Appendix K - Hydraulic and Wet Fire Services Report
REPORT
Appendix K
Hydraulic and Wet Fire Services Report
PR139784 | Town Planning Report | v4 | 5 June 2019
rpsgroup.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 13 pages
Page 2
D.A. Report
Hydraulic and Wet Fire Services
Job No. 14,967
Cooroy Care Farm Development Project,
521 Elm Street,
Black Mountain, Cooroy, Qld.
Prepared By : BRW Hydraulics Pty Ltd
P.O. Box 2158
TOOWONG QLD 4066.
Date: May 25, 2018.
Document Number : 14,967/da-rep/A
Revision : A
Page 3
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 1
______________________________________________________________________________________
HYDRAULIC SERVICES.
1.0 SCOPE OF WORKS and SERVICES CONNECTIONS
The Hydraulic Services works shall reflect compliance to recognised professional standards and the
following documents :-
Queensland Sewerage and Water Supply Act and Associated By-Laws;
Authority Requirements and Noosa Shire Council and Unity Water Regulations;
National Construction Code of Australia; and
All relevant Australian Standards as listed in the following document text.
The Scope of Works encompassed under the Hydraulic Services area shall include the following :-
Sewer/House Drainage : Inground house drainage piping system that shall collect all sanitary
plumbing stacks and discharge all house drainage to a sewer pump station on site that shall then
discharge via a sewer rising main to the Unity Water Sewer Rising main infrastructure with
connection to Unity Water’s infrastructure arranged by the civil discipline. All internal house
drainage and any required reflux valves shall be supplied and installed as part of the hydraulic
services scope, and close liaison shall occur with the Civil Discipline in relation to the location of
the pump station and required sewer rising main for discharge.
It is noted that the existing Unity Water rising main is located to the north of the site in Rose
Gum Road.
Sanitary Plumbing : Comprises the soil and waste piping from the sanitary fixtures to the
inground house drainage system via the stack/drainage dropper system.
Trade Waste Drainage : Trade waste drainage piping system collecting from the trade waste
sanitary plumbing & discharging to new grease interceptor traps to service the central kitchen
area, and any internal/local kitchenettes to ensure that any waste water has all grease and oils
removed prior to discharge to the pump station and rising main.
Trade Waste Plumbing : Trade waste plumbing pipework system encompassing the provision of
connection points to the kitchen and kitchenette areas of the development.
Domestic Cold Water Service : It is important to highlight at the outset that there is no Unity
Water / Council water main infrastructure in the surrounding streets/areas, and thus, the site shall
have to be self-sufficient with regards to domestic water services.
Given the proposed staging for the development, and given the gradient of the land, the site is
ideally structured for water harvesting. As the proposed accommodation dwellings will be
elevated, it is noted that rainwater harvesting tanks could be located in the undercroft of the
buildings, and such a location positions the tanks in an ideal location to receive roof drainage
directly from the roof areas of individual buildings. Alternately, the tanks could be located
external to the building footprint, but the tanks will be a crucial source of water for the site.
The harvested rainwater can then be reticulated directly back to each individual building to
provide water for toilet flushing.
Document : 14,967/da-rep/A
Page 4
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 2
______________________________________________________________________________________
Integral with the rainwater harvesting strategy shall be the construction of a bore on the site to
provide all required non-potable water services. The bore shall be provided at the outset of the
development, and shall provide a further crucial source of water for washdown and irrigation
purposes. Testing of the bore shall further determine usage demarcation between the harvested
rainwater and the bore water.
Fire Services: As noted above, there is no authority/mains water supply available to the site, and
thus, fire hydrant and fire sprinkler services shall be sourced from on-site fire service storage
tanks, which will operate with the use of fire service pumps, with provision for a fire hydrant and
fire sprinkler booster at the front of the site.
Fire services tanks of a volume of 288,000 litres for fire hydrants and 86,400 litres for fire
sprinklers will be required to be incorporated in the development.
The tanks are to be above ground, with the fire boosters located to face north at the front of the
site to enable connection by an attending QFES Brigade Tender.
Note that the volume of water to be stored may be reduced through Fire Engineering
involvement for the development, but the above volumes of water evidence compliance with AS
2419.1 (hydrants) and AS 2118.1 (sprinklers), and thus, represent a “deemed to satisfy” solution.
