132006.268.03 - Amended Court Approval - Attachment 2
Attachment 2 [OCR of page images] Attachment 2 510 No. 4884 of 2014 Applicant And: NOOSA SHIRE COUNCIL Respondent FINAL ORDER Before: His Honour Judge Rackemann Date of Hearing: 23 January 2015 Date of Order: 23 January 2015 This matter relates to a request to change a development permit for a Material Change of Use (Resource-Based Spring Water Bottling Plant) in respect of land located at 314 Cooroy Mountain Road, Cooroy in the State of Queensland, which has a real property description of Lot 2 on SP143409, originally granted by this Court on 2 August 2010 by Judgment in Appeal No. 318 of 2008 (Approval). UPON THE COURT BEING SATISFIED THAT: Le There has been compliance with requirements of the Sustainable Planning Act 2009 (Qld) (SPA) relating to giving written notice of this proceeding. 2. The changes to the Approval, identified in the affidavit of Cameron Gregory Adams sworn 20 January 2015, are a permissible change having regard to section 367 of the SPA. IT IS ORDERED THAT: A. The Approval be changed by omitting ‘Attachment A” of the Approval and substituting ‘Appendix A’, which is comprised of the Respondent's amended conditions together with plans and reports, which appear at pages 1 to 44 inclusive of this Final Order. 2. Each party bears its own costs of and incidental to this proceeding. Iw r Final Order McInnes Wilson Lawyers Filed on behalf of the Appia el AR. ORDER 3.5 Queen Street Brisbane QLD 4000 Form PEC-7 Phone: 07 3231 0410 Fax: 07 3221 2921 Email: [email protected] Ref: CIH:ALO:101570 101570:5451697_4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 45 pages
Page 2
Filed on: Filed by: Service address: Phone: Fax: Email: et Registrar Date ory January 2015 McInnes Wilson Lawyers 345 Queen Street Brisbane QLD 4000 07 3231 0410 07 3221 2921 [email protected] EGISTRAI 101570:5451697_1
Page 3
\4 Application No: | 132006.268.02 | Street Address: | 314 Cooroy Mountain Road Cooroy Mountain Qld 4563 Appendix A APPLICATION DETAILS Real Property Description: | Lot 2 SP 143409 Planning Scheme: | The Noosa Plan (16 September 2013) | 2 RELEVANT PERIOD OF APPROVAL The relevant period for this Development Approval is identified in the Assessment Manager conditions. 3 ASSESSMENT MANAGER CONDITIONS Land Use Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are numbered SKO1 and SK02 dated 2 August 2010 and as may be amended by these conditions. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. Vehicle and Truck Movements 3. 5A. 5B. 5C. 5D. All vehicles associated with the use shall travel to the site via the western end of Cooroy Mountain Road. Trucks are not to arrive at or leave the premises outside the hours of 7.00am to 6.00pm Monday to Friday Trucks attending the site must not exceed a total of 8 trucks per day and must not include B-Doubles. Truck Driver will comply with the requirements of the Truck Drivers Code of Conduct” dated 2 August 2010 which requires, amongst other things but is not limited to: (a) The use of engine/exhaust brakes along Topaz Street and Cooroy Mountain Road be prohibited except in case of an emergency (i.e. safety requirement); (b) Maximum speed on Topaz Street and Cooroy Mountain Road to be 60 km/hr. Hours of Operation 5E. The hours of operation for the use are limited to 6:00am to 6:00pm Monday to Friday. Maximum Staff 5F. A maximum of 12 staff (including drivers) are permitted on the premises during the hours of operation and are not permitted prior to 6:00am.
