Council archive · source document
SUPERSEDED Decision Notice - 010.2007.00002179.001 [As Published] · 172007.2179
Officer: Glen Conforti
Direct Telephone: (07) 5449 5379
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 2007/2179
Your Reference:
27 August 2008
R J Neller
PO Box 284
PEREGIAN BEACH QLD 4573
Dear Sir
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 26 August 2008 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2007/2179
Street address: 66 Tingira Crescent, Sunrise Beach
Real property description: Lot 30 RP 126838
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Preliminary Approval for Building Works - Additions & Alterations to Detached House
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are numbered, titled and dated:
Plan / Rev. Plan / Document Name Date
Document No.
Sheet 1/8 Site Plan – Deborah Wagner Architect 26.7.08
Sheet 2/8 Lower Level Floor Plan – Deborah 26.5.08
Wagner Architect
Page 1 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
2007/2179
Sheet 3A/8 Upper Level Floor Plan – Deborah 26.7.08
Wagner Architect
Sheet 4A/8 Clerestory & Roof Plans – Deborah 26.7.08
Wagner Architect
Sheet 5A/8 Elevations 1 – Deborah Wagner 26.7.08
Architect
Sheet 6A/8 Elevations 2 – Deborah Wagner 26.7.08
Architect
Sheet 7A/8 Sections 1 – Deborah Wagner Architect 26.7.08
Sheet 8A/8 Sections 2 – Deborah Wagner Architect 26.7.08
and as may be amended by these conditions and annotations on the plans.
2. The rear balcony shall not extend beyond the average outermost seaward projection of
buildings on directly adjoining properties as outlined on the Approved Survey Plans. The
approved plans are numbered, titled and dated:
Plan / Rev. Plan / Document Name Date
Document No.
08067-1 A Partial Detail Plan – Donald James 14.3.2008
Colston Cadastral Surveyor
08067- HEIGHT A Heights Survey Plan – Donald James 13.8.2008
Colston Cadastral Surveyor
3. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the maximum
allowable building height and the maximum permissible seaward building line as required by
either the conditions of approval or the Planning Scheme.
4. External colours and finishes of the building shall comprise of muted/environmental tones that
blend with the natural environment.
5. Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
6. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
7. A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to
service the detached house. The tank is to be installed to ensure water from the tank can be
used both:
7.1. For external use such as watering gardens, irrigation, ornamental ponds or water
features, topping up swimming pools, outdoor cleaning; and
7.2. For use in flushing of toilets internal to the building.
Page 2 of 8
Page 3
2007/2179
8. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
9. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
10. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use. All other
vegetation shall be protected from interference resulting from clearing or construction activities
by:
10.1. Clearly marking vegetation to be retained with flagging tape;
10.2. Installing protective fencing around the drip line of the vegetation;
10.3. Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
11. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site: -
11.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
11.2. Disposal for firewood.
11.3. Disposal for landscaping purposes.
11.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
11.5. The Applicant is advised that other methods may be considered provided full details of
the method are submitted.
11.6. The applicant is advised that burning off is an unacceptable method of disposal.
12. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are
not constructed under overhead electricity transmission lines, or within any easements.
13. The rear fence adjacent to the beachfront shall be no more than 1.2 metres in height, be of
open construction (at least 50% transparent) and constructed of lightweight materials.
13.1. Gates must not be installed along the rear property boundary.
Demolition
14. Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be
protected from damage and made safe to the standard required by the regulatory authority;
15. All infrastructure must be disconnected, capped or sealed including:-
Page 3 of 8
Page 4
2007/2179
electricity meters removed and electrical wires disconnected; and
telephone lines are disconnected; and
high speed data cables and television provider boxes are disconnected and removed to
the standard required by the regulatory authority;
16. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging, must be removed from the building and disposed of in accordance with industry best
practice.
17. Waste generated during construction must be stockpiled in a centralised location and covered
as required to prevent material being blown onto adjoining properties including the road
reserve or food waste from generating vermin. All site waste must be disposed of to an
approved waste disposal facility either directly or via an approved waste receptacle and
collection service.
18. Sediment and erosion control measures must be placed on site prior to the works
commencing and shall be maintained until all works are complete. The erosion and sediment
control measures shall be in accordance with the “Best practice guidelines for control of
stormwater on building sites” prepared by Healthy Waterways (available at
www.healthywaterways.org). If such measures are not in place or are not satisfactory, ‘on the
spot’ fines may be issued. Such fines can be issued if sediments from the site are found to
enter or have the potential to enter Council’s stormwater system or natural waterways.
Currency
19. The Preliminary Approval for Building Work lapses if building work has not happened by 26
August 2010, unless an application to extend the currency is approved by Council.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
Sheet 1/8 Site Plan – Deborah Wagner Architect 26.7.08
Sheet 2/8 Lower Level Floor Plan – Deborah 26.5.08
Wagner Architect
Sheet 3A/8 Upper Level Floor Plan – Deborah 26.7.08
Wagner Architect
Sheet 4A/8 Clerestory & Roof Plans – Deborah 26.7.08
Wagner Architect
Sheet 5A/8 Elevations 1 – Deborah Wagner 26.7.08
Architect
Sheet 6A/8 Elevations 2 – Deborah Wagner 26.7.08
Architect
Page 4 of 8
Page 5
2007/2179
Sheet 7A/8 Sections 1 – Deborah Wagner Architect 26.7.08
Sheet 8A/8 Sections 2 – Deborah Wagner Architect 26.7.08
08067-1 A Partial Detail Plan – Donald James 14.3.2008
Colston Cadastral Surveyor
08067- HEIGHT A Heights Survey Plan – Donald James 13.8.2008
Colston Cadastral Surveyor
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
1.1. On a Sunday or public holiday, at any time; or
1.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
2. Prior to the commencement of the development, a plumbing assessment must be obtained
from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage
Act 2002 (as applicable).
