                                             Officer:          Tracy Jones
                                             Direct Telephone: (07) 5449 5228
                                             Response Address: Locked Bag 72
                                                               Sunshine Coast Mail Centre QLD 4560
                                             Email:            [email protected]
                                             Our Reference:    2007/2398
                                             Your Reference:
24 June 2010

RSL Care
CARE PlanTech Town Planners Pty Ltd
PO Box 228
ESK QLD 4312



Dear Sir

                              Negotiated Decision Notice
                                  Integrated Planning Act 1997

I refer to your application and the representations you made in respect to the Decision Notice. On
23 June 2010 Council decided your representations.
Details of the negotiated decision are as follows:

1     APPLICATION DETAILS

 Application No:                2007/2398
 Street address:                19 Trading Post Road COOROY, 4 Lamonts Road COOROY
 Real property description:     Lot 1 RP215922, Lot 2 RP165418
 Planning Scheme:               The Noosa Plan

2     DECISION DETAILS
Council on 8 February 2010 decided to issue the following type of approval:-
            Development Permit for Material Change of Use – Multiple Housing Type 3 - Retirement
             & Special Needs
In relation to representations, Council decided to:
A.    Agree to amend Conditions 2.2, 17, 18, 19, 23, 37 & 49
B.    Amend Condition 33
C.    Issue a Negotiated Decision Notice.

3     RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4     ASSESSMENT MANAGER CONDITIONS

1.    Development, including staging of the development, shall be undertaken in accordance with
      this approval and must generally comply with the approved plans of development. The
      approved plans are titled and numbered: -


                                                                                              1 of 31
Full text of the other 30 pages

Page 2

                                                                                      2007/2398




     Site Masterplan                              0805-TP03       Revision B      1 November 2008
     Schedule of Independent Living Units         0805-TP04       Revision B      1 November 2008
     Masterplan Staging                           0805-TP05       Revision B      1 November 2008
     Village Community Centre – Plans &           0805-TP06       Revision B      9 March 2009
     Elevations
     Village Community Centre – Roof Plan         -               -               -
     Apartment Building – Floor Plans             0805-TP07       Revision B      1 November 2008
     Apartment Building – Roof Plan               -               -               -
     Apartment Building – Elevations              0805-TP08       -               June 2008
     Aged Care Residence – Floor and Roof         0805-TP09       Revision B      9 March 2009
     Plans


     Aged Care Residence – Elevations             0805-TP10       Revision B      9 March 2009
     External materials & colour palette          0805-TP11       -               June 2008
     Typical Sections                             0805-TP13       -               June 2008
     Standard Aged Care Unit Type Z1-B Plan       -               -               October 2007
     & Elevations - Floor Plan (Hip Roof)
     Standard Aged Care Unit Type Z1-B -          -               -               October 2007
     Elevations
     Standard Aged Care Unit Type Z2-B            -               -               30 September 2008
     Reversed Plan & Elevations – Floor Plan
     (Hip Roof)
     Standard Aged Care Unit Type Z2-B            -               -               30 September 2008
     Reversed - Elevations (Skillion Roof)
     Standard Aged Care Unit Type Z3-B Plan       -               -               October 2007
     & Elevations – Floor Plan (Hip Roof)
     Standard Aged Care Unit Type Z3-B –          -               -               October 2007
     Elevations
     Standard Aged Care Unit Duplex Type Z4-      -               -               30 September 2008
     B Reversed Plan – Floor Plan (Hip Roof)
     Standard Aged Care Unit Duplex Type Z4-      -               -               30 September 2008
     B Reversed – Elevations (Gable & Hip
     Roof)
     Standard Aged Care Unit Duplex Type Z4-      -               -               30 September 2008
     B Reversed – Elevations (Hip Roof)

     prepared by Smith and Tracey Architects and as may be amended by these conditions.
General
2.   Prior to the issue of a Development Permit for Operational Works, amended architectural plans
     shall be submitted demonstrating a revised layout having regard to the conditional
     requirements contained herein:-
     2.1   A mix of independent living units and residential aged care, with a maximum of 179
           independent living units and 120 aged care beds.

                                                                                        2 of 31

Page 3

                                                                                    2007/2398




     2.2   A maximum of 8 building forms (single or duplex form) and driveway accesses shall be
           provided to Trading Post Road.
     2.3   Truncation at Elm and Pearsons Road for existing powerlines.
3.   Security in the form of a cash bond or trading bank guarantee to the sum of $100,000 must be
     submitted, to secure performance of all conditions of this approval, prior to the commencement
     of Stage 1 of the development. The cash bond or trading bank guarantee will be returned on
     performance of the conditions of approval less any costs incurred by Council in respect of
     enforcing performance of this permit.
4.   The requirements of this development approval are to be effected, prior to the use of the
     premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
     this approval to effect compliance with conditions.
5.   The development must be undertaken and operated in a manner that causes no detrimental
     effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
     lighting nuisance or other emissions.
6.   The Development Permit for a material change of use of premises lapses if the use has not
     commenced within 4 years of the date of this approval (8 February 2014) and the development
     completed, including all works within 8 years of the date of this approval (8 February 2018).
Staging
7.   The staging of the development shall be in accordance with the plan titled Masterplan Staging
     0805-TP05 Revision B dated 1 November 2008 prepared by Smith and Tracey Architects.
     The following works shall be undertaken and completed prior to the commencement of use of
     Stage 1:-
     7.1   All access, roadworks and frontage works including footpaths as required by conditions
           of this approval;
     7.2   Bus stop works as required by conditions of this approval;
     7.3   Fencing, including all acoustic fencing as required by the approved Acoustic Report; to
           all site boundaries;
     7.4   Landscaping treatments to open space areas including the establishment and
           rehabilitation of all detention basins, the establishment of landscaping buffers to site
           boundaries and adjoining residential properties and street trees; and
     7.5   Payment of relevant bonds as required by conditions of this approval.
Landscaping
8.   A Landscape Plan shall be prepared by a suitably qualified Landscape Architect or
     Horticulturalist and shall be in accordance with Council’s Landscaping Code of The Noosa
     Plan and Planning Scheme Policy PSP3 Landscaping Plants and Guidelines.                   The
     Landscaping Plan shall be submitted and approved as part of an application for Operational
     Works. The Landscaping Plan shall address landscaping treatments for the development
     including internal streetscapes and open space areas, adjoining road network and properties.
     The detailed Landscaping Plans shall identify and/or address the following:-
     8.1   Street tree planting to Pearsons Road and Trading Post Road to allow good shade
           canopy once fully mature;
     8.2   Existing vegetation to be removed, with this vegetation clearly identified on site for
           inspection by Council;
     8.3   Existing vegetation to be retained and measures employed to ensure vegetation
           retention;
     8.4   Landscaping treatments to internal road network and between buildings;

                                                                                      3 of 31

Page 4

                                                                                      2007/2398




      8.5   Landscaping treatments to open space areas, including any rehabilitation and planting
            enhancement requirements around the drainage basins within the site;
      8.6   Landscaping buffers and fencing to Elm Street, Pearsons Road, Trading Post Road and
            Lamonts Road;
      8.7   Landscape buffers and fencing to adjoining properties;
      8.8   The location of pedestrian pathways and seating within the site and on the road reserve
            adjoining the site.
      Such landscaping is to be completed in accordance with the approved landscaping plan prior
      to acceptance of the development on maintenance.
9.    Existing trees on the site and within road reserves are to be retained, except where required to
      be removed due to building operations or the conduct of the approved use.
10.   All underground services, drainage, footpaths, bike paths, roads and other site works shall be
      located to minimise adverse impacts on retained vegetation, particularly their root systems.
Public Open Space
11.   Communal recreational facilities shall be located a minimum of 15 metres from bedrooms of
      Independent Living Units and Aged Care Residence.
12.   Seating shall be provided in communal areas and along pedestrian pathways within the site.
Acoustics
13.   The site is to be developed in accordance with the recommendations of the Acoustic Report as
      prepared by ASK Consulting Engineers (Project 499IR0IVoI dated 12 March 2009 and the
      addendum dated 20 March 2009), which include the use of minimum construction methods for
      buildings and acoustic barriers along site boundaries.
14.   The acoustic report shall be amended, where appropriate, to include additional measures
      required to address potential road noise on habitable rooms and private open space areas
      from haulage vehicles along Lamonts Road.
15.   Where mechanical ventilation systems are to be used for the development, the most energy
      efficient systems shall be installed.
16.   On completion of the development, the developer is required to submit to Council a written
      certification from an Acoustic Consultant confirming that the proposed noise barriers meet the
      noise limits for each adjoining residence as outlined under the Acoustic Report for the subject
      site.
Fencing
17.   Fencing shall be erected on all boundaries of the site and shall have a minimum height of 1.5
      metres Trading Post Road and Pearsons Road and 1.8 metres on all other boundaries with the
      exception of those fences which are required to have a greater height for the purpose of
      meeting acoustic requirements.
18.   All fencing to road frontages of the site shall be setback a minimum of 1 metre with an average
      of 2 metres and be screened with landscaping, with the exception of:-
      18.1. Where open or transparent (ie. minimum 50%) fencing is provided to Pearsons, Trading
            Post and Lamonts Road, fencing may be incorporated within a minimum 2 metre wide
            landscape area and/or
      18.2 Where fencing to Trading Post Road is provided in alignment with the front building
           facades of the independent living units, a minimum 2 metre wide landscape area is to
           be provided within the front building setback.




