Council archive · source document
08/0774 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.774
INTEGRATED PLANNING ACT 4997 Part E, Version 3.1, 3 March 2008.
Building &/or operational works assessable
against a planning scheme
1. Nature of work that requires assessment against a planning scheme:
(J Building work - Complete TableA [X] Operational work - Complete Table B
Table B
eS (i) Whatis the nature of the operational work?
(1 Roadworks Stormwater (L) Water infrastructure [J Sewerage infrastructure
(J Landscaping (J Earthworks {[] Drainage Works C1 Signage
Oo Clearing vegetation under the planning scheme Other - Specify below
Jetty
ii) What type of approval is being sought? (VOTE: if you have indicated muttiple operational works in question {]) above and your answers to this
pel que yo
question would be different for different operational work; it may be more appropriate to provide these details in an attachment to this form)
[JX] Development Permit [7 Preliminary approval (C] Both (Specify below)
{iii)_ ts the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
EXJNo [1] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot) :
KXNo =] Yes - Complete Table Ba)
2, What is the dollar value of this operational work? (ie. the total value inctuding GST, materials and abor) |$ 12000
3. Confirm that the following mandatory information accompanies this application
aa
Plans, andspecifications if applicable, showing the nature and location of the proposed works finciuding the
extent of any cut and fil) (XJ Confirmed _ | over the counter
OFFICE USE ONLY
Date Received Reference Numbers [-
~ Advice for completing Part E
General advice
° Part A must also be completed for all IDAS development applications.
The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
na
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0774 - Op Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 971 KB (small file)
- File type
No other editions are linked here.