INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 21.2, 31 March 2008
42 Is y of the proposed operational work associated with reconfiguring a fot and the reconfiguration is also assessable?
X] No -Gotoas3 [_] Yes
IPA, schedule 8, part 1, lable 4, Rem 2; IP Regulation, schedule 1, part 2, lable 5, item I{c)
Wild Rivers code (Note: the code does not currently contain agplicable provisions for residential, industrial or commercial development inside a designated urban
area)
WEGETATION CLEARING; KOAEA CONSERVATION: 4
43 Is any of the proposed operational work for the ceating of fative vegetation to which the 2 Vegetation Management Act 1999
applies?
(KI No -Gétoasa [[] Yes . :
IPA, schedule 8 part 1, table 4, items 1A-1G; IP Regulation, schedule 2, fable 2, item 5 (vegetation clearing), IP Reguiation, schedule 2, te 2, item 34 (koala 4
conservation); IP Regulation, schedute 1, part 3, table 4, item (vegetation clearing/wild river area); Vegetation Management Act 1999, section 22A {vegetation
Clearing/wild river area); Wild Rivers Act 2005, sections 31F and 43A
{IAKING OR INTERFERING WITH WATER: WILD RIVERAREA., =
FAKING OR INTERE rR An
AN
44 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or, *,,
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under a
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
[K] No -Gotoass oO Yes - Answer {a} and (b) below
IPA, schedule 8, pari 7, table 4, tems 3(a); IP Regulation, schedule 2, table 2, item 8: IP Regulation, schedule 1, part 3. table 4, tems 3 and 3A; Water Act 2000, section 956A (wild nver
area): Wild Rivers Act 2005, section 43A; relevant mid river declaration; Wild Rivers Code
45 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water}?
No Goto Q46 oO Yes - (Complete Farm 1, Part K,} This application requires assessment by the Department of Natural Resources and Water
{NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(PA, schedule 8, part 1, table 4, item 3{b); IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Wild Rivers code (Note: the code does not currently contain applicable provisions for taking ar interfering with artesian water)
46 ts any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
” BQ] No -Gotoas7 [[] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, item 3ic}{): IP Regulation, schedule 2, table 2, item 8 IP Regulaton, schedule 1. past 3, table 4, item 3; Water Act 2000, section 966A (vald river area):
Wild Rivers Act 2005, section 434; relevant wild river declaration: Wild Rivers Code,
47 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water}?
PX) No -Gotoass [[] Yes
IPA, schedule 8, part 1, table 4, tem 3{c}{ii); iP Regulation, schedule 2, tabte 2, item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000, section 966A {wild river area}(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does not curently contain applicable provisions for sub artesian water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water}?
[EX] No -Gotoas9 [7] Yes - Answer both (a) and (b) below
IPA, schedtite 8, part 1, table 4, tams 3{c)G} and 3{d); IP Regulation, schedule 2, table 2, tem 9: IP Regulation, schedule 1, part 3, table 4, tem 3A; Water Act 2000, sectinn 966B (wil
fiver aren}: relevant vatd tiver deciaration; Wild Rivets Coda.
49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [J No O Yes
(ii) To increase the storage capacity of a referable dam by more than 10% No 0 Yes
If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRWis not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 4; iP Regulation, schedule 2, table 2 item 10
{DAL WORK: WILD RIVER AREA
4.10 ts any of the proposed operational work tidal work, other than excluded work defined under the IPA?
BX] No -Gotoasi7 [7] Yes - Answer a) and (b) below
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0774 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 971 KB (small file)
- File type
No other editions are linked here.