Page 4
5G. Home and Office Deliveries 5H. No home or office delivery staff or vehicles shall operate from the premises. Miscellaneous 6. Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. These landscape plans required to be submitted are to denote areas of existing vegetation or existing trees proposed or required to be retained. 7. Any advertising sign or device is to comply with Council's policies on advertising. Land Development Vehicle Access and Frontage Works 8. The existing site access shall be upgraded. The works must be undertaken as part of an Operational Works application and include the following: (a) Design and construction generally in accordance with Council's Standard Drawing No SEQ R-056. (b) The clearing of vegetation in the road reserve as described in the submitted Traffic Impact Assessment prepared by RoadPro Development dated 11 December 2013. (c) Any other clearing necessary to provide the “Safe Sight Distance” as indicated on Council’s Standard Drawing No SEQ R-056. (d) Additional signage in Cooroy Mountain Road warning of “Trucks Turning”. The signage must be in accordance with the current edition of the Manual of Uniform Traffic Control Devices Queensland. The ongoing maintenance of the site access, associated clearing and signage is the property owner's responsibility. 9. The access driveway extending from the Cooroy Mountain Road frontage to the buildings must have a sealed surface and be maintained in good order. 10. All vehicles shall enter and leave the site in a forward direction. Loading Areas 11. Sealed loading and manoeuvring areas for the heavy vehicles shall be provided on site generally as shown on drawing number SK-01, dated 2 August 2010 and shall comply with the requirements of AS 2890.2-2002 where applicable. Car Parking 12. A sealed car parking area shall be provided on site generally as shown on drawing number SK-01, dated 2 August 2010 and shall comply with the requirements of AS/NZS 2890.1-2004 where applicable. 13. A minimum of 13 uncovered carpark spaces shall be provided on site, including 1 clearly defined disabled carpark space. 14. All carparking shall be kept, maintained and line-marked in a condition fit for use.
Page 5
Roadworks Contributions 15. 16. A contribution of $5,960 shall be paid to the Council towards the cost of improvements to the major road network of Cooroy, as a result of increase traffic generation caused by the proposed development. The contribution shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from December 2007 until the date of payment. A contribution of $160,975 shall be paid to the Council towards the cost of improvements to Cooroy Mountain Road, as a result of increase traffic generation caused by the proposed development. The contribution shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from December 2007 until the date of payment. Water Quality 1%. The applicant shall submit a Water Quality Management Plan for approval prior to the issue of any Operational Works Permit. The water quality management plan shall address treatment of runoff from the proposed use including effluent, car park runoff and by product of the industrial use occurring on site. It shall demonstrate that the treatment system proposed results in a no worsening of the water quality of runoff from the site as a result of the business operations. It will include the requirement for water quality to be monitored for a period of three years from the construction of the car parking and effluent disposal systems. Effluent Disposal 18. 18A. The design and construction of the on-site effluent disposal system and disposal area shall be in accordance with the Site and Soil Investigation for On-site Wastewater Treatment and Effluent Disposal prepared by Future-plus Environmental, dated February 2014, subject to the following requirements: (i) | Ongoing monitoring of treatment process and disposal areas shall be undertaken to ensure both are functioning effectively over time. They shall be undertaken generally as follows: . Annual monitoring shall be undertaken from the time of commissioning to determine the quality of the wastewater produced from the effluent treatment system; . Monitoring of the soils, vegetation and groundwater in the application area shall be undertaken every three years to establish that such is not percolating into the groundwater; . Sampling and testing shall be in accordance with relevant regulatory requirements and manuals such as those provided by the Environmental Protection Agency, with testing undertaken by an accredited Laboratory; ° Continuous monitoring shall be undertaken by the system for any water on the surface of the application area, downslope resurfacing, changing plant growth on or around the application area and any other signs of problems, and addressed through maintenance or servicing. (i) - (ii) -
Page 6
(iv) - (Vv) = (vi) Washing plant, equipment or vehicles shall be undertaken off-site. If on-site washing of any plant or equipment is necessary, all wastewater shall be collected in a sump and disposed of off-site as trade waste by a registered operator. (vii) (viii) Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan (Open Space-Conservation & Waterway Protection) is to be undertaken in addition to replanting as detailed in Drawing HJ0085.1.2 of the Conceptual Site- Based Stormwater Management Plan. 18B. - Erosion & Sediment Control 19. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. General 20. 21. 22. 23. For the following classes of work associated with development, a Development Permit for Operational Works must be obtained prior to commencement of works relating to that class of work. The application may combine any or all of these classes of work:- ° Access and/or Carparking. ° Roadworks. . Stormwater Drainage. . Frontage Works. . Erosion & Sediment Control A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works that will become Council infrastructure, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any application for Operational Works. Digital detailed designs including drawings, calculations, specifications and a schedule of works, shall be submitted with any application for a Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The design shall be in accordance with Council’s Planning Scheme Policy PSPO5 — Engineering Design Standards — Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au).