                                                                                         4 of 31

Page 5

                                                                                         2007/2398




Building Setbacks
19.   All buildings shall be setback a minimum of 6 metres to Elm Street, Pearsons Road and
      Lamonts Road. A minimum setback of 4.5 metres applies to Trading Post Road, providing
      garages are setback a minimum of 5.5 metres.
20.   All buildings shall be setback a minimum distance that is equivalent to half their building height
      to adjoining properties, excluding to Lot 1 on RP 165418 where a minimum setback of 2
      metres is required.
21.   The distance between any part of any building shall be a minimum of 1.5 metres plus 0.5
      metres for each storey of the building with the greatest number of storeys.
Built Form
22.   Buildings shall be varied in their architectural style, construction materials, colours and finishes
      with no more than four (4) adjoining or consecutive independent living units having the same
      external colours, materials or finishes.
23.   All buildings shall comprise eave overhangs of a minimum 600mm to 75% of the buildings,
      with the exception of approved design types Z1-B, Z2-B and Z3-B (including reversed
      designs), where no or limited eave overhangs are permitted to one side of the building.
24.   Transformers, waste storage areas, etc shall be screened to reduce their visual intrusiveness.
Aged Care Residence
25.   A maximum of 82 employees at anyone time are permitted to be engaged in the operation of
      the aged care residence.
26.   Employees and visitors of the aged care residence shall be encouraged to utilise the site’s
      vehicular access from Lamonts Road.
Lot Amalgamation and Road Dedication
27.   All separate, adjoining lots that form part of this application shall be amalgamated into one
      undivided allotment in accordance with Section 3.7.3 of the Integrated Planning Act and the
      Plan of Survey submitted for registration at the Land Titles Office. The Plan of Survey must
      also include any land dedication required by this permit. Proof of title being issued for the
      amalgamated lot shall be submitted to Council prior to the issue of the Development Permit for
      Operational Works.
28.   Prior to commencement of use the applicant shall dedicate road reserve truncation at the
      intersection of Pearsons Road with Elm Street to ensure that the existing power lines crossing
      this corner of the site be located within the road reserve. The new boundary line setback from
      the power line shall be in accordance with ENERGEX’s requirements and adequate to
      accommodate any proposed or future pathway at this corner of the site.
Vehicle Access, Roadworks and Frontage Works
29.   All pathways and roadworks required by this approval including the works required by
      Department of Main Roads (DMR) on Cooroy Connection Road (Elm Street) at its
      intersections with Pearsons Road and Lamonts Road, and the roadworks required by Council
      on Trading Post Road, Pearsons Road and Lamonts Road must be included in Stage 1 of the
      development with the exception of roadworks relating to the site’s access from Lamonts Road
      which must be carried out as part of the development of the aged care residence (whether or
      not staged) or the commencement of works for the development of Stages 8 or 9, whichever
      comes first .




                                                                                            5 of 31

Page 6

                                                                                      2007/2398




30.   The applicant must design and construct kerb and channel along the western side of Pearsons
      Road with any associated road widening and drainage works to achieve Local Road standard
      for Urban area (8m Kerb to Kerb) in accordance with Council’s Planning Scheme Policy 5 -
      Engineering Design Standards – Roads, Drainage and Earthworks. The existing kerb line at
      the intersection of Pearsons Road and Elm Street must also be upgraded in accordance with
      Department of Main Roads Standard to match the proposed new width and new kerb line of
      Pearsons Road or as may be specified by Department of Main Roads in the operational works
      approval. A Development Permit for Operational Works shall be required.
31.   The applicant must construct a cul-de-sac head at the end of Trading Post Road in
      accordance with Section 3.12 of Council’s Planning Scheme Policy 5 - Engineering Design
      Standards – Roads, Drainage and Earthworks. A Development Permit for Operational Works
      shall be required.
32.   The applicant must design, construct and seal Lamonts Road from Elm Street to 10m beyond
      the access to the development site in accordance with Council’s Planning Scheme Policy 5 -
      Engineering Design Standards – Roads, Drainage and Earthworks with 7m wide seal and flush
      kerb be provided on both sides of the seal. The intersection of Lamonts Road with Elm Street
      must be designed in accordance with Department of Main Roads Standard or as may be
      specified by Department of Main Roads in the operational works approval for this intersection.
      Accesses to other properties shall be adjusted as necessary to match the new levels of
      Lamonts Raod. A Development Permit for Operational Works shall be required.
33.   The site shall have only three main (3) vehicular accesses to Council’s roads network including
      a gated emergency vehicles access from Pearsons Road. There shall be no other vehicular
      accesses from the site or from any unit within the site directly to Council’s roads (excluding 6
      driveway crossovers to Trading Post Road).
34.   The access crossings shall be designed and constructed to Council’s design standards and to
      grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
      movements along the footpath without any step or level difference. All access driveways must
      comply with AS/NZS 2890.1:2004 and AS 2890.2:2002. A Development Permit for Operational
      Works shall be required.
35.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the all
      road frontages of the site in accordance with Planning Scheme Policy PSP03 Landscaping
      Plants & Guidelines. Grass shall be couch, free of weeds.
36.   A new 2m wide concrete path shall be constructed along the Trading Post Road frontage of
      the site in accordance with Council’s design standards and to an alignment that protects any
      significant vegetation and underground services. The path shall extend around the cul-de-sac
      and join to the existing path on the opposite side of Trading Post Road. A Development Permit
      for Operational Works shall be required.
37.   A new 2m wide concrete path shall be constructed along the Pearsons Road frontage of the
      site and be extended along Elm Street to connect to the required bus stop on Elm Street. The
      path shall be in accordance with Council’s design standards and to an alignment that protects
      any significant vegetation and underground services. Two pedestrian accesses to the site
      shall be provided along Pearsons Road frontage to provide connection between the internal
      and external pathways. A development Permit for Operational Works shall be required.
38.   A pedestrian refuge island shall be constructed on Pearsons Road near its intersection with
      Elm Street to provide connection between the new pathway in Pearsons Road and the
      pathway in Elm Street.
39.   Pram ramps shall be installed at road intersections and wherever needed to direct pedestrians
      across the road. All pram ramps must be constructed in accordance with Council’s design
      standards.




