06/2689 - MCU - Commercial Business Type 1 - Office [As Published] · 132006.2689
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedule 2 of the !P-
Regulation.
Refer to Chapter 2, part SA and schedule 10 of the
Integrated Planning Act 1997, and schedule 2 of the
Regulatory Provisions for relevant definitions.
Unless you answered ‘none of the above” to Q20,
the application requires assessment by the Office of
Urban Management (OUM).
Fisheries matters
For more information refer to schedule 2of the IP
I
Unless you answered “none of tha above" to 021,
the application requires assessment by the
Department of Primary Industries and Fisheries
(OPI8F).
If an agency other than OPI&F is the assessment
manager for the application, DPI&F is a concurrence
agency for the application in relation to items (i) -
{iv) and an advice agency in relation to item (v).
IDAS Assessment Checklist, Version 18.0, 10 November 2006,
20. The application involves (tick applicable box/es) -
CO (i amaterial change of use of premises -
(a) ina Major Development Area in the Urban Footprint for -
OO (i) anurban activity -
(1) inan area included in a structure plan where
applies;
(J sinan area not included in a structure plan where -
e the IPA, section 3.1.6 applies to the application for the material change
of use; or
the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
¢ impact assessment is required under the relevant planning scheme
OO (ii) intensive animal husbandry, or
C {ii) residential development involving a rural residential purpose
the IPA, section 3.1.6
(b) in the Regional Landscape and Rural Production Area for -
1 (i) anurban activity and not specified in section 2.4(2); or
(1 (i) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for -
OC (i) an urban activity and not specified in section 2.10(2);
© (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
CC (iii) intensive animal husbandry
(1 (ii) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
{a) not included in a structure plan; and
(b) not specified in section 3.1(2).
&
21. The application involves: (tick the applicable box/es)
Oo (i) an assessable material change of use for aquaculture - complete Part O; of Form 1;
Ci (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;
Cli) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;
Li (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(1 v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
{X] (vi) none of the above.
{iii) none of the above
Page?
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - MCU - Commercial Business Type 1 - Office [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.