Downpipes and Gutters and Stormwater Drainage : Supply and installation of the downpipes
and gutters to primarily discharge to the individual rainwater harvesting tanks at the site. The
overflows from the rainwater tanks, and the surface stormwater shall then discharge to the civil
stormwater infrastructure, for discharge from the site.
Harvested rainwater will be used for potable water supply and for toilet flushing, whilst bore
water will be utilised for landscape irrigation purposes at the overall development. As noted
above, the actual demarcation of services will be determined further to testing of the bore water.
Gas Services: The site will be supplied with an LPG gas supply to facilitate energy services for
the purpose of hot water heating, cooking and potentially laundry equipment.
Whilst no natural gas service is available, an LPG gas “bullet” / cylinder can be located near the
incoming entries to the site, to facilitate filling/supply of LPG gas from tanker sources.
Paramount throughout the design and documentation of the Hydraulic Services shall be the
requirement for energy management, control of noise pollution, redundancy requirements,
minimal ongoing maintenance requirements and odour containment.
Safety, efficiency and cost effectiveness are fundamental properties to be effectively identified
for the provision of an optimum Hydraulic Service system. The design of the Hydraulic Services
system shall be structured to allow for future flexibility and potential expansion. The size of the
plumbing pipework shall be theoretically sized to ensure continuing supply throughout all peak
periods of usage.
Document : 14,967/da-rep/A
Page 5
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 3
______________________________________________________________________________________
With regards to fire services, the fire service tanks and pumps, and booster assemblies, will be
required to be installed within the first part of the development, and can then be further utilised to
service the future stages. As part of the masterplan design for the overall site, a fire hydrant ring main
will be proposed for the overall site, but smaller ring mains will then facilitate supply to the
individual stages of the development to achieve compliance.
With regards to pipework materials and hydraulic items to be used in this project, a full
assessment of all commercially available products shall ensure that the most suitable and durable
products are specified. Equipment and materials shall be selected with particular relevance to
extended longevity with minimal maintenance. The schematic design and design development
phase of the project shall fully encompass and review all ESD Items and Initiatives including
water harvesting methodology and the use of WELS rated tapware.
1.1 DESIGN PARAMETERS
Sewer drainage, house drainage and sanitary plumbing and trade waste drainage and
plumbing shall be designed in accordance with Australian Standard, AS 3500.2.2.
Hot and cold water services shall be designed in accordance with Australian Standards, AS
3500.1 and AS 3500.4.
Fire services shall be designed in accordance with Australian Standards, AS 2118.1, AS
2419.1 and AS 2441.
Pipework materials, fixtures and tapware shall be specified in accordance with Australian
Standards and specific client requirements.
All underground drainage and water service pipework shall be identified with approved
traceable marker tape. All visible pipework shall be identified/labeled in accordance with
Australian Standard, AS 1345 – 1995.
Gas Services shall be designed in accordance with AS/NZS 5601.
The hydraulic service system shall be inspected and tested by the applicable authority to ensure
conformance. Hydraulic service documentation submission shall be made to the Noosa Shire
Council & QFES to ensure that all required permits are obtained for the hydraulic service system.
Document : 14,967/da-rep/A
Page 6
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 4
______________________________________________________________________________________
1.2 POTENTIAL RISK ELEMENTS – HYDRAULICS.
Further to our firm’s extensive review works of the hydraulic services, the main risk associated with
the development is the incorporation of the required infrastructure to cater for the rainwater
harvesting tanks and the fire services tanks, pumps and boosters.
a) Fire Services Tanks.
As previously noted, the Australian Standards and Brigade preference is for fire storage
tanks to be located above ground, and for the tanks to be no more than fifteen [15] metres
from the fire booster facilities to assist in efficiency in suction operations. The tanks can be
no lower than three [3] metres from the booster level, and to achieve system efficiencies, the
fire service pumps should be sited close to the fire tanks and booster.
As noted in the previous text of this report, intervention by a Fire Engineer in the design
phase of the development may result in a reduction in the volume of the fire tanks, but the
above noted volumes of 288,000 and 86,400 litres respectively for hydrants/sprinklers are
provided as “deemed to satisfy” solutions.
b) Fire Hydrant Ring Main.
It is highlighted that due to the expansive nature of the site, the site will require a fire hydrant
ring main. Whilst the ring main can be easily designed, any dual pillar hydrant will need to
be located within fifty [50] metres of hardstand to achieve compliance. This therefore
denotes that a QFES Tender will need to access all areas of the site, to ensure the 50 metre
ruling is compliant.
