Appendix K - Hydraulic and Wet Fire Services Report

of 14

Page text shows just the words. Original shows the document exactly as it was published.

REPORT

                                                                               Appendix K

                                                     Hydraulic and Wet Fire Services Report




PR139784 | Town Planning Report | v4 | 5 June 2019
rpsgroup.com
Log in to download the original file

Appendix K - Hydraulic and Wet Fire Services Report.pdf · 544 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 13 pages

Page 2

                            D.A. Report
Hydraulic and Wet Fire Services




                                    Job No. 14,967

Cooroy Care Farm Development Project,
                      521 Elm Street,
         Black Mountain, Cooroy, Qld.


               Prepared By : BRW Hydraulics Pty Ltd
                                    P.O. Box 2158
                          TOOWONG QLD 4066.


                                Date: May 25, 2018.


                    Document Number : 14,967/da-rep/A

                                          Revision : A

Page 3

                                                             BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC.                           Page : 1
______________________________________________________________________________________

HYDRAULIC SERVICES.
1.0 SCOPE OF WORKS and SERVICES CONNECTIONS

The Hydraulic Services works shall reflect compliance to recognised professional standards and the
following documents :-
         Queensland Sewerage and Water Supply Act and Associated By-Laws;
         Authority Requirements and Noosa Shire Council and Unity Water Regulations;
         National Construction Code of Australia; and
         All relevant Australian Standards as listed in the following document text.

The Scope of Works encompassed under the Hydraulic Services area shall include the following :-

 Sewer/House Drainage : Inground house drainage piping system that shall collect all sanitary
  plumbing stacks and discharge all house drainage to a sewer pump station on site that shall then
  discharge via a sewer rising main to the Unity Water Sewer Rising main infrastructure with
  connection to Unity Water’s infrastructure arranged by the civil discipline. All internal house
  drainage and any required reflux valves shall be supplied and installed as part of the hydraulic
  services scope, and close liaison shall occur with the Civil Discipline in relation to the location of
  the pump station and required sewer rising main for discharge.

    It is noted that the existing Unity Water rising main is located to the north of the site in Rose
    Gum Road.

 Sanitary Plumbing : Comprises the soil and waste piping from the sanitary fixtures to the
  inground house drainage system via the stack/drainage dropper system.

 Trade Waste Drainage : Trade waste drainage piping system collecting from the trade waste
  sanitary plumbing & discharging to new grease interceptor traps to service the central kitchen
  area, and any internal/local kitchenettes to ensure that any waste water has all grease and oils
  removed prior to discharge to the pump station and rising main.

 Trade Waste Plumbing : Trade waste plumbing pipework system encompassing the provision of
  connection points to the kitchen and kitchenette areas of the development.

 Domestic Cold Water Service : It is important to highlight at the outset that there is no Unity
  Water / Council water main infrastructure in the surrounding streets/areas, and thus, the site shall
  have to be self-sufficient with regards to domestic water services.

    Given the proposed staging for the development, and given the gradient of the land, the site is
    ideally structured for water harvesting. As the proposed accommodation dwellings will be
    elevated, it is noted that rainwater harvesting tanks could be located in the undercroft of the
    buildings, and such a location positions the tanks in an ideal location to receive roof drainage
    directly from the roof areas of individual buildings. Alternately, the tanks could be located
    external to the building footprint, but the tanks will be a crucial source of water for the site.

    The harvested rainwater can then be reticulated directly back to each individual building to
    provide water for toilet flushing.




                                                                                 Document : 14,967/da-rep/A

Page 4

                                                             BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC.                           Page : 2
______________________________________________________________________________________

    Integral with the rainwater harvesting strategy shall be the construction of a bore on the site to
    provide all required non-potable water services. The bore shall be provided at the outset of the
    development, and shall provide a further crucial source of water for washdown and irrigation
    purposes. Testing of the bore shall further determine usage demarcation between the harvested
    rainwater and the bore water.

