Skip to the record
Accept no substitutions.

Council archive · source document

06/2689 - MCU - Commercial Business Type 1 - Office [As Published] · 132006.2689

of 116

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

Table 4.2 - SIDRA Results, Site Access with David Low Way Upgrades

 

 

 

 

 

 

 

~ 2008 With Upgrades "2018 With Upgrades
AM PM AM PM

David Low David Low David Low David Low

“Waysth | ASS | waysth | AM? | ways | ACeS® | ways | Access
DOS (%) 32.3 17 36.8 3.6 47.1 3.1 53.3 77
Avg Delay
(seconds) 0.2 8.4 0.1 9.9 0.1 14.3 0 19.5
Queue (m) 0 0 0 1 0 4 oO 2

Los A A A A A B A Cc

 

 

 

 

 

 

 

 

 

 

 

The modelling shows that the access will operate adequately for existing
conditions on David Low Way with minor queuing and delays to southbound
vehicles on David Low Way. This will be due to vehicles waiting to turn right into
the site.

Modelling for future upgraded conditions on David Low Way shows the
intersection will operate adequately without restricting traffic flow on David Low
Way. Acceptable delays of up to 19.5 seconds can be expected for vehicles
exiting the site in 2018 with queue lengths of up to 1 vehicle.

There is a maximum DOS of 53% to through traffic on David Low Way, which is
well below the acceptable value of 80% as stated above.

The intersection is also expected to operate adequately during holiday periods.
The worst LOS is “C” and highest DOS is 53%, which is well within the acceptable
parameters as stated in Council’s Coastal Major Road Network Infrastructure
Changes Plan.

Eventually some vehicles will need to conduct U turns at the Woodland Drive and
Herron Street roundabouts due to the site being restricted to left in left out. The
volume of vehicles performing these manoeuvres is low (between 3 and 7 in the
peak hours) and the affect on these roundabouts is expected to be unnoticed.

4.3. ROADWAY CAPACITY

The desirable maximum roadway capacity standard for Noosa Council is given in
Council's Coastal Major Road Network Infrastructure Changes Pian and is shown
in Table 4.2 below.

 

Report No. 4284-0

December 2006 vem BURCHILL VDM

Used in these records

About this file

File size
7.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_2689 - MCU - Commercial Business Type 1 - Office [As Published].pdf · 7.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.