Again, as noted in the above text, fire engineering solutions and strategies worked through
with a Fire Engineer may enable alternate solutions to be considered, but the above
references to the “deemed to satisfy” solutions.
c) Supply of Potable Water for Consumption.
The potable water supply is currently proposed to be sourced from treated rainwater
harvesting processes.
At the current time, legionella control is a major criteria in all aged care developments, and
whilst compliance at the current time can be achieved through filtration and UV treatment,
any potential changes to government legislation may necessitate further treatment to further
refine water quality.
Document : 14,967/da-rep/A
Page 7
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 5
______________________________________________________________________________________
1.3 SEWER DRAINAGE/SANITARY PLUMBING and
TRADE WASTE DRAINAGE/TRADE WASTE PLUMBING
House/sewer drainage shall collect all sanitary plumbing stacks and transport the waste to a sewer
pump station that shall then discharge to a sewer rising main for connection to the nearby Unity
sewer rising main. The connection to the Unity Water main shall be undertaken by the Civil
Engineers, and full demarcation of scope between hydraulic and civil shall be undertaken.
The trade waste system shall incorporate the provision of trade waste connection points to the
kitchen and laundry areas, and shall discharge to grease interceptor traps, to be sized
commensurate with the discharge volumes from the layout plans.
The sewer drainage, house drainage and sanitary plumbing system shall conform to the following
Australian Standards :-
AS 1074 Steel Tubes and Tubulars for Ordinary Service.
AS 1152 Specification for Test Sieves
AS 1167 Welding and Brazing – Filler Metals
AS 1192 Electroplated coatings - Nickel and Chromium
AS 1254 Unplasticized PVC (UPVC) Pipes and Fittings for Storm or
Surface Water Applications
AS 1260 PVC Pipes and Fittings for Drain, Waste and Vent Applications
AS 1304 Welded Wire Reinforcing Fabric for Concrete
AS 1345 Identification of the Contents of Piping, Conduits and Ducts
AS 1432 Copper Tubes for Plumbing, Gasfitting & Drainage Applications.
AS 1449 Wrought Alloy Steels - Stainless and Heat Resisting Steel Plate,
Sheet and Strip
AS 1477 PVC Pipes and Fittings for Pressure Applications
AS 1530.4 Methods for Fire Tests on Building Materials, Components and
Structures. Part 4 - Fire Resistance Tests of Elements of Building
Construction
AS 1572 Copper/Copper Alloys–Seamless Tubes for Engineering Purposes
AS 1589 Copper and Copper Alloy Waste Fittings
AS 1631 Cast Grey and Ductile Iron Non-Pressure Pipes and Fittings
AS 1646 Elastomeric Seals for Waterworks Purposes
AS 1650 Hot Dipped Galvanised Coatings on Ferrous Articles
AS 1976 Vitreous China for Use in Sanitary Appliances.
AS 2032 Code of Practice for Installation of UPVC Pipe Systems
AS 2887 Testing Plastic Waste Fittings
AS 2888 Methods of Testing Plastic Waste Fittings
AS 3500 National Plumbing and Drainage Code – Compendium
AS 3500.2.2 Sanitary Plumbing and Drainage
AS 3517 Capillary Fittings of Copper and Copper Alloy for Non-Pressure
Sanitary Plumbing Applications
AS 3879 Solvent Cements and Priming Fluids for Use with Unplasticised
(PVC) Pipe and Fittings
AS 4058 Precast Concrete Pipes (Pressure and Non-Pressure)
BS 5153 Cast Iron Check Valves for General Purposes
AS 4139 Fibre-Reinforced Concrete Pipes and Fittings
Document : 14,967/da-rep/A
Page 8
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 6
______________________________________________________________________________________
All sewer drainage/house drainage shall be installed in UPVC (SN6 DWV) pipework for inground
installation complete with all necessary junctions, bends and inspections openings. Inspection
chambers shall have gas-tight covers with the denotation “SAN” stamped onto each cover. Gatic
type light duty covers shall be used (except in roadways).
The sanitary plumbing shall also be installed in UPVC (SN6 DWV) and shall comprise the soil,
waste and vent pipes from the drainage points to vent terminals and includes all bends, offsets,
expansion joints, branches, brackets and sundry equipment necessary to complete the installation.