 Fire Services: As noted above, there is no authority/mains water supply available to the site, and
  thus, fire hydrant and fire sprinkler services shall be sourced from on-site fire service storage
  tanks, which will operate with the use of fire service pumps, with provision for a fire hydrant and
  fire sprinkler booster at the front of the site.

    Fire services tanks of a volume of 288,000 litres for fire hydrants and 86,400 litres for fire
    sprinklers will be required to be incorporated in the development.

    The tanks are to be above ground, with the fire boosters located to face north at the front of the
    site to enable connection by an attending QFES Brigade Tender.

    Note that the volume of water to be stored may be reduced through Fire Engineering
    involvement for the development, but the above volumes of water evidence compliance with AS
    2419.1 (hydrants) and AS 2118.1 (sprinklers), and thus, represent a “deemed to satisfy” solution.

 Downpipes and Gutters and Stormwater Drainage : Supply and installation of the downpipes
  and gutters to primarily discharge to the individual rainwater harvesting tanks at the site. The
  overflows from the rainwater tanks, and the surface stormwater shall then discharge to the civil
  stormwater infrastructure, for discharge from the site.

    Harvested rainwater will be used for potable water supply and for toilet flushing, whilst bore
    water will be utilised for landscape irrigation purposes at the overall development. As noted
    above, the actual demarcation of services will be determined further to testing of the bore water.

 Gas Services: The site will be supplied with an LPG gas supply to facilitate energy services for
  the purpose of hot water heating, cooking and potentially laundry equipment.

    Whilst no natural gas service is available, an LPG gas “bullet” / cylinder can be located near the
    incoming entries to the site, to facilitate filling/supply of LPG gas from tanker sources.

Paramount throughout the design and documentation of the Hydraulic Services shall be the
requirement for energy management, control of noise pollution, redundancy requirements,
minimal ongoing maintenance requirements and odour containment.

Safety, efficiency and cost effectiveness are fundamental properties to be effectively identified
for the provision of an optimum Hydraulic Service system. The design of the Hydraulic Services
system shall be structured to allow for future flexibility and potential expansion. The size of the
plumbing pipework shall be theoretically sized to ensure continuing supply throughout all peak
periods of usage.




                                                                                Document : 14,967/da-rep/A

Page 5

                                                             BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC.                           Page : 3
______________________________________________________________________________________

With regards to fire services, the fire service tanks and pumps, and booster assemblies, will be
required to be installed within the first part of the development, and can then be further utilised to
service the future stages. As part of the masterplan design for the overall site, a fire hydrant ring main
will be proposed for the overall site, but smaller ring mains will then facilitate supply to the
individual stages of the development to achieve compliance.

With regards to pipework materials and hydraulic items to be used in this project, a full
assessment of all commercially available products shall ensure that the most suitable and durable
products are specified. Equipment and materials shall be selected with particular relevance to
extended longevity with minimal maintenance. The schematic design and design development
phase of the project shall fully encompass and review all ESD Items and Initiatives including
water harvesting methodology and the use of WELS rated tapware.


1.1 DESIGN PARAMETERS

   Sewer drainage, house drainage and sanitary plumbing and trade waste drainage and
    plumbing shall be designed in accordance with Australian Standard, AS 3500.2.2.

   Hot and cold water services shall be designed in accordance with Australian Standards, AS
    3500.1 and AS 3500.4.

   Fire services shall be designed in accordance with Australian Standards, AS 2118.1, AS
    2419.1 and AS 2441.

   Pipework materials, fixtures and tapware shall be specified in accordance with Australian
    Standards and specific client requirements.

   All underground drainage and water service pipework shall be identified with approved
    traceable marker tape. All visible pipework shall be identified/labeled in accordance with
    Australian Standard, AS 1345 – 1995.

   Gas Services shall be designed in accordance with AS/NZS 5601.

The hydraulic service system shall be inspected and tested by the applicable authority to ensure
conformance. Hydraulic service documentation submission shall be made to the Noosa Shire
Council & QFES to ensure that all required permits are obtained for the hydraulic service system.




