co

NEORO@KY:WeE Referral Agencies Checklist

 

IDAS REFERRAL AGENCY + TRIGGERS

YES

NO

 

Please tick “

 

Department of Main Roads (Concurrence or Advice)
e¢ State Controlled Road

 

Environmental Protection Agency (Concurrence)

« Environmentally Relevant Activity (for non-devolved Council as EPA)
e Contaminated land

= Environmental Management/Contaminated Land Register

=» UXO

* Land recently used as a ‘notifiable activity’

= Industrial land changed to sensitive uses (eg school)
«Coastal related developments

 

Department of Natural Resources & Mines
e Acid sulphate soils (Advice)
e Clearing of native vegetation on freehold tand (Concurrence)
e Operational Work - taking or interfering with
water/watercourse/referrable dam (Concurrence)
e _Removat of quarry material from a water course (Concurrence)

 

Department of Primary Industries (Concurrence)
e Environmentally Relevant Activities (piggeries/feedlots)

 

Queensland Fire & Rescue Authority (Advice)
¢ Building work containing special fire services required by SBRs

 

Department of Emergency Services (DES)
® MCU - Major hazard facility (Concurrence)

 

Department of Local Government & Planning (Referral-Coordination)
e 30or more different concurrence agencies
« Involves a prescribed facility (Schedule 6 IP Regulations)
e Within a prescribed area (Schedule 7 IP Regulations)

 

OTHER STATE AGENCIES + TRIGGERS

 

Portable Long Service Leave Levy (PLSL)
* Check for Operational Works Value in excess of $85,000.00 with
respect to PLSL

 

OWNER’S CONSENT

 

 

 

Department of Natural Resources and Mines

 

 

 

 

 

REFERRAL AGENCY RESPONSE RECEIVED BEFORE LODGEMENT

 

 

 

For further clarification refer to |IOAS Guides 1 - 18 prepared by Department of Local Government & Planning.

AQP2 15/10/2003 g:\landuse\templates\eferral agencies checklist.doc

 

 
Full text of the other 115 pages

Page 2

 

NE@kONG we Checklist - Applications Involving Land
or Development & Land Use Sections
IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

1. APPLICATION FORMS
1.1. Form 1 PartA

1.1.1. Ensure that the form is fully completed. VY

 

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.4.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 _ if the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [A

 

1.1.2.1. Ensure that each of Forms B-O which are attached are fully compieted. [7
2. REFERRAL INFORMATION. ~ [email protected] Ensure that items 1-23 have been checked and/or completed with regard to referrals. mee
3.” ENVIRONMENTALLY RELEVANT ACTIVITIES.
3.1 Ensure that Part G is completed if EPA referral is required. |

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

4. FORM 2-.REQUEST TO CHANGE APPROVAL

 

 

 

 

 

 

 

4.1. Ensure that items 1-28 have been checked and/or completed including information regarding ]
applicant details and owners consent.
5. PLANS w *
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational (
Works) accompanies the application. In addition ensure that each set is compiete.
§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is |
unbound.
6. SUPPORTING INFORMATION OT
6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfi iguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is b @

 

capable of reproduction. [A
6.2. Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound,

faa ce mem em eee ce cee ate ee ee ae a

 

 

 

 

 

7.41 Ensure that the application fee, as determined | from the Council’ Ss adopted scale of fees, i)
accompanies the application or has been paid. Dorp ce.
7.2 Ensure that the fee which has been paid is recorded on the application form. os

 

 

Xv

  
  
 

Receiving Officer ....... L S we

Having completed this forin and accepted the a|

trays:-

« Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

« — Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

* If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively — AOD2 in the
Land Development Section.

¢ tnall other circumstances — AOP1's desk in the Land Use Section.

Piease DO NOT leave the application at the counter and DO NOT deliver the application to Records.

pate ......2/ ef. OO.

tion, please deliver both to the following 1DAS Application Receiving

 

 

 

SEPI g:\antVorms\application checklist.doc

Page 3

4 December 2006 I |

Our Ref: 060642 ke n h | C ks

AND ASSOCIATES

The Chief Executive Officer
Noosa Shire Council

PO Box 141

TEWANTIN QLD 4565

Attention: Development Assessment

Dear Sir

SUBMISSION OF DEVELOPMENT APPLICATION

MATERIAL CHANGE OF USE (COMMERCIAL BUSINESS: TYPE 1 OFFICE)
ON LAND AT 247 DAVID LOW WAY, PEREGIAN BEACH

AND DESCRIBED AS LOTS 1 & 2 ON RP 903222

FOR MORGAN & BEIERS PTY LTD

Please find enclosed a Development Application for Material Change of Use (Commercial Business: Type 1 Office)
made under the provisions of the Noosa Plan.

 

The subject site is located at 247 David Low Way, Peregian Beach and described as Lots 1 & 2 on RP903222.

The property is identified in the Eastern Beach Locality (Peregian Beach), in a Semi Attached Housing Zone. The
establishment of the proposed use is subject to Impact Assessment (Consistent Use) under the applicable table of
development assessment.

In accordance with the Jntegrated Planning Act 1997 please find enclosed the following documentation supporting
the application:

* — IDAS Form A, IDAS Form D, and the IDAS Referral Checklist duly completed and signed;

* Nine (9) copies of our town planning report including Proposal Plans prepared by Ken Down Architects,
Landscape Plan prepared by LandGraphics, and Services Report/Stormwater Management Report/Traffic Report
prepared by Barlow Gregg & Associates; and

« — Acheque in the amount of $7,841.00 made payable to the Noosa Shire Council being the applicable lodgement
fee derived from the 2006/2007 fee schedule. The fee has been calculated on the following basis:

 

 

 

 

 

 

 

 

 

WE Level of Assessment Base Fee Increment akel<:)

Commercial Impact Exceeding 100sqm | Plus per additional $2,960.00 +

Business: Type GFA - $2,960.00 sqm - $3.45/sqm $3,381.00

1 Office $2,960.00 980sqm x $3.45 $6,341.00

$3,381.00 r

Landscape - $1,500.00 - $1,500.00 | ~~ fof Al
Plan Ale ep Werks
Total - : : $7,841.00 lacagect .

We trust that the information supplied with this development application is sufficient in order for Council to
commence assessment of the application.

Should you have any queries with respect to the application please contact me on (07) 5443 2844,

       

Yours faithfully
ASSOCIATES

~4 DEC 2006

SA SHIRE COUNCIL
MOeFONTCUUMNTER /

7
TOWN PLANNERS | CONSULTING SURVEYORS l BODY CORPORATE MANAGERS

Ken‘Hicks & Associates Pty Ltd [| Suite 7 Dalton Centre, 1 Newspaper Place, PO Box 6380, Maroochydore BC QLD 4558
P 07 5443 2844 | F 07 5443 7146 | E christian. [email protected] | A.C.N. 010 278 823 | A.B.N. 74 308 405 611

Page 4

INTEGRATED PLANNING ACT 1997

      

Form 1 Development Application

Y Common details

Part A, Version 2.4, 29 May 2006

 

—
0
Q..

A

 

The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.aid.cov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.

Description of land 1.
All land the subject of the application, must be
identified. However, a description of the land is not
required In relation to a mobile or temporary 2
Environmentally Relevant Activity (ERA), *
Advice for completing Q2 - Q2 applles if
development Is proposed within a water body or
watecourse, 3.
Advice for completing Q3 - Most land can be
identified by a lot on plan description. Thase details
can be obtained from title documents or through the
local government, 4.
However, if the land on which the development is
proposed does not have a lot on plan description (le.
the development is proposed in @ water body or
watercourse) provide -
) the lot on plan description for the
adjelning/adjacent tand; or
(i) GPS coordinates where there Is no
adjoining/adjacent land (eg. in Moreton Bay), 5.
Advice for completing Q7 - Q7 does not apply if the
development is within a water body or watercourse,
Advice for completing Qa - Q8 applies it 8
development is within a local government area. .
Note: Areas below high water mark are not within a
focal govemment's area unless provided for under the
Local Government Act 1993. 9,
Advice for. q - Q9 applies if
development is on strategic port land of a strategic
port land tidal area. For more details refer to Guide 11

Street address: fncludinghouse number, street name, suburb/ocality name & postcode) (if applicable)

[ 247 David Low Way, Peregian |
Name of water body or watercourse, within which the development is proposed: (if applicable)
[N/A |
Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:

[ Lot 1 & 2 RP 903222
The above description is for: (tick applicable box)

I (i) the land on which the development is proposed; or

(Gi) the land adjoining the water body or watercourse, within which the development is
proposed; or
(1 dil) the water body or watercourse.

 

 

 

 

 

Shop / tenancy number:
[ N/A

6. Storey / level: 7.
[ NWA |

Total area of land: (m? or ha):
| 1,521sqm |

Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo ef.) {if applicable)
| Noosa Shire Council |

Port authority for the strategic port tand or strategic port land tidal area on which the
development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)

| N/A |

 

 

 

 

 

Proposal details 10.

If there is insufficient room available, detaits may be
provided in an attachment to the application.

Existing use of the land: (eg. vacant, single house, shop etc.)
[ Detached Dwellings ]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11. Proposed use of the land: (ag. 6 unit apartment building, 30 Jot residential subdivision, ERA for aquacutture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
[ Professional Offices
Other applicable parts of Form 4 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part /, otc)
Carte ee oe nara aT eS by Oar [ IDAS Form D - Material Change of Use / IDAS Referral Checklist |
when a part of Form 4 may apply refer to Guide 1,
Applicant details 13. Applicant's name: 15. Contact person:
Clearly identify who Is making the application. Th :
mnenttee wibetere see [ MORGAN & BEIERS PTY LTD | [Simon Dwyer |
When signing and lodging this application 14. Contact number. 16. Facsimile number/e-mail address:
The applicant is ible for ensuring the
ioraton proved scone The sxesenet | 5443 2844 | [5443 7146
manager, any referral agency & the Chief Executive
(where applicabya) wilt rely on this Information when | 17. Postal address:
assessing and decidg te application Ci- Ken Hicks & Associates
{fthe applicant is a. company -
{tthe 3 wticant company - a contact person PO Box 6380
MAROOCHYDORE BC QLD 4558
18. Signature: 19, Date:

 

A

VY / tif 006

 

 

Lb baa 2

 

 

 

 

Page 5

 
 
 
 
 

INTEGRATED PLANNING ACT 1997
Land owner’s consent (if applicable)

Section 3.2.1(3) of the (PA prescribes that an
application must contain, or be supported by, the
writlen consent of the land owners, if the application
lavolves:

{} amaterial change of use:

(i) reconfiguration of a tot;

(i) work on land below high-water mark & not within a
‘canal as defined under the Coastal Protection and
Management Act 1995,0°

(lv) work on rail coridor tand defined under the
Transport Infrastructure Act 1994,

‘Section 3.8.1(2)(a) of the IPA provides that

landowner’s consent is not required for a mobile or

temporary ERA

For more Information refer to Guide 4

20.

Part A, Version 2.4, 29 May 2006
Land owner's consent to the making of this application:
Name

 

‘Signature Date

 

()_ MORGAN & BEIERS PTY LTD

 

 

 

 

 

 

 

 

Resource entitlement (if applicable)
Section 3.2,1(5) of the IPA requires evidence of
resource entitlement be given for appilcations that
involve a prescribed State resource.

Section 3.2.1(10)(a)(i) of the (PA prescribes that an
application cannof be taken to be properly made
without evidence of the resource entitlement.
Advice for completing Q21 & 22

Refer to schedule 10 of the Integrated Planning
Reguiation 1998 that prescribes the natura of evidence!
Tequired by the State in support of the lodging of this
development appiication.

Advice for completing Q23

The information in () - (v) is mandatory if evidence Is
eequired under Q22 (i) or (i) above.

The official stamp of the Oepartment of Natural
Resources, Mines and Water is mandatory where the
application involves any water or riverine quarry
material under the Water Act 2000.

‘Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used, Q23 (vi) must be
completed If the evidence is time limited.

Assessment triggers

This checklist does not apply if the application requires|
the completion of Parts A and 8 of the Form onty. It
must be completed for all other applications,

21,

22.

23.

24,

Does this application involve a State resource prescribed under a regulation (other than involving
quarry material on State coastal land under the Coastal Protection and Management Act 1995)?

EX] NO - go to 024 (1 YES - goto a22

This application is accompanied by evidence: (tick applicable box)
C1 (i) of the allocation of, or entitlement to, the resource — attach evidence and go to Q23(vi)

[-) (i) the chief executive of the department administering the resource is satisfied the
development is consistent with an allocation of, or entitlement to, the resource - go
to Q23

LO iii) the chief executive of the department administering the resource is satisfied the

development application may proceed in the absence of an allocation of, or
entitlement to, the resource ~ go to 023

 

Evidence of the resource entitlement:

(i) Resource entitlement / authority details (vil) Official stamp of the department
applicable)

(i) Name of “eee officer

(iii) Position of a officer

(iv) Signature of delegated officer

 

 

 

 

 

{v) Date

(vi) _ date of evidence feta

Is the IDAS Assessment Checklist completed and attached to this application?
YES

 

 

 

oO NO - the assessment manager may refuse to accept this application on the
grounds that the application has not been properly made

 

Plans / drawings / reports

An application should be accompanied by detaits to
Support the proposal & enable the assessment
manager, referral agencles and any person viewing
the application during public scrutiny or public
Aotification to understand the scope of the proposat
and any potential impact.

 

 

25.

Plans/drawings/reports accompanying this application:
Plan / Drawing / Report Number

 

 

(i) Refer town planning report

 

 

 

 

 

 

 

     

    

nt anager may refuse to accept an application that, at the time of ladgement, fails to provide all applicable information required by Part A
Glevant part of Form 1.

 

  

OFFICE U

 

iP iskessment manager's)

 

Soon

FEE 8)

 

K DATE F RECEIVING OFFICER'S | REFERENCE
_i & RECEIVED _. — jf NAMES) fe NUMBER/S

 

7. Notification of Engagement of Private Certifier (Optional format}

Accreditation Number.

Council, Hhave been engaged as the private certifier for the building work referred to in this application.

 

   

__ Name: Signature:

Page 6

   
 

      
 

INTEGRATED PLANNING ACT 1997

Part D, Version 2.0, 4 October 2004

Form 1 Development Application

 

Material change of use

assessable against a local government's planning scheme

—
<<
Q..

R

 

 

Completion of all appficable questions on Part D is mandatory for all applications involving assessment of a
material change of use (MCU) assessable against a local governments planning scheme.

 

Nature of the application

A development permit authorises
development to occur, white a preliminary
approval is a step in the approval process
and does not authorise development to occur.

1.

This application is for: (tick 1 or both if applicable)

(7 Preliminary approval for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme (ie.
consideration of the proposal concept)

AND/OR

&J Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.

 

 

 

 

 

 

 

 

 

 

 

 

 

The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
For the definition of “gross floor area” go to . A ‘ ‘
the planning scheme against which the | Eastern Beaches Locality (Peregian Beach) / Semie Attached Housing Zone |
application will be assessed.
3. Existing gross floor area: (iteppicable) — [NIA |
4. Are there any existing easements on the land?
INO
DYES - attach plans of the focation and details of the purpose of the easement
Material change of use details 5. Details of the change to the use of the land: (eg. vacant land fo shopping centre, house to apartment building,
vacant land to industry (tyre manufacturing) etc.)
[ Material Change of Use (Commercial Business: Type 1 Office)
6. Number of employees: [ unknown |
7. Operating days and hours: [ unknown |
Associated building works details (if 8. Site cover:
applicable) . ,

For the definition of "site cover”, “gross floor
area” and “storey” go to the planning scheme
against which the application will be
assessed,

10.
11.
12.
13.

1,080sqm
[wo
Number of storeys / maximum height above natural ground: 2 storeys (8m)

Gross floor area:

Number of on-site car parking spaces:

 

Hours and days the use will operate | unknown ]

 

 

Associated operational works details
(it applicable)

 

Details of associated operational works (eg. landscaping, cut and fill, drainage, road works etc.)

 

To be determined

 

 

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.
ager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information

 

requested by Part A and any other relevant part of Form 1.

 

optide be BALY (ehpttatie to assessment manager)

 

“avon |

REFERENCE
NUMBERS

 

 

 

“woasa SHIRE COUNCIL” 2<37
MOPRONT COUNTER

 

Page 7

INTEGRATED PLANNING ACT 1997

Part N, Version 1.0, 4 October 2004

   

 

  

CT Pe t Application

Contaminated land

PART

 

Comptetion of all questions on Part N is mandatory for all applications involving assessment against the Environmental Protection Act 1994 when
development is proposed on contaminated or potentially contaminated land.
For furlher information refer to Guide 5 Contaminated land matters available free from www.ipa.qld.gov.au or the Environmental Protection Agency's
(EPA's) information sheets available free from www.epa.qid.gov.au under Ecoaccess/ business and industry. Alternatively, contact the local government.

 

 

 

 

 

 

 

 

 

 

    
   
 
 
 
  
  

   

Nature of the application 1. This application is for: (Tick one (1) or both if applicable)
Exemptions may apply to your proposal. .
Refer to Guide 5 Contaminated land matters Aspect of development Type of approval being sort
for advice regarding development that is : — ~
exempt from this assessable development {XJ Material change of use C1 Preliminary approval [XJ Development permit
trigger.
C1 Reconfiguring a lot (Preliminary approval _|[_] Development permit
2. Does this application require assessment against a planning scheme?
(no {] YES - complete other relevant parts of the IDAS Application Form 1
~ The subject land 3. Has an Environmental Management Register (EMR) and/or Contaminated Land Register (CLR)
search been conducted for the land the subject of the applicatio, & |! 1 & »
KINO (YES - attach results of the search and a

4. Alor part of the land the subject of the application is: S & cf
C(i) on the EMR or the CLR under the Environment abpotection el 1994, 5
CO (ii) used for, or if the land is vacant, was lastused for. geet ww
Cia) anotifiable activity at ne CQUNGE

eh 2 0
(1(b) an industrial activity and the propose: ysbis ford hiduaistentre
educational, recreational or residential BiurpdSe, Grctuding a caretal Bfice on
e industrial land); /
C1 (iii) in an area for which an area management advice has bee
mineralisation or industrial activity and the proposed use is for child care, educational,
recreational or residential purpose {including a caretaker residence on industrial land),

(iv) in an area for which an area management advice has been given for unexploded

 

 

 

ordnance.
Plans and documents 5. Confirm, by ticking the applicable box(es), that the following details are provided in plans and
For further information about preparing a written information supporting this application:
proposal repor refer to Guide 7 Preparing 8 (i) _ plans showing where any Notifiable Activity, Hazardous Contaminant, or potentially

: contaminated activity / activities have occurred on site;

C1 (i) _ if the application involves a material change of use from an industrial use to a more
sensitive use (eg, child care, educational, recreational or residential purposes), supply a detailed
site history outlining previous potentially contaminated uses on the site

PLEASE NOTE
PART N of Form 1 cannot be accepted by the assessment manger unless accompanied by PART A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.

 

 

 

OFFICE USE ONLY {applicable to assessment manager)

REFERENCE
DATE RECEIVED NUMBER/S

 

 

 

 

 

 

 

Page 8

        

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006

IDA S Assessment
Checklist

(Formerly the “Referrals Checklist”)

 

IMPORTANT NOTE FOR ALL APPLICANTS:

1,
2.
3.
@ 4.
5.
6.

7.

10.

This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources, Mines and Water, Queensland Heritage Council etc.).

This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.

Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
Itis the responsibility of the applicant to accurately complete this checklist.

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination’,

To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.ald.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www.ipa.gid.qov.au.
Section 2 on page 10 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The foflowing state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.

Environmentally relevant activity 1. The application involves: (tick applicable box/es)

 

 

 

 

For mare information refer to Guide 4, C1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
anton Seemed be {0.Q1, the has not been made - complete Part G of Form 1
administering authority®, (1 (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administer authority, is made - complete Part G of Form 1 .
the assessment manager for the application, the se
administering authority is a concurrence agency for Xl (iil) none of the above S 6
the application Ia relation to this matter. >
Nota: An application involving ERA 19 and/or 20 wilt Ve >
also require completion of Part Ky of Form 1 for c\\
approval where an allocation under the Water Act RECEN te oe
2000 is required, ~ : oy
State-controlled road matters 2. The application involves: (tick applicable box/es) -& ber 7
For more information refer to Guide 3. oO (i . cA.
i) development on land contiguous’ to a State controll d and for - apg COUN™.
Unless you answered ‘none of the above" to Q2, the . | . QOSh on
application triggers referral to the Department of (1 (a) materia! change of use assessable against the rephing Sthemand ¥
Main Roads (DMR} as a referral agency. . lf
In certain croutons DMR vite an advice (CO (b) reconfiguring a lot unless - Z led
agency, while in other circumstances DMR will be a « the total number of lots is not increased; and Cli: 2

concurrence agency.
Schedute 2 of the IP Requtation will assist you to

« the total number of lots abutting the State-controlled road is Tiotinéreased;

determine where OMR is an advice or concurrence C1 (c) operational work (not associated with a material change of use assessable against the

agency for the application.

planning scheme or reconfiguring a lot mentioned in (b) above)—

« associated with access to a State-controlled road; or

« for filling or excavation; or

« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.

 

 

 

‘The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed In schedule 8A of the IPA.

For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?”

The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devotved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).

Land contiguous to a State-controlled road is defined in schedule 14 of the 1P Regulation to mean land - if part of the fand is within 100m of the State-contrelted road; or that is part of a future State-
controlled road.

Page 1

Page 9

INTEGRATED PLANNING ACT 1997
State-controlled road matters (cont)

Clearing vegetation
For mora information refer to Guide 12.

Unless you answered "none of the above" to Q3, the
application requires assessment by the Department
of Natural Resources Mines and Water (NRMW).

if an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency far the application in relation to
this matter.

Ifyou ticked Q3(i) or (ii), your application requires
feferral o NRMW for assessment regardless of
whether vegetation clearing is proposed or nol.

IDAS Assessment Checklist, Version 18.0, 10 November 2006
U (ii) development on land not contiguous to a State-controlled road and -
(D(a) material change of use -
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;

LD (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
-and exceeding the thresholds set by that schedule;

(1 (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
« assessable against the local government's planning scheme, and

« mentioned in schedule § of the IP Regulation and exceeding the thresholds set by
that schedule.

EX] (ili) none of the above

The application involves: (tick applicable box/es)
[C1 () material change of use -
(a) assessable against the planning scheme;
(b) on a lot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
QO (ii) reconfiguring a fot -
(a) on alot containing a category 1, 2 or 3 area shown on a property map of

assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d)_ where the size of any tot created is 25 hectares or smaller - complete Part J of Fosm 1
C1 (il) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning

scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1

EX (iv) none of the above.

 

Strategic port land

For more information refer to Guide 11,

(fyou ticked {i) - the relevant Port Authority is the
assessment manager for the application.

Ifyou ticked (ii) Queensland Transport is a
concurrence agency for the application.

The application involves:

(1(i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (Tl
Act) - complete Part { of Form 1

D (ii) a material change of use that is inconsistent with the land use plan approved under the
Tl Act for the strategic port land - complete Part | of Form 7

£X] (ili) none of the above

 

 

Acid sulfate soils

For more information refer to Guide 10.

Unless you answered “none of the above" to Q5, the
application requires assessment by Department of
Natural Resources Mines and Water (NRMW).

If an agency other than NRMW is the assessment
manager for the application, NRMW is an advice
agency for the application in relation to this matter.

 

The application involves development on land situated in an identifieds local government area
and where the surface of the land is: (tick applicable box)

[1 (i) below 20m AHDS and the development will involve the excavation of 1000mS or more of
soil or sediment at or below 5m AHD, or

1 (ii) at or below Sm AHD and the development will involve filling the site with 1000m? or more
of material

K (iii) none of the above

—_———

5 The identified tocal government areas are: Aurukun, Bowen, Brisbane, GBroadsound, Bundaberg, Burdekin, Burke, Bumett, Cabootture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirum Vate, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

6 Australian Height Oatum (AHD).

Page 2

Page 10

INTEGRATED PLANNING ACT 1997

Major hazard facilities or possible 6.

major hazard facilities

For mora information tefer to Guide 17.

if you answered "YES" to 06, the application
requires assessment by the Department of
Emergency Services (DES).

If an agency other than DES is the assessment
manager for the application, DES is a concurrence
agency for the application in relation to this matter.

(DAS Assessment Checklist, Version 18.0, 10 November 2006
Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

KI No
(11 YES - complete Part L of Form 1

 

 

Water related development under the | 7,

Water Act 2000

For more Information about items (a) - (4), refer to
Guide 15. For more information about item (e},
refer to Guide 14 Does my application involve
assessment of a referable dam?

Unless you answered "none of the above' to Q7, the
application requires assessment by the Department
of Natural Resources Mines and Water (NRMW),

If an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter.

The application involves:

(1 operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)

O(a) ina watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
@ pump, gravity diversion, stream re-direction, weir or dam} - complete Part Kz, Ka, Ks, Ka, or Ks of
Form 1 whichever is applicable;

(1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
K; of Form 1;

C (@) for a subartesian bore, in declared groundwater area’, for use for purposes other
than stock and/or domestic use - complete Part K; of Form 1;

(1d) for a subartesian bore, in certain declared groundwater area, for use for stock
and/or domestic purposes - complete Part K: of Form 1,

C1 (e) for constructing a referable dam® or that will increase the storage capacity of a
teferable dam by more than 10% - complete Part Ks of Form 1; oF

(1 (A) for taking or interfering with overland flow water - complete Parts Ks and G of Form 1
1 (i) none of the above.

 

 

Removal of quarry material from a 8.

watercourse

For more information refer to Guide 16.

Ifyou answered "YES" to Q8, the application
fequires assessment by the Department of Natural
Resources Mines and Water (NRMW).

Ifan agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter,

Nota: Part G of Form 4 is required to be completed
as the activity of removing quarry material from @
watercourse is also an Environmentally Relevant
Activity (ERA).

 

Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?

{J NO

(YES - complete Parts Ky and G of Form 1

 

7 The declared ground water areas are listed In Guide 13 Development ina deci Jared catchment area,

8 Referable dam Is defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the IPA,

Page 3

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006

Operational works in a tidalareaor /9. The application involves operational work that is: ( tick the applicable box/es)
coastal management district

i) ti 10 ic
For mate information refer to Guide 18. For more LO) tidal work? as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed fidal work in local Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF :
1 ti ide 24. oe . . 7 5 .
thle ou eennanney ae sio0e,tne| Ll). tidal work that is prescribed tidal work"" other than in a canal’? -complete Pert P of Form 1; oF
, he sae. 5
application requires assessment by the (1 (ii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) fo (i) below are ticked,
manager tt te appleaion EPA's aconcurence [1 (@) constructing or installing works in a watercourse between MHWS and HAT (ie.
agency for the application in relation to this matter. other than those works in tidal water) where the development has been determined not
Local government is the assessment manager for ai fo be assessable against the Water Act 2000 ;
prescribed tidal work.

(.1(b) constructing a canal’? intended to be connected to tidal waters;

{1 (c)_ constructing an artificial waterway;

(J) (4) reclaiming land under tidal water;

Ce) disposing of dredge spoil or other solid waste material in tidal water;

(1 (A) _ interfering with quarry material on State coastal land above high-water mark;

(1g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

(J (h) removing or interfering with coastal dunes on land, other than State coastal land,
@ ; that is in an erosion prone area and above high-water mark;

(1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

El (iv) none of the above.