                                                                                         6 of 31

Page 7

                                                                                        2007/2398




40.   All paths, pram ramps, driveways and parking areas shall be designed and constructed to
      ensure pedestrian safety using non-slip materials, to produce an evenly graded surface finish,
      and to be in accordance with the Disability Discrimination Act 1992 and Australian Standard
      1428.1 Design for Access & Mobility.
41.   Where applicable, all redundant vehicular crossings to the site shall be removed and replaced
      by kerb and channel and footpath paving or landscaping in accordance with Council’s
      Standard prior to the commencement of the use.
42.   To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
      the driveway and any associated fencing or vegetation near the driveway shall comply with the
      minimum sight line requirements as defined in AS/NZS 2890.1:2004, section 3.2.4.
Bus Stop
43.   The applicant shall design and construct a bus stop on Elm Street to the frontage of Lot 135
      MCH 978 (north of 156 Elm Street) at approximately 70m south of the centre line of Pearson
      Road intersection. A Development Permit for Operational Works shall be required.
44.   The proposed bus stop is to be “Indented” and be an “Intermediate Bus Stop” design
      according to the TransLink Public Transport Infrastructure Manual shown on:
      http://www.transinfo.qld.gov.au/qt/TransLin.nsf/index/ptim. The bus stop shall contain all
      Mandatory and Preferred components as stated in Chapter 2 of the manual.
45.   The design for the bus stop shall consider a Pedesrian Refuge Island and a coupled bus stop
      (indented but unsheltered) on the opposite side of Elm Street for future construction.
46.   The bus stop required on Elm Street must be included in Stage 1 of the development.
Internal Driveways and Parking
47.   The internal roads shall be concrete or bitumen sealed driveway of a minimum width of 6m
      for Primary Roads and 5.5m for Secondary roads and must comply with AS 2890.2-2002. A
      Development Permit for Operational Works shall be required.
48.   All parking areas and garages must be in compliance with the requirement of the current
      Australian standards applicable to their use (AS/NZS 2890.1-2004 and/or AS 2890.2-2002)
      with a minimum head clearance (headroom) at any point of 2.3m.
49.   All vehicles shall enter and leave the site in a forward direction with the exception of vehicles
      leaving driveway accesses of the duplex from independent living units fronting Trading Post
      Road.
50.   Carparking shall be provided within the site generally as shown on drawing titled Schedule of
      Independent Living Units 0805-TP04 Revision B 1 November 2008, except as modified herein.
51.   Carparking shall be provided at a minimum rate of 1 space per independent living unit for
      resident parking and 1 space per 4 independent living units for visitor parking; and 1 space per
      2 employees based on the maximum number of employees engaged at any one time at the
      aged care residence and 1 space per 5 beds or occupants of the aged care residence.
52.   A minimum of two clearly defined disabled car space shall be provided to service the aged
      care residence and village community centre.
53.   All staff carpark spaces shall be clearly defined by line marking each space with the words
      “Staff Parking Only” and by sign posting each space with a similar wording.
54.   All carparking shall be kept maintained and line-marked in a condition fit for use.
55.   An emergency parking bay shall be available at all times in front of the community village
      centre and the aged care residence.
56.   Parking shall be provided for boats, trailers and caravans etc.
57.   Visitor car parking shall be conveniently located to all independent living units, village
      community centre and the aged care residence.
                                                                                            7 of 31

Page 8

                                                                                            2007/2398




Earthworks
58.   All excavation and filling works required on site must be carried out in accordance with
      Council’s Planning Scheme Policy PSP5 – Engineering Design Standards. A Development
      Permit for Operational Works shall be required.
59.   Fill imported to the site may only be from a site licensed with The Environmental Protection
      Agency or from a site for which a Development Permit for Operational Works has been issued
      approving the export of fill.
60.   A registered practicing Geotechnical Engineer shall test the existing ground conditions for
      suitability of placing additional fill, prior to such fill being placed.
      Filling works shall be restricted to the subject site itself, and the finished fill levels are to taper
      to the existing levels on the property. Batters shall be at a maximum grade of 1:4 unless
      retained by an engineer-designed wall or approved retention method.
61.   Following completion of the filling works and prior to endorsement of the Plan of Survey, the
      registered practicing Geotechnical Engineer supervising the works shall submit compaction
      tests across the entire filled areas and make recommendations if special foundations
      requirements will apply.
62.   Earthworks carried out on site must not adversely affect the drainage conditions on any other
      properties or existing roads. Filling works required on site shall not cause additional ponding of
      water on any adjoining lands or the blockage of, or interference with, any natural
      watercourses. Detailed site surveys indicating natural surface levels and contours of the
      affected properties (eg Lot1 RP165418) must be provided with the application for a
      Development Permit for Operational Works for Filling and Drainage.
      This may require the design and construction of drainage pipes and/or an overland flow-path
      within the development site that caters for drainage from the adjoining sites for a design storm
      with an Average Recurrence Interval of 1 in 100 years.
Vegetation Protection & Preservation
63.   Vehicular pavements within the drip zone of any of the existing trees on site to be retained
      shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
      allow water that falls on this surface to penetrate to the trees root system. The pavement shall
      be constructed so as not to damage the tree or their root system and in this regard temporary
      fencing shall be provided around the trees during construction to help protect them.
      Plans shall be submitted to the Council for approval that clearly show the type and extent of
      the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
      Operational Works.
64.   Where retained trees are located in areas proposed to filled on site (or are located on
      neighbouring allotments to the actual site to be filled), there will be a need to prevent fill
      material from being placed on the trees root system. To this end the design of the filling works
      will need to incorporate terracing around the tree or a similar means of ensuring that the
      natural ground level around the trees remains generally the same as existing. These
      measures shall clearly be shown on the plans submitted for Operational Works approval and
      any drainage required to drain these areas shall also be shown on the plans.
Stormwater Drainage
65.   A suitably qualified Registered Professional Engineer, specialising in hydraulics shall prepare
      engineering drawings and specifications for stormwater designs and shall be submitted in
      conjunction with an application for a Development Permit for Operational Works.
66.   Peak discharges of stormwater shall be managed in accordance with the Concept Stormwater
      Management Plan for Cooroy Retirement Village Trading Post Road, Cooroy prepared by
      Brown Consulting dated June 2008 and any subsequent amendments approved by Council.


                                                                                               8 of 31

Page 9

                                                                                       2007/2398




67.   Stormwater pipelines within the site shall cater for 1 in 10 Years storm event and secondary
      flowpaths shall be provided within the site to cater for 100 years storm event.
68.   The development must not adversely impact on the existing drainage conditions on other
      properties including not depriving dams on other properties of their natural stormwater runoff.
69.   The applicant shall revise the Concept Stormwater Management Plan for Cooroy Retirement
      Village Trading Post Road, Cooroy prepared by Brown Consulting dated June 2008 to detail a
      stormwater treatment train that can achieve Load Reduction Targets for Total Suspended
      Solids, Total Phosphorous and Total Nitrogen in accordance with the Healthy Waterways
      Water Sensitive Urban Design – Technical Guidelines for South East Queensland (2006). This
      revised stormwater treatment train for the site shall ensure that nutrients can be adequately
      treated prior to release off site. The revised Concept Stormwater Management Plan shall
      specify water quality objectives for stormwater prior to it leaving the site to ensure the
      modelled outcomes are achieved. All stormwater runoff treatment must be undertaken within
      the development areas of the site.
      The applicant shall submit an amended plan for Council approval prior to a Development
      Permit for Operational Works being issued.
70.   Stormwater Quality Improvement Devices as detailed within the Concept Stormwater
      Management Plan for Cooroy Retirement Village Trading Post Road, Cooroy prepared by
      Brown Consulting dated June 2008 and any updates approved by Council shall be installed
      within the development to ensure compliance with the designated water quality objectives are
      achieved. Stormwater likely to contain grease and oil (i.e. from carparking areas) shall be
      managed via grease and oil arrestors prior to treatment within bioretention basins and
      wetlands.
71.   Wetlands and bioretention basins shall be designed and constructed in accordance with
      Healthy Waterways Water by Design Construction and Establishment Guidelines: Swales,
      Bioretention Systems and Wetlands February 2009.
72.   A Stormwater Monitoring and Maintenance Plan (SMMP) shall be prepared ensure stormwater
      treatment infrastructure is performing its intended purpose. The SMMP shall be approved by
      the Council’s CEO or delegated officer prior to issue of any Operational Works Approval. The
      SMMP shall specify:
      72.1    performance indicators including water quality objectives;
      72.2    monitoring schedule to ensure specified performance indicators are achieved;
      72.3    maintenance schedule for all elements of the stormwater treatment train;
      72.4    reporting requirements;
      72.5    corrective actions for non compliance with performance indicators; and
      72.6    responsibility framework.
Sewer Mains
73.   The site must be connected to Council's existing sewerage reticulation system by gravity, and be
      constructed in accordance with Council's standards and requirements at no cost to Council.
74.   The sewer connection shall be generally in accordance with the Sewerage Layout Plan
      Drawing No N07058-DA10 Issue E dated 22/01/09 and the Proposed Sewer Details N07058-
      DA20 Issue (A) dated 22/01/2009 by Brown Consulting. A Development Permit for
      Operational Works is required.
75.   A new sewer connection must be provided within the property boundary of Lot 4 RP 215922.
76.   The applicant must provide written approval from all property owners through which external
      sewers will traverse, to enter, construct and provide a sewer easement. This must be submitted
      prior to the associated development application for Operational Works.

