5. The proposed changes do not remove a component that is integral to the operation of the development.
Comment: The proposed changes do not seek to remove any components that are integral to the operation
of the development.
6. The proposed changes do not significantly impact on traffic flow and the transport network, such as
increasing traffic to the site.
Comment: As demonstrated in the response to point 1. above, the proposed changes are not anticipated as
generating impacts on traffic flow or the existing road network beyond what was already anticipated under
the existing development approval.
7. The proposed changes do not introduce new impacts or increase the severity of known impacts.
Comment: The proposed changes do not introduce any new impacts or increase any known impacts in
relation to environmental values, bushfire hazard or landslide risk nor visual impacts beyond that which was
already anticipated and addressed under the existing development approval.
8. The proposed changes do not remove an incentive or offset component that would have balanced a negative
impact of the development.
Comment: The proposed changes do not remove any incentive or offset component that was considered
under the existing development approval.
9. The proposed changes do not impact on infrastructure provision, location or demand.
Comment: As demonstrated in the response to point 1. above, the proposed changes are not anticipated as
having any increased demand on infrastructure as provisioned in the existing approval.
JFP Ref: M2652/E2 Page 8