 

 

Operational work below high water |10. The application involves operational work that is: ( tick the applicable box/es)

 

mark ifoaton rele to Guide 18, Forme C1 (i) tidal work’? as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed fidal work in loca! Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
Sic os anenera ae : eee oor (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; oF
the application triggers referral to Queenstand C1 (iii) carried out within a coastal management district's under the Coastal Act and for -
Transpod (orate Safe) ee (1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager for all M of Form 7;
presorbed Udal work. (1 (b) reclaiming land under tidal water - complete Part M of Form 1; or
(J (c)_ constructing a canal’®, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;

(iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For more Information refer to Guide 18. CI (i) amaterial change of use assessable under a planning scheme involving operational

Unless you answered ‘none of the above” to Q11,

i : ‘ctrinltS
the apphealon requires assessment by the work carried out completely or partly in a coastal management district

Environmental Protection Agency (EPA). Ci (ii) a material change of use assessable under a planning scheme involving building
\fan agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -
manager for the application, EPA is a concurrence . . .

agency for the application in relation to this matter. « the construction of a new premises with a GFA’ of at least 1000m?

« the enlargement of the GFA of existing premises by more than 1000m?

D (ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

(iv) reconfiguring a lot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal' - complete Part M of Form 1

[XJ {v) none of the above

 

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in tha Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.

12 Canal means canal as defined under the Coastaf Protection and Management Act 1995

13 Tidal work is defined in sch 40 of the IPA.

44 Prescribed tidal work is defined In the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or parlly within a toca! government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 Cana! means canal as defined under the Coastaf Protection and Management Act 1995

17 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to ihe planning scheme against which the application is being assessed.

18 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.

Page 4

Page 12

INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

For more information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24.

lf you answered "YES" to Q12, the application

triggers referral to the Port Authority.

The Pon Authority is a concurrence agency if the

development is —

within 200m of a shipping channel or an entry
‘and exit shipping corridor for the port

@ within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

© within 1000m of a planned port facility identified
in aland use plan approved under the Transport
Infrastructure Act 1994,

{n all other situation the Port Authority is an advice

agency.

IDAS Assessment Checklist, Version 18.0, 10 November 2006
Does the application involve development below high water mark’? and within the limits of a port
under the Transport Infrastructure Act 1994?

KINO

(11 YES - complete Part M of Form 4, or Part P of Form 1 if the work is prescribed tidal work

 

Marinas

For more information refer to Guide 18. For
information about whether @ marina is prescribed
tidal work refer to Guide 24. The local government
is the assessment manager for all prescribed tidal
work,
@ If you answered “YES” to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.

Tidal works in strategic port land tidal
areas

For more information rafer to Guide 18.

Unless you answered ‘NO” to Q14, the relevant Port
Authority is the assessment manager for the
application and the Environmental Protection

Agency (EPA) and Queensland Transport (QT) are
concurrence agencies for the application.

Heritage
For further information refer to Guide 19,

Ifyou answered "YES" to Q15, the application

triggers referral to the Queenstand Heritage Council
as concurrence agency for the application.

Declared catchment areas

For more information, including a list of the declared
catchment areas within Queensland, refer to Guide
43,

Unless you answered “none of the above” to Q16,
the application requires assessment by the
Department of Natural Resources Mines and Water
(NRMIN).

If an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter,

13.

4.

15.

16.

Does the application involve operational work that is tidal work for a marina2° with more than 6
vessel berths?

INO

(1 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

Does the application involve tidal works within a strategic port land tidal area2"?
XJ NO

[YES - complete Part M of Form 1

Does the application involve development in a heritage registered place as defined under the
Queensiland Heritage Act 1992?

KINO

(1 YES - complete Part C of Form 1

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es}

(i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
LD (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
(ii) none of the above

 

Contaminated land

Applications involving material change of use and/
or raconfiguring a lot may trigger this referral.

For more information refer to Guide 5.

Unless you answered “none of the above” to Q17,
the application requires assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment manager
for the application, EPA will be a concurrence
agency for the application in relation to this matter.

 

17.

The application involves: (tick the applicable box/es)
(1 (i) reconfiguring a lot for which all of part of the premises are -
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
1 (ii) a material change of use -
{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or

(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1

Di) none of the above

 

19 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
20 Marina is defined in the Transport Operations (Maritime Pollution} Regulation 1995.
21. Strategic port land tidal areas ara the areas generally 50 metres seaward of high water mark adjacent to strategic port tand.

Page 5

Page 13

INTEGRATED PLANNING ACT 1997
Electricity infrastructure

For more information refer to schedule 2of the |P
Regulation.

Untess you answered ‘none of the above” to Q18,
the application triggers referral to the agency to
which the easement is granted in favour of as advice’
agency.

IDAS Assessment Checklist, Version 18.0, 10 November 2006

18. The application involves: (tick the epplicable boxes)

De

iii

O iil)

CI ()

(v)

reconfiguring a fot where any part of the lot is —

subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if -

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

« any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation

site;

operational work that is filling or excavation assessable against the planning scheme,

not associated with reconfiguring a lot, if —

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

« the work is located wholly or partly within 10m of a substation site;

none of the above.

 

Land designated for community
infrastructure

Applications invotving development on land
designated for community infrastructure may trigger
this referral,

For more information refer to schedule 2 of the IP
Regulation.

Ifyou answered “YES’ to Q49, the application
fequires assessment by the chief executive of the
department administering the Act authorising the
development for the designated purpose.

If an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence agency for
the application in relation to this matter.

 

Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?

(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development ~

(a)
(b)

No

for the designated purpose; or
carried out by, or on behalf of, the designator.

LI YES

 

Page 6

Page 14

INTEGRATED PLANNING ACT 1997
SEQ Regional Plan

For more information refer to schedule 2 of the !P-
Regulation.

Refer to Chapter 2, part SA and schedule 10 of the
Integrated Planning Act 1997, and schedule 2 of the
Regulatory Provisions for relevant definitions.
Unless you answered ‘none of the above” to Q20,
the application requires assessment by the Office of
Urban Management (OUM).

Fisheries matters
For more information refer to schedule 2of the IP
I

Unless you answered “none of tha above" to 021,
the application requires assessment by the
Department of Primary Industries and Fisheries
(OPI8F).

If an agency other than OPI&F is the assessment

manager for the application, DPI&F is a concurrence

agency for the application in relation to items (i) -
{iv) and an advice agency in relation to item (v).

IDAS Assessment Checklist, Version 18.0, 10 November 2006,
20. The application involves (tick applicable box/es) -
CO (i amaterial change of use of premises -
(a) ina Major Development Area in the Urban Footprint for -
OO (i) anurban activity -
(1) inan area included in a structure plan where
applies;

(J sinan area not included in a structure plan where -

e the IPA, section 3.1.6 applies to the application for the material change
of use; or

the premises exceeds 10,000m2; or

« the gross floor area (GFA) on the premises will exceed 10,000m2; or

¢ impact assessment is required under the relevant planning scheme
OO (ii) intensive animal husbandry, or

C {ii) residential development involving a rural residential purpose

the IPA, section 3.1.6

(b) in the Regional Landscape and Rural Production Area for -
1 (i) anurban activity and not specified in section 2.4(2); or
(1 (i) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the Investigation Area for -
OC (i) an urban activity and not specified in section 2.10(2);

© (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or

CC (iii) intensive animal husbandry

(1 (ii) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
{a) not included in a structure plan; and

(b) not specified in section 3.1(2).

&

21. The application involves: (tick the applicable box/es)
Oo (i) an assessable material change of use for aquaculture - complete Part O; of Form 1;

Ci (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;

Cli) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;

Li (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

(1 v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

{X] (vi) none of the above.

{iii) none of the above

 

 

Page?

Page 15

INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport

For more information refer to Guide 23, schedule 8A
of the IPA, & schedule 2 of the 1P Requlation,
Untess you answered “none of the above’, the
application triggers referral to QT as a concurrence
agency.

IDAS Assessment Checklist, Version 18.0, 10 November 2006

22. The application involves: (tick the epplicable box/es)—

C1 (i) a material change of use assessable against the planning scheme for a purpose

mentioned in schedule 13C of the iP Regulation and exceeding the thresholds set by that
schedule.

C1 (ii) reconfiguring a lot—

(C1 (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;

(J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;

(J (c) _ on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is §000m? or greater;

(1 @) fora residential purpose within the 25 ANEF contour for an airport,

CJ (e) for a residential purpose resulting in 100 or more allotments.

C1 (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

((a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
CO (b) will result in work that encroaches into an airport's operational airspace.

E&I (iv) none of the above.

 

Railway safety and efficiency

For more information refer to Guide 23, schedute 8A
of the IPA & schedule 2 of the IP Regulation,

Unless you answered “none of the above’, the
application triggers referral to QT as a concurrence
agency.

23, The application involves: (tick the applicable box/es)—

(i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule. .

CA (ii) reconfiguring a fot—

(a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(1 (b) on tand that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater,

C1 (c) on land that abuts rail corridor tand, commercial corridor tand or future railway
land, and the total number of lots increases;

(J (d) on tand that abuts rail corridor land, commercial corridor land or future railway

‘ land and an easement abutting the corridor or future railway land.is created;

{J (e)  onland that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

Ci(f) fora residential purpose resulting in 100 or more allotments.

Li (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—

Ci (a) _ is completely or partly within rail corridor tand or commercial corridor land, and
-the work is not for rail transport infrastructure or other rail infrastructure,
(1 (b) is completely or partly within future railway land, or a railway tunnel easement;
(){c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
EI (iv) none of the above.

 

Moonie to Brisbane pipeline 24,

For more information refer to schedule 2of the |P
Regulation.

Unless you answered ‘none of the above’, the
application triggers referral to the holder of pipeline
licenca No { issued under the Petroleum Act 1923,
currently Santos QNT Pty Ltd, for advice.

 

The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

(C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

D1 (i) reconfiguring a fot

. (di) operational work assessable against the planning scheme, thatis filling, excavation,

compaction, drilling, boring or piling not associated with a reconfiguring a tot, and the
__ work is located wholly or partly in the easement.
[XI (iv) none of the above.

 

Page 8

Page 16

INTEGRATED PLANNING ACT 1997

Koala habitat area
For more information, refer to Guide 26 and

schedule 2 of the IP Regulation.

Unless you answered "none of the above", the
application requires referral to the Environmentat

Protection Agency as a concurrence agency.

IDAS Assessment Checklist, Version 18.0, 10 November 2006

25. The application involves: (tick the applicable box/es)—

(1 (i) a material change of use of premises in a koala conservation area or koala _
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in ~
(O(a) clearing of native vegetation over an area greater than 2500m?;

[ (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;

(1 (©) anextension to an existing building and any reasonably associated structure if
the extension has a tota! footprint greater than 1000m?;

(1 (d) extracting gravel, rock or sand from an area greater than 5000m?;

DJ (e) excavating or filling an area greater than 5000m?;

(1 (f)\_ additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

Li (ii) reconfiguring a lot in a koala conservation area or koala sustainability area that will
result in —

(1) (a) an increased number of lots;
(1) (») clearing of native vegetation over an area greater than 2500m?.

D (ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m2,

(C1 (v) operational! work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in ~
C1 (a) clearing of native vegetation over an area greater than 2500m?;

(1 (b) extracting gravel, rock or sand from an area greater than 5000m2;
(1 (c)_ excavating or filling an area greater than 5000m?,

LX] (v) none of the above.

 

Referral coordination

An information request requires refertal coordination
if the application involves =
(i) 3 or more concurrence agencies; or
(i) a facility or area assessable under a
planning scheme and prescribed in
schedule? or 8 of the IP Regutation; or
(ili) development which is subject to an
application for preliminary approvat
mentioned in 3.1.6 of the IPA.

For more information go to Guide2 and Guide §.

26. Does the application trigger referral coordination?

BJ No
(YES, as the application: (tick the applicable box/es)

(i) _ triggers 3 or more concurrence agencies;

C1 (ii) involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation,

Ci (ii) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a lot, in an area prescribed in schedule 8 of the IP Regulation;

C1 (iv) _ is for a preliminary approval mentioned in s3.1.6 of the IPA

 

Referral agency responses prior to
lodgement .

Under $3.3.2 of IPA a referral agency may give a
referral agency response on a matter within its
jurisdiction about a proposal before an application
for the proposal is made to the assessment
manager.

This is commonty the case where an application
requires referral to a building referral agency (eg.
Qld Fira and Rescue Service).

 

27. Did a referral agency give a referral agency response under $3.3.2 of the IPA before the

application was made to the assessment manager?

&] No

(21 YES - attach a copy of the referral agency/s response/s

 

 

PLEASE NOTE:

The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the

completed DAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable fo assessment manager)

DATE RECEIVED |

| REFERENCE NUMBERIS |

Page 9

Page 17

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 18.0, 10 November 2006

 

SECTION 2 - BUILDING REFERRALS (completion not mandatory)

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

Special fire services - generally 1,

For more information go to schedule 2 table 1 and
schedute 2A of the IP Regulation.

Assessment period 15 days. No response is a
deemed refusal.

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
fequires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
(IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Building Code of Australia.

f

 

Fire safety for budget accommodation | 2.
For more information go to schedule 2 of the [P.
Regulation

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safety system for a budget accommodation
building.

 

Spray painting 3,
For more information go to schedute 2 of the !P
Regutation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.

 

Retail meat premises 4,
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
tetail meat premises.

 

Private health facilities 5.

Regulation

An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.

 

For more information go to schedule 2 of the IP

Workplace area less than 2.3m? 6.
For more Information go to schedule 2 of the |P
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m?

 

Land contiguous to a State-controlled | 7.
toad

For more information go to schedule 2 of the [IP
Regulation

An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlled road.

 

Pastoral workers accommodation 8.
For more information go to schedule 2 of the !P-
Requtation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation.

 

Child care centre 9.
For mare information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.

 

Coastal development 10.

For more information go to schedule 2 of the IP.
Regulation

An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application involves land completely or partly seaward of a coastal building line22.

 

Heritage 11,

For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place.

 

Fisheries matters 12.

For mare information go to schedule 2 of the IP
Regulation

An application may trigger referral to he Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.

 

Integration of land use and public 13.

transport
For mare information go to schedule 2 of the IP
Regulation

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace®?,

 

Railway safety and efficiency 14.

For more information go to schedule 2 of the [P
Regulation

 

 

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no

response is taken to be a deemed approval.

 

Amenity and aesthetic impact of 15,

+] particular building work for single
detached class 1 building or class 10
building or structure

For more information go to schedule 2 table 1 of the
(P Regulation,

Assessment period 16 days. No response is a
deemed approval.

 

 

An application will trigger a referral to the local government if it is «
¢ fora single detached class 1 building or class 10 structure; and *
« the local government has deciared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
~ the appearance of the building or structure would be in extreme conflict with the character of the
locality.

 

2% Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
2 Operational airspace is as defined in State Planning Policy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities”.

Page 10

 

 

Page 18

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 18.0, 10 November 2006

 

 

 

 

 

 

 

 

Whether particular buildings may be |16. An application to use an existing building that is not class 1, 2, 3 of 4 for residential purposes may trigger a

occupied for residential purposes Teferral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

IP Regutation.

Assessment period 15 days, No response is a

deemed refusal.

Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work

For mora information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.

Ip Regulation. 18. An application may trigger referral to the local government as the concurrence agency if the building work

Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal 19. An application may trigger referral to the local goverment as the concurrence agency if the building work
- does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland

. Development Code, part 14 or 12.

Fire safety in particular budget 20. An application may trigger referrat to the local government as the concurrence agency to determine the

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has

For more information go to schedute 2 table 1 of the been completed.

IP Regulation.

Assessment period 15 days. No response is 2

deemed refusal.

Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the

services building work

For mora information go to schedule 2 table 1 of the * complies with the performance criteria of the Queensland Development code part 15; and

JP Regulation and the QDC part 15. «the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No response is a

deemed refusal. .

Bullding work for residential service | 22. An application for building work for premises in which residential care service under the Residential

For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

IP Requlation and the QDC part 20. teferral to the local government as the concurrence agency.

Assessment period 15 days. No response is 2

deemed refusal.

Building work for removal or 23. An application for the removat and/or rebuilding at another site of a building or other structure, will trigger

rebuilding referral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

IP Regulation,

Assessment period 5 days. No response is a

deemed refusal. :

Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the

designated rainwater tank area

For more information go to schedule 2 table 1 of the
{P Regulation and the QDC part 25.

Assessment period 15 days. No response is a
deemed refusal.

 

building work or structure complies with the relevant performance criteria if -

Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and.

© Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

Page 11

 

Page 19

TOWN PLANNING REPORT

DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
(COMMERCIAL BUSINESS: TYPE 1 OFFICE)

@ IMPACT ASSESSABLE

MORGAN & BEIERS PTY LTD

247 DAVID LOW WAY, PEREGIAN BEACH
LOT 1 & 2 RP903222

i ken hicks

DATE: DECEMBER 2006
AND ASSOCIATES

 

Page 20

TABLE OF CONTENTS

 

EXECUTIVE SUMMARY 2
1.0 INTRODUCTION 3
2.0 DESCRIPTION OF SITE CONTEXT 4
2.1 Subject Site 4
2.2 Surrounding Land Uses 4
3.0 DESCRIPTION OF PROPOSED DEVELOPMENT 5
3.1 Description of Proposal 5
3.2 Architectural Statement 5
4.0 SUPPORTING DOCUMENTATION 6
4.1 Landscape Plan 7
4.2 Services 7
4.3 Stormwater Management 7
4.4 Traffic Impact 8
5.0 ASSESSMENT OF THE NOOSA PLAN 9
5.1 Interpretation 9
5.2 Eastern Beaches Locality Code 9
5.2.1 Assessment of Eastern Beaches Loclity Plan 9
Assessment Table for the Semi Attached Housing Zone 9
Overall Outcomes for the Eastern Beaches Locality 10
Specific Outcomes and Probable Solutions for the Eastern Beach Locality 11
Specific Outcomes and Probable Solutions for the Semi Attached Housing Zone 16
5.3 Business Uses Code 18
, 5.4 Driveways & Carparking Code 20
, 5.5 Landscaping Code 23
6.0 GROUNDS FOR SUPPORT 28
7.0 CONCLUSION 29
ATTACHMENTS
Attachment A ~ Proposal Plans prepared by Ken Down Architects
Attachment B - Landscape Plan prepared by LandGraphics
Attachment C —- Services Report prepared by Barlow Gregg & Associates
Attachment D ~ Stormwater Management Report prepared by Barlow Gregg & Associates
Attachment E - Traffic Impact Assessment prepared by Burchill VOM
Development Application for Material Change of Use Morgan & Beiers Pty Ltd

Commerclal Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach

Page 1 of 29

Page 21

EXECUTIVE SUMMARY

DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE
COMMERCIAL BUSINESS: TYPE 1 OFFICE

Applicant:

Landowner/s:

Property Address:

Property Description:

Site Area:

Local Government:

Planning Scheme:

Locality:

Zone:

Proposal:

Level of Assessment:

Referral Agencies:

Project Team:

Morgan & Beiers Pty Ltd

Morgan & Beiers Pty Ltd
A.C.N. 112 212 272

247 David Low Way, Peregian Beach

Lot 1 & 2 RP 903222

1,521sqm

Noosa Shire Council

The Noosa Plan

Eastern Beaches (Peregian Beach)

Semi-Attached Housing

Development Permit for Material Change of Use
Commercial Business: Type 1 Office (1,080sqm)

Impact Assessable (Consistent Use)

Dept. Natural Resources & Mines (Acid Sulfate Soils)

Ken Hicks & Associates — Town Planning
Ken Down Architects — Design
LandGraphics — Landscape Concept Plan
Barlow Gregg & Associates — Engineering
Burchill VOM — Traffic

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 2 of 29

Page 22

1.0 INTRODUCTION

This town planning report has been prepared to accompany a Development Application for Material
Change of Use (Commercial Business: Type 1: Office) made by Morgan & Beiers Pty Ltd.

The subject site is located at 247 David Low Way, Peregian Beach and is described as Lots 1 & 2
on RP 903222. The site has an area of 1,521sqm.

The purpose of this report is to describe the subject site and surrounding land uses whilst outlining
the proposed development. An assessment of the applicable town planning provisions guiding
development of the site has been undertaken.

The formulated project team has prepared various supporting documentation addressing issues
associated with developing the subject site including site layout and design, concept landscaping,
engineering matters, and traffic.

This town planning report should be read in conjunction with the correspondence accompanying
this development application, the IDAS Development Application Forms, and supporting
documentation.

 

Development Application for Material Change of Use Morgan & Beiers Pty Ltd
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach Page 3 of 29

Page 23

2.0 DESCRIPTION OF SITE CONTEXT

2.1 SUBJECT SITE

The subject site is located at 247 David Low Way, Peregian Beach and is described as Lots 1 & 2
on RP 903222. The area of the site is 1,521sqm with dwellings constructed on each property.
Vehicular access is achieved from the David Low Way.

The topography of the site grades slightly from the southern property boundary to the northern
boundary with a transition of approximately 1 metre.

Minimal vegetation exists on the site however selected species will be retained. Vegetation to be
retained is illustrated on the Landscape Plan prepared by LandGraphics.

The subject site is serviced by essential infrastructure including Council reticulated sewer and
water. Connection to these services and telecommunications and electricity has been addressed by
Barlow Gregg & Associates.

2.2 SURROUNDING LAND USES
The residential land surrounding the subject site comprises a mixture of housing types including
duplexes, and detached dwellings.

The Peregian Beach Bowls Club is located to the immediate west behind the site. Access to this site
is gained through Council land.

A parcel of Council owned land is located on the property north of the subject site. This property
remains undeveloped and vacant.

To the south of the site is a residential parcel of land containing a detached dwelling.

Further to the south of the site along the David Low Way is the commercial and retail hub of
Peregian Beach. This area includes a hotel, small convenience store, professional offices,
associated cafes and restaurants, newsagency, bakery, and other retail outlets.

A mixed use residential and commercia! development has also been approved by Council on the
eastern side fronting the David Low Way to the north of these commercial land uses.

 

Development Application for Material Change of Use Morgan & Belers Pty Ltd
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach Page 4 of 29

Page 24

3.0 DESCRIPTION OF PROPOSED DEVELOPMENT

The following section of this town planning report describes the proposed development and
provides an architectural statement with regards to the design of the proposal.

3.1 DESCRIPTION OF PROPOSAL

It is the intention of the applicant to remove the existing residential land uses on the subject site
and develop the property for the purposes of professional offices in accordance with the proposal
plans prepared by Ken Down Architects which are included as Attachment A.

The proposed use of the site will operate under the defined use of Commercial Business: Type 1
Office contained within the Noosa Plan document.

The proposal includes 1,080sqm GFA divided between 6 individual tenancies.

The development is 2 storeys (8m) in height and is designed to present to the David Low Way as
two individual buildings joined by a common area on the first floor level. The two buildings are
orientated on differing aspects or planes which will ultimately contribute to enhancement of the
David Low Way streetscape and reduce the appearance of one building. Adopting this design
approach, the project architect has produced a built form outcome which minimises bulk and scale
whilst promoting Council's intention for this precinct.

The design of the buildings includes balconies protruding from the upper level tenancies which will
break up the building form and contribute to adding visual interest to the building facade. This will
also give the development more of a residential type feeling as opposed to the appearance of
strictly a commercial building.

The roof form once again has been designed in order for the buildings within the development to
present as separate entities. In parts the roof fine extends to the eastern property boundary of the
site (David Low Way frontage) to create comfort in the form of shading to those pedestrians
utilising the proposed footpath along the front of the site.

The proposed materials and finishes have been selected to reflect the beachside character
associated with Peregian Beach whilst contributing to the setting of the building form for this
section of the David Low Way identified for commercial type uses.

An architectural statement has been prepared by Ken Down Architects which is included in Section
3.2 of this town planning report below.

The applicant proposes a single driveway on the southern boundary of the site which accesses 16
car parking spaces (including 1 disabled bay) on the ground level. These spaces will be screened
from the street by the physical siting and presence of Tenancy 1 and 2 in combination with the
proposed lift and stairs leading to the second level of the development. Landscaping treatments in
this area will also serve as a screening element. 38 carparking spaces are further located in a
single level underground basement configuration accessed via a graded ramp from the driveway.

An area as depicted on the proposal plans has been dedicated for the storage of waste bins. This
area has been suitably screened utilising various design treatments.

Extensive landscaping is proposed within the development layout to define and provide buffering
to adjoining property boundaries and to visually enhance the streetscape. Plantings along the
street frontage will complement the existing streetscape theme of Peregian Beach.

3.2 ARCHITECTURAL STATEMENT

The design proposition has been the result of many discussions and redrafts with the involvement
of various key members of the Noosa council assessment team including both local Councillors and
senior town planning staff to ensure the final design outcome meets the expectations of both the

 

Development Application for Material Change of Use Morgan & Beiers Pty Ltd
Commercial Business: Type 4 Office (Impact Assessable)
247 David Low Way, Peregian Beach Page 5 of 29

Page 25

Council and the community in a precinct envisaged for development following recent planning
modifications. The major design requirement was in relation to the proposed building bulk and
scale, with specific requests that the building was to appear as two separate buildings over the
amalgamated sites.

The building has been designed to respect this design philosophy, with the buitding broken into
two separate components and connected by a higher communal link that overlooks a courtyard
below. It was also imperative that pedestrians moving along David Low Way had the ability to
view between both buildings so that it presented a true massing separation, which is visible in East
Elevation SD-06.

The amalgamation of multiple sites requires only one cross over from the David Low way,
promoting a safer interface between cars and pedestrians. The cars enter and exit the proposed
development at the higher end of the site (south eastern corner) which enables the creation of a
safe, lush and communal courtyard between both buildings. This space can be occupied by
tenants at various times of the day for both leisure and work activities.

It was felt that the building had to respect and promote occupants to embrace the relaxed
atmosphere of the Peregian Beach setting, where future users can move between the inside and
out with the introduction of the court yard and individual decks off each tenancy. The decks also
succeed in creating a level of residential detail that is not typical of commercial buildings, and
mitigates the integration of commercial projects within a predominantly residential precinct.

The building fagades have been greatly articulated with the introduction of differing roof lines,
solar protective hoods, aluminium screens and habitable decks which breakdown the overall length
of each elevation. This is also out of respect to the surrounding residences.

The proposed commercial development is in a key location for the creation of a strong urban
design philosophy which will act as precedent for future commercial development along the
western face of the David Low Way.

The above mentioned design concepts are presented in order to justify a minor relaxation on the
site cover calculation. It is important to note that the proposed building adheres to all setback and
height requirements, particular that of the southern boundary where the only existing residence is
located.

The important issue is that the community of Peregian Beach welcomes buildings that respect the
history and regiona! context of the surrounding area and allow for growth in particular nodes which
council recognizes as areas for future development.

 

Development Application for Material Change of Use Morgan & Beiers Pty Ltd
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach Page 6 of 29

Page 26

4.0 SUPPORTING DOCUMENTATION

4.1 LANDSCAPE PLAN

The applicant has commissioned LandGraphics to prepare Landscape Concept Plans illustrating the
proposed landscaping treatments to be implemented with the development layout. The treatments
include:

* — streetscape works including footpaths and landscaping along the David Low Way frontage
of the site;

* vegetation species existing on the site to be retained;

* landscaping strips along the key boundary interfaces;

= screen planting to the adjoining Peregian Beach Bowls Club.

Comment: the proposed landscaping treatments will visually enhance the proposed development
whilst contributing to define the future streetscape theme of this section of Peregian Beach. The
Landscape Plans are included as Attachment B.

4.2 SERVICES

The applicant has commissioned Barlow Gregg & Associates to investigate the developments ability
to connect to essential services. The associated Water and Sewer Services Report is included as
Attachment C and is summarized below.

= @ sewer main enters the subject site at the north western corner and extends approx
15m into the site along the rear boundary. It appears from council records that multiple
service connections are available. An additiona! sewer connection point is available at the
south western corner of the site. The site is adequately serviced with sewerage
reticulation.

