06/2689 - MCU - Commercial Business Type 1 - Office [As Published] · 132006.2689
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Operational works in a tidalareaor /9. The application involves operational work that is: ( tick the applicable box/es)
coastal management district
i) ti 10 ic
For mate information refer to Guide 18. For more LO) tidal work? as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed fidal work in local Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF :
1 ti ide 24. oe . . 7 5 .
thle ou eennanney ae sio0e,tne| Ll). tidal work that is prescribed tidal work"" other than in a canal’? -complete Pert P of Form 1; oF
, he sae. 5
application requires assessment by the (1 (ii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) fo (i) below are ticked,
manager tt te appleaion EPA's aconcurence [1 (@) constructing or installing works in a watercourse between MHWS and HAT (ie.
agency for the application in relation to this matter. other than those works in tidal water) where the development has been determined not
Local government is the assessment manager for ai fo be assessable against the Water Act 2000 ;
prescribed tidal work.
(.1(b) constructing a canal’? intended to be connected to tidal waters;
{1 (c)_ constructing an artificial waterway;
(J) (4) reclaiming land under tidal water;
Ce) disposing of dredge spoil or other solid waste material in tidal water;
(1 (A) _ interfering with quarry material on State coastal land above high-water mark;
(1g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(J (h) removing or interfering with coastal dunes on land, other than State coastal land,
@ ; that is in an erosion prone area and above high-water mark;
(1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
El (iv) none of the above.
Operational work below high water |10. The application involves operational work that is: ( tick the applicable box/es)
mark ifoaton rele to Guide 18, Forme C1 (i) tidal work’? as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed fidal work in loca! Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
Sic os anenera ae : eee oor (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; oF
the application triggers referral to Queenstand C1 (iii) carried out within a coastal management district's under the Coastal Act and for -
Transpod (orate Safe) ee (1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager for all M of Form 7;
presorbed Udal work. (1 (b) reclaiming land under tidal water - complete Part M of Form 1; or
(J (c)_ constructing a canal’®, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
(iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For more Information refer to Guide 18. CI (i) amaterial change of use assessable under a planning scheme involving operational
Unless you answered ‘none of the above” to Q11,
i : ‘ctrinltS
the apphealon requires assessment by the work carried out completely or partly in a coastal management district
Environmental Protection Agency (EPA). Ci (ii) a material change of use assessable under a planning scheme involving building
\fan agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -
manager for the application, EPA is a concurrence . . .
agency for the application in relation to this matter. « the construction of a new premises with a GFA’ of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?
D (ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
(iv) reconfiguring a lot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal' - complete Part M of Form 1
[XJ {v) none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in tha Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastaf Protection and Management Act 1995
13 Tidal work is defined in sch 40 of the IPA.
44 Prescribed tidal work is defined In the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or parlly within a toca! government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 Cana! means canal as defined under the Coastaf Protection and Management Act 1995
17 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to ihe planning scheme against which the application is being assessed.
18 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - MCU - Commercial Business Type 1 - Office [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.