                                                                                   Document : 14,967/da-rep/A

Page 6

                                                             BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC.                           Page : 4
______________________________________________________________________________________

1.2 POTENTIAL RISK ELEMENTS – HYDRAULICS.

Further to our firm’s extensive review works of the hydraulic services, the main risk associated with
the development is the incorporation of the required infrastructure to cater for the rainwater
harvesting tanks and the fire services tanks, pumps and boosters.

    a) Fire Services Tanks.

        As previously noted, the Australian Standards and Brigade preference is for fire storage
        tanks to be located above ground, and for the tanks to be no more than fifteen [15] metres
        from the fire booster facilities to assist in efficiency in suction operations. The tanks can be
        no lower than three [3] metres from the booster level, and to achieve system efficiencies, the
        fire service pumps should be sited close to the fire tanks and booster.

        As noted in the previous text of this report, intervention by a Fire Engineer in the design
        phase of the development may result in a reduction in the volume of the fire tanks, but the
        above noted volumes of 288,000 and 86,400 litres respectively for hydrants/sprinklers are
        provided as “deemed to satisfy” solutions.

    b) Fire Hydrant Ring Main.

        It is highlighted that due to the expansive nature of the site, the site will require a fire hydrant
        ring main. Whilst the ring main can be easily designed, any dual pillar hydrant will need to
        be located within fifty [50] metres of hardstand to achieve compliance. This therefore
        denotes that a QFES Tender will need to access all areas of the site, to ensure the 50 metre
        ruling is compliant.

        Again, as noted in the above text, fire engineering solutions and strategies worked through
        with a Fire Engineer may enable alternate solutions to be considered, but the above
        references to the “deemed to satisfy” solutions.

    c) Supply of Potable Water for Consumption.

        The potable water supply is currently proposed to be sourced from treated rainwater
        harvesting processes.

        At the current time, legionella control is a major criteria in all aged care developments, and
        whilst compliance at the current time can be achieved through filtration and UV treatment,
        any potential changes to government legislation may necessitate further treatment to further
        refine water quality.




                                                                                    Document : 14,967/da-rep/A

Page 7

                                                             BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC.                           Page : 5
______________________________________________________________________________________

1.3 SEWER DRAINAGE/SANITARY PLUMBING and
    TRADE WASTE DRAINAGE/TRADE WASTE PLUMBING

House/sewer drainage shall collect all sanitary plumbing stacks and transport the waste to a sewer
pump station that shall then discharge to a sewer rising main for connection to the nearby Unity
sewer rising main. The connection to the Unity Water main shall be undertaken by the Civil
Engineers, and full demarcation of scope between hydraulic and civil shall be undertaken.

The trade waste system shall incorporate the provision of trade waste connection points to the
kitchen and laundry areas, and shall discharge to grease interceptor traps, to be sized
commensurate with the discharge volumes from the layout plans.