* a water connection shall be provided from the reticulation main in David Low Way. This
would be the most appropriate connection point for a water service to the site. Council
advise that the current infrastructure is adequate for the proposed redevelopment of the
site. The preferred existing sewer service connection will be maintained and the
remainder to be capped and sealed at the service point. Council advise that the current
infrastructure is adequate for the proposed redevelopment of the site.

Comment: the proposed development can connect to Council reticulated sewer and water supply.

4.3 STORMWATER MANAGEMENT

The applicant has commissioned Barlow Gregg & Associates to prepare a Stormwater Management
Report including a Stormwater Management Strategy. The associated report is included as
Attachment D and is summarized below.

* the stormwater drainage system for the proposed development will be designed in
accordance with QUDM and AS3500 Part 5;

« — runoff from as much of the external area of the development as is practicable will be
conveyed to landscaped areas for infiltration. Surface runoff external to the building will
be allowed to flow through landscaped areas as far as practicable to allow infiltration to
occur;

= runoff from the site will be discharged into a proposed new stormwater gully pit to be
located at the frontage of the site. From there a stormwater pipe will convey discharge
into the existing stormwater manhole some 25m north of the site on the David Low Way.
As this system is under Council control it is proposed that this is a lawful point of
discharge;

» where runoff enters the proposed grated drain, it will be treated by a gross pollutant trap
prior to discharge to the proposed stormwater pit at the frontage of the site.

 

Development Application for Material Change of Use Morgan & Beiers Pty Ltd
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach Page 7 of 29

Page 27

Comment: Barlow Gregg & Associates note that the implementation of this Stormwater
Management Plan will ensure that the proposed development would not create a nuisance to other
landowners, or degradation of the environment due to its effects on the hydraulics and hydrology
of the site.

4,4 TRAFFIC IMPACT

The applicant has commissioned Burchill VDM to undertake a Traffic Impact Assessment assessing
potential impacts of the proposed development and the proposed car parking configuration. The
associated report is included as Attachment E and is summarized below.

= Council propose to upgrade the section of David Low Way between Herron Street and
Woodland Drive to address traffic issues associated with the expected development as per
the Peregian Beach Master Plan. This includes the construction of a roundabout at the
David Low Way / Woodland Drive / Ibis Street intersection and a raised median extending
from the roundabout to Herron Street. This will restrict turns at driveways along the
section to left in / left out. Vehicles wishing to turn right will need to conduct U turns at
either the Herron Street roundabout or Woodland Drive roundabout;

= the total office space GFA of the proposal is 1080sqm. Using the applicable RTA rates this
gives a total traffic generation for the site of Peak Hour Trips 22 trips and Daily Trips 108
trips

= as Council propose to construct an unbroken raised median past the site between
Woodland Drive and Herron Drive, future access to the site will be restricted to left in and
left out only.

* the two way, 6.0m wide driveway access is considered adequate for the site and should be
constructed as per AS 2890.1: 2004 Parking Facilities - Off Street Car Parking, and
Council’s Noosa Plan 2006 — Part 14 Assessment Criteria for Development for a Stated
Purpose or of a Stated Type.

* As per Council’s Noosa Plan 2006, 1 car parking space per 20sqm GFA is required. The
Proposal will be 1080sqm GFA, which equates to a requirement of 54 spaces. 54 spaces
will be provided as part of the proposal, which complies with Council’s requirements.

* Vehicles likely to service the site include maintenance vehicles, emergency vehicles
(ambulance), small delivery vehicles and garbage trucks. Garbage collection will be from
the frontage of the site via either a kip bin or wheelie bins. Vehicles likely to service an
office development will be delivery vans and smal maintenance vehicles accessing the site
on an irregular basis. Casual parking for these vehicles has been accommodated in the
parking rate specified in the Noosa Plan 2006.

Comment: Burchill VDM conclude by noting that the internal layout is considered adequate for the
site and the number of car parking spaces provided complies with Council's requirements. The
traffic impacts of the proposed office development on the external road network are expected to
be minimal and there are no reasons in terms of traffic impacts that the proposal should be
refused provided the recommendations stipulated in the report are considered.

 

Development Application for Material Change of Use Morgan & Beiers Pty Ltd
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach Page 8 of 29

Page 28

—_

5.0 ASSESSMENT OF THE NOOSA PLAN

The following section of this town planning report undertakes an assessment of the proposed
development against the applicable provisions of the Noosa Plan document.

5.1 INTERPRETATION

Section 2.11 of the Noosa Plan outlines the defined uses and use classes applicable to the
development of land with the Shire. The proposed development as described in Section 3.1 of this
report is best defined as Commercial Business: Type 1 Office. The definition is included below.

Commercial business means the conduct of a business activity, where a service is offered or
provided and that service is not more clearly defined by other business or community uses. The
term includes the following types.

Type 1 Office: the use of premises for a commercial business conducted in an office environment.
The use includes a band, professional office, travel agent, and estate sales office.

Comment: the proposed development fits within the above definition as professional offices are
proposed which will offer a service to the Peregian Beach and wider community.

5.2 EASTERN BEACHES LOCALITY

Part 7 of the Noosa Plan and in particular Zone Map ZM4 identifies the subject site within the
Eastern Beaches Locality in a Semi-Attached Housing Zone. The site is not covered by any Overlay
mapping though the property fronts a Major Road Network being the David Low Way.

5.2.1 ASSESSMENT OF EASTERN BEACHES LOCALITY PLAN

Assessment Table for the Semi-Attached Housing Zone

The following table of assessment outlines the level of assessment for the development of
land within the Semi-Attached Housing Zone in the Peregian Beach Locality for the purposes
of a Commercial Business: Type 1 Office land use.

Business Uses

 

Consistent use

Home-based business Type 1
Limited visibility or

Type 2 Evident;

or

Type 3 Significant scale where
located on the westem side of
David Low Way between 215 and
253 David Low Way

or

Commercial business Type 1
Office or Type 2 Medical where
located on the westem side of
David Low Way between 215 and
253 David Low Way.

Inconsistent use
Those Business Uses
listed in Section 7.17

 

 

Self-assessable if Home-based
business Type 1

Code assessable if—

Home-based business Type 1 and
not complying with Column 2 of
Table 14.7, Acceptable Solutions
$21.1 to S26.1 of the Business Uses
Code

impact assessable if—

a) Commercial business; or

b) Entertainment and dining
business; or

c) Home-based business Types 2
or 3; or

d) Industrial business; or

e) Retail business

 

\f se/f-assessable—

Column 2 of Table 14.7,
Acceptable Solutions $21.1 to
$26.1 of the Business Uses Code

\f code assessable—
Business Uses Code

 

 

Comment: the proposed use of the subject site for the purpose of Commercial Business: Type
1 Office is listed in Column 1 as a Consistent Use where located on the western side of David
Low Way between 215 and 253 David Low Way (Note: the subject site is located at 247 David
Low Way). Column 2 notes that all Commercial Business proposals will be subject to Impact

Assessment.

 

Development Application for Material Change of Use

Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 9 of 29

Page 29

Overall outcomes for the Eastern Beaches Locality
The following table undertakes an assessment of the proposed development against the
applicable Overall Outcomes of the Eastern Beaches Locality.

ON sec HMelel cee laits} Proposal

a) New uses and works are located, designed and
managed to—

i be compatible with other uses and works;

ii maintain the safety of people and works;

iii avoid significant adverse impacts on the amenity
enjoyed by users of other premises, including acoustic
and visual qualities;

iv avoid significant adverse Impacts on the natural
environment, including native habitat removal,
fragmentation and attrition; and

Vv protect the natural beach experience and overall
visual amenity for beach users;

b) The Eastern Beaches Locality retains its primary role
as a residential area, though continues to provide
some visitor accommodation and a range of local retail
and commercial functions at Sunshine Beach, Sunrise
Beach and Peregian Beach;

¢) The scale and form of buildings and other structures
are—

i designed to be responsive to the informal beachside
character of the locality, being low rise buildings, with
pitched or curved roofs and building materials that
blend with the dune and coastal landscape;

ii in keeping with the surrounding streetscape and
landscape qualities;

ifi integrated into the topography and native vegetation
of the dune system which dominates the locality; and

iv consistent with the amenity and safety expectations
of the community;

p) For Peregian Beach—

 

 

The proposed development is the first redevelopment of
those sites identified on the western side of David Low
Way. The proposal is considered to have produced a
desirable built form outcome for the site and will set the
standard for design of further buildings in this defined
precinct.

The proposal maintains the safety of people and works.

The site adjoins a bowls club and one detached dwelling
only. It is considered that amenity of other premises will
not be impacted upon in light of the proposal.

The site will retain some existing vegetation as indicated
on the Landscape Plan prepared by LandGraphics.

The visual amenity of the precinct will be enhanced by
the building design and final built product and the
extensive landscaping treatments proposed,

The proposal includes professional offices which are
listed as a consistent use within those properties on the
western side of the David Low Way between 215 and
253 David Low Way.

The proposal incorporates design elements which reflect
the beachside character of Peregian Beach including
landscaping and the building materials and finishes. The
roof line will prove visually appealing and complements
existing residential forms in the locality. The building
has been designed in accordance with the height
prescribed in the Planning Scheme of 2 storeys (8m).

Given this site is the first for redevelopment along this
section of the David Low Way, the landscape qualities
together with how the building presents to the street
has been considered. Landscaping will complement that
existing to the south along the David Low Way in
proximity to the Hotel and round-about and will add
visual interest to the development.

Not applicable

The development is considered a good outcome for the
site and community as a whole as the design truly
reflects a beachside character associated with Peregian
Beach. The safety of the users of the David Low Way
being pedestrians or motorists will ensured through the
provision of one access point only from the
development.

Not applicable

 

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 10 of 29

Page 30

 

i Peregian Beach provides a mix of detached houses,
Multiple housing and Visitor Accommodation for
residents and visitors;

ii Multiple housing Type 2 Duplex and Visitor
Accommodation Type 4 Conventional are located
in close proximity to the Peregian Beach
neighbourhood centre shown in the Neighbourhood
Centre Zone;

iii a wide range of local Retail, Commercial and
Entertainment and Dining Uses within the
neighbourhood centre serve the immediate needs of
residents and visitors of the locality;

iv the neighbourhood centre provides an informal
village-like atmosphere, with a low key, attractive and
safe village square that engenders a ‘sense of place’
and a public focus for local community interaction and
activity; and

v the sense of arrival to the coastal communities
of Noosa Shire from the south is emphasised and
enhanced;

 

 

Not applicable

Commercial uses in the form of professional offices are
proposed which will service Peregian Beach and
surrounding communities.

Not applicable

The proposed design outcome for the site will act as an
attractive entry feature for those residents or visitors
from other parts of the Shire who pass through or visit
Peregian Beach. The development will essentially be the
first visible key building heading into the beachside town
from the north. It is considered that the building
sufficiently takes advantage of this key location with
extensive landscaping and a modern built form product.

 

Comment: The proposed development meets the Overall Outcomes of the Eastern Beaches

Locality applicable to the site.

Specific Outcomes and Probable Solutions for the Eastern Beaches Locality
The following table undertakes an assessment of the proposed development against the
applicable Specific Outcomes and Probable Solutions of the Eastern Beaches Locality.

Column 1
Specific Outcomes

Leith te
Probable Solutions (if Code

Proposal

Pel

7.9 EFFECTS OF USE

 

Amenity

O1 Uses are located, designed
and operated to avoid significant
adverse changes to the light, air
quality, noise, accessibility or
other conditions enjoyed by users
of associated, adjoining or nearby
uses.

No prescribed solution

Complies

The proposal will not significantly
impact upon the existing amenity of
users of the area.

 

Character and function of the
David Low Way

the David Low Way is protected
and new development recognises
and protects the function,
capacity and efficiency of the
David Low Way as the major
north-south link throughout the
coastal part of the Shire.

2 The vegetated character of | No prescribed solution

Complies

The vegetated character of the
David Low Way will be protected
through the retention of selected
species on the development site.
Extensive supplementary plantings
are proposed which will be
consistent with the streetscape
theme of the David Low Way.

 

7.10. BUILT FORM

 

Density

03 The density of development
within the site area—

a) is compatible with surrounding

 

 

No prescribed solution

Complies
The proposal has been designed to
present as two individual buildings

 

development; designed to a height in accordance

and with the Planning Scheme. The
density is not considered excessive

b) does not exceed— in light of the commercial nature of

 

 

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)

247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 11 of 29

Page 31

Column 1 rele Proposal
Specific Outcomes bable Solutions (if Code
BSS]

 

 

ii. for the Semi-Attached Housing the development.

Zone:

A. for sites between 500m2 and The proposal will set the design

599m2 inclusive - 4.8 persons; or standard for future developments of

B. for sites 600m2 or more - 6.6 this nature between 215 and 253

persons. David Low Way.

Height

04 Buildings and other $4.1 Buildings and other structures Complies

structures— have a maximum height of — The proposed development is

a) are low rise and present a located in the Semi-Attached

building height consistent with e) in all other zones— 8m. Housing Zone. Accordingly, the

structures on adjoining and development has been designed to a

surrounding land; maximum height of 2 storeys (8m)
as depicted on the proposal plans

b) do not exceed a maximum prepared by Ken Down Architects.

height of—-

iii. For any other zone— 2

storeys;

c) do not visually dominate the
street, adjacent properties,
surrounding spaces or the
existing skyline;

d) preserve the amenity of
surrounding land, including
existing sunlight to neighbouring
properties; and

@) respect the scale of the dune
and coastal vegetation.

 

Setbacks
OS Buildings and other structures | $5.1 Buildings and structures comply | Specific Outcomes

are appropriately designed and with the minimum building setbacks Schedule 1 — Minimum Boundary
sited to— Identified in Schedule 1 - Minimum Setbacks of the Planning Scheme
Boundary Setbacks. does not specify minimum boundary
setbacks for the subject site.
Accordingly the siting provisions of
Parts 11 and 12 of the Queensland
Development Code apply. Upon
review of these applicable Parts it is
determined that these setback
provisions are for detached houses.
In this case the Specific Outcomes
have been drawn upon to justify the
proposed building setbacks.

a) provide amenity for users of The design of the building provides
the premises as well as preserve visual privacy to adjoining premises
the visual and acoustic privacy of through screening elements

adjoining and nearby properties; introduced on the building. Further,

the extensive landscaping and the
setting forward of the building
towards the David Low Way frontage
creates pedestrian comfort through
the creation of shade and attractive
streetscape treatments.

b) provide adequate distance Ken Down Architects advise that the
from adjoining uses; side boundary setbacks have been
derived from the Standard Building
Regulations. In any case, the only
immediate neighbour is on the
southern property boundary. The
development has been appropriately
treated on this interface as the
driveway entering the development
is located on this boundary. Fencing

 

 

 

 

 

 

Development Application for Material Change of Use Morgan & Beiers Pty Ltd
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach Page 12 of 29

Page 32

roo ies
Specific Outcomes

   

¢) preserve any existing

proposed building;

provided between buildings;

and pattern of buildings and

street; and

and visual amenity of the
beachfront.

vegetation that will buffer the

d) allow for landscaping to be

e) maintain the visual continuity

landscape elements within the

f) protect the natural character

fers
Probable Solutions (if Code
Sec

Proposal

and landscaping is proposed.

Existing vegetation will be retained
as indicated on the Landscape Plan
prepared by LandGraphics.

Landscaping is provided between the
proposed buildings.

The devetopment will set the built
form standard for buildings along
this section of the David Low Way.
Landscape elements previously
introduced will be incorporated.

The visual amenity will be improved
due to the construction of a modern
and architecturally designed building
reflecting the beachside character of
Peregian Beach.

 

and plot ratio

development;

b) does not present an
appearance of excessive

the site;

additional! soft landscaping
between buildings;

ground level for outdoor

and

management and vehicular
access.

Zone—40%;

 

Site cover, gross floor area
Q6 The site cover, gross floor
area and plot ratio of buildings
and other roofed structures—

a) results in a building scale that
is compatible with surrounding

bulk to adjacent properties, roads
or other areas in the vicinity of

c) maximises the retention of
existing vegetation and allows

d) allows for adequate area at

recreation, entertainment, clothes
drying and other site facilities;

e) facilitates onsite stormwater

07 Site cover does not exceed—

b) for the Semi-attached Housing

 

No solution provided

 

Complies

The building scale presents as two
buildings. It is considered that given
the surrounding sites have not been
developed achieving maximum
development potential in line with
the Noosa Plan (ie 215 to 253 David
Low Way) that the proposal is
setting the scale and built form
outcome for this section of the David
Low Way.

Complies

The development will not appear
excessively bulky when viewed from
adjacent properties or the David Low
Way. This is best represented in the
perspective drawings prepared by
Ken Down Architects.

Complies

The retention of existing vegetation
has been achieved with soft
landscaping areas between the
building and side boundaries.

d) Not applicable

Complies

The proposal facilitates onsite
stormwater management and
vehicular access.

Performance Based Outcome
The site cover of the proposed
development has been derived
based on the definition of the
Planning Scheme. The site cover is
51% and is justified below this

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (impact Assessable)

247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 13 of 29

 

Page 33

Column 1
Tero rem Ol iment ed

beeliTiia
Probable Solutions (if Code
Be

 

Proposal

assessment.

 

Roof form

013 Roof forms—

a) contribute positively to the
local skyline;

b) complement the beachside
character of the locality;

¢) use soft and articulated
pitched or curved roof
forms;

d) avoid low pitched (eg. less
than 5 degrees) or box
profiles/parapets; and

e) do not create opportunities for
residents to overlook the private
open space areas of neighbouring
properties.

$13.1 The main roof of the building
has a roof pitch no less than 5
degrees and has roof overhangs a
minimum of 600mm wide;

AND

$13.2 Buildings and structures do
not include roof top terraces.

Complies

The proposed roof line of the
building has a roof pitch exceeding 5
degrees with roof overhangs
achieving the minimum 600mm
requirement.

 

7.11 Environment, Conservation and Recreation

 

Environment and cultural
heritage values

016 There are no significant
adverse effects on biodiversity,
natural vegetation, native fauna
habitat, landscape quality, water
quality or cultural

heritage values, including those
related to—

a) changes to natural drainage;

b) changes to natural coastal!
processes;

c) disturbance of the dune
system and wetiand system;

d) management of landslide and
fire risk;

e) erosion and the transport of
sediments off site;

f) unmanaged public access;
g) effluent disposal;

h) changes to fauna habitat and
behaviour; and

i) disturbance of Suiidings and
features, including natural
features of cultural heritage
significance.

No solution provided

Advisory note

PSP24 - Effluent Disposal details
requirements for the design and
siting of effluent disposal systems
where located outside a sewerage
service area. Compliance with PSP24
wilt be considered as part of Council’s
assessment of the plumbing and
drainage application.

Complies

The proposal does not have any
significant effects on the biodiversity,
native vegetation, native fauna,
landscape quality, water quality or
cultural heritage values in the
locality.

 

 

Open space network

017 An integrated open space
network is established, enhanced
and protected throughout

the locality to—

@) provide for both passive and
active recreational pursuits;

b) provide connectivity for
pedestrians and cyclists,

 

$17.1 Open space corridors and
existing native vegetation in areas
indicated in Schedule 5 - Map 4 are
protected from fragmentation and
encroachment by development.

 

Complies

The proposed development does not
adversely impact upon open space
corridors in the area.

 

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 14 of 29

Page 34

Column 1 Column 2 Proposal
ific Outcomes Probable Solutions (if Code
DES)

 

¢) provide habitat connectivity for
wildlife;

d) protect watercourses and
drainage lines;

e) protect vegetation on steep
slopes; and

f) form a scenic backdrop for
residential development.

 

Pedestrian and bicycle

pathways

018 Safe and convenient $18.1 Pedestrian and bicycle Complies

pedestrian and bicycle pathways pathways are provided and retained The pedestrian and bicycle path will
are provided and retained where indicated in Schedule 5- Map | be retained along the frontage of the
between and throughout key 2; site.

destinations including—
AND
a) an east-west link between the
beach and the northern end of $18.2 Contributions toward a
Lake Weyba via Burgess Pathways Network are provided in
Creek; accordance with PSP20.

b) a north-south link between the
Noosa National Park to the north
of the locality and the Shire
boundary near Peregian Beach;
and

¢) links within and around
Sunrise and Sunshine Beach
linking business and community
uses with residential
development.

 

 

 

 

 

Comment: the proposed development meets the Probable Solutions of the Eastern Beaches
Locality Code and where applicable the Specific Outcomes have been utilised to justify any
relaxation. As described in the assessment the proposal does not meet the requisite site cover
provision of 40%. The increased site cover is justified below:

* the proposed development is architecturally designed and will present to the street as
light-weight buildings. The development is not considered to be bulky in nature and
will not dominate the streetscape;

« — the building footprint on the ground level of the development is minimal and in fact is
dominated landscaping and by car parks which are screened from the street by
extensive buffer treatments and the presence of the proposed buildings. Only 2
tenancies are proposed on this ground floor level.

The site cover measurement exceeds the 40% minimum largely due to the first floor
level of the building designed over the car park at the rear of the development. Once
again, this section of the building will be screened from the David Low Way frontage
having minima! impacts on amenity of the locality.

* the proposal includes many design elements to articulate the development and to
meet other Probable Solutions of the Planning Scheme Codes including balconies,
interesting roof forms and screening treatments. This will break up the fagade and
building as a whole and will serve to further create residential character rather than
commercial and promote Council’s intended beachside theme.

 

Development Application for Material Change of Use Morgan & Beiers Pty Ltd
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach Page 15 of 29

Page 35

= albeit the increased site cover the development meets the minimum provision under
the applicable Planning Scheme Codes for landscaping (10%) and provides the
required minimum number of car parks.

Specific Outcomes and Probable Solutions for the Semi Attached Housing Zone
The following table undertakes an assessment of the proposed development against the
applicable Specific Outcomes and Probable Solutions of the Semi-Attached Housing Zone.

Column 2
eg) sr L (mt

feos Proposal

BO)

 

7.16 Consistent Uses
032 The following defined uses | No solution provided
and use classes are consistent
uses and are located in the Semi-
Attached Housing Zone—

 

Complies

The proposed Commercial Business:
Type 1 Office use is listed as
consistent uses within the Semi-
Attached Housing Zone.

c) Commercial business Type
1 or 2, where located on the
western side of David Low Way
between 215 and 253 David Low

 

 

Way;

7.19 BUILT FORM

Streetscape character

035 Buildings and other $35.1 The main entrance of the Complies

structures— building faces and is recognisable The main entrance of the building

from the street; faces the street and is easily

a) contribute positively to the recognisable.
streetscape character by AND

addressing the street and adding

visual interest through stepping $35.2 Buildings and other structures

the front facades; are designed to—

b) have a bulk and architectural a) have maximum wall length of 15m | Complies

scale that does not dominate the
streetscape or detract from the
visual amenity of adjoining
Properties;

and each external wail plane
incorporates at least one design
element to add visual interest and
amenity (such as windows, pergolas,
sun shading devices, balconies or a
¢) present as a smail building of a | change of building material).
domestic scale within a
landscaped setting; and

The proposal achieves this
requirement with feature elements
proposed on the building facade.

b) vary and break up the roof form Complies

d) present well articulated
facades where garages or

the street;

carports are not the dominant
visual element when viewed from

through gables or different pitches to
add visual interest and define the
individual dwelling units (see Figure
7.2, Figure 7.3 and Figure 7.4);

d) break up building facades by
incorporating different but
complimentary textures and building
materials; and

e) visually break up the bulk of the
building by integrating tall plant
species in front of and to the side of
buildings

The proposal includes an interesting
and modern roof line and pitch
reflecting the beachside character of
Peregian Beach.

Complies

The building facade will be
extensively articulated as reflected
on the proposal plans.

Complies

A variety of landscaping will be
introduced to add visual interest to
the development.

 

Professional offices

038 Professional offices along
the western side of David Low
Way between Woodland Drive
and the Peregian Beach Caravan
Park are designed and located
to—

No solution provided

a) present a domestic scale and
form of architecture, rather than
commercial, when viewed from
the street and surrounding

Complies

The proposed development will
present to the street as two
individual buildings with a common

 

 

 

 

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 16 of 29

Page 36

feria
Probable Solutions (if Code
Eee)

Column 1
Specific Outcomes

Proposal

properties; area linking the buildings on the
second level. This achieves Council’s
intention to retain a domestic
residential type scale. The proposal
will set the character for the
remaining properties in this precinct
to be redeveloped in accordance
with the Planning Scheme.

b) accommodate small-scale
businesses that conform with the
amenity of surrounding
residential properties;

Complies

The proposal accommodates
professional offices which are a low
impact use, Amenity will be

preserved,

¢) protect the visual and acoustic

privacy of adjoining and nearby Complies

residential properties; Visual and acoustic privacy will be
maintained.

d) provide for car parking at the

rear of the site; and Complies

Parking is provided at the rear of the
) avoid the generation of high site and in a basement configuration.
volumes of traffic and customer
car parking. Complies

Refer to traffic report accompanying
this town planning report. The
proposed use Is considered to have a
low customer and employee turnover
and will not generate high volumes
of traffic.

 

Front fences and walls

designed and sited
to—

a) contribute to the
attractiveness of the street,

039 Front fences and walls are

$39.2 For premises with frontage to
the major road network front fences
or walls are no more than 1.8m in
height and are articulated so that a
minimum total of 2m of landscaped
area is provided between the fence
and the front property boundary.

Complies

No fencing is proposed along the
frontage of the site in order to
promote an attractive entry to the
building and to create a landscape
theme along the David Low Way.
Fencing would detract from the

b) be compatible with the
existing streetscape character;

overall outcome seeking to be
achieved.

c) relate to the architectural
period of the building;

d) avoid interference with the
movement of surface
stormwater;

e) allow for casual surveillance
from the street or where
premises adjoin part of the major
road network, mitigate traffic
noise;

f) provide for planting in front of
high solid fences and walls; and

g) ensure planting between the

front fence and the footpath does

not create an impediment for
edestrians using the footpath.

 

 

 

 

 

Comment: the proposed development is considered to sufficiently meet the Probable
Solutions and Specific Outcomes of the Semi-Attached Housing Code.

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 17 of 29

Page 37

5.2 BUSINESS USES CODE

An assessment of the proposed development against the applicable provisions of the Business Uses
Code has been undertaken in the table below.

Column 1
Jerome i caer nd

14.17 Effects of Use

fooled
Probable Solutions (if Code
Ses)

 

 

Electricity infrastructure
01 The development does not
adversely impact on existing or
future electricity supply
infrastructure;

$1.1 No solution provided

Complies

The proposal wil! not adversely impact on
existing or future electricity supply
infrastructure.

 

14,18 Amenity

 

Noise

03 Development is designed and
sited to avoid noise emissions that
unreasonably diminish the amenity
of the area or surrounding uses.

No solution provided

Complies

The proposal is designed to avoid
unreasonable noise emissions through the
establishment of a fence along the
southern boundary where the adjoining
residential use exists. This will mitigate
the nolse generate by vehicles entering
and exiting the basement and site.

 

Mechanical plant and
equipment and storage areas
4 Mechanical plant and
equipment (including air
conditioning equipment) and
storage areas are designed and
located to—

a) avoid adverse visual impacts
when viewed from the street and
adjoining properties; and

b) visually integrate with the
building design.

$4.1 Mechanical plant and
equipment are—

a) located more than 2m from any
property boundary;

b) where located at ground level,
screened by fencing 1.5m in height
or dense vegetation of at least 1.5m
in width incorporating grouped trees
and shrubs with maximum
separation distance of 1m measured
from the centre of the tree or scrub;
and

C) are visually integrated into the
line and plane of the building and
roof design and do not project
beyond the height or width of the
building when viewed from the
street and adjoining properties,

Complies

All mechanical plant and equipment will
be visually integrated within the building
and located to avoid adverse visual
impacts when viewed from the street and
adjoining properties.