                                                                                         9 of 31

Page 10

                                                                                         2007/2398




Water Supply
77.   The site must be connected to Council's existing town water supply and be constructed in
      accordance with Council's standards and requirements at no cost to Council.
78.   Works be carried out in accordance with the approved findings of the water supply network
      analysis by Worley Parsons and dated 10 June 2008
79.   The existing 100mm diameter watermain within Pearson Road must be upgraded between the
      existing 150mm diameter main in Carruthers Court to the existing 150mm diameter main to the
      North in Pearsons Road
80.   The water connection to the water reticulation system shall extend to the property boundary and
      be metered. All fees for the supply of water meters shall be paid to the Council
81.   For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development shall
      be served by:
      81.1 Single Body Corporate water meter to measure the total water consumption (including fire
           hose reels, but excluding fire hydrants and fire sprinkler systems)
      81.2   Individual water meters to each tenement capable of being separately rated. These meters
             must be supplied and installed in accordance with Councils requirements
      81.3   All water meters must be located in an easily assessable location to facilitate
             unhindered reading by Council and/or Council’s contracted water meter readers, and
             not behind fences or locked gates
      81.4   A fire service (fully testable single detector check with metered bypass), where applicable,
             for flows to fire hydrants and fire sprinkler systems (excluding fire hose reels)
82.   Fire hydrants are to be provided throughout the development in accordance with Council
      Engineering Design Standards and in accordance with Queensland Fire Service Standards.
Service Easements
83.   A registered easement shall be created over the zone of influence of the proposed sewer
      mains within the subject site and on the adjoining property Lot 4 RP 215622. The easements
      shall generally be parallel to and centred over the sewer main and be equivalent in width to
      twice the depth to invert level of the sewer at the deepest point (measured from the finished
      surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor shall
      accurately locate all sewer mains and determine the necessary width of the easement, which
      shall be shown on any plans submitted for Operational Works / Building Works approval. To
      this extent the surveyor shall certify that the sewer and the zone of influence is wholly
      contained within the easement to be created. The applicant must be pay all costs associated
      with the acquisition and the registration of easement/s.
84.   The Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that
      the Title Deed and the easement documents will be lodged at the Land Titles Office and any
      additional Titles Office forms or requisitions requiring the consent of Council will be attended to
      promptly.
      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
      use commencing.
Power Supply
85.   An underground electricity service shall be provided to the site if not already provided.
      In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
      with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
      The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their
      approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
      Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
      prior to Council endorsing the Plan of Survey.
                                                                                          10 of 31

Page 11

                                                                                                      2007/2398




                 Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
                 be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
                 purchasers of the proposed lots.
          86.    The requirements of ENERGEX shall be satisfied in relation to any existing services traverse
                 the site. Written confirmation by ENERGEX that satisfactory arrangements have been made to
                 formalise any required easements and/or existing informal services shall be submitted prior to
                 Council endorsing the Plan of Survey.
          87.    Streets lighting and pathways lighting throughout the development site must be provided in
                 accordance with Australian Standards.
          88.    Street lighting shall be provided along Pearsons Road frontage of the site in accordance with
                 Australian standards.
          Telecommunication
          89.    The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
                 provision of new telephone services to the developed site. In this regard written confirmation
                 from an approved telecommunication agency shall be submitted to the Council prior to Council
                 endorsing the Plan of Survey.
          Erosion and Sediment Control
          90.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
                 site. Site control measures such as silt fencing, controlled gravel access to the site and
                 controlled disposal of waste, will be necessary.
                 In this regard plans detailing the methods of controlling erosion and sediment are required to
                 be submitted to the Council for approval prior to obtaining a Development Permit for
                 Operational Works.
          Contributions Towards Council Infrastructure
          91.    Monetary contributions shall be paid to Sunshine Coast Regional Council towards the cost of
                 providing and/or upgrading various infrastructure at the rates applicable at the time of
                 payment. An estimate only of the contribution amounts under the current Council policies and
                 requirements is outlined in the table below:
                                                                                                Rebate       for
                                                                                  Total         Eligible
                INFRASTRUCTURE NETWORK
                                                                                  Contributio   Community
                                                                                                Organisation        Total
                                                                                  n                                Amount
Stage           PSP    12   PSP      16   PSP     17   PSP     20   Rural     /   Applicable    Charitable non-    Payable
                Public      Rural         Water        Pathway      Local         to            profit      for
                                                                                  Developme                           $
                Open        Sewerage      Headworks    Trunk        Roadworks                   community
                Space       Headworks                  Network                    nt            services
                (Park)                                                                          facilities
Stage 1         $105,504       $202,017     $197,531      $49,374       $17,848     $572,274         100%            $0
Stage 2           $22,936       $65,655      $59,003      $10,495        $7,349     $165,438         100%            $0
Stage 3           $31,673       $90,667      $81,480      $14,492       $10,149     $228,461         100%            $0
Stage 4           $14,198       $40,644      $36,525       $6,497        $4,549     $102,413         100%            $0
Stage 5           $22,936       $65,655      $59,003      $10,495        $7,349     $165,438         100%            $0
Stage 6           $26,212       $75,035      $67,432      $11,994        $8,399     $189,072         100%            $0
Stage 7           $19,659       $56,276      $50,574       $8,995        $6,299     $141,803         100%            $0
Stage 8           $21,844       $62,529      $56,193       $9,995        $6,999     $157,560         100%            $0
Stage 9           $13,106       $37,517      $33,716       $5,997        $4,200      $94,536         100%            $0
Total =         $278,068       $695,995     $641,457     $128,334       $73,141   $1,816,995         100%            $0




                                                                                                       11 of 31

Page 12

                                                                                         2007/2398




      Please note that these amounts are all subject to variations in the Consumer Price Index, All
      Groups Brisbane from December 2009 until the date of payment. All contributions must be
      paid prior to commencement of use.
General
92.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works that will become Council infrastructure, which shall be
      submitted in conjunction with an application for a Development Permit for Operational Works.
      In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
      submitted in conjunction with any application for Operational Works.
93.   Digital detailed designs including drawings, calculations, specifications and a schedule of
      works, shall be submitted with any application for a Development Permit for Operational Works
      in respect of roadworks and stormwater drainage works. The design shall be in accordance
      with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards – Roads,
      Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing
      and proposed services required by the development shall be shown on the plans.
94.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
      use of ADAC are available at www.adac.com.au).
95.   A construction management plan/strategy shall be prepared by a suitably qualified Registered
      Professional Engineer and submitted to Council in conjunction with any application for
      Operational Works. The construction management plan shall ensure no damage occurs to
      Council services and that any adverse impact on the local area due to the construction works
      is within the acceptable limit and properly managed to the satisfaction of Council.
96.   A Traffic Management Plan for the each separate demolition and construction phase of the
      development shall be submitted to and approved by Council at least 5 working days prior to
      the commencement of any Demolition or Building works or at least 5 working days prior to the
      pre-start meeting for Operational Works. The Traffic Management Plan shall include but not
      be limited to:
      96.1   Mitigate any adverse impact and disturbance on the local residential area and on the
             traffic in the local and main roads to acceptable limits;
      96.2   Mitigate dust disturbance caused by vehicles and machinery movements;
      96.3   Limiting the routes for the heavy vehicles to the major road network and limit the use of
             the local roads within residential area as access to the site;
      96.4   Indicate provision for on-site and off-site parking for the required workforce;
      96.5   Indicate the location of loading and unloading areas;
      96.6   Indicate the location of any “holding” areas for heavy vehicles and
      96.7   Operating hours.
      It is be noted that the Elm Street frontage of site shall not be used for access, parking or
      loading and unloading during construction (and post construction) phase unless a specific
      written permit obtained from the Department of Main Roads.
97.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
98.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
99.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
                                                                                           12 of 31