The sewer drainage, house drainage and sanitary plumbing system shall conform to the following
Australian Standards :-
                AS 1074        Steel Tubes and Tubulars for Ordinary Service.
                AS 1152        Specification for Test Sieves
                AS 1167        Welding and Brazing – Filler Metals
                AS 1192        Electroplated coatings - Nickel and Chromium
                AS 1254        Unplasticized PVC (UPVC) Pipes and Fittings for Storm or
                               Surface Water Applications
                AS 1260        PVC Pipes and Fittings for Drain, Waste and Vent Applications
                AS 1304        Welded Wire Reinforcing Fabric for Concrete
                AS 1345        Identification of the Contents of Piping, Conduits and Ducts
                AS 1432        Copper Tubes for Plumbing, Gasfitting & Drainage Applications.
                AS 1449        Wrought Alloy Steels - Stainless and Heat Resisting Steel Plate,
                               Sheet and Strip
                AS 1477        PVC Pipes and Fittings for Pressure Applications
                AS 1530.4      Methods for Fire Tests on Building Materials, Components and
                               Structures. Part 4 - Fire Resistance Tests of Elements of Building
                               Construction
                AS 1572        Copper/Copper Alloys–Seamless Tubes for Engineering Purposes
                AS 1589        Copper and Copper Alloy Waste Fittings
                AS 1631        Cast Grey and Ductile Iron Non-Pressure Pipes and Fittings
                AS 1646        Elastomeric Seals for Waterworks Purposes
                AS 1650        Hot Dipped Galvanised Coatings on Ferrous Articles
                AS 1976        Vitreous China for Use in Sanitary Appliances.
                AS 2032        Code of Practice for Installation of UPVC Pipe Systems
                AS 2887        Testing Plastic Waste Fittings
                AS 2888        Methods of Testing Plastic Waste Fittings
                AS 3500        National Plumbing and Drainage Code – Compendium
                AS 3500.2.2    Sanitary Plumbing and Drainage
                AS 3517        Capillary Fittings of Copper and Copper Alloy for Non-Pressure
                               Sanitary Plumbing Applications
                AS 3879        Solvent Cements and Priming Fluids for Use with Unplasticised
                               (PVC) Pipe and Fittings
                AS 4058        Precast Concrete Pipes (Pressure and Non-Pressure)
                BS 5153        Cast Iron Check Valves for General Purposes
                AS 4139        Fibre-Reinforced Concrete Pipes and Fittings




                                                                             Document : 14,967/da-rep/A

Page 8

                                                             BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC.                           Page : 6
______________________________________________________________________________________

All sewer drainage/house drainage shall be installed in UPVC (SN6 DWV) pipework for inground
installation complete with all necessary junctions, bends and inspections openings. Inspection
chambers shall have gas-tight covers with the denotation “SAN” stamped onto each cover. Gatic
type light duty covers shall be used (except in roadways).

The sanitary plumbing shall also be installed in UPVC (SN6 DWV) and shall comprise the soil,
waste and vent pipes from the drainage points to vent terminals and includes all bends, offsets,
expansion joints, branches, brackets and sundry equipment necessary to complete the installation.
Sanitary plumbing stacks and sanitary plumbing drainage shall be lagged with Soundlag 4525C
and/or condensate insulation as required by the hydraulic documentation and/or the National
Construction Code.

Alternately, the pipework system can be installed in Raupiano, a new pipework system that has
integral acoustic properties, but further review of materials shall be undertaken during design
development phases of the project.

The system shall comprise of a REVAS (reduced velocity aerator stack system) that incorporates a
single stack, with aerator stack junctions and branches designed in accordance with sanitary drainage
principles and installed in accordance with supplier’s and manufacturer’s specifications. Sanitary
plumbing pipework shall be positioned in concealed locations where practicable in ceilings, ducts
and/or stud walls. Any suspended pipework shall adhere to the clearance height requirements in
accordance with the National Construction Code.

Fire stop collars shall be installed at fire rated floor slabs and fire rated wall penetrations, with the
exception of areas subject to hot discharges (including but not limited to hot water tundishes, etc)
which shall be copper pipework and waste branches. Note that the fire stop collars shall have a
minimum two (2) hour fire rating.

Inspection openings shall be installed to pipework such that each section of pipe is accessible in at
least one direction. Inspection openings shall be brought to the finished ground level and capped with
an identifiable and labelled screwed brass cap. Inspection openings to surface shall be located next to
toilets for maintenance purposes.

The mechanical plant rooms shall be provided with one hundred (100) mm floor wastes and trapped
tundishes. This pipework shall be lagged to prevent the formation of any condensation below the
Plant Rooms. Insulation to condensate drainage shall be sealed tube for pipes with an external
diameter of up to 100mm and thermolag for pipes with an external diameter of greater than 100mm.

Floor wastes shall have a minimum 100mm diameter inlet with chrome plated brass screw in
gratings complete with puddle flanges. All exposed sanitary plumbing pipework below basins,
fixtures, etc shall be chrome plated.

