Council archive · source document
06/2689 - MCU - Commercial Business Type 1 - Office [As Published] · 132006.2689
3.2 DEVELOPMENT TRAFFIC Traffic generation for the proposed office development has been determined using the rates outline in the RTA’s Guide to Traffic Generating Developments. The rate given for office space is: Peak Hour Trips _—_2 trips per 100m? GFA Daily Trips 10 trips per 100m? GFA The total office space GFA of the proposal is 1080m”. Using the rates above this gives a total traffic generation for the site of: Peak Hour Trips 22 trips Daily Trips 108 trips Report No. 4284-0 December 2006 vem BRURCHILL VDM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - MCU - Commercial Business Type 1 - Office [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.