Page 13

                                                                                      2007/2398




100. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
     for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
     type of all services and structures. All of which shall be submitted to Council for checking and
     for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to
      roadworks, pathway, sewer main, water supply main, finished ground levels and pavement
      surface levels and drainage structures that will become Council asset. The data shall be
      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
      use of ADAC are available at www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.
Waste Management
101. A Waste Management Plan (Operational) generally in accordance with Planning Scheme
     Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”,
     must be submitted for the day-to-day operation of the development and approved by Council’s
     Health Section prior to issue of development permit for operational works. The Waste
     Management Plan (Operational) is to incorporate the following changes to the proposed
     development:-
      101.1 The proposed general waste bulk bin storage areas at the Aged Care Residence,
            Apartment Building, Village Community Centre and temporary service to the
            Independent Living Units whilst under construction, will require HRV 12.5m length travel
            path and turning access.
      101.2 If the waste storage area at the Aged Care Residence is not roofed, then the actual
            bunded bin wash area is to be decreased in size to a maximum one square metre area.
      101.3 The waste storage area at the Apartment Building is to be relocated to the western end
            of the adjoining car parking spaces, to allow ease of access for collection and avoid the
            unnecessary manoeuvring through this car park.
      101.4 The waste storage areas at the Aged Care Residence, Apartment Building, Village
            Community Centre and temporary service to the Independent Living Units whilst under
            construction, each require their own separate bin wash facility.
      101.5 Submit details for approval of the proposal for bin washing of the recycling bins located
            at the service nodals.
      101.6 Council will not provide a roadside collection service to the 80L and/or 120L general
            waste wheelie bins at the Independent Living Units after their completion. The following
            options must be considered including client costings, and an alternative proposed for
            approval.
             101.6.1   Option 1: Continue the temporary service of the bulk bins as a permanent
                       arrangement. This requires:
                          Details of the permanent waste storage area (location, size, bin wash,
                           etc).
                        HRV 12.5m length travel path and turning access for collection.
                       OR
                       Option 2: Provide a roadside collection service of 240L general waste wheelie
                       bins (one bin shared between two units). This requires:
                          10m vehicle length (not 9m as proposed) travel path and turning access
                           for collection.
                          Where possible bins are to be placed on one side of the road only to
                           prevent duplication of travel path and minimise service time and travel.
                                                                                        13 of 31

Page 14

                                                                                      2007/2398




                           The “Turning Path 3” at the north western corner cul-de-sac to be
                            deleted. The bins for these nine units are to be placed at the nearest
                            trafficable thoroughfare for collection without any unnecessary reversing
                            or turning.
102. Provide an adequate number of recycling bins (240L or 1.1 cu.m. bulk) at the waste storage
     areas of the Aged Care Residence, Apartment Building, Village Community Centre and
     temporary service to the Independent Living Units whilst under construction. The proposed
     HRV 12.5m length travel path and turning access to these areas will suffice for collection.
103. The 240L recycling wheelie bin service to the completed Independent Living Units requires:
      103.1    Size of the service nodals to increase to accommodate eight bins i.e. one bin shared
               between two units.
      103.2    10m vehicle length (not 9m as proposed) travel path and turning access.
      103.3    Bulk bins (1.1 cu.m.) may also be considered provided HRV 12.5m length access is
               available.
104. Plans are to be submitted for approval by Council’s Environmental Health Section of the HRV
     12.5m and 10m length waste vehicle travel paths and turning access. Plans must clearly show
     routes and ensure that vehicle overhangs when turning are clear of all obstructions e.g. posts,
     poles, fences, landscaping, etc.
105. All road traffic islands are to be trafficable for the waste vehicles.
106. All bins are to be placed in the correct position for collection at the roadside without the need
     of the driver leaving the waste collection vehicle.
107. Council’s waste collection service during Stage 1 will not commence until the required road
     access and waste storage facilities (including temporary ones), are in place.
108. A Waste Management Plan (construction and demolition) shall be submitted prior to
     demolition, removal or relocation of any building other than a shed. Waste Management Plan
     (construction and demolition) is also required for construction of 15 or more dwelling units or
     for any business use of greater than 500m².
      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
      Waste storage areas are to provide for adequate separation of all reusable, recyclable and
      waste materials. These shall be located so that they are convenient and safe to use. The Plan
      shall contain the following information:
             The site area for the storage and separation of waste is to be shown on the plan
              drawings accompanying the application.
             A waste management table as indicated below is to be completed showing how waste
              material is to be segregated - recycled – reused or disposed.




                                                                                         14 of 31

Page 15

                                                                                         2007/2398




     MATERIALS ON-SITE                           DESTINATION
                                                 Re-use and Recycling                    Disposal
     Expected waste               Estimated      On-site            Off-site             *specify
     materials                    volume         *specify proposed *specify              contractor    and
                                  (m³)           re-use or on-site contractor      and   landfill site or
                                                 recycling          recycling outlet     other     disposal
                                                 methods                                 site
     Excavation material
     Green waste
     Bricks
     Concrete
     Timber-please specify
     Plasterboard
     Metals - please specify
     Asbestos
     Other - please specify
      Note * If a demolition contractor is undertaking works, then the Waste Management table is to
      be completed by the demolition contractor.

      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
      effective reuse and recycling of such materials. Additionally Council rewards those who
      segregate waste by significantly reducing disposal fees at the landfill some items are free.
      Higher gate fees are charged for loads of mixed waste.

Mosquito Protection
109. Submit a Management Plan for the control of mosquitos from the three large water basins,
     including form of construction of basins, vegetation in and along the shoreline, on-going
     monitoring and eradication treatments. Plan is to be approved by Council’s Environmental
     Health Section.
110. Doors and windows of the Aged Care Residence, Apartments, Community Centre and
     Independent Living Units are to be fitted with insect screens.
Noise Management
111. The location and operational hours of mechanical plant equipment including domestic air
     conditioning units, is not to create a noise nuisance to occupiers.
112. Noise from building works associated with residential development shall comply with the
     following –
      112.1   Limited to between 7:00am to 6:30pm Monday to Saturday.
      112.2   All reasonable measures are taken to minimise noise emissions.
      112.3   Not permitted on Sunday or public holidays.
113. All water taps from the onsite rainwater storage system are to be labelled “Not fit for drinking”.
5     REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger              Referral Status     Referral Agency            Referral Address

 100 metres of a State-        Concurrence         Department of Main         PO Box 1983
 Controlled Road                                   Roads                      GYMPIE QLD 4570
 Railway Corridor              Concurrence         Queensland Transport       Transport Planning
                                                                              GPO Box 213
                                                                              BRISBANE QLD 4001
                                                                                          15 of 31

Page 16

                                                                                     2007/2398




A copy of any referral agency conditions is attached.

6     APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:

 Plan / Document No.       Rev.   Plan / Document Name                           Date
 0805-TP03                 B      Site Masterplan                                1 November 2008
 0805-TP04                 B      Schedule of Independent Living Units           1 November 2008
 0805-TP05                 B      Masterplan Staging                             1 November 2008
 0805-TP06                 B      Village Community Centre – Plans &             9 March 2009
                                  Elevations
 -                         -      Village Community Centre – Roof Plan           -
 0805-TP07                 B      Apartment Building – Floor Plans               1 November 2008
 -                         -      Apartment Building – Roof Plan                 -
 0805-TP08                 -      Apartment Building – Elevations                June 2008
 0805-TP09                 B      Aged Care Residence – Floor and Roof           9 March 2009
                                  Plans
 0805-TP10                 B      Aged Care Residence – Elevations               9 March 2009
 0805-TP11                 -      External materials & colour palette            June 2008
 0805-TP13                 -      Typical Sections                               June 2008
 -                         -      Standard Aged Care Unit Type Z1-B Plan &       October 2007
                                  Elevations - Floor Plan (Hip Roof)
 -                         -      Standard Aged Care Unit Type Z1-B -            October 2007
                                  Elevations
 -                         -      Standard Aged Care Unit Type Z2-B              30 September 2008
                                  Reversed Plan & Elevations – Floor Plan (Hip
                                  Roof)
 -                         -      Standard Aged Care Unit Type Z2-B              30 September 2008
                                  Reversed - Elevations (Skillion Roof)
 -                         -      Standard Aged Care Unit Type Z3-B Plan &       October 2007
                                  Elevations – Floor Plan (Hip Roof)
 -                         -      Standard Aged Care Unit Type Z3-B –            October 2007
                                  Elevations
 -                         -      Standard Aged Care Unit Duplex Type Z4-B       30 September 2008
                                  Reversed Plan – Floor Plan (Hip Roof)
 -                         -      Standard Aged Care Unit Duplex Type Z4-B       30 September 2008
                                  Reversed – Elevations (Gable & Hip Roof)
 -                         -      Standard Aged Care Unit Duplex Type Z4-B       30 September 2008
                                  Reversed – Elevations (Hip Roof)




                                                                                        16 of 31

Page 17

                                                                                                  2007/2398




7    ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1    The applicant is advised that development contributions and infrastructure charges applicable
     to this development approval have been based on the following Uses Class/ Uses and
     applicable quantities:-
         Existing Development                   Approved Development
         Existing Use Class /   Existing        Approved Use
                                                                      Approved Quantity
         Use                    Quantity        Class / Use
                                                                      Stage 1 = 120 single beds + 21x 2 bed units
                                                                      Stage 2 = 21x 2 bed units
                                                                      Stage 3 = 29 x 2 bed units