 

Safety and security

OS All property boundaries are
clearly identifiable with public and
private spaces clearly defined.

Q6 All premises and access routes
are clearly identifiable to all
persons, particularly emergency
services personnel.

Q7 All building entries are
designed to be obvious and easily
identifiable.

 

 

$5.1 Boundaries are identified by
such means as -

a) fencing; or

b) changes in surface materials or
levels;

or

C) landscape treatments.

S6.1 All premises are identified by
the provision of the street number in
@ prominent location, preferably
near the site entry, (i.e. on the kerb
or letterbox or by signage on the
building or site).

$7.1 The number of entrances and
exits are limited and main building
entrances/exits are located at the
front of the site, in view of the
street. Where this is not possible,
due to site or existing building
constraints, a well defined path is

 

Complies

Boundaries are identified though fencing.
Front property boundary is identified
through landscaping treatments.

Complies

The premises will be clearly identified with
the street number in a prominent
location.

Complies
The entrance to the building is easily
identifiable.

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)

247 David Low Way, Peregian Beach

Morgan & Belers Pty Ltd

Page 18 of 29

 

Page 38

 

coo g
Specific Outcomes

O8 Uses are arranged within
buildings and on sites to enable
external areas to be monitored.

010 Buildings and structures are
designed to minimise opportunities
for vandalism.

011 Lighting of appropriate
intensities is provided
to maximise safety.

 

cero ed
Pacer cmera Use ae CL lel 3
Cees
provided to the entrance/exit;

and

$7.2 All entrances/exits to buildings,
are lit and signed, and signage
includes hours of operation; and

$7.3 Entrances/exits are located to
provide a direct link to driveways
and carparking areas; and

S7.4 Recessed doorways are
avoided where the recess is of
sufficient size to conceal a person,
Where recessed doorways are
unavoidable, measures are used to
enhance safety, as follows—

@) good lighting installed;

b) strategically placed mirrors
installed;

¢) angled approaches provided; or

d) gates which restrict access
provided.

$8.1 Windows and main entrances
are positioned to allow for casual
surveillance.

$10.1 Buildings or structures that
are visible from a public street or
laneway—

a) avoid the use of solid fences and
blank walls which attract graffiti.
Where solid blank surfaces are
unavoidable, creepers, murals,
vandal resistant paint, etc are used;
and

b) use toughened glass, security
screens and other measures (but not
including security shutters that
obscure the view of shopfronts) are
used in windows which are provided
at ground level, to deter break and
enters; and

c) use hardy vandal proof materials
and anti-graffiti paint are used in the
construction of buildings.

$11.1 Lighting of appropriate
intensities is provided which satisfies
the requirements of Australian
Standard AS1158: Public Lighting
Code, unless otherwise specified in
this Code; and

$11.2 External lighting of a
graduated intensity is provided
which starts at a lower level of
brightness at the perimeter of the
site and rises to a higher level at the

 

Proposal

Complies
Hours of operation will be clearly signed.

Complies

Car parking is accessible to the building.

Complies
The doorways will be easily identifiable.

Complies
Surveillance is promoted.

Complies
Solid fences are not proposed.

Complies
Such materials will be incorporated.

Complies
As above,

Complies
Appropriate lighting will be installed.

Complies
Appropriate lighting will be installed.

 

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 19 of 29

Page 39

Column 1
Outcomes

 

Too

Column 2
Probable Solutions (if Code
Eee
entrance to buildings or at the
centre of the site; and

$11.3 Lighting is directed onto the
site and away from neighbouring
properties; and

$11.4 Vandat-resistant lighting is
used in public and publicly accessible
areas.

Proposal

Complies
Appropriate lighting will be installed.

Complies
Appropriate lighting will be installed.

 

Shower and storage facilities
012 For Commercial business
or Retail

business premises with a gross
floor area exceeding 500m’,
shower and storage facilities are
provided to meet the needs of
owners and staff.

$12.1 At least 1 unisex shower and
1m? of locker or cupboard space Is
provided for every 500m? of gross
floor area.

Complies

Storage is provided in the basement
together with public amenities on the
ground and first floor of the development.

 

Site facilities

013 Waste storage areas, external
storage areas and loading docks do
not detract from the visual amenity
of the streetscape or cause
nuisance to adjoining properties.

 

 

$13.1 Waste storage areas, external
storage areas and loading docks are
situated to the rear of the building or
under the ground; or

$13.2 With the exception of the
access way, waste storage areas,
external storage areas and loading
docks are visually screened by
landscaping or fencing.

 

Complies

Refer to the proposal plans prepared by
Ken Down Architects which indicate the
location of the screened waste storage
area.

 

Comment: the proposed development meets the Probable Solutions and Specific Outcomes of the

Business Code.

5.3 Driveway and Carparking Code
An assessment of the proposed development against the applicable provisions of the Driveway and
Carparking Code has been undertaken in the table below.

Column 1
Specific Outcomes

14,130 General

ree
dceler i-mode CL mele l 1
Assessable)

dee rk:

 

O1 Vehicular access does not
adversely impact on safety, capacity
and operations of the existing or
planned road network, the proposed
driveway, cycleways or pedestrian
pathway systems.

designed in accordance with
AUSTROADS Guide to Traffic

sight distance and Section 3 of
AS2890.1 Parking Facilities;

AND

$1.2 Only one footpath crossing is
provided;

AND
setback have a maximum grade in

accordance with Section 3 of
AS/NZS2890.1

$1.1 Vehicular access is located and

Engineering Practice requirements for

$1.3 Driveways, other than within any

Complies

The proposed driveway location offers
safe sight distances. The David Low
Way speed limit is 60 km which
requires a minimum site distance of
65m under AS2890.1 which is
achievable.

Complies
One footpath crossing is provided.

Complies
The driveway is designed to meet the
applicable standards.

 

 

02 Driveways and crossovers—

a) are suitable and safe for their
intended use; and

 

$2.1 Design of the driveway across
the footpath is in accordance with
Council’s Standard Drawings 9002 or
9005 as appropriate for the particular

 

 

Complies

Driveways and crossovers will be
constructed to a suitable and safe
standard to match existing Council

 

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 20 of 29

Page 40

Column 1
Specific Outcomes

b) match Council infrastructure.

Column 2
Pareles] (merolteeelin (im Meter)
See
type of development as annotated on
the drawings;

AND

$2.2 Driveways are designed and
constructed in accordance with Council
Standard Drawings 9014, 9019, 9020,
9021, as appropriate for the particular
type of development as annotated on
the drawings;

AND

$2.3 The change in grades in the
driveways and ramps is in accordance
with Section 3 of AS2890.1 Parking
Facilities.

Proposal

infrastructure.

Complies
Driveways have been designed in
accordance with applicable standards.

Complies

The basement ramp has been
designed in accordance with
applicable standards.

 

04 Vehicular access does not
adversely impact on the capacity,

existing infrastructure;
AND
O5 Vehicular access does not

existing landscaping or native
vegetation.

 

operations and maintenance of the

adversely impact on the integrity of

$4.1 Footpath and kerb crossings are
located clear of existing stormwater
inlet structures, water and sewerage
infrastructure fittings, any other
exiting utility infrastructure, existing
landscaping and vegetation.

$5.1 No solution provided

 

 

Complies
Existing infrastructure will not be
affected by the proposed site access.

Complies

Vegetation will be retained where
indicated on the Landscape Plan
prepared by LandGraphics,

 

Table 14-46 — Carparking and manoeuvring

oul s
Specific Outcomes

14.132 Carpark design and layout

Column 2
Probable Solutions (if Code
Bese)

Proposal

 

O9 Sufficient carparking is
provided to accommodate the
number and type of vehicles likely
to be generated by the
development having regard to the
specifics of the use including—

a) the type and intensity of land
use;

the site;

¢) hours of operation;

d) likely numbers of users;

e) the peak parking demand
periods of uses on the site; and

f) the availability of alternative
carparking.

b) any existing parking available on

$9.1 The number of parking and
loading bays is not less than the
minimum number specified in Table
14-47 Vehicle Parking Requirements;

Complies

The applicable parking rate is 1 space per
20m? or thereof, of use area

OR 1 space per 2 employees whichever is
the greater.

OR A minimum of 4 spaces are provided.

$9.2 If insufficient carparking spaces
are provided on-site a monetary
contribution is made to Council in
accordance with Section 6 of PSP13
Contributions in lieu of provision of
off-street carparking.

The proposal! includes 1,080sqm of GFA.
This equates to 54 spaces,

54 car parking spaces are provided within
the development layout.

Refer to the Traffic Impact Assessment
prepared by Burchill VDM which address
traffic related issues.

 

O10 The layout of the
development provides adequate,
clearly defined and easily
accessible—

a) on-site vehicle parking and
manoeuvring areas; and

 

b) loading and manoeuvring areas

 

$10.1 Parking bays, manoeuvring
areas, queuing areas, loading,
setdown and pickup areas and
driveways are designed to the
standards set out in Sections 2 and 3
of Australian Standard AS 2890.1
Parking Facilities (Part 1: Off-street
Carparking) and AS 2890.2 — Off-
street Parking (Part 2: Commercial

 

Complies

All parking areas are clearly identifiable
on site and sufficient manoeuvring areas
are provided for vehictes to enter and
leave the site in a forward gear.

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)

247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 21 of 29

 

 

Page 41

Column 1
Tei em Ome od

for delivery and service vehicles

Column 2
Probable Solutions (if Code
te] dD)
Vehicles);

AND
$10.2 The number of loading bays

is not less than the minimum
number specified in Table 14-47

Proposal

Not applicable
Refer to Traffic Impact Assessment

 

011 Parking areas are located
where they will not unduly conflict
with pedestrians and will not
dominate the streetscape.

$11.1 Carparking areas are
accessed from rear laneways where
practicable.

Complies

Car parking is accessed from a single
driveway located on the southern
property boundary of the site which is
most suitable from a sight and visibility
perspective.

 

012 Provision is made for a
reasonable number of on site
carparking spaces identified and
reserved for people with
disabilities.

$12.1 Carparking spaces are
provided for people with disabilities
at the rate specified in Section 2.4.5
of AS 2890.1 — Parking Facilities
(Part1: Off-street Carparking).

Complies

A disabled parking bay is provided in
accordance with AS 2890.1 - Parking
Facilities (Part1: Off-street Carparking).

 

O13 Access and egress points do
not impact on the safety and
operations of the road system,

$13.1 Vehide manoeuvring areas
are provided in accordance with
Section 3 of AS 2890.1 Parking
Facilities (Part 1: Offstreet
Carparking) so vehicles enter and
leave the site in a forward gear.

Complies

The safety and operations of the local
road systems is not affected by the
access and egress points of the proposed
development.

 

014 Development with the
potential to generate significant
traffic and parking impacts gives
appropriate consideration to
transport and land use issues.

No solution provided

Complies
Refer to traffic report accompanying this
town planning report.

 

015 Business Uses and
Community Uses are

designed and constructed to
encourage users of the
development to access the site by
means of foot or bicycle through
provision of appropriate end-of-trip
facilities including bicycle parking
and shower/change rooms.

 

 

$15.1 Safe and convenient cycle
access to and from the site from the
existing road and bicycle network,
and safe bicycle movement within
the site is provided;

AND

$15.2 Secure and convenient
parking space for bicycles is provided
on site in accordance with Table 14-
48 Minimum requirement for bicycle
parking and AS2890.3 Bicycle
Parking Facilities;

AND

$15.3 Where at least 10 bicycle car
parking spaces are required in
accordance with Table 14-48, end-
of-trip cycle facilities are provided at
the following rate:

a) 1 locker per 2 bicycle parking
spaces;

and

b) 1 shower cubicte with ancillary
change rooms per 10 bicycle spaces
or part thereof, providing facilities
are either unisex or both males and
female facilities are provided.

AND
$15.4 Bicycle parking spaces and

cyclist facilities are designed in
accordance with AUSTROADS Guide

 

Complies
Safe access to the site is available by
both foot and bicycle.

Complies

Secure and convenient parking space for
four (4) bicycles is available in the
basement.

Complies

Adequate facilities are provided for the
proposed development as depicted on the
proposal plans.

Complies
Such parking areas have been designed
in accordance with applicable standards.

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)

247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 22 of 29

 

Page 42

Column 1
Specific Outcomes

Column 2
Probable Solutions (if Code
Seely
to Traffic Engineering Practice, Part
14 - Bicycles, Section 10.

AND

S15.5 On-site pedestrian facilities
such as seating and shade are
provided in developments for the
convenience of persons walking to
the site.

Proposal

Complies
Shade will be provided and seating will be
provided within individual tenancies.

 

016 Carparks are designed to
ensure run-off is treated to remove
pollutants prior to leaving the

$16.1 Grease and oil arrestors or
stormwater quality improvement
devices are incorporated into the

Complies
Such treatment will occur and be
implemented.

 

designed to ensure drainage
without the use of pumps or other
electrical apparatus,

premises. design to treat run-off prior to it
leaving the premises.
O17 Carparking areas are No solution provided Complies

Such treatment will occur and be
implemented.

 

018 Site layout and building
design provides for soft
landscaping to be established.

 

 

$18.1 Below ground components of
buildings, including car parks, do not
extend beyond the above ground
footprint to allow for the provision of
landscaping, particularly within
building setbacks.

 

Complies

Extensive landscaping is proposed at the
rear of the site to provided an attractive
interface with the bowls club.

 

 

Comment: the proposal meets the applicable provisions of the Driveways and Carparking Code
through proposing the minimum number of required car parking bays in accordance with
appropriate standards. The proposed access to the development is also considered acceptable.

5.4 Landscaping Code
An assessment of the proposed development against the applicable provisions of the Landscaping
Code has been undertaken in the table below.

14.152 General Requirements

 

Streetscape and amenity
Sufficient landscaped areas are
provided to—

a) enhance the visual amenity and
natural landscape character of the
area, streetscape and local area;

b) retain natural landscape
features, such as rock outcrops
and existing large trees;

¢) retain existing native vegetation
and enhance buffer areas around
property boundaries;

d) suit the relative size and nature
of the development and its setting;

e) reduce the visual impact of large
or bulky structures and fencing
along waterways; and

f) conceal service, carparking and
loading areas of developments;

 

 

$1.1 Landscaped areas, not less
than the minimum areas and
dimensions specified in Tables 14-53
or 14-54, are provided and
maintained.

 

Specific Outcomes

Table 14-54 requires the provision of
10% of the site to be landscaped with an
average width of 2m soft landscaping
provided along the frontage and 3m
along side and rear boundaries.

The landscape concept plans prepared by
LandGraphics illustrate the proposed
landscaping treatments to be
implemented throughout the
development layout.

The landscaping scheme includes
landscape strips on the southern and
northern boundaries in the order of Im
which is considered acceptable given the
envisaged land use of these sites will be
for commercial uses rather than
residential. This planting will consist of
screening shrubs and other species to
provide shading and buffering.

The plantings along the street frontage
are varied and achieve an average of 2m.
Due to the nature of the use, a consistent

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 23 of 29

Page 43

Column 1
Specific Outcomes

g) screen incompatible land uses;
and

h) provide privacy between any
dwelling units and accommodation
units on and adjoining the site.

fer ed
Probable Solutions (if Code
PSS

$1.2 Landscaping is designed,
planted and maintained in
accordance with PSP3 Landscaping
Plants and Guidelines

  
 
 
 
   

Proposal

2m landscape strip could not be achieved
as various entrances are required to
access the tenancies of the buildings.

The streetscape planting will contribute in
setting the future theme for similar type
development of this nature along the
western side of David Low Way.

Screen planting along the rear boundary
will be retained and where proposed will
serve to screen the car park and
basement ramp from the existing bowls
club.

Existing vegetation will also be retained
as depicted on the Landscape Plans.

The proposed landscaping exceeds 10%
of the site area and is considered
acceptable in light of the overall design
outcome achieved on the site.

Complies

Landscaping will be endemic to the
Peregian Beach and Eastern Beaches
locality.

 

Building and landscape design
02 Site layout and building and
landscape design—

a) provides for soft landscaping to
be established in and around the
development;

b) maximises the retention of large
canopy trees;

¢) within the Eastern Beaches
Locality and Noosa Heads Locality,
avoids the removal of heath
vegetation, except where required
for internal roads and service and
Infrastructure construction;

d) minimises the extent of
impervious paved areas,

e) provides for suitable plant
layouts and densities; and

$2.1 Below ground components of
buildings do not extend beyond the
above ground footprint to allow for
landscaping particularly within
building setback areas;

AND

$2.2 Basement carparks do not
encroach into building setback areas;

AND

$2.3 Plants are grouped in mulched
beds rather than planted individually
to provide for optimum growing
conditions and less maintenance;

AND

$2.4 Landscaping is designed,
planted and maintained in
accordance with PSP3 Landscaping
Plants and Guidelines

Complies

The basement ramp is located at the rear
of the site though adequate landscaping
is achieved through the provision of
planting beds and the presence of
existing vegetation on the bowls club site.

Complies

The basement ramp is located on the rear
property boundary though is considered
not to have any adverse impacts on
surrounding amenity or development.

Complies
Landscaping has been designed to accord
with this item,

Complies

Landscaping has been designed to accord
with this item, This is illustrated on the
Landscape Plan prepared by

 

a) are appropriate to the
biophysical conditions and
landscape character of the area;

b) are suitable for the space
available, the level of visual and
climatic exposure, the functional
requirements of the site and the
scale of the development;

 

 

for the relevant landscape character
area in PSP3 Landscaping Plants and
Guidelines; and

b) avoid undesirable plant species
identified in PSP3 Landscaping Plants
and Guidelines.

OR

 

f) facilitates the adoption of LandGraphics.
appropriate planting techniques.
Species selection
O3 Landscaped areas include plant | $3.1 Plantings—
species that—
a) comprise plant species identified Complies

Landscaping will be endemic to the
Peregian Beach and Eastern Beaches
locality.

Complies
As above,

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)

247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 24 of 29

 

Page 44

 
    
 
 
 
 
 
 

tees
Specific Outcomes

¢) provide for appropriate levels of
shade and sunlight to occupants of
the development throughout the
year;

d) minimise the demand for water
use;

e) in road reserves, provide street
trees with effective canopy shade
having regard to the size and scale
of the road reserve and the
location of services and other
structures;

f} for street trees in towns are
villages, are consistent with the
existing streetscape character;

g) do not cause potential damage
to buildings or structures;

h) are not harmful to pedestrians,
particularly around schools,
childcare centres, shopping areas
and other high pedestrian areas;

i) in intensively used environments,
can endure high levels of activity;
and

Column 2
Probable Solutions (if Code
Eee

$3.2 For landscaping around pool
areas—

a) no more than 30% of the
landscaped area is a mixture of
plants of local origin and exotic plant
species, provided none of the plant
species are undesirable plants
identified in PSP3 Landscaping Plants
and Guidelines; and

b) palms are specifically located in
group plantings in accordance with
PSP3 Landscaping Plants and
Guidelines;

AND
$3.3 Root guards are utilised

around species with potentially
invasive roots.

   

Proposal

   
   

Not applicable

Complies

Landscaping will be endemic to the
Peregian Beach and Eastern Beaches
locality.

 

Safety and security

04 Landscaping is designed and
located to maximise the safety and
security of public and private areas
by—

a) clearly defining the boundaries
between private and public spaces;

b) promoting casual surveillance of
buildings and public areas from the
street and other public areas for
Personal security reasons;

¢) avoiding concealment spots; and
maintaining safe site distances to
and from road and building
corners, carpark entrances;

d) maintain safe site distances at
planting bed ends within carparks;

) protecting solid fences from
graffiti by incorporating elements
such as landscaping, creepers,
murals or vandal resistant paint;
and

f) separating and defining
pedestrian and vehicle circulation
routes.

O5 The provision of landscaping is
to a satisfactory standard ensuring
that it does not lead to
opportunities for concealment and
possible assault sites.

 

 

$4.1 No solution provided.

$5.1 Landscaping provided which
allows adequate visibility for casual
surveillance of public and semi-public
spaces, including entrances and exits
to sites and buildings, by:

a) planting trees which have clean

 

Complies
Boundaries are clearly defined.

Complies
Surveillance is promoted.

Complies
Concealment is avoided.

Complies
Safe sight distances are achieved.

Complies
Such landscaping will be introduced
where applicable,

Complies
Landscaping defined driveway and access
to basement car park.

Complies
Landscaping promotes surveillance.

 

 

 

Development Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)

247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 25 of 29

Page 45

Column 1
Outcomes

 

Ayer

06 Street trees and plantings in
towns and villages, carparks and
other areas where potential
conflicts with vehicles and
pedestrians are evident, are
planted so as to maximise vehicle
and pedestrian safety.

Column
Probable Solutions (if Code
Ee)
trunks to a height of at feast 1.8 m;
and

b) appropriately spacing shrubs at
1.2m horizontal centres, with a
maximum height of 0.75m, to avoid
clumping and to retain sightlines.

S6.1 Street trees and trees in
carparking areas achieve a maximum
of 900mm clear trunk height for a
2.0m high tree at planting and are
able to attain a clear trunk height of
1900mm on maturity;

$6.2 All scrub planting to be a
maximum height of 700mm from the
road pavement (not top of kerb).

Proposal

Not applicable

Complies
Such vegetation will be designed in
accordance with Code,

 

14,154 Specific Requirements for Business Uses

 

Design of commercial and
retail spaces

019 Landscaping softens building
bulk and creates pleasant settings
for visitors and staff that function
well in an intensively used
environment by—

a) providing canopy trees and
shade structures;

b) using shrubs and garden beds to
clearly define public spaces and
pedestrian walkways;

Cc) providing areas for public art,
where appropriate;

d) providing outdoor areas with
seating for staff and visitors,

e) adopting landscape solutions
that reduce the visual impact of
building bulk;

f) using mounding and screen
planting to conceal service and
loading areas;

g) making provision for outdoor
dining areas where appropriate,
that integrate well within the
streetscape;

h) providing adequate screening
along the perimeters of the
development;

i) avoiding the use of formal
planting design for frontage works;
and

j) providing planting design and
species selection that can endure
an intensively used environment.

 

 

No solution provided

 

Complies
Shading is promoted with the introduction
of various established species,

Complies

Such garden beds are proposed to define
key entrances to buildings and the car
park.

Not applicable

Complies

Such outdoor areas are provided on the
balconies however seating could be
accommodated on the ground floor level.

Complies
The proposed landscaping will visually
enhance the proposal.

Complies
Screen planting will be used where
applicable.

Not applicable

Complies
Planting is proposed along boundaries to
define the property.

Complies

Ultimately frontage works will be guided
by negotiations between the applicant
and Council.

Complies
The species have been selected by
LandGraphics and will be endemic to the

 

 

Oevelopment Application for Material Change of Use
Commercial Business: Type 1 Office (Impact Assessable)

247 David Low Way, Peregian Beach

Morgan & Beiers Pty Ltd

Page 26 of 29

 

Page 46

Column 1 Column 2 Proposal
Specific Outcomes Probable Solutions (if Code

Eee

 

locality and environment.

Comment: the proposed landscaping treatments are considered adequate for the development
with the provision of a minimum 10% of the site being met. The Specific Outcomes of the Code
have been utilised to justify the reduced side and rear plantings. The proposed streetscape works
will contribute to set the theme for this section of the precinct.

 

Development Application for Material Change of Use Morgan & Beiers Pty Ltd
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach Page 27 of 29

Page 47

6.0 GROUNDS FOR SUPPORT

This town planning report provides justification for Council to support the proposed use based on
the following grounds:

* the proposed use of Commercial Business: Type 1 Office is a consistent use as identified
under the Noosa Plan for those properties located on the western side of the David Low
Way between 215 and 253 the David Low Way;

= the proposal meets the overall outcomes for the Eastern Beaches Locality by providing a
development comprising 2 architecturally designed buildings presenting a residential
domestic scale. The proposed use is supported within the Peregian Beach locality;

* the proposal incorporates design elements which reflect the beachside character of
Peregian Beach and includes landscaping and building materials which will contribute to
setting the future built form and streetscape theme of the precinct between 215 and 253
the David Low Way;

* the development meets the Specific Outcomes and Probable Solutions for the Eastern
Beaches Locality through preserving the amenity of adjoining developments and
maintaining the character and function of the David Low Way. The proposed streetscape
works will significantly improve this section of the precinct. The building will form an
attractive entry statement from the north of Peregian Beach;

« the proposal has been designed to present as 2 buildings joined by common area on the
first floor level of the development. This achieves Council's intention to respect the
domestic scale of Peregian Beach;

* the proposed buildings setbacks provide a sense of entry to the precinct through the
building being set forward addressing the David Low Way. Consequently, pedestrian
comfort will be increased through shading opportunities and improved streetscape works;

« the applicant has utilised a performance based outcome to justify the increase in site cover
over the property. This is largely due to the introduction of balconies and an interesting
roof form creating a residential development in appearance. The ground floor level
includes car parking screened by 2 tenancies;

= the proposal is considered to meet the Specific Outcomes and Probable Solutions of the
Semi Attached Housing Zone;

= the development meets the Business Use Code, Driveway and Carparking Code, and the
Landscaping Code.

 

Development Application for Material Change of Use Morgan & Beiers Pty Ltd
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach Page 28 of 29

Page 48

7.0 CONCLUSION

This town planning report has been prepared to accompany a Development Application for Material
Change of Use (Commercial Business: Type 1 Office) on land at 247 David Low Way, Peregian
Beach.

The report has undertaken an assessment of the applicable provisions of the Noosa Plan and
indicates general compliance. Where the proposal does not meet a Probable Solution of a Code the
Specific Outcome has been utilised to justify relaxation.

Various supporting grounds provide justification for the proposed use and it is considered that
approval of this development application is warranted subject to the imposition of reasonable and
relevant conditions.