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
A preliminary approval under section 3.1.6 of Integrated Planning Act 1997 has been granted and as
such the level of assessment and applicable codes for any development approval resulting from this
approval are identified in the conditions.
Page 5 of 8
Page 6
2007/2179
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Detached House Driveways Code
12 SUBMISSIONS
Not applicable
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Kerri Coyle
MANAGER – LAND USE
Page 6 of 8
Page 7
2007/2179
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
(5) If an application is processed under section
The following is an extract from the Integrated 6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4). application are available only for the aspects of the
Division 8 - Appeals to court relating to development that would have required public
development applications notification under the repealed Act.
Appeals by applicants
(6) If an application involves assessment
4.1.27.(1) An applicant for a development against a concurrence agency code, appeal rights
application may appeal to the court against any of for submitters for the application are not available
the following- against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a concurrence agency’s response for the code.
development application; Appeals by advice agency submitters
(b) a matter stated in a development approval, 4.1.29.(1) An advice agency may, within the limits
including any condition applying to the of its jurisdiction, appeal to the court about the
development, and the identification of a code giving of a development approval for a
1
under section 3.1.6; development application if-
(c) the decision to give a preliminary approval (a) the development application involves impact
when a development permit was applied for; assessment; and
(d) the length of a currency period; (b) the advice agency told the applicant and the
(e) a deemed refusal. assessment manager to treat its response to
(2) An appeal under subsection (1)(a) to (d) the application as a submission for an appeal.
must be started within 20 business days (the (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the business days after the day the decision notice or
decision notice or negotiated decision notice is negotiated decision notice is given to the advice
given to the applicant. agency as a submitter.
(3) An appeal under subsection (1)(e) may be Appeals for matters arising after approval given
started at any time after the last day a decision on (co-respondents)
the matter should have been made. 4.1.30.(1) For a development approval given for a
Appeals by submitters development application, a person to whom any of
4.1.28.(1) A submitter for a development the following notices have been given may appeal
application may appeal to the court about- to the court against the decision in the notice-
(a) the giving of a development approval, including (a) a notice giving a decision on a request for
any conditions (or lack of conditions) or other extension of the currency period for an
provisions of the approval; or approval;
(b) the length of a currency period for the approval. (b) a notice giving a decision on a request to make
a minor change to an approval.
(2) The appeal must be started within 20
business days (the “submitters appeal period”) (2) The appeal must be started within 20
after the day the decision notice or negotiated business days after the day the notice of the
decision notice is given to the submitter. decision is given to the person.
(3) If a person withdraws a submission before (3) Subsection (1)(a) does not apply if the
the application is decided, the person may not approval resulted from a development
appeal the decision. application (superseded planning scheme)
that was assessed as if it were an
(4) If an application involves both impact application under a superseded planning
assessment and code assessment, appeal rights scheme.
for submitters are available only for the part of the
application involving impact assessment. (4) Also, a person who has made a request
mentioned in subsection (1) may appeal to
the court against a deemed refusal of the
request.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 7 of 8
Page 8
2007/2179
(5) An appeal under subsection (4) may be For Building Works Only
started at any time after the last day the Rights of appeal conferred by Section 4.2.9 of the
decision on the matter should have been Integrated Planning Act 1997 as follows:
made.
Division 3 – Appeals to tribunals relating to
development applications
Division 9 - Appeals to court about other
matters Appeals by applicants
Appeals for matters arising after approval given
(no co-respondents)
4.2.9(1) An applicant for a development application
4.1.31.(1) A person to whom any of the following may appeal to the Building and Development
notices have been given may appeal to the court Tribunal against any of the following-
against the decision in the notice-
(a) the refusal, or the refusal in part, of a
(a) a notice giving a decision on a request to development application;
change or cancel a condition of a development
approval. (b) a matter stated in a development approval,
2 including any condition applying to the
(b) a notice under section 6.1.44 giving a decision development, and the identification of a code
to change or cancel a condition of a under section 3.1.6;
3
development approval.
(c) the decision to give a preliminary approval when a
(2) The appeal must be started within 20 development permit was applied for;
business days after the day the notice of the
(d) the length of a period mentioned in section 3.5.21
decision is given to the person.
currency period;
(3) Also, a person who has made a request
(e) a deemed refusal.
mentioned in subsection (1)(a) may appeal
to the court against a deemed refusal of the (2) An appeal under subsection (1)(a) to (d) must
request. be started within 20 business days (the “applicant’s
appeal period”) after the day the decision notice or
(4) An appeal under subsection (3) may be negotiated decision notice is given to the applicant.
started at any time after the last day the
(3) An appeal under subsection (1)(e) may be
decision on the matter should have been started at any time after the last day a decision on the
made. matter should have been made.
Appeals against decisions to change approval The Registrar for the Building and Development
conditions under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a http://www.localgovernment.qld.gov.au/
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.
(2) The appeal must be started within 20
business days after the day notice of the decision
is given to the applicant.
2
Section 6.1.44 (Conditions may be changed or
3
cancelled by assessment manager or concurrence Section 3.1.6 (Preliminary approval may override
agency in certain circumstances) local planning instrument)
Page 8 of 8
Used in these records
SUPERSEDED Decision Notice - 010.2007.00002179.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 60 KB (small file)
- File type
No other editions are linked here.