Council archive · source document
06/2689 - MCU - Commercial Business Type 1 - Office [As Published] · 132006.2689
Movement Summary SIDRA INTERSECTION Movement Summary David Low Way and Access 2008 PM Peak + Development with Upgraded Road Give-way Vehicle Movements Page | of 1 95% Dem Deg of Aver Aver MovID Turn Flow OHV Satn _—iDelay wevel of ‘Gacue. Quene 4 Eft. Stop Speed (veh/h) (v/c) (sec) (m) (km/h) David Low Way Sth 1 L 6 0.0 0.375 7.8 LOSA oO 0.00 0.66 49.4 2 T 712 0.0 0.368 0.0 LOS A 0 0.00 0.00 60.0 Approach 718 0.0 0.368 0.1 LOS A 0.00 0.01 59.9 Access 10 L 16 0.0 0.036 9.9 LOS A 1 0.63 0.79 28.0 Approach 16 0.0 0.036 9.9 LOS A 1 0.63 0.79 28.0 All Vehictes 734 «0.0 0.375 0.3 Not 1 0.01 O02 585 Applicable SIDRA SOLUTIONS A0463, Burchill VDM Pty Limited, Large Office Produced by SIDRA Intersection 3.0.060813.12 Copyright 2000-2006 Akcelik and Associates Pty Ltd Processed Nov 30, 2006 02:23:56PM about:blank 1/12/2006
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - MCU - Commercial Business Type 1 - Office [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.