 

Development Application for Material Change of Use Morgan & Beiers Pty Ltd
Commercial Business: Type 1 Office (Impact Assessable)
247 David Low Way, Peregian Beach Page 29 of 29

Page 49

 

7
maton rte TS |

-ver wv co roney \\ SE
O11 Ald S298.LIMORfy NAWOG Nad 0 Avedout |

 

 

 

@ vase: bO-GS epee woumar

tv Bove, He a] MED gHNZ ONY MEP
by @ ooos't

NW1d ALI1V301

Cumau

LS.
HOVad NVIOSY3d
AVM MO1 GIAVG bz
e

2 ASNUYL ALYAdOUd ASNVY TINA AHL
dLV SU3I3ad 2 NVOYOW
29}

LNAWdO13A30 JDIddO GASOdOud
Polos

ver 19@ 28019 Nav

Re! ByGy 40 Xd Geri aver 10 Hd
HOW3G ANwIV ‘OY UNOBYVH ALNHS OOF
(BURG FUDAREOIONY OFT BLL, eens

7 XC
VEVIOOIOON ABIULS NVIVM 41
DOWIE.

SLIAILINOUV
NMOQG NAW

 

 

 

SLNAWNDOd WAOYddVv
LNSWdO1SAA0

 

 

 

 

 

 

2 =

 

 

LS NVOIT4d

Gdge8 ..£

 

 

 

 

 

 

 

 

 

NW1d ALITV9O1 oO

 

 

aunionurs ova
04 $¥0014 40 .INTOWY
BAL BLYOKIM SUZQANN

azo (_])
xous0 [_J
wi)
wowarnoo [—]
wunsas3u (_]
GNa931

 

 

 

ieee nsccem-nensicusesonoronmnnmnnete aeons

Page 50

 

 

oan ot
scuanjaud uy mLONUOLRD pUINY OCH" HORENY Oh >
oy encundn0oup ge OOH BUPUMLIEDS Ov ve
Stet oe commune tae orrsnoeny |
“sth v0 0 Oty Loe
011 Ald Sida. ony NMiod NaS fo Aamdond
Serere ak bol BOD Soa MOOD

qomne — ZO-dS ebeE Homan f )
ev@o0z:1 12 ar wer gooz ony ser LINAWSASVa
toon:

NV1d YOO1d LNAWASVa
Guyneap

 

 

HOVvad NVISaYdad

AVM MO CIAVG 262

w

2 ASNYL ALY3AdOdd AANVYINW FHL
dLV SY3Id8 9 NVOYOW

~

LNAWdO13A40 351440 G3SOdONd
pajord

 

NB"WOd" DPA" MMM gam.
ne woo epNG@ulwpy wna
yor 100 20018 Nav
cea) ever 40 x4 PebL Brey LO Hel
HOWAG APMIV ‘OY UNOEHVH SLNHS oor
(BRUTD JOUDIARO;OLG OMT UL, 2ans
696" wre 40 XJ LUST wrrs 10 He
4997 VEVIOOTOON BSL XOB Od.
Yevi00100W. 133ULS NVM Lt

DOWNEY,

SLOALIHOUV
NMOQG NI

QO

NOILSIY9S30

 

 

WLLGL ‘snssi vo v
Bani anssi'va a

very
AN3W3SV9

dWVd YaONN
DINVL NOLLN3L3Y

@.... = Wid 90 ¢ ROS CHEZ fy MORASS TL BEMVALLOd ZISINSANDOD CVONNAMUANE UnHered LPZZIONCNSDNMAVEATD,

 

¥90 igts904 sitoonl oo
OBL Av auvinIrwA Sud
Tavs WEI

swroot BATT WOW OMNOND
RWOR AN YOOU LINE

 

 

 

 

 

 

‘SNDRVE BVO
SLNAWNDOd WAOdddVY ® oan voor
LNAWdOTSAa0

 

 

 

 

 

 

vad $0014 SSOuD

 

 

 

Page 51

 

 

“papew
couse sucjmeus panty at aewcy we
Of eeaUECRORD We Lode Gur AOS OO 8H
Stecione nseup rete crew sneaaeey |)
"ess 100 19 NEY LG
01) Aid €2ONLINOUY MoO Nae aad ww
(Sejenyare eg MUL RUNG TA JO H/C AGO,

gms g0-GS  ebzz wer f \
ev@ooz, 8 31 =P gooz ONY SKE yYOO1d GNNOYD
tw@ooe:,

NW1d YOOTs GNNOYND

Cumap

 

 

HOVad NVIO3Yad
AVM MO1 GIAVG 2oz

®
2 ASNYL ALYAdOUd AANVYINW FHL
dLVv SY314ad 2 NYSYOW

~

ALNSWdO13AR0 3DIdd0 GASOdOUd

 

 

 

pefosd
Wee
Ovis- Ty &
Ae woo" epH Mmm 834 4S AONVNAL
ne-woo epx@uswoo awa
¥SP (90 20019 nav *
CODt aver Zo xs cerl gy6r LO Hd
HOWaG AMUIV “OM ENOBUVH AUNHS OOF
91RD MOREA /Oid BHIV OU, cans
696r vr¥s 40 Xd Lisy revs 10 Hd
iss¥  VaYIOOIOON 65}. XOS Od
vavioo 100" UBaMLS NVTYM LL
OOVTEUIHONY,
SLIALIHOYY
NMOG NI 2 16487
ove TY
oO % 2 AONWNAL
NOUANIISIO
asv Onn
forum mssivo ov
patel & awsivo a

YAO 40014 40 3NI1

dn diva

@... -navoe-nuos cr tense seni OU mS NINE mend DAN EHONNEND

 

VD RESO OORT ONMOTIY
YORI RO WIND
war “Wiel

sous ATOTUaRD
Baas | BATT LOOU NGRaSYS

 

 

 

 

 

 

 

SLNAWNDOd WAOUddV ® am core
LNAWdOTSAS0 sats

mn Sao
gz YAMA
05 Soe

 

 

 

 

ae, eapenal
oO Lowa

Wad" YOOTA SS0uD

 

 

 

Page 52

GSDRAWINGS\ob_NoXZ243 pasegian commarcaeACAD DOCUMENTSW2 PLOTMAKER Fi, ESY Vernon 4} 2243 SDB - 3.08 PM “@

GROSS FLOOR AREA

 

 

 

DEVELOPMENT
@ APPROVAL DOCUMENTS

 

BASEMENT FLOOR LEVEL SECARS ne ae
‘GROUND FLOOR LEVEL HHCARS, seorera ser asOr

 

 

Tot,
CARSCALOUATED At 120
ALLOWING {080r? POSSIBLE GFA

   
  

TENANCY 4
. RL- 14.20
285.01 m?

 
     

TENANCY 5 /
RL- 14.20 /
97.49 m*

      
     
   
   
    
  

. 8 DA. ISSUE 1 1gt8
ae A OAISSUS ane
A . PRED A. ISSUE E 201000

    

DESCRIPTION

oO

KEN DOWN
ARCHITECTS
TENANCY 3

 

‘ARCHIPELAGO’
11 WALAN STREET MOOLOOLABA
RL- 14.20 y POBOX 159 — MOOLOQLABA 4557
146.76 m* PH 07 $444 4511 FX 07 5444 4969
TENANCY 6 f00 SHUTE HARBOUR RO, ARLE SEACH
RL- 1420 ‘, PH 07 4948 1433 FX 07 4048 1633
184,48 m?
ABN 61087 681 454
EMAIL [email protected]
3 ep WES: www.kde,com.au
project
PROPOSED OFFICE DEVELOPMENT
tor
—-- BA y MORGAN & BEIERS ATF
: 5 THE MULRANEY PROPERTY TRUST 2
3 ; st
a a spar 247 DAVID LOW WAY

PEREGIAN BEACH

g wees
@ drawing

FIRST FLOOR PLAN

1:100@A1
FIRST FLOOR dato AUG 2008 drawn IE meals 1:200@A3
Oo ae trewingno, 2243 SD-04 revision B

 

 

 

 

 

Page 53

CGADRAWINGS Ucb_NoZ243 poregan corntntciaCAD DOCUMENTS? PLOTMAKER FLES\ Yarion 4)2243 SD fit - 308M - “@

 

 

DEVELOPMENT
@ APPROVAL DOCUMENTS

 

 

 

 

OA. ISSUE m Isitee
OA ISSUE tants
PREDA, ISSUE © agnoee

‘om

 

REV DESCRIPTION ORAWN DATE

O

KEN DOWN
ARCHITECTS
"ARCHIPELAGO’

11 WALAN STREET MOOLOOLABA
POBOX 159 MOOLOOLABA 4557
PH 07 54444531 PX 07 5444 4968
Sulte 7 "Tha Aittia Profeasional Centra’
400 SHUTE HARBOUR RD, AIRLIE BEACH
PH 074948 1433 #X 07 4949 1833
ABN 61007 B81 454
EMAN [email protected]
Wea www. kda.com.ay

project
PROPOSED OFFICE DEVELOPMENT

for

MORGAN & BEIERS ATF

THE MULRANEY PROPERTY TRUST 2
at

247 DAVID LOW WAY

PEREGIAN BEACH

 

drawing
ROOF PLAN
+:100@At
¢ ) ROOF date AUG 2006 dawn IE scale 1:200@A3
drewingno. 2243 SD-05 revision B
Copyright oF tie.

Coane remain oe exaaea
mM moet of KEN DOWN ANGHITECTS PUY CTO.
(Op Raw! oar net

FA AY Corencor re vert af dante ad tee on
Gerber b camenanah Ropor of dsepetcie fo
tne Acicl Une ted naratre by orterenee
ioeoed

 

 

Page 54

CGSORAWANGSLb NAZI paren comenarct CAD DOCUMENTS42 PLOTMAKER F&ES{Verio 4 243 SD th 2 08 PM -@

x
i ‘ALUMINIUM FRAMED GLAZING ‘
PAINTED F.C.

SHEETING, COLOUR SHS POSTS, COLOUR
TOBE SELECTED. TOBE SELECTED.

TO UPPER SECTION,

 

 

aie. —. : — —— a . -L. . DEVELOPMENT
|| , APPROVAL DOCUMENTS

 

 

 

 

 

 

 

BASEMENT
LEG

 

 

C ) NORTH ELEVATION

8
A

DA. ISSUE © 1wit08

© ni8

 

QESCRIPTION

 
     
 
  
 

5
‘ALUMINUM BATTEN al
SCREENS,

[— ALUMINIUM FRAMED GLAZING
TOUPPER SECTION.

  
     
   

PANTE
SHEETING COLOUR
weer - ee J_d TOBE SELECTED.

ene

 

 

 

 

Se aS
TFRs 3 -

 
 
     

    
   
    
      

 
 
 

    
 

 

 

 

 

 

 

Ti SAT Cone oe .
mite TOC ee “os

     

PAINTED F.C. SHEETING TO.

LOWER SECTION. tw

BASEMENT
PLAS

 

 

at

247 DAVI

(4 ) EAST ELEVATION |

O

KEN DOWN

ARCHITECTS

"ARCHIPELAGO"

11 WALAN STREET

POBOX 159 = MOOLOOLABA 4557

PH 07 5444 4514 FX 07 $444 4969

Cent
400 SHUTE HARBOUR RD, AIRLIE BEACH
PH 07 4948 1433 FX 074948 1633

ABN 81067 881484
EMAIL [email protected]
Wes, www. kde.com.au

ED OFFICE DEVELOPMENT

MORGAN & BEIERS ATF
THE MULRANEY PROPERTY TRUST 2

ID LOW WAY

PEREGIAN BEACH

ELEVATIONS

VA of Bie oouret

 

1:100@A1
dure AUG 2008 down IE scale 1:200@A3

drewingnon, 2243 SD-06 revision B

Copntepe: recaira the erchsis
‘peapenty of KEN OQWH ARCHITECTS PTY LTD
‘ABH 61 057 833 454,

Page 55

a |

  
 
  
  
 
 

 

 

ae DEVELOPMENT
APPROVAL DOCUMENTS

 

 

’
POWDER COATED.

 

 

PAINTED F.C, SHEETING TO
LOWER SECTION.

 

C \ SOUTH ELEVATION

 

    
   

  

 
 

 

 

 

 

 

 

 

 

8 DAISSuE isto.
A DALISSUE ante
- PRE-OA ISSUE 1 Ton008 |
"REV DESCRIPTION —~—==~=CDRAWN_ DATE |
: : oO
( ‘SHS POSTS. COLOUR PAINTED F.C. SHEETING, ‘COLORBOND ROOF x
‘JO BE SELECTED. ‘COLOUR TOBE SELECTED. SHEETING ee eee rr ere h--— KEN DOWN
-aee oer ARCHITECTS
- "ARCHIPELAGO"
tee eee ee 7 = = 11. WALAN STREET MOOLOOLABA
‘CEILING a PO BOX 159 MOOLOOLABA, 4557
RLIZO PH 07 $444 4511 FX 07 $444 4969
‘Sute 7 ‘The Airtia Professional Centre’
400 SHUTE HARBOUR RD, AIRLIE BEACH
PH 07 4948 1433, Fx 07 4948 1633
FIRST
BLM3__ ABN 81087 883 454
EMAIL [email protected]
wea [email protected]
GROUND ae = |} Ae eho ER Seth R 2 ol}. project
RNA His : i ia Sanaa cae A PROPOSED OFFICE DEVELOPMENT
for
BASEMENT MORGAN & BEIERS ATF
OS THE MULRANEY PROPERTY TRUST 2

 

 

a
247 DAVID LOW WAY
PEREGIAN BEACH

 

C : WEST ELEVATION '

ELEVATIONS

1:100@A1
date AUG 2008 drawn IE seato 1:200@A3

crawingno, 2243 SD-07 revision B

Copyright of fie docurientremmicn the emcoshee
N Property of KEN DOWN ARCHITECTS PTY LID
ORT, ABN 61 O87 a8 454,

Contractors sra ta very a clmanalona end feveta on
sa por © commencing, Report wl dixcapsncies 12
tha Arche Use Bg dwt otferece

 

 

Page 56

GADRAWINGS sO, NoK2243 parecpan comsmerciehCAD DOCUMEN TSI PLOTHAKER FALES\ertson 4) 2243 SOc - 3 00°M - 15711

 

DEVELOPMENT

 

APPROVAL DOCUMENTS

  
 
  

 

 

 

ALM3__

  
 
 

 

  
 

 

 

ane (et tte
RL
i
gi
a
K
SY
@ASEMENT Sy
ms oo Le 5
QIK: TOES IONS RSA SIRSIRSTRSSRSRSRPSIRSR Sy
YI »SOSIOSIASIIIRBSKSYSTRBIRBIAOESIAOASASIRIBASKIARBBBAABRARABEBRDBSAIBES
CRRA RRARRKKRKRARKAARARARARAKAAARARARARDARDADKA

SECTION A-A

8 OA. ISSUE rE 181106
a DA. ISSUE, 41108
: PRE DA IS9UE © 201006

DESCRIPTION

 

oO

KEN DOWN

 

   
   

 

  
  

   

 
 
   
     

   
       

 

 

 

 

PROPOSED OFFICE DEVELOPMENT

ARCHITECTS
Cj ARCHIPELAGO’

41 WALAN STREET MOOLOOLABA

cs PO BOX 159 MOOLOOLABA 4557

= —~ PH O7 54a 4519 FX 07 S444 4969

) ‘Sulte 7 “The Ale Professional Centre’

400 SHUTE HARBOUR RD, AIRUE BEACH

TENANCY 3 Ht] PH 07 4048 1433 FX. 07 4948 1633

il ill en. 1 won

-—] ——— EMAIL, [email protected]

CI Tl | ™ “—
TENANCY 4 C TENANCY 2 ‘
ee wot

  

tor

MORGAN & BEIERS ATF
THE MULRANEY PROPERTY TRUST 2

 

C= —H ed nL

oe

 

 

 

 

  

WIIRIRABIIRORORORSR TOOT KOOEXS SEITE
LSS IASI IE ISIE I ERR RRR RRR RK RK RE LIKI
—WOIRNDAAD AND AAO AD RAR AARAAABARARAAKADAAASA SAYS SAYRE

ot
247 DAVID LOW WAY

PEREGIAN BEACH
SECTION B-B

 

rowing

SECTIONS

1:100@A1
date AUG 2006 drown IE scale 1:200@A3

drawing no, 2243 SD-08 rovison B

 

Congr of fe dosurarsvemana a auchan
Mt propa of KEN Down ARGHIVECTS PTY LTD
OR rp, \\| tenet or eet ate
Cortrore ac 0 very dans a ive on
se porto comrnareny, Report mt Sesreperce
the area Une Rue dara hy petrenen
tread.

 

 

 

Page 57

GROSS FLOOR AREA

 

 

 

DEVELOPMENT

APPROVAL DOCUMENTS

 

 

    

vig
tie
i

       

it

 

 

8 DA. Issue yer
a DA. ISSUE €  att66
201008

        

¢ \ GROUND FLOOR GFA ¢ \ FIRST FLOOR GFA : aloe €

Oo

KEN DOWN
ARCHITECTS
‘ARCHIPELAGO”
11 WALAN STREET MOOLOOLABA
POBOX159 = MOOLOOLABA 4557
PH O7 544d 4511 FX 07 5444 4969

Suite 7 “The Aire Protessionat Centre’
400 SHUTE HARBOUR RD, AIRUE BEACH
PH 07 4948 1433 FX 07 4948 1633

 

ABN 61087 891 454
EMAIL [email protected]
Wee www.kdo.com.au

project

PROPOSED OFFICE DEVELOPMENT

for

MORGAN & BEIERS ATF

THE MULRANEY PROPERTY TRUST 2
a

247 DAVID LOW WAY

PEREGIAN BEACH

 

Grewing
GFA CALCULATIONS

1:200@ At
date AUG 2006 dam IE scalp 1400 @A3

drawing no, 2243 S$D-09 revision B

Copyright ofthis document renee the anche
property of KEN DOWN ARCHITECTS PTY LTO
ABN 61 087 681 ab4,

CContraczors are to very al ceimmrsorea ened berets on
1888 port cornering. Report wll ocr eET chen >
‘he Architect, Use Nur dimenalona in preference
to ecaled.

i
§
i
|
I

 

Page 58

 

 

 

APPROVAL DOCUMENTS

DEVELOPMENT

 

 

 

 

 

4357

FX 07 5444 4969

©
€
C3
DRAWN DATE
MOOLOOLARA
FX 07 4948 1633
61087 881 454
[email protected]
revision B

1:100@A1
scale 1:200@A3

www.kda.com

MOOLOOLABA
“Tha Aira Professional Contre’

ARCHITECTS

"ARCHIPELAGO!

dawn IE

the ArchNac, Use fgued clertiore in preference

Contractors are to varty 2 cimenalos aril beveta on
‘the port commencing. Repent al dacrepancias 10
@

property of KEN DOWN ARCHITECTS PTY LIO

‘AGN 61 047 28S 454.

Copyright of nia document remuina tha archive

KEN DOWN
400 SHUTE HARBOUR RD, AIRUE BEACH

11 WALAN STREET

PO BOX 159
PH 07 $444 4811
PH 07 4048 1433

ABN
EMAIL
‘WEB

Suite 7

 

THE MULRANEY PROPERTY TRUST 2

 

PROPOSED OFFICE DEVELOPMENT
MORGAN & BEIERS ATF
247 DAVID LOW WAY

PEREGIAN BEACH
Grawingno. 2243 SD-10

aN

SITE AREA
date AUG 2006

drawing

g
g

for

DA IssUB
DA, ISSUE.

: PRE-DA. ISSUG

REV DESCRIPTION

 

 

 

 

670.93

 

 
 
   

 
    
   
   
   

   

ero OO 5
ZF OOOO OO OOOO Og
2 O-O-O-O-O OO (OOO OOOO
COOCoOoooooo oa o-0°-or od
OOO oo ooo OO CO OOOO
on CLO OOO OOOO OOOO OOOO
~) OOOO ONO NO NON ONO NON ONO NON ONONONONONON ONO)
COMO KO NON OKO KOKO NONON ONO NON ONO NOON OKONONOKO KONO KONG
OOoorooococooo ooo ooo oo oo Oooo O°
COO or oro oor oeoc oo ooo oo oo oo Ooo >
OOOO Ooo ooo oo oro ooo Coo eo oro ao
LOO OOO OOO OOo OO OO OO OOOO OOOO)
DOO OOOO OOo oes arora OOOO
OCOOo ooo nooo OO OO OOO OOF
POO OOO OOOO OOO OOOO OOO OO OOOO OF
D-O-O(O(O-O OO OOOO OO OO OO OO OO OOO OO}
NOOO NO KOKO ONO NOON ONON ON ONO NON ONO MONON ONO ONOKONON(!
NO KON ONC ONO NONO NON CMON ON ONONONONONONON ONO ONO NONONO)
OCOOoocooooo ooo oro ooo ooo oe oF
OOOO oc oo oo ooo ooo oo OO OOo OOo
YOO OKO ONO O NON OOO NON ONONONCNONO MONO NONONONONONG I
OTO-OLO-O OO OOOO OOO OOOO OOOO OOO
COOO Oooo oo ooo Oo OO 0 OG
POLOlOO OO OOO OOO OOOO OOOO OOOO OF
COPD PL PA, re OO, PLLA, Oo OL, ae
P-0-0-0-0-©-0-0-0-0-0-0-0-0-0-0-0,-0-0-0- 0-0-0000}

 
  
 
    
    
  

   
     
 

    

 

  

     
    
 

  
 

  

     
 
    
 
     
   
 
  

 

0-0-0000 O70 5
(ONO MONONONOKOKOKORORY
O7O-0-0°0 (00 0-00 0 OO One
0-00-0000 0 00-0-0-0-0- OL
ONO OFOFOTO OOO OOO OOOO F
(ONO NOM ONO KONO KONO KONOKOKONOKONO
O-OO-O-O- 070-070 (00-00 O00
OO-O-O-O- OOOO OOO OOOO .
1-000-000-0000 0000-00000, Oss
OTO-O OOF OO OO OOO OOO 0 OO 00, Ore
D-O-O-O-0-0-0 0-0-0 0-0-0 OO OO OO OOO
O-0-0-°0-0°0"°0°0 0 000700000000 0-00-0000, Oss
DO OOOO O-O OO OOO OO OO OO OOOO COL OOOO Of
OC O-O707070 (00-0 00000 000000000 00-00 OF
D-O-O-O-O-O-O-O 00-00-00 OO OOO 0-0 0-0-0 0-00-00 OF
OO OOO OOO OOO or OO 0000 Ff
DROKONONO NON ONOK ON ON ONONONONONO MONON ONO NON OKO KONO KOKORO KG!
COO OOO OOOO OOOO OOOO OOOO)
D_O-O-O OO OOO OOOO OOO OOOO OOF
O-O-O-O-O-O-O-O( OO O( OOOO OOO 0000 OO OOOO >
D“O-O-O-O-O (OOOO OOO OO OOO OO OOOO OF
(OKO NOON ONO NOM ONONON ONO NON ONO KONO KOKOMO KONONONONONORONON(,
O-O-O-O" OOO OO OOOO OOOO OOO 000-00 OO
0-070-070-0700 C (0 OOOO OOO OOOO OOOO)
O070707°0-07°0°0°0 0-070-000-0000 000-000-0007:
(OKONOKO OKO KONC ORONO KONO NOON ONO ON OK ON ONO KORONONO MONO)
OOOoo ooo ooo ooo oO OO OOOO OOO OF
(OOKONO NOON ONO ON ONONONONO KONO ON ORO ONONONOKONONORONO
O-O-O(O(O-O 00 OOOO OOOO OO OO OC OOO
COCO O OOOO COO OOOO OOOO OOOO OOO Fg
OOO" OTC OO OOOO OOOO OOOO OOO OOOO
OOOO OO OOO OOOO OOO OOOO OOOO:
COCO OOo oro oor oro OOOO OOOO FF
OOOO ON ONO NON OKO NO KONO KONO NOON OK ONO KOKO KONOROROKS))
O-O-070-0-070 "00-00 (0°00 0 000 00 0000-00, F
DOO Or Oo-o Oro OOOO“ OO OOOO OOOO F>=F
O-0-O- 0-0-0 OOO O70" 0-0-0 00-0 0-0-9, O00 OO OF
D OPP POLO PPR LPL EOE QO 0 O-O-$
OOF OOOO OOOO AS

  
   
  
    
  
  
    
   

!
DECK AREA

  
   
 
 
  
  
    
 
  
 
   
 
 
 
 
  
  
    
 
 
 

SITE AREA

 

 

 

 

44% COVER

 

AREA - 1520.65m?|

OVERALL SITE

COVERED SITE | 56% COVER

AREA - 849.72m?
SITE AREA -
670.93m?

 

 

 

q

OO
OCS

.
oO

 

 

 

 

 

 

 

 

e en esc ics meersinmovensnersegnnannetnen enue

 

Page 59

a |

 

 

DEVELOPMENT
APPROVAL DOCUMENTS

 

 

 

 

 

 

    
           

  
 

   
 
 

     

   

— eee] 8 DA isSuE 5 181100
a Batssue nes
Ik | * PreDA issue E2100

OESCRIPTION

 
 

za

 

HA

Oo

KEN DOWN
ARCHITECTS
‘ARCHIPELAGO’
11 WALAN STREET MOOLOOLABA
POBOX 159 MOCLOOLABA 4557
PH 07 5444 4511 FX 07 $444 4969,

 
    

 

 

Suite 7 ‘Tha Aire Professional Contra’
400 SHUTE HARBOUR RO, AIRLIE BEACH
PH 07 4948 1433 FX 07 4948 1633,

ABN G108T 881 454
EMAIL [email protected]
WEB www.kda.com.au

project
PROPOSED OFFICE DEVELOPMENT

tor

MORGAN & BEIERS ATF

THE MULRANEY PROPERTY TRUST 2
at

247 DAVID LOW WAY

PEREGIAN BEACH

 

drawing

PERSPECTIVES

4100@At
doe AUG 2006 drawn IE scale 1:200@A3

drawing no, 2243 SD-11 revision B

Camano dort rer tre acre
Ne prcouty ot EN DOWN ARCHITECTS PYYLTO
Oren, Yair or sas

tne Kec Gu Spd craton oon

 

 

 

 

Page 60

 

“pope
Ls coctcuadohesusrarniclensce bedlameto tect

aut arg suoauoue woo nan Ses
Sayeed thane aN ees

 

 

 

@ vsne ZEGS eyzZZ woman

ev@o0z:, 9 a “ee gooz ony see
tw@o01:+

S3ALO3dSuad
Supamip

HOvad NvI9ayad
AWM MO GIAVE 22
® o
2 iASNYL ALYadOUd AANVEING SHL
dLV SURI 8 NVOUOW

ay

 

~ - a ~ : ee RD
SPT Try peeae eB yy ete TPM TET ee ur F

cagrseneenae age
_eeereneneenent

 

te
a

ANSWdO13A30 351dd0 GASOdOud
elas

 

Re WOT EPH Mmm sam
ne wos epy@ulwpe aww
rob Lee 20019 Ney
809s aver 20 Xd Ser) Br6r 20 Hd
HOWE STRIY “GM MNOSYYH AINHS OOF
2522 FEUOREE Spa OBI OL, Lang
6067 r¥¥S £0 Xd Lise y99g 20 Ha
isse_VEYIOOWON 851 XOROd
VEWIOOIO0N LARS NVM LL

{ODYTadIHOMY,

SLIILIHDUV

 

alwa NMVUG NOUdISaq
wie ansst VO. ¥
mG) a anssi-vo °

 

 

SLNAWNSOd WAOdddV
INAWdO1SA30

 

 

 

 

 

 

 

Qi ncrvcimnnenvrnurninmene ona nncesnreeoune

Page 61

ae |

 

 

5 ! DEVELOPMENT
. APPROVAL DOCUMENTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

       

DA ISSUE = wes
DA, ISSUE Eten
PREDA (S9UE © wos

DESCRIPTION

‘se

        

Oo

KEN DOWN
ARCHITECTS
'ARCHIPELAGO'

11 WALAN STREET MOOLOOLABA
POBOX 159 — MOOLOOLABA 4557
PH 07 54d 4511 FX 07 54a 4969
Suts 7 “The Airis Professional Centra’
400 SHUTE HARBOUR RD, AIRUE BEACH
PH 07 4948 1433 FX 07 4548 1633
ABN 81087 851 454
EMARL [email protected]
WEE [email protected]

project
PROPOSED OFFICE DEVELOPMENT

for
MORGAN & BEIERS ATF
THE MULRANEY PROPERTY TRUST 2

at
247 DAVID LOW WAY
| PEREGIAN BEACH

 

£. Ave im ately tne SBT
“ a wae ae ge ak BERR sre
wr votes

 

fle eo emea sane AR TAN SE TE

            

drawing
PERSPECTIVES
' 4:100@A1
I data AUG 2006 = drawn IE scale 1:200@A2

drawing a. 2243 SD-13 revision B

 

Copyright of the document romaine the exchhe
N proparty of KEN DOWN ARCHITECTS PTY LTD.
ORT, ‘ABN 61 O87 681 454,

 

 

 