Sanitary plumbing stacks and sanitary plumbing drainage shall be lagged with Soundlag 4525C
and/or condensate insulation as required by the hydraulic documentation and/or the National
Construction Code.
Alternately, the pipework system can be installed in Raupiano, a new pipework system that has
integral acoustic properties, but further review of materials shall be undertaken during design
development phases of the project.
The system shall comprise of a REVAS (reduced velocity aerator stack system) that incorporates a
single stack, with aerator stack junctions and branches designed in accordance with sanitary drainage
principles and installed in accordance with supplier’s and manufacturer’s specifications. Sanitary
plumbing pipework shall be positioned in concealed locations where practicable in ceilings, ducts
and/or stud walls. Any suspended pipework shall adhere to the clearance height requirements in
accordance with the National Construction Code.
Fire stop collars shall be installed at fire rated floor slabs and fire rated wall penetrations, with the
exception of areas subject to hot discharges (including but not limited to hot water tundishes, etc)
which shall be copper pipework and waste branches. Note that the fire stop collars shall have a
minimum two (2) hour fire rating.
Inspection openings shall be installed to pipework such that each section of pipe is accessible in at
least one direction. Inspection openings shall be brought to the finished ground level and capped with
an identifiable and labelled screwed brass cap. Inspection openings to surface shall be located next to
toilets for maintenance purposes.
The mechanical plant rooms shall be provided with one hundred (100) mm floor wastes and trapped
tundishes. This pipework shall be lagged to prevent the formation of any condensation below the
Plant Rooms. Insulation to condensate drainage shall be sealed tube for pipes with an external
diameter of up to 100mm and thermolag for pipes with an external diameter of greater than 100mm.
Floor wastes shall have a minimum 100mm diameter inlet with chrome plated brass screw in
gratings complete with puddle flanges. All exposed sanitary plumbing pipework below basins,
fixtures, etc shall be chrome plated.
Trade waste drainage and trade waste plumbing pipework shall be installed in HDPE, including all
bends and junctions.
The design of the house drainage, sanitary plumbing, trade waste drainage and trade waste plumbing
shall be closely co-ordinated with other mechanical, electrical and structural requirements and
associated disciplines.
Document : 14,967/da-rep/A
Page 9
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 7
______________________________________________________________________________________
1.4 COLD WATER SERVICES
The potable and non-potable cold water services shall be sourced from a rainwater harvesting
methodology strategy, whereby all roofwater is captured and harvested in storage tanks, with
treatment applied commensurate with use. Low treatment will be provided for water to be used for
toilet flushing, whilst high treatment processes shall be applied for water that shall be consumed in
potable applications.
Furthermore, a bore shall be constructed on the site, and is proposed for supply of all non-potable
water services. However, further water testing of the bore water shall further confirm the
capacity/quality of such water to be used for other purposes – either with or without treatment.
The cold water system shall conform to the following Australian Standards :-
AS 1167 Welding and Brazing – Filler Metals
AS 1345 Identification of the Contents of Piping, Conduits and Ducts
AS 1432 Copper Tubes for Plumbing, Gasfitting and Drainage Applications.
AS 1530.4 Methods for Fire Tests on Building Materials, Components and
Structures. Part 4 - Fire Resistance Tests of Elements of Building
Construction
AS 1628 Water Supply - Copper Alloy Gate, Globe and Non-Return Valves.
AS 1718 Water Supply - Copper Alloy Screw Down Pattern Taps –
Specified by Dimensions
AS 2129 Flanges for Pipes, Valves and Fittings
AS 2638 Sluice Valves for Waterworks Purposes
AS 3500 National Plumbing and Drainage Code – Compendium
AS 3500.1.2 Water Supply
AS 3500.4.2 Hot Water Supply Systems
AS 3688 Water Supply – Copper and Copper Alloy Body Compression and
Capillary Fittings and Threaded-End Connectors.
The design shall encompass all piping, valves, unions, fittings, and sundry equipment to the
satisfaction of the Noosa Shire Council.
Water services pipework shall be as follows :-
all 100mm (or larger) inground water service pipework shall be either copper or poly
pipe suitably sized in accordance with the areas serviced;
all inground water service pipework less than 100mm shall be copper. The size of such
pipework shall be in accordance with the fixtures/areas being services;
all water service pipework within buildings shall be copper. No pressurised services
shall be located in slabs.
