Council archive · source document
06/2689 - MCU - Commercial Business Type 1 - Office [As Published] · 132006.2689
é Movement Summary SIDRA INTERSECTION Movement Summary David Low Way and Access 2018 AM Peak + Development with Upgraded Road Give-way Vehicle Movements Page | of 1 95% Dem Deg of Aver Aver MovID- Turn Flow %HV Satn Delay Level of Oucue Queve d Eft. Stop Speed (veh/h) (v/c) (sec) (m) (km/h) David Low Way Sth 1 L 14 0.0 0.467 7.8 LOS A 0 0.00 0.66 49.4 2 T 904 0.0 0.471 0.0 LOS A 0 0.00 0.00 60.0 Approach 918 0.0 0.471 01 LOS A 0.00 0.01 59.8 Access 10 L 9 0.0 0.031 14.3 LOS B 1 0,76 0.88 26.5 Approach 9 0.0 0.031 14.3 LOS B 1 0.76 0.88 26.5 . Not All Vehicles 927 0.0 0.471 0.3 Applicable 1 0.01 0.02 59.1 SIDRA SOLUTIONS A0463, Burchill VOM Pty Limited, Large Office Produced by SIDRA Intersection 3.0.060813.12 Copyright 2000-2006 Akcelik and Associates Pty Ltd id js Processed Nov 30, 2006 02:23:56PM about:blank 1/12/2006
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - MCU - Commercial Business Type 1 - Office [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.