Page 62

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nw
BSS |e wo $88 258 $2: Z & 38 bey
al ne res ll
ro) con /E 2 gs GE Ei 9 oF SP a | ie
E § F i: ee u @ i gp fad
z= g 6; > ww : i
z = ae £3 wi Fa e 38
Ww su a 28 eS o <O > a t Tat
Sees fe = 8 BF $x “5 aly
= Oke e #: 39 pS |e
> Z #353 52 5 wn é hy
oO wif] «© Gerdes GP 8 #38 a2] 3 #8 [Han
20 325 |§ 6 <2 25 & 3
wo ask |8 S 25 OH] pn 26 f g
3g § . 4
SW 3 ef ,S2.5H] 25 33 7)
a < e
oO
O
Lu a
>o
iu a
Act
a aw
g g oo _
o oO
oO oO
sf 3s
& e
: -
we ES
32 OF 2
36 98 @.
2 Ge <s
2 Sse Ho
Goa Of GR
om
exe)
exe)
bxo,

     

 

 

 

 

 

 

 

 

 

 

  

weer) O-O-O-O-O-O-O- 0-9
FOO OOOO OOO O-O- Oo)
00-00-0070 (OOO OO
oO O-O-O-O-O-0-0-0-0-0-0-0
O-0-0-0-0-0-0-0-0-0-0-O
O-0O- 0-0-0000 00-00-00)
O-O-O-O7O-O°O O-O-0-O-0
(OO KOKOKO KONO NO KOKOMO KOKO KORO)
O-O-O-0-0- OOO OOOO,
O-0-0-0-0-0-0 0-0-0 0-0-0)
(OO NOKOKOKOKOKOKORONOKO)
O-O-O-O- O70 OF O“O“O-O OF Oro
O07 0-00-00 07070070
0-070-000-0700 0-0-0 (OO
(ONO KOKOKOKOKOKOKOKOKOKO)
(ONO KONO KOKOMO MONON ONOKONOKORO)
O-O BRON ORONORONONGRONGROKOKG) Oo
O-O-O-0-0- 0-0-0000 0-00-00 O08

    

   

  
  
 

  

O
O-0-0)

Oo
OO

 
     
 

oO

     

O-O-O;
oO

©

Oo

oO
oO
oO
O7O-Ol OOOO OOF OOOO)

    
    

oO

oO
©

    
      

07070)
OCO
oO
(one xe)

   

oO

    
     
 

oO
Oo}
oO
Oo

         
 

DECK AREA

    

   
  
  
  
 
 
    
 
  
 
   
 
 
 
 
  
 

CS
O-O-O-0-0-0- 0-0-0000 02000“ Oey tte
BE0L070-0-0"0-0-0%0"0-0°0"0-0-0°0- 0 OOO OOO Tk
O-O-0°O"0"00-0-0 00-0" 000000 OL OOOO L >
YOO 0-0 OO" OKO OOOO OO OLOLOOL OOOO OLOIS ;
O°O0"O"00 02000 ON O00 OO OL OLOOO 000
b-0-0-0°0-0-0-0"0"0"0"0"0-0"0-0" 0-00-0000 0-00-04
0-000 20-020-0- 00-0 0-00-0000 000K"
bYO"0-0-0 00° 0"000- 0-0-0 O° OL0000 OOO OO000)
OOOO OLOPOLO- OOO OLOLOLOLOLOLOLOLOLOLOOOOOO-d |
DRORO MONON OKO MONO MONON ON ONOM ONG MOMORONOMOMOMOMOMOMOMORO)|
OXON ONO NO KOKO NONOKONOKONONONOKOKOKOROKONONOKONONOKO EEE
D~ONONO~0-0 0-0-0" 0-000 000-0 OO" 000-000 OOF
OOO OLOLO LOO OO OL OOOO OPO OLOLOOLOLOOOO
ONONONONONOMONORONOROMON ONO MO ROMO RON OMOMOMOMOMOMORONC
OO OM OLOL000- 00 OOOO OPO OOOO 00-0"
@HONONONONOMOMONONONONOMOMOMORORORORONOMOMOMOMONOMO)
O-0-020-0-0"0 0°00" 0 O00 00-00-00 00-00 OF
OO" 000-00. 0-0-0“ OL 0020-000 OO OOOO
OO“ ON OL0L0- 000 OOO OL OOO OOOO |
O0-0- OKO" 00-00-0000 050-0 O-0-O-0-0-O0-O-0-0F |
SKOKOKOKONOKOKO MONON ONO ON ONONORONONONONONO MONO MONON
O-0-0-0-0202020"0"0" 0-0" 0" 0-0-0 0-0-0-00- 0-00-09
ROO OLOOPOE OPER
IOLO-0- OO OOOO OPP LAEOOO-00 0000067
OL0"0"0"00000,, OOO" :
D0-020-0L0" 0" 0" 00-0-0-0
0-0-0-0 200 -000-0-0-0
POSS CHOOSES
DEOL OOOO
5

 
 
  

SITE AREA 2

O00 OOOO OPP

 

 

 

 

752.69 m?

 

e or ne wero tersinonn nrceranmam at oenrerenaans

Page 63

 

 

 

 

 

 

 

 

 

 

 

e 40 10 WW) | O9Lt HOT
Neer =
‘002 Mow a0 ' i
=| = |
oAk| {1}9AD
41d39NO9 AdVOSONV1

 

SLOALIHONW NMOG N3¥

 

$u3138 9 NVONOW

 

yusludojeneq
yoeeg uebaeg BIIHO

 

Burin pesodold
mee een he tenes oni ep me ee NI

 

 

 

anssi1dz0n0o | oobas| @
HOLES AUYNINTIR | BO-KiES |

 

 

 

 

gles

enesowep | mp

 

 

 

SINSWONAWY

‘$3003 11INS, 3H1 NILJOS SNICHVO
G3ONNON NI ONIN Id BNYHS MOT

ONLINVId H3AODONNOND ONY
$3341 OSNNYL HVINO 'ONIAVd

SW3HOS JdV9S1IFH1S NVIOSHId 5

SLLVuOdHOON! GINOD AVMHL Wd
QOOHYNOBHOIIN
FYNLNA IWISSOd

ONLLNV Id BNYHS:
SNINTTHOS ONY MOT

 

3AM3S3Y OVO OL UNL
SU3AOOONNOYO ONY SENYHS MOT vi

S@NUHS ONINTZYOS Ks

our coy PRA |
(00}) seg feise09, eyojUBequ) ersyueg
S33UL SOVLNOUS 133U1S d3SOdOdd

$334 ONIINOBHOISN Pp
ONY L33ULS ONILSIXS iw

edeosyos

 

 

 

SIOM 3dVOSLAFULS FIeISSOd Ay
ONLLYAS/ STIVM [ ml

ONINIVL3Y HOON SVM
me
ANBINBAWd / STW EE3

edeospiey

 

 

\peag ueBaisd - wewdojenag 8210 pesodaig
GN3931

SNLNVId
w3d339D
MOT HLIM:
wBINVId

WNI00d

'SS300V
NVINLS303d
OOOHYNOBHOISN

se png us pur eeuepunog ize. 28 8
4.0 Aqssus esi 04g encachy ps0 IYOS OL

 

SITAR uOgRAQUID  Bugen E88>80U77

         
     

                  
   

yoeeg uelBeieq - JUQLUGOJSABQ BdIJ¥O Ppesodoid

AVM MO1 GIAVQG

S3NITHIMOd GV3HH3AO HLM
SW3180Ud F1VFHO LON

Od ONW 30VOv4 SHI N3140S
“HALOVHVHO 133H1S 1NOddNS
‘dds esyueg TVNS

3W3HOS 3dv9S13I41S 40

Lud JWOO3S ATIVNINIAZ

(NCO 3dvOSONV1 G3SOd0ud

(2O10Hd 43.43x) GINIV134 38 OL

AdVOS1IFU1S 3H! OLN! ONILXG ONY S3NI7
TWYNLOBLIHONW SHV 1 SNIGHVD

 
       

ONLINWId HO4 ONIGNNOW MOTIV
OL WNIGOd H3AO $3D0F NWI
(ONLLW3S Sv ONNENOG)

HOLSYMS AdVOSGNVT

 

 

ids SONORION ONLIEKXS STIVM 38vMa ONY WNIGOd ‘youd e1ueBv0d
FOAVaS SNIAHV ANOS pur equbo asyueg saneds 19ENRUODE

Meg 4g Sursn Aynuguos edeasjeeRs

Bugpe@ og 0 seynquucs Burdedspury

 

 

 

              

Pit Toe
teat

eat

AONVNSL
qgasoOd0Oud

  
   

AONVNAL
gGasOdOud

 

+
MG
saa)

 

4
3
ae

|
_ |
G |
ay |
Q |
|
/

 

AONVNSL
GasOdOud

HOLS 3SN43u

(Ww We XOUddY) ANWONNOE OL
ONLNV Id SNYHS ONINSSYOS
Uy

Yj)

a oR

 

 

     
  

(4 OLOHd 43538) ONLINVId
BMIHS ONINSSHOS
WNOLLIGGY SOMONI ONY
G3NIVi34 38 OL NIGHYD
N70 SIMOB ONUSDG

GSNIVINIVIN 38 O1 ONINIVI3Y
30 NOE ONLUSDG
ONLINV1GY3ONN ON 3541 39YV7

  
  

(§ OLOHd 43434)
G3NIV13Y 38 O1 S33UL
ONIENOSHOIIN ONIISIXA

 

‘soar Sug.ad 91 0 voRe}UaLO pur ooeds
aye 04 2, owyxtoxide UE OYGENOL Ox
sapeds papas Oy. yea [RIX JO4NY
‘apg Gy HONEY J0.NO OWOS Jo LORIDPE
0g wa sopeds owepue AjuRUWOPOId

0 oma # 448104209. 0} BUNUEI

 

 

 

      

(HOIH We XVN ONY WE NIN)
AYVONNOB ONOTY

JHOISH ONY S3103dS OFINWA 40
S®NYHS ONINSSYOS

‘SONMYH SHHOM
TWNOLLVeIO WN HO4 CFU ATHd 38 THM FINGIHOS LNV Id
NSNFSHANCO Y IOVS NOISIO TWN LY CR0CV 38 AVAL
S3ORS WNOWOCY CLYHOdHOON! 38 AYAY C3157 SINV Id
TW ION NOLVOTHdY ONY 19 37O€d SIH HO4 FIAVLINS
SINVd 40 NOUOTTIS V THY 0318'7 $3103d5 ‘ALON

 

 

 

wunuodoAy) |B1SB0D wunandiiye wnsodody

urn uowwos WRN ROIURIOR
4JBAOOPUNOIS

Aseweson [218209 ‘es0oqin4) Be6ujs9),

aua 04, wintohzks

Aueyo Bwuebey eegsne wniBAzks

Pmped, suscserey wnusedsojde7

PRBAS JOAIIS, pughy Byeverq

Ay) xe|4 -s@ounpedinesg 8/0ve1q

Ap) dems wneinounped wnug

eureN UOWWOD URN P21UR}08

sjuec0y” B sqnius

 

 

 

\peeg vey gpuurd eweBU0g
POONA UOHOD ‘sr 9084/) SOSH
‘(PURN UOWWOD WRN RIURIOB

sued B Seal,

 

 

NOISNIONI YOsS
SAlDAadS
LNVi1d GaSOdO0u8d

Page 64

 

LANDSCAPE DESIGN APPROACH

PLANTS have been selected to acheive combination plartngs appraptate
tho Poragian locally Nominated piants that are both tocaly Carte anc
tolerant of local environmental factors will erhance te tuncion and veal
amenity of the Development. Plant selection is genaraby i accorcance wih
‘The Noosa Plan Landscaping Code and Noosa Planning Scheme Priicy
‘Landscaping Plants & Gutotres.

‘SCREENING to side boundaries consists of dense shrub plarings. Many
large trees will be incorporated around the building to son the bul fonm and
‘omphasise the archtectural design and stroatscape ntagraton Parting
combinations are simsc at producing a unied landscaping theme whit
{ulfiling the required objectives of visual butterhng ard screaning i
accordance with The Noosa Plan Landscaping Cote

NATIVE TREES TO THE STREET will bo in accordance with The Noosa Pan
Landscaping Code and Noosa Planning Scheme Palcy Landscaping Plats
{8 Guidelines, for racogrised and praferred species tr amanty plartngs
Barksia integrtoke anc Pongamia pinnata have bean seloced ta het
predicable growth and pertormance if this spectic station as wal as or thar
contextual rlavance and endear sts

 

 

 

PHOTO 5

View from neighbouring
site

S

 

SECTION 3

Front boundary sketch

PHOTO 4

Panorama of site frontage along David Low Way

LANDSCAPE SKETCH

 

PHOTO 1

View of rear boundary
adjoining Bowls Club

Proposed Office Development - Peregian Beach

 
     

OMMERCIAL SFE E]
2
vi]

Jew!

 
 
     
         
 
 

irate
) ©

sg exer [7 Cl

>
ota

 

~
~
Eq > PROPOSED COMMERC!

DEVELOPMENT _—

POSSIBLE FUTURE
COMMERCIAL SITE

   
 

—

 

PHOTO 3

View of current site frontage

o5\
Oo qnoed-
Om" oo0eo

PELICAN ST

i

  
  

 

SECTION 2

Northem Side boundary sketch

 

PHOTO 2

Existing Melaleuca spp. street tree to be retained

 

THE SITE IS DENSELY VEGETATED
ALTHOUGH MOST NATIVE TREES HAVE
REACHED THEIR LIFE SPAN AND HAVE
BEGUN TO DECAY AND UNDERGROWTH

1S GENERALLY UNDERSIREABLE

WEED SPECIES. THESE INCLUDE

‘Camphor Laurel, Balsam, Mother in Laws Tounge:
AND Mother of Millions. THE SITE WILL BE
CLEARED WITH WEED MATERIAL CAREFULLY
DISPOSED OF

 

 

 

   

| 13:11.08 | PRELIMINARY SKETCH
8 | 17-11-08 | CONCEPT ISSUE

 

c a a

LANDGRAPHICS

 

Proposed oa%.0n Way
ice Peragian Beach

Development

MORGAN & BEIERS

 

KEN DOWN ARCHITECTS

 

Orang Te

LANDSCAPE CONCEPT

Supporting Documentation

 

 

 

 

 

 

 

 

 

 

 

 

worm omer “a
ome: ue
I. ee l=

5 i one Nov 2008

ae eA

1300 @ 3
= — wee _
LGKH 1180 | Lace 02 OF a2 8

 

Page 65

 

STORMWATER MANAGEMENT
REPORT

 

PROPOSED OFFICE
DEVELOPMENT
DAVID LOW WAY,
PEREGIAN BEACH

FOR
MORGAN & BREIERS

November 2006
Job No. M3087

BARLOW GREGG VDM

Consulting Civil and Structural Engineers

24 WALAN STREET MOOLOOLABA PO BOX 200 MOOLOOLABA QLD 4557
PHONE: (07) 54440400 FACSIMILE: (07) 54440536
EMAIL: [email protected]

cx
B W
&  BARLOY GREGG VPM

Page 66

STORMWATER MANAGEMENT REPORT

TABLE OF CONTENTS

SECTION

1.0 INTRODUCTION

1.1 Description of Development
1.2 Pre-Development Site

2.0 STORMWATER MANAGEMENT STRATEGY

2.1 Hydrology

2.2 Proposed Stormwater Drainage
2.3 Flows from Driveways

2.4 Stormwater Quality

2.5 Flood Protection

2.6 Construction Phase

3.0 MAINTENANCE

3.1 Construction Phase
3.2 Operational Stage

4.0 SUMMARY
ATTACHMENTS

DRAWING No M3087-SWMP-01 — Storm Water Management Plan

Page 67

1.0 INTRODUCTION

1.1

1.2

Description of Development
The proposed site is subject to an application for a material change of use at Lots

1 & 2 RP903222 David Low Way, Peregian Beach. The development will involve
the construction of 5 office tenancies with ground level and basement carparking.

Pre-Development Site
The subject site is currently undeveloped, is sparsely vegetated and falls gently
to the north. It is located in the Eastem Beaches precinct of Noosa Shire.

2.0 STORMWATER MANAGEMENT STRATEGY

2.1

2.2

2.3

2.4

Hydrology
The site is located on the David Low Way, Peregian Beach, adjacent to the

Peregian Beach Bowls Club. The site is generally flat with surface levels ranging
from RL 10.0 m AHD to RL 11.0 m AHD. The proposed use of the site will not
alter existing catchments or detrimentally redirect surface flows.

Proposed Stormwater Drainage
The stormwater drainage system for the proposed development will be designed

in accordance with QUDM and AS3500 Part 5.

Runoff from as much of the extemal area of the development as is practicable
will be conveyed to landscaped areas for infiltration. Surface runoff external to
the building will be allowed to flow through landscaped areas as far as
practicable to allow infiltration to occur.

Runoff from the site will be discharged into a proposed new stormwater gully pit
to be located at the frontage of the site. From there a stormwater pipe will convey
discharge into the existing stormwater manhole some 25m north of the site on
the David Low Way as noted on drawing M3087-SWMP-01. The location and
alignment of this stormwater infrastructure will be detailed at the operational
works stage of design. As this system is under Council control it is proposed that
this is a lawful point of discharge.

Flows from Driveways
The runoff from the driveway will be directed onto adjacent unpaved areas where

practicable to allow for infiltration. The use of a grated drain constructed at the
bottom of the ramp will catch driveway runoff before it flows into the basement.

Stormwater Quality

It is proposed that low flows collected from the driveway will be dissipated over
unpaved areas for infiltration as much as practicable. Where runoff enters the
proposed grated drain, it will be treated by a gross pollutant trap prior to
discharge to the proposed stormwater pit at the frontage of the site.

The quality of the runoff from the development would meet the requirements of
Environmental Protection (Water) Policy ANZECC standards and Council’s Code
for Waterways and Wetlands.

Page 68

2.5 Flood Protection

The proposed access driveway to the basement will meet QUDM flood protection
requirements by rising to 100mm above the top of kerb, before ramping down
into the basement.

2.6 Construction Phase
A Sediment and Erosion Management Plan (SEMP) will be included as part of a
future Operational Works Development Application. The SEMP would implement
measures in accordance with the Engineering Guidelines for Queensland
Construction Sites and Council’s guidelines to ensure that sediment would not
enter the waterways or cause nuisance to adjoining properties or the public.

3.0 MAINTENANCE

3.1 Construction Phase
The SEMP will be implemented by the Project Managers and maintained until
completion of building works and the establishment of landscaping.

3.2 Operational Stage
The permanent stormwater treatment devices will be inspected and maintained

on a regular basis by the manager of the development on behalf of the Body
Corporate in accordance with the manufacturer's recommendations.

4.0 SUMMARY

The implementation of this Stormwater Management Plan will ensure that the
proposed development would not create a nuisance to other landowners, or
degradation of the environment due to its effects on the hydraulics and hydrology
of the site.

Page 69

 

 

 

 

 

 

 

 

   

  

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

10 - dWMS - LEOEW EES O96 (20) ROL = BUSY VS (40) Nd uae ae “amon ey “am ve wo ok Ag] ayog jusupueuy oN Ag} 3409 quawpuawy ‘ON
NOISIASU-193HS-13S@NS-1)30¥d Sualgda 3 NVOUOW Oy SLIALIHIUW, NMOG NDI) super ay eae La) ‘pas sue sin a nee ata 2
wa Os a HOW3@ NVID3U9d "AVM ae rime 67 D
wn we] MOT GIAVO 40 LNaWdOT3AR0 NV1d HY NL AY Qa yet a a pm
mouse | it x0sn W1sJO GISOdCAd | |NIWIOWNVW UALVAMWUOLS | WARES 99SND MOTE S| 0 ton rn tin 0 pe tea as
NAOHS SY wis | 90 Y3GH3AON ava *193f0ud “SUL *S3LON
Wy ® 0011 31¥9S
——
uu 5s € z t e
NVid LINSNS9VNVAW HSLVMAHOLS
[“ A/S IAIN [- A/S 3N
F Bw aS BS aS BS aS aS BS as — y
“$33dS SLNVLINSNOD IINVYEOAH
“NIVSO HINZUL OI1¥#D
2 Lo

“Lid A/S
WNNOD ONILSIXA

 

  

  

 

 

 

Ol “dKNS LNIWISVE WO:

“JAI LNIWLV3YL BILWAWYOLS:

  

 

 

 

rw LOWS?
Orth - We

Z AINVNAL

T=
i\

 

 

 

 

 

 

 

 

2 e564
orn

b AINWN3L

 

 

 

 

 

 

 

 

 

 

 

 

 

i
a
a

 

 

 

 

 

 

 

st

 

 

 

 

 

 

 

 

 

 

      

La 40 d01 2A08¥ WOO,
WNWININ 3SIY OL AVMIAINO

“1d08 X03
009 * 009

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

43A0 80013 30 3NIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 70

 

WATER AND SEWERAGE
SERVICES REPORT

 

PROPOSED OFFICE
DEVELOPMENT
at
DAVID LOW WAY,
PEREGIAN BEACH

for
MORGAN & BREIERS

November 2006
M3087

BARLOW GREGG VDM

Consulting Civil and Structural Engineers

24 WALAN STREET MOOLOOLABA PO BOX 200 MOOLOOLABA QLD 4557
PHONE: (07) 54440400 FACSIMILE: (07) 54440536
EMAIL: [email protected]

ms
B Dm
G 7) BARLOW GREGG WED

Page 71

 

WATER AND SEWERAGE SERVICES REPORT

 

TABLE OF CONTENTS

PART A

1.0 INTRODUCTION

1.1 Description of Development
1.2 Pre Development Site

2.0 SUMMARY

PART B

DRAWING M3087-W8&S-01
Water & Sewerage Services Layout Plan

Page 72

1.0 INTRODUCTION

1.1 Description of Development
The proposed site is subject to an application for a material change of use at Lots

1 & 2 RP903222 David Low Way, Peregian Beach. The development wilt involve
the construction of 5 office tenancies with ground level and basement carparking.

1.2 Pre Development Site
The proposed site is currently undeveloped. A small number of trees are on the

site and the land falls to the north. An existing water main is located in David Low
Way adjacent the subject site.

A sewer main enters the subject site at the north western corner and extends
approx 15m into the site along the rear boundary. It appears from council records
that multiple service connections are available. An additional sewer connection
point is available at the south western corner of the site. The site is adequately
serviced with sewerage reticulation.

®@ 2.0 SUMMARY

A water connection shall be provided from the reticulation main in David Low
Way. This would be the most appropriate connection point for a water service to
the site. Council advise that the current infrastructure is adequate for the
proposed redevelopment of the site.

The preferred existing sewer service connection will be maintained and the
remainder to be capped and sealed at the service point. Council advise that the
current infrastructure is adequate for the proposed redevelopment of the site.

Existing services referred in the aforementioned have been obtained from Noosa
Councils Geographic Information System.

Refer attached drawing M3087-W&S-01 for details of both water and sewerage
connection details.

Page 73

PART B - DRAWINGS

TABLE OF CONTENTS

PART B

DRAWING M3087-W&S-01
Water & Sewerage Services Layout Plan

Page 74

10-S3M-L80EW

 

 

 

 

 

 

 

 

 

 

 

 

FUL wT SATS | ee Fey 8100 qusapusey on] a] 8400 apuRY en]ta] 9400 apy ron] Aa_ 840d apy
WOISIASE 133H5-125@NS- 408d SUalaUe # NVOUOW 494 | salviOss¥ 2 DQ NI) manera Sima dod we mie eo at
sal fin eae HIVIG NVIDANId “AVM MOT <euey ws g2 a ie 9 Lm iS press
rv] a GIAVO 4° LN3Wd013A30 NV1d LNOAY] S32AN3S ‘Oe ae Te ou a LY a paca inh popes ava pee
sume | 1a Soest 301440 Gasod0ud JOVUIMAS F YILVM [WAEaK DOSHD MOVE SND | meee ny pases
WADHS Sv wwe | $87 UDA TIVE {Low odd su STH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

'

\

"STIV130 ONISENL
GQNY ONILNY1d YOd SONIMVEO SLNVLINSNOD JdVISONVT 83438

 

       

 

           

  

“HINVEB JDVUIMIS ZB Y3LYM TINNOD 3¥IHS YSOON
HIM G3WYIJNOD 38 TIVHS NOILV301 NOILIINNOD YIMIS O3Y3IINd

*$3NI1301ND ONY
SNOILVIISII9dS WINNOD LNIAYND HLIM ATdWO} TIVHS WHOM TIV

 

2 “FStMY3H10O 03193e10 SS21NN
WINNOD 3H1 AB Q3WYOINId 39 TIVHS SNIVW ONILSIX] NO XYOM
“SONIAVUG ‘NDISIO OL HOidd ZINVISNI LSI IHL NI WONNOD IYIHS YSOON
WSNLIZLIHINY HLIM G3WHI4NO] 39 TIVHS SNVL Y3LVANIVE HLIM O3WUIZNOD 38 TIVHS S3IINVd3uISIG YO NMOHS NOILVWYOANI
"S1IV130 ONIGWIId ONIQUVDIY SNOISSINO ANY ‘NOILVWHOINI AJAYNS O371¥130
ONY XNVL YILYANIVY YOS LNVLINSNOD WINVYGAH Y3dze ONY SNYTId S3ILINOHLNY WOUS JUY NMOHS S32IAN3S ONILSIX3 4
SALON *SSLON YAM3SS
|
TY 49 9063 31VIS
eeS=—
we ss 2 oS & S 0
NVId LNOAVT S3S0IAN3SS
| | ,
' ww
HH i = gee — :
: > :
< | i ,
| = 3 ah ee
e |, a \
\ 200 |
= = 3 Yo een on ,
2 gl\\- \
> oe \
BS + %N\\ * |
x \\ |
s
3 \ F BYOHNVW DNILSIX] LV ‘ |
= NOIL¥301 NOILI3NNOD iv
git YaM3S Z1GSSOd
% Gl ! r
5\\ [+ \
\
A 22260644 { | \
4\ z 101 1 \
1 £ “ \
4
\ %\ | 3|
eel {a
an % i
{ sg 97) SIMO8 (2
4 \ 8 22ZE06da 1 bin
% JOHN ONULSIX] LY
S WOLL¥307 NOL I3NNOD
ced 4S BaMaS F1gISSOd
a7 y \
2 om

NIVH ULV 1010

B0S7 ONILSIXA WONT

+ NOWLI3NNO) 31 ¥M
we

~ \

‘

 
 

ANOd NO1LI3NNOD
UBLWAHYOLS 0350d0¥d

     

 

N¥330

      

"NDISIO
OL MOldd JINVISNI LSHI4 3Hi NI Y2L¥M TWONNOD BYIHS
VSOON HLIM G3NUIINOD 38 TIVHS S3IINVdIYISIO

YO NMOHS NOLLYWYOINI DNICYV93Y SNOISSINO
ANY ‘NOILYWYOINI AZAUNS O3TIV130 ONY SNVId

S3ILIMOHLNY WOUS IXY NMOHS SNIVH WILY ONILSIXE

WINNOD 38IHS YSOON AS LN OAV) 38 TIVHS

S3IAS3S NOILIINNDD Y3LVM JO NOILINALSNOD
“NOILVIIIdd¥ SHXOM TWNOILWYSdO LV 031130
AVINd 38 VIVHS GNV AINO S3S0duNd NDIS30

Od NMOHS SI NOILVIOT NOILIINNOD JNAYIS YILVM

 

JIS O1 LON

dA 907

BYO0AHIOONVH
OL 1

j

(sl

ea!
\

 

Tory —
Sw i .
4d ONVTGO0M
Coca
vo Tee ha
A XS ' : .
<— a
aN pie
xo * ‘
ene —~ ce PRE E

 

 

 

Page 75

PROPOSED
OFFICE DEVELOPMENT
DAVID LOW WAY, PEREGIAN BEACH

TRAFFIC IMPACT ASSESSMENT

December 2006

Job No: C3694
Report No: 4284-0

Prepared for: Barlow, Gregg & Associates

 

Page 76

DOCUMENT CONTROL SHEET

 

 

BURCHILL VDM PTY LIMITED

Evandale Place Job No. C3694
142 Bundall Road

SURFERS PA

Telephone:
Fax:
Email:

RADISE QLD 4217 Report No. 4284-0
+61 7 5574 0511 Original Date of Issue _1* December 2006
+61 7 5574 0011
[email protected] Project Leader Dale Kleimeyer

 

REPORT DETAILS

 

 

 

 

 

 

 

Title: Proposed Office Development
David Low Way, Peregian Beach
Traffic Impact Assessment

Author(s): Matt Murphy

Client: Barlow, Gregg & Associates

Client Contact: Peter Barlow

Client Reference:

Synopsis: This report assesses the traffic impacts of the proposed office
development on the surrounding road network, and assesses the
internal adequacy of the site in terms of vehicle movement.