Document : 14,967/da-rep/A
Page 10
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 8
______________________________________________________________________________________
The design shall incorporate strategically located control valves. Each cold water riser shall be
isolated at the bottom (or top in cases of downfeeds). Branch lines shall be isolated at the riser on
each level and further, where servicing an outlet or group of outlets. Isolation valves shall be
butterfly valves where the service exceeds 80mm diameter. Ball valves shall be used on services less
than 80mm diameter. All valves shall be tagged to identify the areas serviced.
All fittings shall comply with the requirements of SAA MP52 and shall have AS markings and
manufacturer’s License N° stamped into the fitting.
Pressure reducing valves set to 500kPa (in accordance with Australian Standard, AS 3500) are to be
installed to equipment, pipework, etc requiring pressure limitations.
Document : 14,967/da-rep/A
Page 11
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 9
______________________________________________________________________________________
1.5 HOT WATER SERVICES
The hot water system shall comprise a flow and return pipework system provided to each building.
The hot water shall be generated from a central bank of LPG gas fired hot water units.
The hot water services shall be in accordance with the following Australian Standards :-
AS 1167 Welding and Brazing – Filler Metals
AS 1345 Identification of the Contents of Piping, Conduits and Ducts
AS 1432 Copper Tubes for Plumbing, Gasfitting and Drainage Applications.
AS 1530.4 Methods for Fire Tests on Building Materials, Components and
Structures. Part 4 - Fire Resistance Tests of Elements of Building
Construction
AS 1628 Water Supply - Copper Alloy Gate, Globe and Non-Return Valves.
AS 1718 Water Supply - Copper Alloy Screw Down Pattern Taps –
Specified by Dimensions
AS 2129 Flanges for Pipes, Valves and Fittings
AS 2638 Sluice Valves for Waterworks Purposes
AS 3500 National Plumbing and Drainage Code – Compendium
AS 3500.1.2 Water Supply
AS 3500.4.2 Hot Water Supply Systems
AS 3688 Water Supply – Copper and Copper Alloy Body Compression and
Capillary Fittings and Threaded-End Connectors.
Hot water units shall provide water at a minimum temperature of sixty-five (65°) Celsuis for outlet
flow to the draw-off points or fixtures. Hot water heaters shall be designed as fully mains pressure
types, complete with all necessary stop valves, expansion valves and pressure relief valves and
safetrays to ensure the installation is in accordance with the regulatory standards.
Hot water pipework shall be copper tube Type “B”. No pressurised services in slabs. All hot water
pipes shall be insulated with preformed sectionalised fibreglass insulation wrapped with sisalation.
The minimum insulation thickness to hot water piping shall be 25mm for pipes less than 50mm
nominal bore and 38mm for pipes of 50mm and above.
Thermostatic mixing valves shall be designed to service all fixtures within accommodation areas,
including all personal washing facilities within the complex. Thermostatic mixing valves shall be
located such that future maintenance and testing can be effected quickly and easily.
Document : 14,967/da-rep/A
Page 12
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 10
______________________________________________________________________________________
1.6 STORMWATER DRAINAGE, DOWNPIPES AND GUTTERS
The stormwater drainage system shall be sized and designed in accordance with Australian Standard,
AS 3500.3.
Stormwater drainage shall collect from the building’s downpipes and shall discharge to individual
rainwater harvesting tanks to be provided in the undercroft areas below each building or outside the
building footprint. Downpipes shall run external on each building, collecting rainwater from the
gutters servicing the roof. Where possible, downpipes shall be located on the external façade to avoid
any potential for water leakage within the building envelope.
Stormwater drainage shall be installed in PVC pipework. Surface internal stormwater shall be
collected in galvanised grated drains with matching metal frames, with square stainless steel grated
sumps being installed in tiled areas. Stormwater collected from planters and hardstand areas shall not
be discharged to the rainwater tank, but shall be discharged direct to the civil stormwater connection.
1.7 PROPOSED SCHEDULE OF FIXTURES AND TAPWARE
The sanitary fixtures to the cleaner’s rooms and toilet facilities shall be in accordance with the
client’s requirements. Fixtures shall be white in colour and shall be fitted with water saving
devices where appropriate and justifiable. Vitreous china pan water closets complete with dual
flush 4.5 litre/3.0 litre vitreous china cisterns. Urinals shall be vitreous china and shall be wall
mounted. Urinals shall be fitted with the new water-saving 0.8 litre flushing mechanism.
