Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

21598 - Glenridge Drive Development Application Engineering Report - Rev B

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Preliminary engineering design drawings have been prepared showing the new road, intersection,
and drainage.

A cul-de-sac radius of 9m has been adopted as per Noosa Planning Scheme Policy section
SC6.7.5 1. (n).



    4. Earthworks
Some minor filling is required on lot 1 to provide a flood free building envelop. This would be
provided as part of the Operational Works. This minor filling has been accounted for in the flood
modelling. The remainder of the building envelops are all located in flood free areas on the site,
however minimum floor heights above the natural ground level will be needed to achieve a
minimum 300mm free board above the flood level or PMF. Filling of these building pads has been
included on the preliminary drawings.



    5. Conclusions and Recommendations

The preliminary plans along with this report demonstrate that the proposed development can be
serviced and designed to meet Council engineering design standards


Prepared by




Doug Reynolds
RPEQ 9072
TOD Consulting Pty Ltd
24 March 2022




                                           Page 7 of 8
Log in to download the original file

21598 - Glenridge Drive Development Application Engineering Report - Rev B.pdf · 1.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.