REVISION/CHECKING HISTORY

REVISION DATE CHECKED BY ISSUED BY DISTRIBUTION - NO. OF COPIES
NUMBER Client Other BP
4284-0 1/12/06 DTK 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Report No. 4284-0

December 2006

vem BURCHILL VDM

 

 

Page 77

TABLE OF CONTENTS

  
 
 
  
 

 

0 [0 ( 010] 901 (0) 5 EOE ES EEESESSSS 1
1.1 B@CKQrOUNG 200... ee eceeeecccseeeeesseeceeeeteeesseeesseeeesessseseeeeascneesceeesesesaauseeaternactaeeess 4
1.2 Report Objectives... eee eesseesseeessesssceeeesseesenecesnesseessnssesseseeasesseenssessaeeenes 1

2.0 Description Proposed Development..........cccccececesseeseeeseetenseeseeecrescrseceseseeenenseeeees 2
2.1 Subject Site... eee 2
2.2 Proposed Development.............. 2
2.3 Site Location 0.0... 3
2.4 Future Development... ud
2.5 Road Network..........ccccccccccesceeceeeceeeeeeseseeecseeeesseeeeeersssaecsseseesenasesasauepeessanesunestess 4

3.0 Traffic Data... ccccceeccecneeeeeteteceeeecesttneeeeeeentneneeeseeepeneeseesseuesesspensesaseesentbeaeaes 5
3.1 Background Data ou... cece cseereeseseerssceeeseseseseseseeesseseesssesseesneseaeees 5
3.2 Development Traffic... 6

4.0 ACCESS... eeeeeeee wil
4.1 Proposed Access wil
4.2 Access Analysis .. desde eeneeecseaeeceuanececnceeseaeessaeeeseedeeeseeesaesenisenssaueesniereeniegee 8
4.3 Roadway Capacity .........ccccccceeceetseeeeeccereeteecseessecseessessessansenssssneesssenresseeeeee 9

5.0 — Internal ANalySis 2.0.0... cece esses ecseeesereseseneeceesseeeseeseeeeeneeesenanesrasaeeessaeeseeneeese 11
5.1 LAYOUL oe eeeeceeceeeeseseeecteesseeseecsetscseseesaseesesssesessessssasieesessessssaseassscsasseesesseneses
5.2 Parking... we
5.3 Service Vehicles..

5.4 Pedestrians ............ “

6.0 Conclusions / DiSCUSSION .....0..... cece eeececeneeeeeeceeeseaeeseueenseetssseeesecnseeeseseseesnasesaaee 13

7.0  RECOMMENAAIONS. 0.0... eee eeeceeceteeeeeeetseceeeereeteseesscssueecsuasessanessersuesaeseseereaeesages 14

Tables

Table 3.1 - Traffic Data Projections .......... cece ccceeseeeseenesescesseeessessaeeecssessscsussatesessatenessees 5

Table 4.1- SIDRA Results, Site Access with David Low Way Without Upgrades............. 8

Table 4.2 - SIDRA Results, Site Access with David Low Way Upgrades
Table 4.3 — Carriageway Capacity 0.0.0... ccc eccccececeecessereseerseesseesesseeesesenseerareenesseeees

 

Figures

Figure 2.1 — Site Location.....
Figure 4.1 — Access Location

 

Appendices

Appendix A ~ Site Plans and Peregian Beach Master Plan
Appendix B — Traffic Census Data

Appendix C — Analysis Volumes

Appendix D — SIDRA Output

 

Report No. 4284-0

December 2006 ¥Em BURCHILL VDM

Page 78

 

1.0 INTRODUCTION

1.1 BACKGROUND

Burchill VDM Pty Limited have been commissioned by Barlow, Gregg &
Associates to conduct a Traffic Impact Assessment (TIA) of the Proposed Office
Development (the proposed development), to be located on David Low Way,
Peregian Beach (the subject site).

1.2 REPORT OBJECTIVES

The objectives of this TIA are to:

1.
2.

Review background traffic volumes on the surrounding road network.

Calculate daily and peak hour traffic generation of the proposed
development and determine its distribution.

Examine the access requirements of the site.
Determine parking requirements and assess the internal layout.

On the basis of the above, examine the traffic impact of the proposed
development.

 

Report No. 4284-0
December 2006

vem BURCHILL VDM

Page 79

 

2.0 DESCRIPTION PROPOSED DEVELOPMENT

2.1 SUBJECT SITE

Peregian Beach is a small coastal town within the Noosa Council Local
Government Area.

The proposed development is to be located on David Low Way, Peregian Beach,
between Woodland Drive and Herron Street. The site location map is presented
in Figure 2.1. The area of the subject site is 1520.65m’.

The site is currently undeveloped and is partially covered by vegetation. An
informal gravel access currently exists to the site.

Surrounding the site is residential development to the south and lawn bowl greens

to the west. The land to the north of the site is undeveloped. David Low Way
fronts the site to the east.

2.2 PROPOSED DEVELOPMENT

The proposed development consists of a 6-tenancy office space development and
associated car parking including basement parking and associated ramp. Key
components proposed include:

° 6 Office Space Tenancies

Ground Floor Tenancy 1 (79.53m* GFA)
Tenancy 2 (281.97m’ GFA)
First Floor Tenancy 3 (146.76m? GFA)

Tenancy 4 (285.01m* GFA)

Tenancy 5 (97.49m* GFA)

Tenancy 6 (184.48m? GFA)
° 54 Parking Spaces

Basement 38 spaces
Ground Floor 16 spaces
Access to the site will be provided via a driveway access from David Low Drive at

the southern end of the lot.

Plans of the Proposal are shown in Appendix A Drawings 2243 SD-01 through to
2243 SD-04.

 

Report No. 4284-0

December 2006 vem BURCHILL VDM

Page 80

 

2.3 SITE LOCATION

Peregian Beach is located on the coastline between Noosa and Maroochydore.
Figure 2.1 shows the location of the proposed development.

 

 

 

 

 

2.4

Figure 2.1 — Site Location

FUTURE DEVELOPMENT

Noosa Council currently have a Master Plan for the central business area
of Peregian Beach. This outlines extensive possible development for the
area and is shown in Appendix A, inset a and inset b from the Peregian
Beach Village Master Plan.

Several developments within this area are already proposed as shown in
Appendix A, Drawing 2243 SD-01.

 

Report No. 4284-0

December 2006

vem BURCHILL VDM

Page 81

 

2.5

ROAD NETWORK

2.5.1 David Low Way

David Low Way runs north south along the coastline connecting to
Maroochydore to the south and Sunshine Beach to the north. Through
Peregian Beach and north, Noosa City Council controls David Low Way.
Further south, past the site, it is a state road under the control of the
Department of Main Roads (DMR).

In the vicinity of the site it is a 2 way 2 lane arterial road with a narrow
sealed shoulder and no kerb and guttering. Further north painted and
raised medians are provided as well as kerb and guttering. Small gaps and
turning lanes are provided for turning traffic.

2.5.2 Road Upgrades

Council propose to upgrade the section of David Low Way between Herron
Street and Woodland Drive to address traffic issues associated with the
expected development as per the Peregian Beach Master Plan.

This includes the construction of a roundabout at the David Low Way /
Woodland Drive / Ibis Street intersection and a raised median extending
from the roundabout to Herron Street. This will restrict turns at driveways
along the section to left in / left out. Vehicles wishing to turn right will need
to conduct U turns at either the Herron Street roundabout or Woodland
Drive roundabout.

The roadway will also be upgraded to 3.5m travel lanes with a 1.5-2.0m
cycle lane in each direction and kerb and gutter on both sides. No on street
parking will be provided.

A crossing point for pedestrians is likely to also be provided midway
between the two roundabouts.

Planning for these upgrades is currently underway with construction of the
roundabout at Woodland Drive envisaged for 2008. For analysis purposes,
construction of the remaining upgrades is also assumed for 2008.

Council have advised contributions towards these upgrades will likely be
sort from developers.

 

Report No. 4284-0

December 2006

vem BURCHILL VDM

Page 82

 

3.0 TRAFFIC DATA

3.1 BACKGROUND DATA

Background traffic data along David Low Way has been obtained from Noosa
Council. This shows a 2006 AADT past the site of 13500 vehicles. A growth rate
of 3.0% per annum has been derived from Council's Coastal Area Traffic and
Transport to 2016 and Coastal Major Road Network Infrastructure Changes Plan
documents. This growth rate corresponds with historic data from the DMR
permanent counting station south of the site, which is shown in Appendix B.

The future predicted AADT’s are shown in Table 3.1 below.

Table 3.1 - Traffic Data Projections

 

 

Year Growth Volume AADT
2006 3% 13500
2007 3% 405 13905
2008 3% 417 14322
2009 3% 430 14752
2010 3% 443 15194
2011 3% 456 15650
2012 3% 470 16120
2013 3% 484 16603
2014 3% 498 17101
2015 3% 513 17614
2016 3% 528 18143
2017 3% 544 18687
2018 3% 561 19248

 

 

 

 

 

 

Peak hour traffic volumes past the site are shown in Appendix C, Figures 3.1 and
3.2. To account for the expected future development in the area an additional 20
peak hour vehicles have been added to David Low Way in each direction for
2018, and 100 vehicles in each direction for 2018.

Traffic volumes may be higher at the site during holiday periods, which occur for
approximately 20% of the year.

 

Report No. 4284-0

December 2006 vem BURCHILL VDM

Page 83

 

3.2 DEVELOPMENT TRAFFIC

Traffic generation for the proposed office development has been determined
using the rates outline in the RTA’s Guide to Traffic Generating Developments.
The rate given for office space is:

Peak Hour Trips _—_2 trips per 100m? GFA
Daily Trips 10 trips per 100m? GFA

The total office space GFA of the proposal is 1080m”. Using the rates above this
gives a total traffic generation for the site of:

Peak Hour Trips 22 trips
Daily Trips 108 trips

 

Report No. 4284-0

December 2006 vem BRURCHILL VDM

Page 84

 

4.0 ACCESS
4.1 PROPOSED ACCESS

Access will be made via a 6.0m two way driveway on the southern end of the site.
The location of the access is shown in Figure 4.1 below.

 

 

Figure 4.1 - Access Location

 

As Council propose to construct an unbroken raised median past the site between
Woodland Drive and Herron Drive, future access to the site will be restricted to
left in and left out only.

 

Report No. 4284-0

December 2006 vem BURCHILL VDM

Page 85

 

4.2 ACCESS ANALYSIS

The access has been analysed at full upgrade of David Low Way with the left in
and Left out only from the development site at expected opening of 2008 and ten
years into the future in 2018.

The access has also been analysed for existing conditions in 2008 without any
upgrades to David Low Way. This was not modelled for 2018 as it is assumed the
upgrade of David Low Way will be complete by this time.

The performance of the access was analysed using the SIDRA 3.0 traffic
modelling software.

For priority controlled intersections (Give-Way or Stop control), a Degree of
Saturation (DOS), (which is the ratio of flow to capacity), greater than 80% is
considered over capacity. Above this value, performance deteriorates quickly and
operation becomes poor.

Council’s Coastal Major Road Network Infrastructure Changes Plan states that in
order for design systems to operate adequately in peak holidays times (i.e. 20% of
the year) it is necessary for the network to operate within the Level Of Service
(LOS) B-C range with give way intersections having a DOS of 70% or less.

The critical gap and follow-up headway parameters used for the model were
derived from Austoads (2002) Urban Road Design Guide.

The traffic volumes considered in this analysis are illustrated in Appendix C,
Figures 3.1 and 3.2. The results of this analysis are summarised and discussed
below. The Movement Summary tables provided by SIDRA are supplied in
Appendix D.

Table 4.1 - SIDRA Results, Site Access with David Low Way Without

 

 

 

 

 

 

 

Upgrades
2008 With Upgrades
AM PM
David Low | David Low David Low | David Low
Way sth_| wavnth | A°°°SS | waysth | waynth | Access
DOS (%) 32 30.3 24 36.7 43.3 8.2
Avg Delay
(seconds) 0.1 3.9 13.1 0 6.4 23.9
Queue (m) 0 31 1 0 66 2
Los A A B A A c

 

 

 

 

 

 

 

 

 

 

Report No. 4284-0

December 2006 ‘vem BURCHILL VDM

Page 86

 

Table 4.2 - SIDRA Results, Site Access with David Low Way Upgrades

 

 

 

 

 

 

 

~ 2008 With Upgrades "2018 With Upgrades
AM PM AM PM

David Low David Low David Low David Low

“Waysth | ASS | waysth | AM? | ways | ACeS® | ways | Access
DOS (%) 32.3 17 36.8 3.6 47.1 3.1 53.3 77
Avg Delay
(seconds) 0.2 8.4 0.1 9.9 0.1 14.3 0 19.5
Queue (m) 0 0 0 1 0 4 oO 2

Los A A A A A B A Cc

 

 

 

 

 

 

 

 

 

 

 

The modelling shows that the access will operate adequately for existing
conditions on David Low Way with minor queuing and delays to southbound
vehicles on David Low Way. This will be due to vehicles waiting to turn right into
the site.

Modelling for future upgraded conditions on David Low Way shows the
intersection will operate adequately without restricting traffic flow on David Low
Way. Acceptable delays of up to 19.5 seconds can be expected for vehicles
exiting the site in 2018 with queue lengths of up to 1 vehicle.

There is a maximum DOS of 53% to through traffic on David Low Way, which is
well below the acceptable value of 80% as stated above.

The intersection is also expected to operate adequately during holiday periods.
The worst LOS is “C” and highest DOS is 53%, which is well within the acceptable
parameters as stated in Council’s Coastal Major Road Network Infrastructure
Changes Plan.

Eventually some vehicles will need to conduct U turns at the Woodland Drive and
Herron Street roundabouts due to the site being restricted to left in left out. The
volume of vehicles performing these manoeuvres is low (between 3 and 7 in the
peak hours) and the affect on these roundabouts is expected to be unnoticed.

4.3. ROADWAY CAPACITY

The desirable maximum roadway capacity standard for Noosa Council is given in
Council's Coastal Major Road Network Infrastructure Changes Pian and is shown
in Table 4.2 below.

 

Report No. 4284-0

December 2006 vem BURCHILL VDM

Page 87

10

 

Table 4.3 — Carriageway Capacity

{table 5.1 from Council's Coastal Major Road Network Infrastructure Changes Plan)

 

 

Large tao-lane roundabout (vith
separate left turn lanes}

 

TYPE OF ROAD DESIRABLE MAXIMUM STANDARD
Terooway tvotane road 16,000-20,000 vehicles per day
Four lane divided road 35,000-40,000 vehicles per day
. Degree of saturation of 0.70
Unsignolised Tunction Intarsecting flows of 18,000 vehiciss per day and 4,000 vehicles par day
. Degree of saturation of 0.70
I undabout
Single lane rat intersecting Nows of 16,000 vehicles per day and 8,000 vehicles par day
Twotane roundabout Degree of saturation of 0,70

Intersecting flaws of 35.000 vehicles per day and 16.0C0 vehictes per day

Degree of saturation of 0.70
intersecting flows of 40,000 vehicles per day and 16.000 vehicles per day

 

David Low Way past the development site is a two way two lane road and, from
Table 4.2, has a desirable maximum capacity of 20,000 vehicles per day. From
Table 3.1, traffic volumes in 2018 on David Low Way past the site can be
expected to be approximately 19,248 vehicles per day, which is within this limit.

The proposed development will not have a major impact on these volumes (up to
108 daily vehicles). However, past 2018 and with additional development
associated with the Peregian Beach Master Plan, volumes may increase to over
20,000 vehicles per day. This may also be the case for holiday periods. Further
upgrading of David Low Way or the redirection of traffic to bypass Peregian

Beach may be required further into the future past 2018.

 

Report No. 4284-0
December 2006

vem BURCHILL VDM

 

Page 88

 

5.0

INTERNAL ANALYSIS

5.1 LAYOUT

The two way, 6.0m wide driveway access is considered adequate for the site and
should be constructed as per AS 2890.1: 2004 Parking Facilities — Off Street Car
Parking, and Council's Noosa Plan 2006 — Part 14 Assessment Criteria for
Development for a Stated Purpose or of a Stated Type.

The internal road layout will provide access from the driveway to ground level
parking and the basement parking area via a ramp.

The internal layout is shown in Appendix A.

5.2 PARKING

As per Council's Noosa Plan 2006, 1 car parking space per 20m” GFA is required.
The Proposal will be 1080m’ GFA, which equates to a requirement of 54 spaces.

54 spaces will be provided as part of the proposal, which complies with Council's
requirements.

Parking space dimensions, aisle widths, ramp grades and overhead clearance
should be designed to AS 2890.1: 2004 Parking Facilities — Off Street Car
Parking.

Also, 1 bicycle parking space is required per 50m? GFA as per Council's Noosa
Plan 2006. Therefore the 1080m? GFA will require 22 bicycle parking spaces. It is
recommended sufficient bicycle parking spaces be provided as per AS 2890.3:
1993 Parking Facilities — Bicycle Parking Facilities.

5.3 SERVICE VEHICLES

Vehicles likely to service the site include maintenance vehicles, emergency
vehicles (ambulance), small delivery vehicles and garbage trucks.

Garbage collection will be from the frontage of the site via either a kip bin or
wheelie bins.

Vehicles likely to service an office development will be delivery vans and small
maintenance vehicles accessing the site on an irregular basis. Casual parking for
these vehicles has been accommodated in the parking rate specified in the Noosa
Plan 2006.

 

Report No. 4284-0

December 2006 vem BURCHILL VDM

Page 89

12

 

5.4 PEDESTRIANS

Sufficient pedestrian facilities are provided so pedestrians can move freely and
safely throughout the site.

Sealed pedestrian paths are currently provided along either side of David Low
Way. A pedestrian crossing midway between Herron Street and Woodland Drive
is expected to be constructed as part of Council’s upgrade of David Low Way.
This will provide safe access for pedestrians accessing the central business area
to and from the site.

 

Report No. 4284-0

December 2006 vem BURCHILL VDM

Page 90

13

 

6.0

CONCLUSIONS / DISCUSSION

The proposed Office Development on David Low Way, Peregian Beach, is likely
to generate up to 22 vehicles in the morning and afternoon peak hours. Before the
proposed upgrade of David Low Way the access is expected to operate
adequately with minor queuing and delays to southbound vehicles on David Low
Way. This will be due to vehicles waiting to turn right into the site.

Ultimately access will be restricted to left in and left out due to the construction of
a median past the site as per Council's planned roadworks for the area. For this
reason some vehicles will need to perform U turns at the roundabouts to the north
and south of the site. As the traffic volumes generated by the proposal are low this
is not expected to have a noticeable impact.

The access has been modelled for left in left out only, which shows the access will
operate adequately at opening and 10 years into the future. The modelling also
shows the access will operate adequately during holiday periods.

By 2018 David Low Way will approach the maximum desirable carrying capacity
of a two way two lane road as per Noosa Council's guidelines. However, the
proposed office development will only add a relatively minor volume of traffic to
the road compared to background traffic volumes. Therefore it is not expected to
have an impact on the carrying capacity of David Low Way.

The internal layout is considered adequate for the site and the number of car
parking spaces provided complies with Council's requirements.

The traffic impacts of the proposed office development on the external road
network are expected to be minimal. There are no reasons in terms of traffic
impacts that the proposal should be refused provided the recommendations below
are considered.

 

Report No. 4284-0

December 2006 vem BURCHILL VDM

Page 91

14

 

7.0 RECOMMENDATIONS

Recommendations for the Proposal are as follows:

e Driveway crossover onto David Low Way be constructed as per the Noosa
Plan 2006 — Part 14 Assessment Criteria for Development for a Stated
Purpose or of a Stated Type, and AS 2890.1: 2004 Parking Facilities — Off
Street Car Parking.

e nsure parking space dimensions, aisle widths, ramp grades and overhead
clearance is designed to AS 2890.1: 2004 Parking Facilities — Off Street
Car Parking.

e Provide 22 bicycle parking spaces as per AS 2890.3: 1993 Parking
Facilities — Bicycle Parking Facilities.

MATT MURPHY
Traffic Planner

 

Report No. 4284-0

December 2006 vem BURCHILL VDM

Page 92

APPENDIX A

Site Plans and Peregian

Beach Master Plan

 

Page 93

 

“massa Yo »~
eaves ws aianau vans oan wary od
Gl eecutoucunie vos Dizon @ S00 ot

ana put MLM RF Aan we EID
ror ise ceo ane
117 Add SLO3LHOWY NMOO NDI Mac
ware mai UNL WeUsOOD FAI Jo MBHGOD

varsina bO-aS epZZ wear

sv Booz, oT gl wp g00z ON se
tv Boor

 

 

 

 

NV1d ALIIV907
peer

HOVaS NVID3Y¥ad
AVM MO1 OIAVG

¥

NV1d ALITVW901 C D

SN31d8 8 NVOYOW
cy

LN3WdO13A30 391540 G3SOdONd

woo feud

oe woo-epy mmm gam
ne woo -eprDuiuipe Www
se 190 12019 wav

 

GeSL ByEr 20 XZ Cee gr ZO Het
HOvae SRY ‘Gu wNOmWH ALNHS Dor
BAUR] [LO}EEAYOAd ORY OU, emg

896 FrrS LO XA Mish rPPs 20 Ha
isSy__VEVIOOTOON SL XO Od
YavT1O0100W ASRS NVTWM LL
OSVTEdHOMY.
SLIIAIHDUV
NMI0 NAY
Eee Se

 

aiva NMWNG NOlteHoS30 AR

 

 

 

 

 

 

 

AS NVSI13d

@Gdbae |. we

A giv Ala

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BwuoMws Hoa
04 SHOOT 40 INNOWY
IAL LVM! SUSSANIN

ann)
zan0 CJ
wi (7
maannoo [J
wunsasz [_)
ONa931

 

 

 

 

OODLE md SES = FATS C077 OF URINE Te HERR Od ZOLSEN BRNNOOD GY DED Mun uRbeLed EREZION @ONSON MOHD,

Page 94

 

mene
UREA U suo eUD DENy 447) TERY a
Pyreecomnnenenicennenone

rg tg 160 La nae
5) sua $192 LHoINW NADO WLP Aes
ringne og tomtom murace Big (21 AuAdo3

worms ZOOS ChZZ “~woame { }
ev@oor:s eB] UME gOOZ ONY oP LN3WaSsva

twBoorr

 

 

 

 

Nv1d 40014 LN3W3Sva

Bunaip &
eap.ve

HOV3@ NVIS3Y3d
AVM MO1GIAVG

e
echo PT 4

SuzI38 9 NVOYOW . > ade Bap yoots 3039 a ‘ Tey i
‘
t o

*

 

ALNZWdO13A40 39td40 GASOdONd
poford

 

 

 

 

 

 

 

 

 

Te Woo'Bpy MMM eam
as woo-Ppx Qube wa
vay Leg 20019 nev

 

 

 

 

 

 

 

 

 

 

.

O01 Grey 20 x4 Cert sver 20 Hd
HOvad SITuTy ‘Oy UNOEWH BINNS OOF
QUOD /OUOHFDE/Gt ORLEY BULL, cas

 

corres 0 xs SASH rng 0 Hd 1
assy WavOO1OON 61 XO8 Od 1

 

‘DOV EHO,
SLoaLIHOVY \
NMOG Nay

 

   

 

 

 

a

 

 

 

 

 

 

 

 

 

 

 

aLvd_NMWEO NOLLsHOSSQ ASU ‘ a

Pa

es i
va-Td
ANAWaS¥a ,

\
\ 2 I 1

 

 

 

 

 

 

 

 

10020102 “Pd D'S = TCS EYZZ Hp URRANET IS DEWPT ZDSSINGINNIO0 OYAND Mis URDU EYELNON CORTON ND

 

1
!
1
!
I
1
!
1
a a 1 s ' c .
‘ N\ !
t
\ \ 1
\ ' /
\ 1
auOLS -- I (
. Leo
1-97 1 LL
I a
I K----@------ Goon -
1 oo" Ty aed red
No
No <iNWG UZONN
{ DINYL NOUNBLSS
ew 4 “
“em q > ee
ale
q 1 ~
, ~ ~™ ‘VD F1GSSOd eKEO] OMMOTHY
ach vcanoNa No
— wr WIT

 

 

aa son _samgowawnein
im SO “HART BOO AGN 35vE

 

 

 

 

AINO NOISSNODSIOC YOs

 

[~~ 9002190 “aiva ansst ’
" AMWNINITSYd = Sar

az ran

 

ome agen

Fries

wauy YOO $s0x9

 

 

 

Page 95

 

Daman

RRM mROLD DO OY MAC) TINIE OS
ci veaedenn 1m uodey Buaubasi0> a Ou mys
vray 490 00 19 NOY

Laud 81 9BLH¢Ouy NONDO NDP Auedaod
unpre nian waunace wa jo WBuldoD

vow COGS EFZZ “tuhmee { 5
ew@oor:s 2 a ED gogz ONY HH y¥OO14 GNNOYOD

Ww®oorr -

 

 

 

 

NV1d 4OOT4 GNNOYND
Bump

HOVag NVID3Yad
AVM MO1 GIAVG

fo

SuzI38 8 NVOYOW
%

AN3WdO13AR0 AdIdAO GASOd0dd
oad

wesee
orth We &
ne woo" apy MMM aM | AONVNSL
Re wos wD Buiwpos WAS

Sy 169 L8019 Nev

 

OL GPGr LO Xs Orvt SEF L0 Hd
HOWaO aITIv ‘Jy MMOH BLNHS OOF
AVES (UO|SSO}ONe OY OU, 2aung

G6” PPV 40 X4 ALS yr¥s 20 Hed
Uy VEVIOOTOON 651 XO Od

Yavi00 100" ARBULS NVTVM +4
OOVIEdHOY,

S$LIDLIHOVY

 

W818
vse
@ AONWNAL

 

Sy PUN

SOO OLOE- d BES = MATOS C12 (> MOURNE ed EEDNTULO IS EOSIN BINOOO CY MURUD UREOAK EDEN ENEOMMYHOD

 

 

 

 

 

 

 

¥3A0 4OOTS 30 3NIT
dn die

[aa RE

_ ne

wen _tsmansorne

gay Benoa

9002 150 :siyaanss! | ® RTWS

AINO NOISSNDSIC YOs

  

AYVNIWIT3ud | z “=

 

‘Wadv YOO SSONd

 

 

 

Page 96

GROSS FLOOR AREA

 

eee ey
| PRELIMINARY
© | FOR DISCUSSION ONLY
| ISSUE DATE: oct 2006 |

(GROWN FLOOR LEVEL TOMS or 307
seoreyor. wow

 

A
GaRsoucasteo at 29
ALOWING Tox POOLE CFA.

  
   

x TENANCY 4
. RL- 1420
285.01 m?

       
     
   
     
   
     

TENANCYS = /
RL- 14.20 /
97.49 m?