Trade waste drainage and trade waste plumbing pipework shall be installed in HDPE, including all
bends and junctions.

The design of the house drainage, sanitary plumbing, trade waste drainage and trade waste plumbing
shall be closely co-ordinated with other mechanical, electrical and structural requirements and
associated disciplines.




                                                                                  Document : 14,967/da-rep/A

Page 9

                                                             BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC.                           Page : 7
______________________________________________________________________________________

1.4 COLD WATER SERVICES

The potable and non-potable cold water services shall be sourced from a rainwater harvesting
methodology strategy, whereby all roofwater is captured and harvested in storage tanks, with
treatment applied commensurate with use. Low treatment will be provided for water to be used for
toilet flushing, whilst high treatment processes shall be applied for water that shall be consumed in
potable applications.

Furthermore, a bore shall be constructed on the site, and is proposed for supply of all non-potable
water services. However, further water testing of the bore water shall further confirm the
capacity/quality of such water to be used for other purposes – either with or without treatment.

The cold water system shall conform to the following Australian Standards :-

                AS 1167          Welding and Brazing – Filler Metals
                AS 1345          Identification of the Contents of Piping, Conduits and Ducts
                AS 1432          Copper Tubes for Plumbing, Gasfitting and Drainage Applications.
                AS 1530.4        Methods for Fire Tests on Building Materials, Components and
                                 Structures. Part 4 - Fire Resistance Tests of Elements of Building
                                 Construction
                AS 1628          Water Supply - Copper Alloy Gate, Globe and Non-Return Valves.
                AS 1718          Water Supply - Copper Alloy Screw Down Pattern Taps –
                                 Specified by Dimensions
                AS 2129          Flanges for Pipes, Valves and Fittings
                AS 2638          Sluice Valves for Waterworks Purposes
                AS 3500          National Plumbing and Drainage Code – Compendium
                AS 3500.1.2      Water Supply
                AS 3500.4.2      Hot Water Supply Systems
                AS 3688          Water Supply – Copper and Copper Alloy Body Compression and
                                 Capillary Fittings and Threaded-End Connectors.

The design shall encompass all piping, valves, unions, fittings, and sundry equipment to the
satisfaction of the Noosa Shire Council.

Water services pipework shall be as follows :-

           all 100mm (or larger) inground water service pipework shall be either copper or poly
            pipe suitably sized in accordance with the areas serviced;
           all inground water service pipework less than 100mm shall be copper. The size of such
            pipework shall be in accordance with the fixtures/areas being services;
           all water service pipework within buildings shall be copper. No pressurised services
            shall be located in slabs.




                                                                               Document : 14,967/da-rep/A

Page 10

                                                             BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC.                           Page : 8
______________________________________________________________________________________

The design shall incorporate strategically located control valves. Each cold water riser shall be
isolated at the bottom (or top in cases of downfeeds). Branch lines shall be isolated at the riser on
each level and further, where servicing an outlet or group of outlets. Isolation valves shall be
butterfly valves where the service exceeds 80mm diameter. Ball valves shall be used on services less
than 80mm diameter. All valves shall be tagged to identify the areas serviced.

All fittings shall comply with the requirements of SAA MP52 and shall have AS markings and
manufacturer’s License N° stamped into the fitting.

Pressure reducing valves set to 500kPa (in accordance with Australian Standard, AS 3500) are to be
installed to equipment, pipework, etc requiring pressure limitations.




                                                                               Document : 14,967/da-rep/A

Page 11

                                                             BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC.                           Page : 9
______________________________________________________________________________________

1.5 HOT WATER SERVICES

The hot water system shall comprise a flow and return pipework system provided to each building.
The hot water shall be generated from a central bank of LPG gas fired hot water units.

