Council archive · source document
06/2689 - MCU - Commercial Business Type 1 - Office [As Published] · 132006.2689
Column 1 Specific Outcomes b) match Council infrastructure. Column 2 Pareles] (merolteeelin (im Meter) See type of development as annotated on the drawings; AND $2.2 Driveways are designed and constructed in accordance with Council Standard Drawings 9014, 9019, 9020, 9021, as appropriate for the particular type of development as annotated on the drawings; AND $2.3 The change in grades in the driveways and ramps is in accordance with Section 3 of AS2890.1 Parking Facilities. Proposal infrastructure. Complies Driveways have been designed in accordance with applicable standards. Complies The basement ramp has been designed in accordance with applicable standards. 04 Vehicular access does not adversely impact on the capacity, existing infrastructure; AND O5 Vehicular access does not existing landscaping or native vegetation. operations and maintenance of the adversely impact on the integrity of $4.1 Footpath and kerb crossings are located clear of existing stormwater inlet structures, water and sewerage infrastructure fittings, any other exiting utility infrastructure, existing landscaping and vegetation. $5.1 No solution provided Complies Existing infrastructure will not be affected by the proposed site access. Complies Vegetation will be retained where indicated on the Landscape Plan prepared by LandGraphics, Table 14-46 — Carparking and manoeuvring oul s Specific Outcomes 14.132 Carpark design and layout Column 2 Probable Solutions (if Code Bese) Proposal O9 Sufficient carparking is provided to accommodate the number and type of vehicles likely to be generated by the development having regard to the specifics of the use including— a) the type and intensity of land use; the site; ¢) hours of operation; d) likely numbers of users; e) the peak parking demand periods of uses on the site; and f) the availability of alternative carparking. b) any existing parking available on $9.1 The number of parking and loading bays is not less than the minimum number specified in Table 14-47 Vehicle Parking Requirements; Complies The applicable parking rate is 1 space per 20m? or thereof, of use area OR 1 space per 2 employees whichever is the greater. OR A minimum of 4 spaces are provided. $9.2 If insufficient carparking spaces are provided on-site a monetary contribution is made to Council in accordance with Section 6 of PSP13 Contributions in lieu of provision of off-street carparking. The proposal! includes 1,080sqm of GFA. This equates to 54 spaces, 54 car parking spaces are provided within the development layout. Refer to the Traffic Impact Assessment prepared by Burchill VDM which address traffic related issues. O10 The layout of the development provides adequate, clearly defined and easily accessible— a) on-site vehicle parking and manoeuvring areas; and b) loading and manoeuvring areas $10.1 Parking bays, manoeuvring areas, queuing areas, loading, setdown and pickup areas and driveways are designed to the standards set out in Sections 2 and 3 of Australian Standard AS 2890.1 Parking Facilities (Part 1: Off-street Carparking) and AS 2890.2 — Off- street Parking (Part 2: Commercial Complies All parking areas are clearly identifiable on site and sufficient manoeuvring areas are provided for vehictes to enter and leave the site in a forward gear. Development Application for Material Change of Use Commercial Business: Type 1 Office (Impact Assessable) 247 David Low Way, Peregian Beach Morgan & Beiers Pty Ltd Page 21 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - MCU - Commercial Business Type 1 - Office [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.