REV DESCRIPTION DRAWN DATE

 

KEN DOWN
ARCHITECTS

"ARCHIPELAGO’

11 WALAN STREET MOOLCOLABA

BOX 158 = MOOLOOLABA 4887
PH 07 Sead 4511 FX O7 544d 4969

TENANCY 3
RL- 1420 “
146.76 mi?
‘Suite 7 ‘The Arka Professional Contra’

400 SHUTE HARBOUR RD, AIRLIE BEACH
Prt O7 4048 1433 FX 07 4948 1633

TENANCY 6
RL 1420 s

184.48 mn? ~
ABN 61087 81 454
EMAL [email protected]

3 WES, www. kda.com, ao

project
PROPOSED OFFICE DEVELOPMENT

 

for

MORGAN & BEIERS

at

ad : DAVID LOW WAY
PEREGIAN BEACH

sy
aoe
@ drawing

FIRST FLOOR PLAN

 

1:100@A4

¢ \ FIRST FLOOR date AUG 2006 drown (Escola 1:200@A3
dawngno. 2243 SD04 revision

Copyngnt of Ws docurart rpmaina te excusive
‘of KEM DOWN ARCHITECTS PTY LTD
ABN 1 O87 a8 454,

‘Cortrastors are ta varty 98 demeraons and tev on
te prer ta commencing Raper a Grownences ©
‘be Archit Une figured deenwora in prfarence
to cated

GSORAWRNGSUco,_MaiZ343 parngan commaraafCAD DOCUMENTS? PLOTHAKER FILESVerton 4} 2249 $0. -§.18 Pu - 7070/2005

 

Page 97

ow?

or #
Rs io
A,

proposed conmmunty

proposed roundabou
commun ty node
business activity
shade trees

@ @ O yakway

D carparking

recreation

 

inset a =

 

master plan

Page 98

village square
community node
business activity
shade lrees
carparking
fecraation

walkway

New Irixes use

al evelopment

ais

fads and}
J ball play |
4} zone

 

Page 99

APPENDIX B

Traffic Census Data

 

Page 100

    

District NORTH COAST HINTERLAND DISTRICT

Queensland Government

7 > Capstone ot Aa Rand

 

  

Traffic Analysis and Reporting s@n

PERMANENT SITE REPORT

 

Site 20009 TRACS Ped Xing Coolum Beach SLSC

   
 
 

Road Section
Site Stream

 
    
  
 

    

(133 MAROOCHYDORE - NOOSA ROAD Taist{ 23.476 |
AlsieSieams

 

 

AADT
Average Week Day
Average Weekend Day

Year| 200:

 

Weekly Pattern

  

14,890

   

 

 

 

 

 

 

 

 

 

 

Daily Pattern

 

 

 

Growth last year ak
Growth last 5 yrs 1.7

Growth last 10 yrs 2.44,

 

 

 

 

AADT Pattern

 

 
  
   

 

 

 

 

 

 

  

 

12000

yaa
1oro4aot
fo-b-e tebe tt
a er roa
coro re
16000 11. + [—-YRI
nr yor od
en) boron be YRS
ee ee ee er enenery
1 ' ’ ‘ wo v YR10
yor 1 (
14000 +r + + > +
yor 4 1
ror 1
qtr
' ' yi
1
‘
4

10000
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

Hourly Pattern

 

 

115

 

 

110

 

105
%

 

 

AADToo -

 

 

95 +

 

90 +t

TAR350

 

 

 

 

Page 33 of 104

 

 

Sat

Thu Fri Sun

Printed on 03-Feb-2006 at 14:00

Page 101

00:71 12 9002-494-€0 UO Pau, POL $0 pe obey OSEYV.L

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_. Jt -JbE It. Ib dt] J] wns
boon: | brie | sor | bosor | bezoi | fess Z'66 9°S6 1g eq
1g°0 be0 ELt Go" 50 Leo 70 6° 2-62
BLL 820 eZ‘ Lee LL Lore 18'0 620 68-22
Lek be"! 0e'z ug'z 10% LZ 89'L Lyk Z2-12
bbz 0% bez Ize BZ Biz kez Vek 12-02
bz BLé ker vo'b 06° 1S" Lee Lore 02-61
bys Ly g6's 19 bes ors bs‘ bo" 61-81
ped Lg Lz o7"2 GL: eSz 1S'Z gg'9 8b-Zh
bez 08'9 bez ces B18 oe Phe 62:2 Zb-9b
bie LEZ Ld ez o's bs'8 zee 1z°8 QI-Sh
Loz bez bez ke eS‘ eZ yz eS" Sh-bh
bez WL 60'8 Bed 96'9 Loz (08"9 169 pl-El
bo" o's 1S'8 tro" LEZ zd oz'z bez eL-zh
PLL kz'8 Ly’ Yee SZ ed REZ vz Zb-Lb
SZ 68" 0z'8 1S bee Go" eed yz LL-O1
beg ho" Loz bo'Z 9 L2'9 06'9 69°9 01-60
19'9 e's K2'S biz SLL bos “ore Le9 60-80
but Le Ly z's 25 rhs bz's L6'b 90-20
Lee bert 192 Ble LE QL be eye 20-90
BLL bz: bo't Len Bz" bz"L ez'1 Le" 90-50
ke'0 6z'0 ge'0 bE‘ 160 LE" bE'0 be°0 g0-b0
SLO 620 z‘0 EEO bio bo 01-0 EL0 p0-£0
BL-0 L€°0 be'0 BLO B10 LO LVO O10 €0-20
z:0 Leo 70 81-0 PLO E10 LEO 60 20-10
bro bs" £0 ke‘0 an B20 bio ez"0 10-00

feq ung wes ud nu. pam any uoWw Jno
abesaay
Lav $0 % si0joe4 385 NOH

 

 

 

 

    

     

 

SWEANS SUS II¥, WEANS eS OS1S yoeeg WN}O0D BuIX Pad SOVEL 6000 US
GVOU VSOON - SYOGAHQOOUYW ce1! UoNDes peoy 191H1SIG ONVINALNIH_ LSVOO HLYON gous

1LY¥Od3y SLIS LNANVIWYSd ___ ren reartn
wes GBunodoay pue sisAjeuy seaL @ waurasenog PursesoRD

=

   

 

 

 

[ QLv'Ee hsips

 

Page 102

. e@ Traffic Analysis and Reporting i
Qe PERMANENT SITE REPORT

District NORTH COAST HINTERLAND DISTRICT 33 MAROOCHYDORE NOOSA ROAD Tdist{ 23.476 |
site P0008 TRACS Ped Xing Cookim Beach SLSC
Day Set by Week Set Matrix and Week Set Factors % of AADT
Week = Start Date Thu Fri Sat Sun Mon Tue Wed Wk Set Week Start Date Thu Fri Sat Sun Mon Tue Wed Wk Set

1]80-DEC-04 116.8: 124.1 119.49 104.5 109.37 113.4 114.08 114. 7-JUL-05 101.49 107. 103.71 90.7! 94.97 98. 99.0 99.2:
ig gq eat 119.4 1045G 10997 113.49 114.09 11439 [28 G_107.8f_ 103.74 90.79 Sq__99:09 99.29

[ 4\06-JAN-05 111.84 118.82 114.34 100.05 104.60 108.54 109.16 109.34 [29 fi4vut-o5” ‘| 100.2q 106.46 102.44 89.64 93.77 97.25 97.80 97.94

  

     

Road Section
Site Stream 'A

 
  

 

      

 

 

 

 

 

 

 

 

 

 

 

9[13-JAN-05 M084 1178G 11344 99.24 103.8] 107.67 108.28 10849 © [_3071-JUL-05 98.0f 104.2] 100.27 87.75 o7G 95.15 95.74 95.99
4|B0-JAN-05 103.07) 109.50] 105.34 92.20 96.49] 100.04 100.64 100.79 | 31)28-JUL-05 102.74 109.15 105.03 91.97] 96.14 99.71] 100.28 100.47]
5B7-JAN-05 104.47) 110.99 106.89 93.48 97.74 101.39 101.97 i0z1g 33 04-AUG-05 100.47, 106.741 102.71 89.84 94.03 97.59 98.09 98.29

 

 

 

03-FEB-05 104.4G 117.0% 106.84 93.47 97.74 101.49 107.99 102.18 [39/11-AUG-05 99.64 105.84 101.84 89.14 93.24 96.64 97.24 97.44

7{{10-FEB-05 103.57 109.97, 105.84 92.60] 96.86 100.49 107.03 101.24 | 3418-AUG-05 101.89 108.25 104.16 91.19 95.35] 98.88 99.44 99.64
[" 8[17-FEB-05 104.7 191.24 107.09 93.71 98.04 107.64 102.25 102.44 [35 25-AUG-05 100.55 106.83 102.79 89.95 94.09 97.58 98.14 98.39
[ae -FEB-05 fo2.16 10859 104.44 9139 9559 99.1 99.77 99.9 (34 1-SEP-05 101.99 108.36 104.27 9124 95.44 98.98 9958 ~ 99.7
rt . [ [ SBESEFSS 98.61 92.27 | 36. ¥
(SEsre ms

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
  

 

[i feiwarcos— [Tors ToT} Tosa — wood — e604 —O65q BHT — HO
[earns ogre og ey aro Talo
oe rosog HHTGT To7sf “99g 9a Trey 7025410273 qT,
gran |— saan org aga — Oso woT veo] [HypSOCTaS [usd Teale ves wea] TOPS TT
19/07-APR-05 e759 10359 9965 87.29 91.24 94.64 95.17, 95.35 rapeccras [101.51] 107.85 103.7 90.81[ 94.99 98.59 99.05 99.27
[14 [}4-APR-05 T0324 709-64 105.54 92.34 96.61] 100.19 100.77, 100.98 © [ 43 0-OCT-05 103.64 110.19 105.9F 92.79 97.0% 100-64 701.25 101.39
TA21-APR-05 100.34 106.60 102.57 89.74 93.8 97.37] 97.95 98.14 { 44P7-OCT-05 104.17] 110.61] 106.4 93.14 97.44 101.04 10T.6A 101.84
128-APR-05 98.54 104.74 100.79 88.20 92.25 — 95.64 96.29 96.41] |_45P3-Nov-05 | 103.21 109.65, 105.51| 92.39) 96.58 100.19 100.74 100.99
19 05-MAY-05 91.64 97.34 93.67 81.97 85.74 88.94 89.43 89.69 [46 [10-Nov-05 [041g 110.6 106.497 93.15 97.47] 101.03 107.67] 107.89
20 f2-MAY-05 9.65 10274 9884 8649 90.47 9385 94.37] 94.55 [47-Nov-05 io6.4i 113.05" 108.74 95.19 99.58 103.27 1 103.6q 104.04
21)19-MAY-05 98.047 104.15 10024 87.74 91.74 95.14 96.6F 95.87, + [48 24-NOV-05 105.18 V17F 10755 94.19” 98.4F 102.08 102.64 102.64

29 26-MAY-05 97.0% 103.14 9929 8685 90.85 94.29 94.78 94.94  [ 49f1-DEC-05 107.45, 114.14 109.84 96.17] 100.59 104.26 104.8G 105.04
[ 2ap2JUN-05 [946i] 1005] 9674 B46q 885d 9184 9234 «9250 [50pe-DEC-05 105.17 111.74 107549 9409 98449 102.07 102.69 102.84

 
 

 
 
    

    

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

24/09-JUN-05 75 10497 1009F 8834 924i, 9584 9639 96.57 [ SI/1S-DEC-05 TOSS] 115.28 110.99 97.07 101.54 105.30 105.9 106.11
[ 25 (16-JUN-05 9475 1006F 9684 8474 BBE 919F—924F O2EF [54 22-DEC-05 107.2 113.99 109.65" 95.99 100.37 104.04 104.69 104-89
26 23-JUN-05 922] 979G 94.24 —824F 86.28 B94F 90.09 ~—«90.1]~—[ 59P9-DEC-05 116.89 124.17 119.49 104.51 109.34 113.37 _ 140g 114.24
[ 27|B0-JUN-05 9.9f 10299 99.09 8677] 7 94.07 ~—«4-T—«84.79

 

 

 

TAR350 Page 35 of 104 Printed on 03-Feb-2006 at 14:00

Page 103

> Traffic Analysis and Reporting sin

Q cere corerman
ea PERMANENT SITE REPORT

       

   

 
      

 
 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site 20009 TRACS Ped Xing Coolum Beach SLSC Site Stream
AADT History
Year AADT GrowthPciyr Growth Pc Syr Growth Pc 10yr Year AADT Growth Pc tyr Growth Pc 5yr Growth Pc 10yr
2005 [ 14890 83 1.79 2.44)
2004] 15014 1.85 = { 2.55} 28
2003) 14744 277 =f 2.9 ‘J
2004 14345) 4.52 3.38 ]
{2001 13725, 2.44 3.39 ‘|
2000, 13401} -.34 3.27] |
1999 13444 [ 5.89 3.47, ]
1998 | sséd2696 SC 7.3) }
1997] 11834 3.61 |
[199g [11429 289 (oO) LL)
LE
[iosq(—aoeg [| EP] UL

 

 

 

 

 

 

 

 

TAR350 Page 36 of 104 Printed on 03-Feb-2006 at 14:00

Page 104

APPENDIX C

Analysis Volumes

 

Page 105

XXX = - Development Traffic
XXX - Background Traffic

MORNING (AM) PEAK

 

 

Way

David Low

 

 

 

Site Access

 

 

 

 

 

 

 

Way

David Low

 

 

 

AFTERNOON (PM) PEAK

 

 

Way

David Low

 

 

[@
15 _t

 

 

 

 

 

6 Site Access

‘) I

 

7

796

 

676
3
+ @|
David Low
Way

 

 

 

 

C3694 - Office Development Peregian Beach

Figure 3.1
2008 Traffic Volumes With Development
and Road Upgrades

BURCHILL VDM

Page 106

MORNING (AM) PEAK
XXX - Development Traffic
XXX _—_- Background Traffic

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

David Low
Way
x )
3
9 _4
Site Access 814
13 859
14
David Low
Way
AFTERNOON (PM) PEAK
David Low
Way

 

 

 

oy
7

15 _t

Site Access 1142

1/1

 

 

 

 

981
3
t_ @|
David Low
Way

 

 

 

 

C3694 - Office Development Peregian Beach

Figur 3.2
2018 Traffic Volumes With Development BURCHILL VDM

and Road Upgrades

Page 107

APPENDIX D

SIDRA Output

 

Page 108

Movement Summary

SIDRA

INTERSECTION

Movement Summary

David Low Way and Access

2008 AM Peak + Development with Upgraded Road

Give-way

Vehicle Movements

Page 1 of 1

 

 

 

 

 

Dem Deg of Aver Level of pack of Pro Eff. Sto Aver
MovID Turn Flow %HV Satn Delay) Selvice Queue Queue 4d Rate P Speed
(veh/h) (v/c) (sec) (m) (km/h)
David Low Way Sth
1 L 14 0.0 0.326 7.8 LOS A 0 0.00 0.66 49.4
2 T 615 0.0 0.323 0.0 LOS A 0 0.00 0.00 60.0
Approach 629 0.0 0.323 0.2 LOSA 0.00 0.01 59.7
Access
10 L 9 0.0 0.017 8.4 LOS A 0 0.56 0.69 28.5
Approach 9 0.0 0.017 8.4 LOS A o 0.56 0.69 28.5
Not
All Vehicles 638 0.0 0.326 0.3 Applicable ° 0.01 0.02 58.8
SIDRA SOLUTIONS
A0463, Burchill VDM Pty Limited, Large Office
Produced by SIDRA Intersection 3.0.060813.12
Copyright 2000-2006 Akcelik and Associates Pty Ltd
www. sidrasolutions.com
Processed Nov 30, 2006 02:23:56PM
about:blank 1/12/2006

Page 109

 

 

 

 

 

Movement Summary Page | of 1
~
SIDRA - =
INTERSECTION
Movement Summary
David Low Way and Access
2008 AM Peak + Development Existing Road
Give-way
Vehicle Movements
95%
Dem Deg of Aver Aver
MovID Turn Flow %HV  Satn Delay cove of Queue. Quove 4 Bry. Stop Speed
(veh/h) (v/c) (sec) (m) (km/h)
David Low Way Sth
1 L 8 0.0 0.320 7.8 LOS A o 0.00 0.66 49.4
2 T 615 0.0 0.320 0.0 LOS A Oo 0.00 0.00 60.0
Approach 623 0.0 0.320 O14 LOSA 0.00 0.01 59.9
David Low Way Nth
8 T 581 0.0 0.303 3.8 LOS A 31 0.72 0.00 51.3
9 R Ss 0.0 0.312 12.1 LOS B 31 0.72 0.90 44.5
Approach 586 0.0 0.303 3.9 LOSA 31 0.72 0.01 $1.2
Access
10 L 6 0.0 0.024 11.6 LOS B 1 0.67 0.74 27.4
12 R 3 0.0 0.024 16.2 Los Cc 1 0.67 0.90 41.4
Approach 9 0.0 0.024 13.1 LOosB 1 0.67 0.80 30.8
Not
All Vehicles 1218 0.0 0.320 2.0 Applicable 31 0.35 0.01 55.0

 

+

SIDRA SOLUTIONS

A0463, Burchill VDM Pty Limited, Large Office

Produced by SIDRA Intersection 3.0.060813.12

Copyright 2000-2006 Akcelik and Associates Pty Ltd

www.sidrasolutions,com

Processed Dec 01, 2006 03:28:20PM

about:blank

1/12/2006

Page 110

Movement Summary

SIDRA

INTERSECTION

Movement Summary

David Low Way and Access

2008 PM Peak + Development with Upgraded Road

Give-way

Vehicle Movements

Page | of 1

 

95%

 

 

 

 

Dem Deg of Aver Aver
MovID Turn Flow OHV Satn _—iDelay wevel of ‘Gacue. Quene 4 Eft. Stop Speed
(veh/h) (v/c) (sec) (m) (km/h)
David Low Way Sth
1 L 6 0.0 0.375 7.8 LOSA oO 0.00 0.66 49.4
2 T 712 0.0 0.368 0.0 LOS A 0 0.00 0.00 60.0
Approach 718 0.0 0.368 0.1 LOS A 0.00 0.01 59.9
Access
10 L 16 0.0 0.036 9.9 LOS A 1 0.63 0.79 28.0
Approach 16 0.0 0.036 9.9 LOS A 1 0.63 0.79 28.0
All Vehictes 734 «0.0 0.375 0.3 Not 1 0.01 O02 585
Applicable
SIDRA SOLUTIONS
A0463, Burchill VDM Pty Limited, Large Office
Produced by SIDRA Intersection 3.0.060813.12
Copyright 2000-2006 Akcelik and Associates Pty Ltd
Processed Nov 30, 2006 02:23:56PM
about:blank 1/12/2006

Page 111

 

 

 

 

 

Movement Summary Page | of 1
-
SIDRA - =
INTERSECTION
Movement Summary
David Low Way and Access
2008 PM Peak + Development Existing Road
Give-way
Vehicle Movements
95%
Dem Deg of Aver Aver
MovID Turn Flow %HV  Satn Delay vier ‘Ouet ‘of Queve 4 err Stop Speed
(veh/h) (v/c) (sec) (m) (km/h)
David Low Way Sth
1 L 3 0.0 0.375 7.8 LOS A 0 0.00 0,66 49.4
2 T 712 0.0 0.367 0.0 LOS A 0 0.00 0.00 60.0
Approach 715 0.0 0.367 0.0 LOS A 0.00 0.00 60.0
David Low Way Nth
8 T 838 0.0 0.433 6.3 LOS A 66 0.90 0.00 49.5
9 R 3 0.0 0.429 14.7 LOS B 66 0,90 1.09 42.0
Approach 841 0.0 0.433 6.4 LOS A 66 0.90 0,00 49.5
Access
10 L 8 0.0 0.082 21.8 LOS C 2 0.83 0.91 24.3
12 R 7 0.0 0.082 26.3 LOS D 2 0.83 0.95 34.7
Approach 15 0.0 0.082 23.9 Los c 2 0.83 0.93 28.2
Not
All Vehicles 1571 0.0 0.433 3.7 applicable 66 0.49 0.01 53.4

 

+

SIDRA SOLUTIONS

A0463, Burchill VOM Pty Limited, Large Office

Produced by SIDRA Intersection 3.0.060813.12

Copyright 2000-2006 Akcelik and Associates Pty Ltd
id fs

Processed Dec 01, 2006 03:35:14PM

about:blank

1/12/2006

Page 112

é

Movement Summary

SIDRA

INTERSECTION

Movement Summary

David Low Way and Access

2018 AM Peak + Development with Upgraded Road

Give-way

Vehicle Movements

Page | of 1

 

 

 

 

 

95%
Dem Deg of Aver Aver
MovID- Turn Flow %HV Satn Delay Level of Oucue Queve d Eft. Stop Speed
(veh/h) (v/c) (sec) (m) (km/h)
David Low Way Sth
1 L 14 0.0 0.467 7.8 LOS A 0 0.00 0.66 49.4
2 T 904 0.0 0.471 0.0 LOS A 0 0.00 0.00 60.0
Approach 918 0.0 0.471 01 LOS A 0.00 0.01 59.8
Access
10 L 9 0.0 0.031 14.3 LOS B 1 0,76 0.88 26.5
Approach 9 0.0 0.031 14.3 LOS B 1 0.76 0.88 26.5
. Not
All Vehicles 927 0.0 0.471 0.3 Applicable 1 0.01 0.02 59.1
SIDRA SOLUTIONS
A0463, Burchill VOM Pty Limited, Large Office
Produced by SIDRA Intersection 3.0.060813.12
Copyright 2000-2006 Akcelik and Associates Pty Ltd
id js
Processed Nov 30, 2006 02:23:56PM
about:blank 1/12/2006

Page 113

Movement Summary

SIDRA
INTERSECTION

Movement Summary

David Low Way and Access

2018 PM Peak + Development with Upgraded Road

Give-way

Vehicle Movements

Page | of 1

 

95%

 

 

 

 

Dem Deg of Aver Aver
MovID Turn Flow HV Satn Delay yevel of ucue. Quone d BA. Stop Speed
(veh/h) (v/c) (sec) (m) (km/h)
David Low Way Sth
1 L 6 0.0 0.545 7.8 LOS A 0 0.00 0.66 49.4
2 T 1033 0.0 0.533 0.0 LOS A 0 0.00 0.00 60.0
Approach 1039 0.0 0.533 0.0 LOS A 0.00 0.00 59.9
Access
10 L 16 0.0 0.077 19.5 LOS C 2 0.84 0.92 24.9
Approach 16 0.0 0.077 19.5 Losc 2 0.84 0.92 24.9
Not
All Vehicles 1055 0.0 0.545 0.3 Applicable 2 0.01 0.02 58.7
SIDRA SOLUTIONS
A0463, Burchill VDM Pty Limited, Large Office
Produced by SIDRA Intersection 3.0.060813.12
Copyright 2000-2006 Akcelik and Associates Pty Ltd
ww.sid .
Processed Nov 30, 2006 02:23:56PM
about:blank 1/12/2006

Page 114

— .
oe oon NOOSA COUNCIL .
xn a PAYMENT REQUEST FORM Creditor No.

Supporting documentation must be attached for all payments
If a requisition for purchase order has been done DO NOT USE THIS FORM.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Max 40 Spaces) | MO rQa~ oa Beirers P hy Crofl

ADDRESS: | cf- Co Bax 6380
Aloo cit Bote POSTCODE: Lesy
TYPE OF PAYMENT — Please tick appropriate box
REFUND ' ) REIMBURSEMENT ( FBT form may be required)

C] TRUST BOND RELEASE Q1_ponation :

QO) Grants . QO tasiny clam -

()__ SUPERANNUATION PAYMENT (PAYROLL USE ONLY) (] LEGALS REQUEST :

Q_ CONFERENCE REGISTRATION OQ) PERFORMANCE PAYMENTS

OQ] _oTHER (AS SPECIFIED)

 

 

QO] EMPLOYEE DEDUCTIONS (PAYROLL USE ONLY)

 

 

é. Detalls = Please tick the appropriate box If applicable (See procedures for more information)
O ABNholder. If yes, ABN #:

OQ sRegistered for Gst

 

FBT DETAILS ~ Please indicate if applicable
Q Fringe Benefits Tax Dectaration ts required and is attached with a photocopy of receipt

DESCRIPTION OF PAYMENT TO APPEAR ON CUSTOMER REMITTANCE — Maximum 40 characters
ele] oJFl jolvicle| Zlaly| qe 7 elu} (2444, 7, jolalmicjeL jelo

inyorcepocumentrer §[Tielet-tebsy-[ [ [|] 2¢1 27° (eee Wo)

 

 

 

 

 

Ledger Number GL Narrative
GST emourt (Description., Receipt No., Property No. etc)
i tle “f? [S20 2412370 Keg Mo

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total Payment [Seo

 

T certify that the articles and/or services charged In the attached and/or detailed above were 7 certify that (Ns payment is being made in accordance with the established payment
satisfactorily performed and according to en agreement with. the above named AND that they procedures of the accordance with the requirements of the Local Government

 

 

in
wore necessarily required for counci AND that the charges were fair and reasonable OR that Act and that such payment is In accordance with the adopted budget of council and that the
eppropriate authorisation for this payment has been by mein nce with 's n of this payment is In accordance with my delegated authority Emit.
established procedures.

wnt AUTHORISED OFFICER ©
SIGNATURE OF REQUESTING OFFICER

 

 

DATE: J J. DATE: &, i246
PRINT NAME OF REQUESTING OFFICER PRINT NAME OF AUTHORISED OFFICER

£5 So Genre
Instruction to AP Team Hold Cheque for:

 

 

Post Cheque UD No

 

 

 

 

(Please refer to Accounts Payable Procedures doc, to ensure correct use of form)

Page 115

 

 

xm LAND USE SECTION FEES
uct MENKOLOSTS

SALE OF DOCUMENTS /
Superseded Planning Scheme Documentation 146104 520
Copy of Permit/Approval Letter 32 146120
The Noosa Plan Documentatian 32 146564.1
APPLICATION FEES :
Material Change of Use - contract? :
Consistent . LSet} 32 146102 521
Inconsistent 32 146102 521
Assessment under Superseded Planning Scheme 32 146102 521
Modification to a Development Permit 32 146102 521
Extension of a Currency Period 32 146102 521
@ Operationa! Works - Landscaping / Doe 32 146102 521
Bldg Work assessable against the Planning Scheme 32 146102 521
PRE LODGEMENT REVIEW
Half Hour 146119 522
‘ One Hour 146119 522
ADVERTISING
Purchase Advertised Apptications 31 146110 523
JETTIES
‘ Jetty Application Fee 146115 524
Jetty Bond 942220 92
BONDS .
Performance Bond 33 95 943200
SIGNS .
Registration Fee 32 137510 222
SEARCH FEE
Search of Land Use Section file 32 146120
Liquor Licensing Request : 32 146120

 

TOTAL $  G-Ses/ 7 HY,

name: — Avefqa eae farcwrsy Pf

 

 

 

ADDRESS: v OA- fe (Ket, oe Aree
fo boxe 6330 ANarecct— ears
FILE NO: of 248% DATE: —_ 6/(z{o6 .

 

RECEIPT NO: / Ze} Zs? Signature of TP Officer: ft SK den

AUTHORITY NO: WS)

/3 2 Oob [ 289 (1

Page 116

 

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

aN

MCU - CODE ASSESSMENT
Details of Development

 

aN

[triconsistent 3.0

FEE CALCULATION

MCU IMPACL ASSESSMENT
Detat evelopment

[oon GRA
Adel TOK © IBEX

ZACbO
3233)

 

FEE CALCULATION

OPERATIONAL WORKS
Details of Development

 

 

 

 

TOTAL FEES -

Shee)

 

 

Used in these records

About this file

File size
7.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_2689 - MCU - Commercial Business Type 1 - Office [As Published].pdf · 7.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.