Page 7
24. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council's records. The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shall not be granted until all As Constructed information has been supplied and accepted by Council. Environmental Health 25. 26. 27. The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy No 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises’, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. A roofed waste/bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, or approved wastewater disposal system via a bucket trap and grease arrestor. The development must allow refuse-loading areas to be located off street. All vehicles associated with the collection of waste/recyclables, shall enter and leave the site in a forward direction, without the need for any unsafe manoeuvring. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises’, must be submitted for the day-to-day operation of the development and approved by Council’s Health Section prior to issue of development permit for operational works. It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9 explaining exactly how to predict waste quantities and design waste areas is available from Council and the web. The Plan shall include the following information: - . The types of waste that will be generated from the activities approved within the development. . Estimated volumes or tonnage of both recyclables and waste generated. . Methods to be used for dealing with garden waste. ° Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling. . Description of procedures for getting all waste to the bins; the storage of bins and the collection of bins by the contractor. . A description of the design details of waste storage and recycling areas including size, location, elevation and floor plan, methods of bin washing and system to prevent storm water getting into sewer via the bin wash. . A description of types and volume of waste storage containers to be used. . The waste and recycling storage area shall include the provision of containers for all waste and recycling materials including putresable matter, non-recycling waste, paper/ cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin washing facilities connected to sewer. . A detailed description of vehicular access to collect waste. Where collection is off street, access must allow vehicles to enter and leave the site in a forward direction.
Page 8
28. As no Plumbing Final has been issued through Noosa Council Plumbing Services, all existing plumbing and drainage, along with Backflow Prevention Devices, are to be assessed to ensure compliance with current Legislation and Acts. Additional Conditions Al, A2. 4 The effluent holding tank and STP shall have visual and audible high level alarms systems installed with secondary power backup (eg: battery power). The effluent facilities and grease trap facility shall be serviced and maintained on a three monthly service regime with all documentation for maintenance and servicing forwarded to Noosa Council. APPROVED PLANS/DOCUMENTS The approved plans and / or documents for this development approval are listed in the Assessment Manager conditions. 15 ADVISORY NOTES The following Advisory Notes are for information purposes only and do not form conditions of approval: 1. 3. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities under the Disability Discrimination Act (DDA) in regard to the installation of disabled access and the provision of disabled facilities, and that access to this building and the provision of sanitary facilities may need to comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia. Noise from building works associated with commercial and or industrial development should comply with the following — e Limited to between 7:00am to 6:30pm Monday to Saturday. ° All reasonable measures are taken to minimise noise emissions. ° Not permitted on Sunday or public holidays. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement, concrete, builder's waste or rubbish should not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot fines apply for such offences. The applicant is informed that payment via credit card transaction will not be an acceptable method of payment for development contributions conditioned in this permit or for infrastructure charge notices issued separately. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any obligations under the ACH Act.
Page 9
|6 PROPERTY NOTES Not applicable \7 PRELIMINARY APPROVAL OVERRIDING SCHEME Not applicable 8 FURTHER DEVELOPMENT PERMITS REQUIRED Type of Development Permit required Subject of the required Development Permit Development Permit for Building Works _ All Building Works Development Permit for Operational Access, Carparking, Roadworks, Stormwater Works Drainage, Frontage Works and Erosion and Sediment Control. 9 SELF ASSESSABLE CODES The developer must comply with the following codes for self-assessable development related to the development approved under this Decision Notice: . Advertising Devices Code
Page 10
FACTORY BELOW
‘STORE
TELEWARKETERS
FARM HOUSE
3 . &
‘\ | COOROY MOUNTAIN SPRING WATER FACTORY UPPER LEVEL PLAN \ {™~ SCALE 1:20 142)
Nes. :
8
Page 11
oe “. 'O3 Be - Preneceevene ‘ ‘ en poverceocene pereneerened MOUNTAIN SPRING WATER FACTORY f SCALE 1:200 142) LOWER LEVEL PLAN
Page 12
DRAFT
Cooroy Mountain Spring Water
314 Cooroy Mountain Road, Cooroy
Cooroy Mountain Spring water operate
Trucks access the site to deliver raw f
The transport route
Mountain Spring Wate
undertake delivery ani
repres'
beaut tRegr with th
other road users. *¢: z
e The use of engine bra is prohibited in residential areas in close proximity to the site including
along Topaz Street and Cooroy Mountain Road except in the case of an emergency ie safety
requirement, . .
