Council archive · source document
06/2689 - MCU - Commercial Business Type 1 - Office [As Published] · 132006.2689
4.0 SUPPORTING DOCUMENTATION 4.1 LANDSCAPE PLAN The applicant has commissioned LandGraphics to prepare Landscape Concept Plans illustrating the proposed landscaping treatments to be implemented with the development layout. The treatments include: * — streetscape works including footpaths and landscaping along the David Low Way frontage of the site; * vegetation species existing on the site to be retained; * landscaping strips along the key boundary interfaces; = screen planting to the adjoining Peregian Beach Bowls Club. Comment: the proposed landscaping treatments will visually enhance the proposed development whilst contributing to define the future streetscape theme of this section of Peregian Beach. The Landscape Plans are included as Attachment B. 4.2 SERVICES The applicant has commissioned Barlow Gregg & Associates to investigate the developments ability to connect to essential services. The associated Water and Sewer Services Report is included as Attachment C and is summarized below. = @ sewer main enters the subject site at the north western corner and extends approx 15m into the site along the rear boundary. It appears from council records that multiple service connections are available. An additiona! sewer connection point is available at the south western corner of the site. The site is adequately serviced with sewerage reticulation. * a water connection shall be provided from the reticulation main in David Low Way. This would be the most appropriate connection point for a water service to the site. Council advise that the current infrastructure is adequate for the proposed redevelopment of the site. The preferred existing sewer service connection will be maintained and the remainder to be capped and sealed at the service point. Council advise that the current infrastructure is adequate for the proposed redevelopment of the site. Comment: the proposed development can connect to Council reticulated sewer and water supply. 4.3 STORMWATER MANAGEMENT The applicant has commissioned Barlow Gregg & Associates to prepare a Stormwater Management Report including a Stormwater Management Strategy. The associated report is included as Attachment D and is summarized below. * the stormwater drainage system for the proposed development will be designed in accordance with QUDM and AS3500 Part 5; « — runoff from as much of the external area of the development as is practicable will be conveyed to landscaped areas for infiltration. Surface runoff external to the building will be allowed to flow through landscaped areas as far as practicable to allow infiltration to occur; = runoff from the site will be discharged into a proposed new stormwater gully pit to be located at the frontage of the site. From there a stormwater pipe will convey discharge into the existing stormwater manhole some 25m north of the site on the David Low Way. As this system is under Council control it is proposed that this is a lawful point of discharge; » where runoff enters the proposed grated drain, it will be treated by a gross pollutant trap prior to discharge to the proposed stormwater pit at the frontage of the site. Development Application for Material Change of Use Morgan & Beiers Pty Ltd Commercial Business: Type 1 Office (Impact Assessable) 247 David Low Way, Peregian Beach Page 7 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - MCU - Commercial Business Type 1 - Office [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.