Council archive · source document
07/2398 - SUPERSEDED Negotiated Decision Notice & copy sent to Referral Agencies [As Published] · 132007.2398
2007/2398 29 of 31 [OCR of page images] 1€ 4062 Prior to the commencement of the use of the | Noise Amelioration Section 258 of the Tramport Infrastructure Aet development The development must incorporate noise | [999 amelioration measures as recommended in the | Development must be located, designed and acoustic report, dated August 2008 by Air Noise | managed to ensure noise levels do not adversely Environment Pry Ltd. affect the operational integrity of railways and future railways. In particular, section 7.1 Conclusion “Rail Noise” to ensure compliance with the intemal noise critena which includes references to acoustic barrier specifications and references to alicrnate design | methods and acoustic treatments of building | elements. Advices Special consideration should be given to the geametric design of the intersections to accommodate resident drivers with impairments, Primary concerns relate to vehicle operators who will be accessing their residence from a school zone where there may be high pedestrian activity of primary school students. Particular attention may need to be given to right-turn movements, which are associated with higher than normal crash rates for elderly motorists, If you have arty questions about this advice please contact Darren Hanis.on 3370 2818. BRIS-1810 Cuncureres Response yeh conditions: Page Soe 86€2/2002
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - SUPERSEDED Negotiated Decision Notice & copy sent to Referral Agencies [As Published]Related documentApplication case desk ↗
About this file
- File size
- 645 KB (small file)
- File type
No other editions are linked here.