Public wash/vanity basins shall be of a vitreous china construction with chrome plated “P” traps
for connection to in-wall sanitary plumbing. Hand wash basins/vanity basins shall be provided
with one (1) hole tapware.
Disabled facilities shall encompass showers, water closets and hand wash basins. Disabled water
closets shall comply with Australian Standard, AS 1428.1 and the National Construction Code
requirements and shall be a vitreous china model.
Preference shall be given to those sanitary fixtures that are manufactured within Australia and
conform to the relevant Australian Standards. Showers shall be graded to a one hundred (100) mm
chrome plated brass floor waste grate and shall be provided with hot and cold tapware. Cleaner’s
sinks shall be wall mounted units, complete with grated cover, and with wall mounted hot and cold
hose bib cocks over.
Document : 14,967/da-rep/A
Page 13
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 11
______________________________________________________________________________________
1.8 FIRE HYDRANT and FIRE SPRINKLER SERVICES
The fire hydrant and fire sprinkler services shall be sourced from on-site fire service storage tanks
with a respective total volume of 288,000 litres (hydrants) and 86,400 litres (sprinklers).
A new fire hydrant booster and fire sprinkler booster shall face parallel to the site frontage, and fire
service pumps shall facilitate the operation of the sprinkler and hydrant services to a compliant level.
The fire services shall be in accordance with the following Australian Standards :-
AS 1167 Welding and Brazing - Filler Metals
AS 1221 Fire Hose Reels
AS 1345 Identification of the Contents of Piping, Conduits and Ducts.
AS 1432 Copper Tubes for Plumbing, Gasfitting and Drainage Applications.
AS 1530.4 Methods for Fire Tests on Building Materials, Components and
Structures. Part 4 - Fire Resistance Tests of Elements of Building
Construction
AS 1628 Water Supply - Copper Alloy Gate, Globe and Non-Return Valves.
AS 1851 Maintenance of Fire Protection Equipment. Part 1 - Portable Fire
Extinguishers and Fire Blankets. Part 2 - Fire Hose Reels and, Part
4 - Fire Hydrant Installations
AS 2129 Flanges for Pipes, Valves and Fittings
AS 2280 Ductile Iron Pressure Pipes and Fittings
AS 2419 Fire Hydrant Installations
AS 2441 Installation of Fire Hose Reels
AS 3688 Water Supply – Copper and Copper Alloy Body Compression and
Capillary Fittings and Threaded-End Connectors.
BS 5163 Ductile flanged cast iron wedge gate valves for water works
purposes.
Internal hydrant valves shall be sixty-five (65) mm diameter complete with all brass valves and shall
be fitted with a steel type handle.
All fire services pipework above ground shall be galvanised wrought iron victaulic mechanical
pipework system. All piping inground shall be poly pipework and fittings. All tees, bends and fittings
to the Blue Rhino pipework shall be ductile iron griptite complete with Rilsan Nylon 11
coating/lining. Gate valves shall be ductile iron norcast resilient sealing sluice valves complete with
Rilsan Nylon 11 coating/lining.
Document : 14,967/da-rep/A
Page 14
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 12
______________________________________________________________________________________
1.9 LPG GAS SERVICES
The work under this section comprises the complete supply and installation of connection of the
LPG gas service from the gas service connection and reticulated throughout the buildings to the
various nominated connection points as nominated on the drawings.
An LPG gas main shall service the hot water generation system, and shall also facilitate
connections to the laundry and kitchen as required for cooking/washing equipment.
The LPG gas service shall be designed in accordance with AS 5601.
Gas services pipework shall be Type B copper tube to AS 1432 of sizes shown on the drawings, and
the underground pipework shall be HDPE pipework complete with gas colour coded pipe.
The gas services works must comply with the following Australian Standards :
AS 1304 Welded Wire Reinforcing Fabric for Concrete
AS 1326 Polythene Film for Packaging and Allied Purposes
AS 1345 Identification of the Contents of Piping, Conduits and Ducts
AS 1599 Pressure Sensitive Adhesive Packaging Tapes
AS 1697 SAA Gas Pipeline Code
AS 2032 Code of Practice for installation of UPVC pipe systems
AG 601 Gas Installation Code
CAROL WILLIAMSON
DIRECTOR
BRW Enterprises (Qld) Pty Ltd
May 25, 2018.
Document : 14,967/da-rep/A