schedule 2. table 2, item 37: Wild Rivers Act 2005, sections 42, 43A

 

7

        

 

BTATECONTROLLED ROAD... ——

 

 

4.16 ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled toad?
K No - End of section 4 O Yes
IP Regulation, schedule 2, table 2, item 3

 

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
teliance on this process and the information contained on this form.

 

 

 

Page 14

 

Sunshine Coast ‘ann use section FEES

Regional Council

 

 

 

 

 

 

 

 

 

RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation : 520
Copy of Permit/Approval Letter . 110
The Noosa Pian Documentation / 111
APPLICATION FEES
Material Change of Use - Code/Impact
Consistent 521
Inconsistent 521
Assessment under Superseded Planning Scheme : 521
Modification to a Development Permit 521
Extension of a Currency Period. 521
@ Operational Works - Landscaping 521
Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW
Half Hour , 522
One Hour 522°
ADVERTISING .
Purchase Advertised Applications 523
JETTIES :
Jetty Application Fee i309 524
Jetty Bond : Se5 51
' (Category 4)
BONDS
’ Performance Bond 51
. (Category 9)
SIGNS :
r ) Registration Fee : . 222
SEARCH FEE .
Search of Land Use Section file. 112
Liquor Licensing Request mo 113
TOTAL $ [Foo
NAME: The Mm els fo =? foo Caer ob Cesk USE?
ADDRESS: Cf- nyecse feth, Bid tert
fo_ bene 249  V MooSavie Stole
FILENO: Of Tate Pou - DATE: fs7oe
RECEIPT NO: ‘ BITS ue Ub Signature of TP Officer: /.S grec
- AUTHORITY NO: /

inf Peo] Bel

Page 15

 

THIS |
- DOCUMENTIS |
- TOLARGETO —

PLEASE REFER
‘TOHARD
DOCUMENT.

Used in these records

About this file

File size
971 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0774 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published].pdf · 971 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.