¢ All vehicles entering our site must be fully roadworthy and maintained. CIMSW reserve the right
to inspect any vehicle or request maintenance records for any vehicle, CIMSW reserves all rights
to prohibit any vehicle from the site if we believe it may not be roadworthy, safe to operate or
generates excessive noise.
e Any accidents, Incidents, complaints, spillages or near misses that occur are to be reported to
the CMWS General Manager as soon as possible after the occurrence.
17a
10
Page 13
A ee oan / ten L ts Se e Any fitter is to be placed in the litter bins provided on site. ¢ No trucks are to access the site prior to 7am on any day of the week. © Delivery hours for trucks are limited to the time period 7am to 6pm Monday to Saturday. © The use of engine/exhaust brakes along Topaz Street and Cooroy Mountain Road is to be prohibited except in the case of an emergency ie safety requirement. *@ Maximum speed of Travel on Topaz Street and Cooroy Mountain Road is to be 60 km/h. © Maximum speed of travel on site is 30 km/hr. Drivers who are found to not comply with the above Code of:Conduct shall be issued a warning, any \ (print) Of (company) Have read/had the Drivel confirm that | will compli 17b 11
Page 14
RoadPro DEVELOPMENT www.roadpro.net.au ABN 98 615 073 565 | ACN 165 601 687 P. 0403 889 039 E. [email protected] 15/76 Wises Rd Maroochydore Q 4558 PO Box 303 Coolum Beach Q 4573 11" December 2013 Cooroy Property Trust C/- Adams Sparkes Town Planning + Development PO Box 1000 Buddina Qld 4575 Dear Cameron, RE: Cooroy Mountain Spring Water Access Arrangements and Trip Generation Lot 2 SP 143409 at 314 Cooroy Mountain Road, Cooroy | refer to our meeting with Council offices held on Monday 18" November 2013 and further traffic engineering advice regarding the number of trucks generated from the site and the access arrangements into the site. The conditions of approval require a change due to ownership changes and changes to the operational management of the business. The proposed bottling plant will be scaled back and therefore changes to conditions, 5B, 5C, 5F, 5G, 8, 12 and 13 are required as the specific numbers of staff and trucks has been reduced. From a traffic engineering perspective a review of the existing access has been undertaken in order to recommend an amendment to Condition 8 of the approval. Condition 8 The applicant shall relocate the existing site to a location between 80 and 110 metres east of the existing access on Cooroy Mountain Road, to the reasonable satisfaction of Council. Proposed Development The proposed development includes a bottling plant with between 3 to 5 staff permanently on site. RoadPro Development ABN 98 615 073 565 13492 Cooroy Mtn Spring Water Access Page | of 4 12
Page 15
The estimated trip generation from the site is expected to generate up to 40 truck movements per week, including refuse collection, deliveries and water carrying vehicles. This equates to 8 trucks per day or 16 trips (8 arrivals and 8 departures) spread throughout the daily hours of operations 7:00am until 6:00pm, Monday to Friday. It is also estimated the site will generate 10 to 15 light vehicle movements per day including staff and ancillary business uses. Assessment of Existing Access The sight visibility has been reviewed in accordance with Clause 3.4 of Austroads 2009 Guide to Road Design — Part 4A: Intersections. Sight distance is measured along the carriageway from the approaching vehicle to the conflict point. The posted speed limit on this section of road is 60km/h. The safe intersection sight distance (SISD) for an observation time of 3 seconds and reaction time of 2.0 seconds (Refer to Table 3.2 of Part 4) for 60km/h is 123m. The access intersection meets this requirement to the west and achieves a sight distance of 130m. The site distance to the east was measured to be 113m; however the additional 10m can be achieved through the removal of vegetation within the road reserve as shown in red in the photographs below. The vegetation is overgrown saplings only ranging in trunk diameter of 50 to 150mm. RoadPro Development ABN 98 615 073 565 13492 Cooroy Mtn Spring Water Access Page 2 of 4
