Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

08/0774 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.774

of 15

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 4997 Part E, Version 3.1, 3 March 2008.

Building &/or operational works assessable
against a planning scheme

 

1. Nature of work that requires assessment against a planning scheme:

 

 

(J Building work - Complete TableA [X] Operational work - Complete Table B
Table B
eS (i) Whatis the nature of the operational work?
(1 Roadworks Stormwater (L) Water infrastructure [J Sewerage infrastructure
(J Landscaping (J Earthworks {[] Drainage Works C1 Signage
Oo Clearing vegetation under the planning scheme Other - Specify below
Jetty

 

 

 

ii) What type of approval is being sought? (VOTE: if you have indicated muttiple operational works in question {]) above and your answers to this
pel que yo
question would be different for different operational work; it may be more appropriate to provide these details in an attachment to this form)

[JX] Development Permit [7 Preliminary approval (C] Both (Specify below)

{iii)_ ts the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
EXJNo [1] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot) :

KXNo =] Yes - Complete Table Ba)

 

 

 

 

2, What is the dollar value of this operational work? (ie. the total value inctuding GST, materials and abor) |$ 12000

 

 

  
 

3. Confirm that the following mandatory information accompanies this application

 

aa

  
 

 

 

 

 

 

 

 

 

 

Plans, andspecifications if applicable, showing the nature and location of the proposed works finciuding the

extent of any cut and fil) (XJ Confirmed _ | over the counter
OFFICE USE ONLY

Date Received Reference Numbers [-

 

 

 

 

~ Advice for completing Part E

General advice
° Part A must also be completed for all IDAS development applications.
The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

 

 

 

na

 

Used in these records

About this file

File size
971 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0774 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published].pdf · 971 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.