                                1 Lot & house                         Stage 4 = 13 x 2 bed units
                                                Multiple Housing -
         Detached House         +               Type 3 - Retirement   Stage 5 = 21 x 2 bed units
                                1 Vacant Lot    & Special Needs
                                                                      Stage 6 = 24 x 2 bed units
                                                                      Stage 7 = 18 x 2 bed units
                                                                      Stage 8 = 20 x 2 bed units
                                                                      Stage 9 = 12 x 2 bed units

2.   The applicant is informed that payment via credit card transaction will not be an acceptable
     method of payment for development contributions conditioned in this permit or for
     infrastructure charge notices issued separately.
3.   The requirement for payment of infrastructure contributions has been assessed in accordance
     with Council’s policy “Infrastructure Contributions (Charges) Rebates for Eligible Community
     Organisations”. This approval is based on the organisation type and purpose of development
     in accordance with Table 1 of the policy as detailed in the contribution condition of the
     Development Permit.
4.   The applicant is advised that a Compliance Permit for all plumbing and drainage works within
     the boundaries of the development site shall be obtained from Council’s Plumbing Services
     Section prior to obtaining a Development Permit for Building Works.
5.   A separate loop of water main should be installed within the property boundary for domestic and
     fire services. Fire hydrants and fire sprinklers are should be connected to the fire main. Fire hose
     reels and the domestic supply to be connected to the metered domestic service.
6.   The applicant is advised that this development may require the provision of fire hydrants and a
     booster pump in accordance with the Building Code of Australia, and in consultation with
     Queensland Fire Services to ensure suitable fire fighting infrastructure is provided. To this end
     any necessary fire hydrants shall be clearly shown on the plans submitted for both Operational
     Works and Building Works approvals and if a booster pump is deemed necessary, the plans
     shall indicate where the fire truck is to be accommodated in order to provide boosting to the
     water supply.
7.   A Waste Management Plan shall be in accordance with Planning Scheme Policy No. 9 and
     further, shall include the following information: -
             The types of waste that will be generated from the activities approved within the
              development.
             Estimated volumes or tonnage of both recyclables and waste generated.
             Methods to be used for dealing with garden waste.
             Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
                                                                                                   17 of 31

Page 18

                                                                                      2007/2398




            Description of procedures for getting all waste to the bins; the storage of bins and the
             collection of bins by the contractor.
            A description of the design details of waste storage and recycling areas including size,
             location, elevation and floor plan, methods of bin washing and system to prevent storm
             water getting into sewer via the bin wash.
            A description of types and volume of waste storage containers to be used.
            The waste and recycling storage area shall include the provision of containers for all
             waste and recycling materials including putresable matter, non-recycling waste, paper/
             cardboard, glass, aluminium/steel cans, waste oil, styro-foam boxes, etc, and bin
             washing facilities connected to sewer.
            A detailed description of vehicular access to collect waste. Where collection is off
             street, access must allow vehicles to enter and leave the site in a forward direction.
8.    The food operations at the Aged Care Facility and the Community Centre require:-
      8.1    Plans and application is to be made to Council’s Environmental Health Section for
             approval prior to any building approval, fitting out or use of the premises.
      8.2    A statement indicating the purpose of the food premises, type of food sold, proposed
             menu and maximum number of patrons at any time, is to accompany the application for
             plan approval.
      8.3    Construction and use of the food premises should comply with Council’s Food Premises
             Policy and the Food Safety Standards (both available from Council).
      8.4    Toilets for customers and staff to be provided in accordance with Building Code of
             Australia. Obtain advice from a building certifier on numbers and standards, including
             disable access.
      8.5    Plans and approval is required for any mechanical exhaust ventilation system, which
             should comply with AS1668. A certificate from the installer certifying the system
             complies with the Standard must be obtained and lodged with Council prior to
             commencement of trade.
      8.6    Any Licensable Food Business, as defined in Chapter 3 of the Food Act 2006, must
             obtain a Food Licence from Council, prior to use of those premises.
9.    The development should be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting, air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any
      other emissions in accordance with the nuisance provisions of the Environmental Protection
      Regulation 1998 or Council’s Local Law No. 12 – Control of Nuisances.
10.   In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
      cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed
      where it could reasonably be expected to move into a roadside gutter, storm water drain or a
      watercourse. On the spot fines apply for such offences.
11.   The plans for the proposed building work have not been assessed for compliance with the
      requirements of the Building Code of Australia as they relate to people with disabilities. Your
      attention is drawn to the matter that either or both the Disability Discrimination Act 1992
      (Commonwealth) and the Anti-Discrimination Act 1991 (Queensland) may impact on the
      proposed building work.
12.   Sunshine Coast Regional Council recommends that the following matters be considered to
      address equitable access and facilities in the building:-
      12.1   The building and environs should be designed to meet the requirements of the Human
             Rights and Equal Opportunity Commission “Advisory Notes on Access to Premises” and
             AS1428.2;
      12.2   Applicants should be aware that a “Disability Standard on Access to Premises is being
             developed and most likely will result in changes to the Building Code of Australia;
                                                                                         18 of 31

Page 19

                                                                                         2007/2398




      12.3   Any services and facilities in the building complex must allow independent, dignified and
             equitable use of the services and facilities for all people.
      12.4   This proposal has not been assessed in relation to the spread of fire between
             properties/buildings. It is the building certifiers responsibility to assess the requirements
             for fire services, fire separation and appropriate methods of construction as part of the
             building works approval process. Referral to the Queensland Fire and Rescue Service
             (QFRS) may be required as part of the Building Approval process.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8     PROPERTY NOTES

Not applicable.

9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable.
10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required           Subject of the required Development Permit

 Development Permit for Building Works         All Building Works

 Development      Permit   for   Operational   Landscaping, site civil works including earthworks,
 Works                                         roadworks including works required by Department of
                                               Main Roads, access, internal roads and carparking,
                                               stormwater       drainage    including   dams  and
                                               underground stormwater harvesting tanks, frontage
                                               works including pathways, sewer reticulation, water
                                               reticulation, erosion & sediment control

11    SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable.

12    SUBMISSIONS
There were 2 properly made submissions about the application. In accordance with Integrated
Planning Act 1997, the name and address of the principal submitter for each properly made
submission is provided and attached.

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable.
                                                                                           19 of 31

Page 20

                                                                                     2007/2398




14      RIGHTS OF APPEAL
You have continuing appeal rights in respect of Council’s decision on your application. Refer Section
4.1.27. of the Integrated Planning Act 1997.
Please note that the Development approval does not take effect and cannot be acted upon, until the
end of the submitter’s appeal period.

15      OTHER DETAILS
Should you wish to obtain more information about Council’s decision, electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.


Decision Notice History
8 February 2010        Original Decision Notice.
23 June 2010           Negotiated Decision Notice with amendments to
                       Conditions 2.2, 17, 18, 19, 23, 33, 37 & 49.

Yours faithfully,




Tracy Jones
Senior Development Planner

Cc:     Department of Main Roads
        PO Box 1983
        GYMPIE QLD 4570



        Queensland Transport
        Transport Planning
        GPO Box 213
        BRISBANE QLD 4001


Encl:    Properly Made Submitters List
         Referral Agency Responses
         Appeal Rights




                                                                                       20 of 31

Page 21

                                                                              2007/2398




                                    List of Submitters
                                   INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




Name                   Company   Address 1             Address 2            Salutation
Mrs Gail Gilliland               17 Tree Street        POMONA QLD 4568      Madam
Noel & Lynn Johnston             4 Trading Post Road   COOROY QLD 4563      Sir & Madam




                                                                               21 of 31

Page 22

                                           2007/2398




Referral Agency Conditions
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                             22 of 31


[OCR of page images]
2007/2398

 

 

 

Sunshine Coast Referral Agency Conditions

7 P INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
Regional Council

 

$0002144

Queenstand
y’ Government

Department of Main Roads

28 August 2008

Mr John Knaggs

Chief Executive Officer
Sunshine Coast Regional Council
PO Box 141

Tewantin Qld 4565

 

Dear Mr Knaggs
Concurrence agency's response - conditions

Sunshine Coast Region

Cooroy Connection Road

Local Government application number 2007/2398

Main Roads number 8231

by RSL Care

Lot 1 on RP215922 & Lot 2 on RP16S5418

situated at 19 Trading Post Road & 4 Lamonts Road, Cooroy

‘The above application has been assessed by the Queensland Department of Main Roads as a
Concurrence Agency.