The hot water services shall be in accordance with the following Australian Standards :-
                AS 1167            Welding and Brazing – Filler Metals
                AS 1345            Identification of the Contents of Piping, Conduits and Ducts
                AS 1432            Copper Tubes for Plumbing, Gasfitting and Drainage Applications.
                AS 1530.4          Methods for Fire Tests on Building Materials, Components and
                                   Structures. Part 4 - Fire Resistance Tests of Elements of Building
                                   Construction
                AS 1628            Water Supply - Copper Alloy Gate, Globe and Non-Return Valves.
                AS 1718            Water Supply - Copper Alloy Screw Down Pattern Taps –
                                   Specified by Dimensions
                AS 2129            Flanges for Pipes, Valves and Fittings
                AS 2638            Sluice Valves for Waterworks Purposes
                AS 3500            National Plumbing and Drainage Code – Compendium
                AS 3500.1.2        Water Supply
                AS 3500.4.2        Hot Water Supply Systems
                AS 3688            Water Supply – Copper and Copper Alloy Body Compression and
                                   Capillary Fittings and Threaded-End Connectors.

Hot water units shall provide water at a minimum temperature of sixty-five (65°) Celsuis for outlet
flow to the draw-off points or fixtures. Hot water heaters shall be designed as fully mains pressure
types, complete with all necessary stop valves, expansion valves and pressure relief valves and
safetrays to ensure the installation is in accordance with the regulatory standards.

Hot water pipework shall be copper tube Type “B”. No pressurised services in slabs. All hot water
pipes shall be insulated with preformed sectionalised fibreglass insulation wrapped with sisalation.
The minimum insulation thickness to hot water piping shall be 25mm for pipes less than 50mm
nominal bore and 38mm for pipes of 50mm and above.

Thermostatic mixing valves shall be designed to service all fixtures within accommodation areas,
including all personal washing facilities within the complex. Thermostatic mixing valves shall be
located such that future maintenance and testing can be effected quickly and easily.




                                                                               Document : 14,967/da-rep/A

Page 12

                                                             BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC.                         Page : 10
______________________________________________________________________________________

1.6 STORMWATER DRAINAGE, DOWNPIPES AND GUTTERS

The stormwater drainage system shall be sized and designed in accordance with Australian Standard,
AS 3500.3.

Stormwater drainage shall collect from the building’s downpipes and shall discharge to individual
rainwater harvesting tanks to be provided in the undercroft areas below each building or outside the
building footprint. Downpipes shall run external on each building, collecting rainwater from the
gutters servicing the roof. Where possible, downpipes shall be located on the external façade to avoid
any potential for water leakage within the building envelope.

Stormwater drainage shall be installed in PVC pipework. Surface internal stormwater shall be
collected in galvanised grated drains with matching metal frames, with square stainless steel grated
sumps being installed in tiled areas. Stormwater collected from planters and hardstand areas shall not
be discharged to the rainwater tank, but shall be discharged direct to the civil stormwater connection.

1.7 PROPOSED SCHEDULE OF FIXTURES AND TAPWARE

The sanitary fixtures to the cleaner’s rooms and toilet facilities shall be in accordance with the
client’s requirements. Fixtures shall be white in colour and shall be fitted with water saving
devices where appropriate and justifiable. Vitreous china pan water closets complete with dual
flush 4.5 litre/3.0 litre vitreous china cisterns. Urinals shall be vitreous china and shall be wall
mounted. Urinals shall be fitted with the new water-saving 0.8 litre flushing mechanism.

Public wash/vanity basins shall be of a vitreous china construction with chrome plated “P” traps
for connection to in-wall sanitary plumbing. Hand wash basins/vanity basins shall be provided
with one (1) hole tapware.

Disabled facilities shall encompass showers, water closets and hand wash basins. Disabled water
closets shall comply with Australian Standard, AS 1428.1 and the National Construction Code
requirements and shall be a vitreous china model.

Preference shall be given to those sanitary fixtures that are manufactured within Australia and
conform to the relevant Australian Standards. Showers shall be graded to a one hundred (100) mm
chrome plated brass floor waste grate and shall be provided with hot and cold tapware. Cleaner’s
sinks shall be wall mounted units, complete with grated cover, and with wall mounted hot and cold
hose bib cocks over.