‘The assessment has had regard to the potential impact of the proposed development on the State-
controlled road network.

Pursuant to Section 3.3.16 of the Integrated Planning Act 1997 the Queensland Department of Main
Roads requires that Council include the attached conditions in any approval of the application, A
Statement of Reasons in respect of these conditions is also provided in the attachment,

Council is considered to be the appropriate authority to address requirements for minor works such as

footpaths, kerb and channel and so on. Should Council choose to impose such requirements then the

applicant is required under section 33 of the Transport Infrastructure Act 1994, to make further
_____ application to Main Roads to carry out the works.

Roads Business Group / Regions ‘Our ref 92114507950.0 A 17 Ish8524
Nosth Coast Region / Sueshine Coast Disinct Office ‘Your ref 2oovi2ase

50 River Road Enquiries  MeLes Hudson jw

PO Box 183 Tolephone +81 7 8482 0333

Gympie Queensiend 4570 Faesimie = +81 7 5482 0465

ABN 57 636727711 Website waw.mainroads. id.gov.au

Email sunshinecosst olficegimainrcods qld.gov au

 

 

22 of 31

Page 23

2007/2398




 23 of 31


[OCR of page images]
2007/2398

 

 

A copy of this letter and attachment has been sent to the applicant
Please forward a copy of Council’s decision notice to this office,
The contact officer for this application is Mr Les Hudson.

Yours sincerely

L. Rll

1R Leyton

Acting Principal Advisor (Development Assessment)
Delegate of the Director-General

Department of Main Roads

*Ene (Attachment | — Conditions and Statement of Reasons)

 

23 of 31

 

Page 24

2007/2398




 24 of 31


[OCR of page images]
2007/2398

 

Main Roads

CONDITION: STATEMENT O)

Application type: Material change of use —
Integrated Residential Aged Care and Seniors Living

 

 

Council; Sunshine Coast Regional Main Roads File No: 92/145/D7950.0 A
Council Ref: 2007/2398 Road: Cooroy Connection Road
Development Number; — 8231
Response Date: 28 August 2008
ISSUES / CONDITIONS OF DEVELOPMENT FOR | THE REASONS, INFORMATION,
CONCERNS THE SUBJECT APPLICATION STUDIES, FINDINGS, USED IN
SETTING OF CONDITIONS
INCLUDED:
Management of access | There shall be no direct access to Cooroy By minimising the number of points of

to a State-controlled
road.

Connection Road. All access is to be via
Pearsons Road or Lamonts Road.

access to the State-controlled road
network, safety and efficiency are
maximised,

 

Works within the State-
controlled road reserve.

 

 

The applicant is to upgrade the Cooroy
Connection Road / Pearsons Road intersection
to incorporate a Channelised Right Turn
(CHR) on a Two Lane Rural Road as shown
on Figure 13.60 of Main Roads' document,
“Road Planning and Design Manual",

The applicant is to upgrade the Cooroy
Connection Road / Lamants Road intersection
to incorporate a Channelised Right Turn
(CHR) on a Two Lane Rural Road as shown
‘on Figure 13.60 of Main Roads' document,
“Road Planning and Design Manual",

Prior to the commencement of any works
within the State-controlled road, the applicant
must arrange for detailed engineering plans
and specifications for the proposed works to
be submitted to Main Roads for assessment
and be approved.

The engineering design, plans and
specifications submitted must be certified by
an appropriate Registered Professional
Engineer Qld (RPEQ).

Note: Further approvals will be required for
construction in accordance with the
requirements of section 33 of the Transport

 

Infrastructure Act 1994,

 

Main Roads’ Road Planning and Design
Manual, Chapter 13 — Intersections at
Grade,

‘Traffic stady submitted by McCormick
Rankin Cagney.

Works to be in accordance with Main
Roads Technical Manuals, Policies and
Guidelines together with relevant State
and National Standards.

 

 

 

 

24 of 31

 

Page 25

2007/2398




 25 of 31


[OCR of page images]
2007/2398

 

 

 

 

 

 

ISSUES / CONDITIONS OF DEVELOPMENT FOR | THE REASONS, INFORMATION,
CONCERNS THE SUBJECT APPLICATION STUDIES, FINDINGS, USED IN
SETTING OF CONDITIONS
INCLUDED:

Cost of works. All works associated with this proposal, Main Roads does not contribute to
including relocation of services, lighting, etc. | private development works unless a
must be carried out at no cost to Main Roads, | specific agreement has been entered

into.

Noise assessment. The applicant is responsible for achieving the | Environmental Protection Act 1994.
acoustic quality objectives of the
Environmental Protection Act 1994 and the Main Roads document, "Road Traffic
requirements of Main Roads document, Road | Noise Managentent: Code of Practice”.
Traffic Noise Management: Code of Practice.

Main Roads will not be responsible for the
provision of any buffers or noise attenuation
measures necessary to maintain an appropriate
level of amenity for residential or other noise
sensitive uses. The applicant is to provide
these noise attenuation facilities which are to
be located clear of the State-controfled road
reserve,
Stormwater runoff. ‘The applicant is to undertake all necessary Maintaining the safety and efficiency of

 

works to ensure that future stormwater runoff
from the proposed development is no worse
than currently exists.

 

the State Controlled road metwork, The
existing downstream drainage
infrastructure has insuflickent capacity
to accommodate any increased runoff.

 

 

 

 

25 of 31

Page 26

2007/2398




 26 of 31


[OCR of page images]
2007/2398

 

 

Cie Mr. Larry Kumskov
RSL Care
C/- Plan Tech Town Planners
PO Box 22
PSK QLD 4312

Attention

Mr, Kumskoy,

Queensland
Government

Queensland Transport

File no: $90/02504
P28625
BRIS-1810

For your information (Application ?9 Trading Post Road, Cooroy refers),

Should you wish to discuss any aspects of this concurrence agency response, please contact

Stephen Baskerville, Planner on 3117 $434

Yours sincerely

CH Ke

Helen Kerr
Principal Advisor (Planning)

23 Seprember 2008

Integrated Transport Planning

Transport Planning

Floor 12 Cromwell House

200 Mary Street Srstane Queensiand 4000
GPO Box 213 Brisbane Queensland 4001
ABN 13 200 530 520

Ourref = BSON2SD4 BRIS-1810 P2ae2s

Yourret 2007/2398

Enquines Stephen Basterville (Planner)

Telephone +617 3117 5434

Facsimile +01 73117 5554

Website — waw transport gi.gov au

Emat Stephen 5 beskerviieg@ransport oe. gow a

26 of 31

Page 27

2007/2398




 27 of 31


[OCR of page images]
2007/2398

 

Queensland
23 September 2008 Government
The Chief Executive Officer
Sunshine Coast Regional Council
Locked Bag 72 Queensland Transpert

NAMBOUR QLD 4560
Attention; Tracy Jones
Concurrence Agency Response—I/ntegrated Planning Act 1997 (IPA) 3.3.16

Application for: Development Permit for Material Change of Use
19 Trading Post Road & 4 Lamonts Road Cooroy QLD 4563
Lot 1 RP21S922 & Lot 2 RP165418
Sunshine Coast Regional Council
QT Reference — BRIS-1810

I refer to correspondence received from Larry Kumskov of Plan Tech Town Planners received by this
department on] | August 2008 secking approval for the above proposal, as indicated on the plans listed
in the table below.

 

 

 

 

Pian Number Plan Name Pian Date Plan Version
0805-TPOS Masterplan staging | June 2008 va
O80S-TPO4 | Schedule of Independent Living Units | _ June 2008 nla

 

 

An assessment of the proposed development within the limits of Queensland Transpor's jurisdiction,
namely land use and transport coordination under the (Transport Planning and Coordination Act
1994) and the operational safety and integrity of raitways and future railways (s258 of the Transport
infrastructure Act 1994) has been completed.

ht is advised that the proposal is supported with conditions of development as identified on the
attached Statement of Reasons. These conditions must be included in any decision notice issued for
this proposal.

A copy of this letter and the Statement of Reasons has becn sent to the applicant for their information
and action as required.

Yours sincerely

LH bon

Helen Kerr

Principal Advisor (Planning)
Integrated Transport Planning Our ref (690902504 BRIS-1870 P28028
Transport Planning Yourmf 2007/2396
Fioor 12 Cromaet Mouse Erquines Stephen Bastervile (Planner
200 Mary Street Hnsbane Queensiand 4000 Telephone +617 3117 6434
GPO Box 213 Brisbane Queensland 4001 Facsimile +617 2117 5554
ABN 13 200330 520 Yeaugile —-www.transport qld gov su

Frat ‘Slephen.p baskondagerensper gid gov ay

27 of 31

Page 28

2007/2398




 28 of 31


[OCR of page images]
1€ 4082

 

Attachment I

Queensland Transport Concurrence Ageney Conditions and Statement of Reasons

Application for: Development Permit for Material Change of Use
19 Trading Post Road & 4 Lamonts Road Cooroy OLD 4563
Lot 1 RP215922 & Lot 2 RPI65418
Sunshine Coast Regional Council
QT Reference — BRIS-1810

 
 

     
  

   
 

Pedestrian Network
The pedestrian pathways must be designed and
constructed generally in accordance with drawing
) 0805-TPO5, Mi
Prior to the endorsement of any Community | Courtesy Bus
| Management Statement (CMS) for the Principal | Ensure that any Community Managemetit Statement
Community Title Scheme (CTS). (CMS) for the Principal Community Title Scheme | To increase the opportunity for people to gecess
(CTS), established for all or part of the development | public passenger transport. The majority of the
site, includes a requirement that the body corporate | proposed retirement village is remote from existing
must: public transport routes and does not allow residents
~ establish, maintain and operate a courtesy bus | casy access to higher order shopping and medical

Service (providing regular services to higher | facilities.

order shopping and medical facilities) on behall’

of the owners of the lots in that CTS, and for

the benefit of the lot owners, occupiers and

their staff; and

Is responsible for ensuring compliance with the

development approval conditions relating 1 the

provision of the courtesy bus service for that

CTs a

Section 258 of the Trunsport Infrastructure Act
1994.

Prior to the commencement of the use of the
development.

   
 
    
  

    

“Section 8A of the Transport Planning and
Coordination Aci 1994.

      
 

 

BRES-1810 Concurrence Respanse with conditions

 

86€2/2002

Page 29

2007/2398




 29 of 31


[OCR of page images]
1€ 4062

 

 

Prior to the commencement of the use of the | Noise Amelioration Section 258 of the Tramport Infrastructure Aet
development The development must incorporate noise | [999

amelioration measures as recommended in the | Development must be located, designed and
acoustic report, dated August 2008 by Air Noise | managed to ensure noise levels do not adversely
Environment Pry Ltd. affect the operational integrity of railways and
future railways.

In particular, section 7.1 Conclusion “Rail Noise” to

ensure compliance with the intemal noise critena

which includes references to acoustic barrier

specifications and references to alicrnate design |
methods and acoustic treatments of building |
elements.

Advices

Special consideration should be given to the geametric design of the intersections to accommodate resident drivers with impairments, Primary concerns relate to
vehicle operators who will be accessing their residence from a school zone where there may be high pedestrian activity of primary school students. Particular
attention may need to be given to right-turn movements, which are associated with higher than normal crash rates for elderly motorists,

If you have arty questions about this advice please contact Darren Hanis.on 3370 2818.

BRIS-1810 Cuncureres Response yeh conditions: Page Soe

 

86€2/2002

Page 30

                                                                                                        2007/2398




                                                     Appeal Rights
                                                     INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                         (6) If an application involves assessment against a
Planning Act (Chapter 4).                                           concurrence agency code, appeal rights for submitters
                                                                    for the application are not available against the part of
Division 8 - Appeals to                court   relating    to       the approval that represents the concurrence agency’s
development applications                                            response for the code.
Appeals by applicants                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application may           4.1.29.(1) An advice agency may, within the limits of its
appeal to the court against any of the following-                   jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development           development approval for a development application if-
    application;                                                    (a) the development      application     involves   impact
(b) a matter stated in a development approval, including any           assessment; and
    condition applying to the development,           and   the      (b) the advice agency told the applicant and the
    identification of a code under section 3.1.6;1                     assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a                 application as a submission for an appeal.
    development permit was applied for;                                (2) The appeal must be started within 20 business
(d) the length of a relevant period;                                days after the day the decision notice or negotiated
(e) a deemed refusal.                                               decision notice is given to the advice agency as a
                                                                    submitter.
    (2) An appeal under subsection (1)(a) to (d) must be
started within 20 business days (the “applicant’s appeal            Appeals for matters arising after approval given
period”) after the day the decision notice or negotiated            (co-respondents)
decision notice is given to the applicant.                          4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be started at         development application, a person to whom any of the
any time after the last day a decision on the matter should         following notices have been given may appeal to the
have been made.                                                     court against the decision in the notice-
Appeals by submitters                                               (a) a notice giving a decision on a request for extension
4.1.28.(1) A submitter for a development application may               of the relevant period for an approval;
appeal to the court about-                                          (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including any                minor change to an approval.
    conditions (or lack of conditions) or other provisions              (2) The appeal must be started within 20 business
    of the approval; or                                             days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval.               the person.
    (2) The appeal must be started within 20 business                   (3) Subsection (1)(a) does not apply if the approval
days (the “submitters appeal period”) after the day the             resulted from a development application (superseded
decision notice or negotiated decision notice is given to           planning scheme) that was assessed as if it were an
the submitter.                                                      application under a superseded planning scheme.
   (3) If a person withdraws a submission before the                   (4) Also, a person who has made a request
application is decided, the person may not appeal the               mentioned in subsection (1) may appeal to the court
decision.                                                           against a deemed refusal of the request.
   (4) If an application involves both impact assessment               (5) An appeal under subsection (4) may be started at
and code assessment, appeal rights for submitters are               any time after the last day the decision on the matter
available only for the part of the application involving            should have been made.
impact assessment.
                                                                    Division 9 - Appeals to court about other matters
    (5) If an application is processed under section                Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application         (no co-respondents)
are available only for the aspects of the development that
would have required public notification under the                   4.1.31.(1) A person to whom any of the following notices
repealed Act.                                                       have been given may appeal to the court against the
                                                                    decision in the notice-
                                                                    (a) a notice giving a decision on a request to change or
                                                                       cancel a condition of a development approval.


1
   Section 3.1.6 (Preliminary approval may override local
planning instrument)
                                                                                                           30 of 31

Page 31

                                                                                                  2007/2398

(b) a notice under section 6.1.442 giving a decision to        (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                    development permit was applied for;
    approval.                                                  (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business                relevant period;
       days after the day the notice of the decision is        (e) a deemed refusal.
       given to the person.
                                                                   (2) An appeal under subsection (1)(a) to (d) must be
    (3) Also, a person who has made a request                  started within 20 business days (the “applicant’s appeal
       mentioned in subsection (1)(a) may appeal to the        period”) after the day the decision notice or negotiated
       court against a deemed refusal of the request.          decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started at           (3) An appeal under subsection (1)(e) may be started
       any time after the last day the decision on the         at any time after the last day a decision on the matter
       matter should have been made.                           should have been made.
Appeals against decisions to change approval conditions        The Registrar for the Building and Development
under the repealed Act                                         Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision       http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or          For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court        4.1.36 Appeals about particular infrastructure
against-                                                       charges
(a) the decision; or                                           (1) This section applies to a person who has been
(b) a deemed refusal of the application.                       given, and is dissatisfied with, an infrastructure charges
                                                               notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of        (2) The person may appeal to the court against the
the decision is to be given to the person.                     notice.
    (3) An appeal under subsection (1)(b) may be started       (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter        after-
should have been made.                                         (a) if the notice is given because of a development
Appeals against local laws                                          approval or master plan approval-the day the
                                                                    applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a                 approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the             (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the     (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the            (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.                                that no reasonable relevant local government, State
   (2) The appeal must be started within 20 business               infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the          have imposed it; or
applicant.                                                     (b) an error in the calculation of the charge.
For Building Works Only                                        (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the             under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                       used to establish the charge in the relevant infrastructure
                                                               charges schedule or regulated State infrastructure
Division 3 – Appeals          to   tribunals   relating   to
                                                               charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
    application;

(b) a matter stated in a development approval, including
    any condition applying to the development, and the
    identification of a code under section 3.1.6;3

2
  Section 6.1.44 (Conditions may be changed or cancelled
by assessment manager or concurrence agency in certain
circumstances)
3
   Section 3.1.6 (Preliminary approval may override local
planning instrument)
                                                                                                    31 of 31

Used in these records

About this file

File size
645 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2398 - SUPERSEDED Negotiated Decision Notice & copy sent to Referral Agencies [As Published].pdf · 645 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.