                                                                                Document : 14,967/da-rep/A

Page 13

                                                             BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC.                         Page : 11
______________________________________________________________________________________

1.8 FIRE HYDRANT and FIRE SPRINKLER SERVICES

The fire hydrant and fire sprinkler services shall be sourced from on-site fire service storage tanks
with a respective total volume of 288,000 litres (hydrants) and 86,400 litres (sprinklers).

A new fire hydrant booster and fire sprinkler booster shall face parallel to the site frontage, and fire
service pumps shall facilitate the operation of the sprinkler and hydrant services to a compliant level.

The fire services shall be in accordance with the following Australian Standards :-

                 AS 1167          Welding and Brazing - Filler Metals
                 AS 1221          Fire Hose Reels
                 AS 1345          Identification of the Contents of Piping, Conduits and Ducts.
                 AS 1432          Copper Tubes for Plumbing, Gasfitting and Drainage Applications.
                 AS 1530.4        Methods for Fire Tests on Building Materials, Components and
                                  Structures. Part 4 - Fire Resistance Tests of Elements of Building
                                  Construction
                 AS 1628          Water Supply - Copper Alloy Gate, Globe and Non-Return Valves.
                 AS 1851          Maintenance of Fire Protection Equipment. Part 1 - Portable Fire
                                  Extinguishers and Fire Blankets. Part 2 - Fire Hose Reels and, Part
                                  4 - Fire Hydrant Installations
                 AS 2129          Flanges for Pipes, Valves and Fittings
                 AS 2280          Ductile Iron Pressure Pipes and Fittings
                 AS 2419          Fire Hydrant Installations
                 AS 2441          Installation of Fire Hose Reels
                 AS 3688          Water Supply – Copper and Copper Alloy Body Compression and
                                  Capillary Fittings and Threaded-End Connectors.
                 BS 5163          Ductile flanged cast iron wedge gate valves for water works
                                  purposes.

Internal hydrant valves shall be sixty-five (65) mm diameter complete with all brass valves and shall
be fitted with a steel type handle.

All fire services pipework above ground shall be galvanised wrought iron victaulic mechanical
pipework system. All piping inground shall be poly pipework and fittings. All tees, bends and fittings
to the Blue Rhino pipework shall be ductile iron griptite complete with Rilsan Nylon 11
coating/lining. Gate valves shall be ductile iron norcast resilient sealing sluice valves complete with
Rilsan Nylon 11 coating/lining.




                                                                                 Document : 14,967/da-rep/A

Page 14

                                                             BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC.                         Page : 12
______________________________________________________________________________________

1.9 LPG GAS SERVICES

The work under this section comprises the complete supply and installation of connection of the
LPG gas service from the gas service connection and reticulated throughout the buildings to the
various nominated connection points as nominated on the drawings.

An LPG gas main shall service the hot water generation system, and shall also facilitate
connections to the laundry and kitchen as required for cooking/washing equipment.

The LPG gas service shall be designed in accordance with AS 5601.

Gas services pipework shall be Type B copper tube to AS 1432 of sizes shown on the drawings, and
the underground pipework shall be HDPE pipework complete with gas colour coded pipe.

The gas services works must comply with the following Australian Standards :

                AS 1304         Welded Wire Reinforcing Fabric for Concrete
                AS 1326         Polythene Film for Packaging and Allied Purposes
                AS 1345         Identification of the Contents of Piping, Conduits and Ducts
                AS 1599         Pressure Sensitive Adhesive Packaging Tapes
                AS 1697         SAA Gas Pipeline Code
                AS 2032         Code of Practice for installation of UPVC pipe systems
                AG 601          Gas Installation Code




CAROL WILLIAMSON
DIRECTOR
BRW Enterprises (Qld) Pty Ltd


May 25, 2018.




                                                                               Document : 14,967/da-rep/A

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.