Page 16
Photograph 2 — View looking west from Access The access driveway location has been reviewed with consideration to the number of vehicles accessing the site. The existing driveway has been operating adequately for many years. The proposal meets the requirement for access driveway location in accordance with Clause 3.2.3 and Figure 3.1 of AS2890.1:2004. Given the good sight visibility, low traffic volumes and the existing local driver awareness of this access, it is considered appropriate to retain the driveway in its current location. The driveway has been assessed in regard to operational performance. According to Austroads Guide to Traffic Management Part 3 — Traffic Studies and Analysis, Table 6.1, “At unsignalised intersections with minor roads where there are relatively low volumes of cross and turning traffic, capacity considerations are usually not significant and capacity analysis is unnecessary’. Table 2 below shows the volumes where intersections operate adequately and capacity analysis is not required. Roadway Capacity Type of Road Light cross & turning volumes Maximum design hour volumes Vehicles per hour (two way) Two Lane major road 400 500 650 Cross road 250 200 100 The traffic volumes for Cooroy Mountain Road are 500 vehicles per day with less than 100 vehicles in the peak hour past the subject site. RoadPro Development ABN 98 615 073 565 13492 Cooroy Mtn Spring Water Access Page 3 of 4
Page 17
The peak hour generation from the site is less than 20 trips per hour. Traffic volumes are low and below the volumes stated in the table therefore, it is considered unnecessary to undertake intersection analysis as the intersection operates with uninterrupted flow conditions. Therefore given the above assessment it is recommended that Condition 8 be amended to allow the applicant to use the existing driveway to access the site. If you require any further information, please don’t hesitate to contact me. Yours faithfully d Ke yer Dianne Hayes B. Eng (Civil) RPEQ 7086 RoadPro Development ABN 98 615 073 565 13492 Cooroy Mtn Spring Water Access Page 4 of 4 15
Page 18
Our Ref: 4377 future-plus ENVIRONMENTAL 18" February 2014 Site & Soil Investigation for On-site Wastewater Treatment and Effluent Disposal Cooroy Mountain Spring Water 314 Cooroy Mountain Road, Cooroy Mountain Client: Cooroy Mountain Spring Water Future-Plus Environmental Sunshine Coast (SQ) PO Box 1250, Buddina QLD Future-Plus Environmental Gladstone (CQ) PO Box 1290, Gladstone QLD p: 07 5450 2688 f: 07 5450 2686 e: [email protected] www.future-plus.com.au PO Box 1250, Buddina Q 4575 ABN 23 658 506 336 16
Page 19
4377-131119-1.0 > future-plus ENVIRONMENTAL DOCUMENT CONTROL INFORMATION File Number: 4377-131119-1.0 Project Manager: Paul Wood Client: Cooroy Mountain Spring Water Project Title: Site and Soil Evaluation Report (Cooroy Mountain Spring Water) Project Authors: Michael Baynes, Anila Cletus, Paul Wood Project Summary: Site & Soil assessment for on-site sewerage treatment facility and effluent disposal system for Cooroy Mountain Spring Water. Document Review ‘ D ent ‘ Document Version eon : Author Reviewed By | Approved By 4377-131119-0.1 Draft Michael Baynes Anila Cletus Paul Wood 4377-131119-0.2 Draft Michael Baynes Anila Cletus Paul Wood 4377-131119-1.0 Final Michael Baynes Anila Cletus Paul Wood Issue Approval Destination Document Version Date Dispatched Client Copy - digital 4377-131119-0.1 29" November 2013 Client Copy - digital 4377-131119-0.2 20" December 2013 Client Copy - digital 4377-131119-1.0 18" February 2014 February 2014 Site & Soil Evaluation Report Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 17
Page 20
future-plus
ENVIRONMENTAL
4377-131119-1.0
NOTICE TO USERS OF THIS REPORT
Apart from fair dealing for the purposes of private study, research, criticism, or review as permitted
under the Copyright Act, no part of this report, its attachments or appendices may be reproduced by
any process without the written consent of Future-Plus Environmental ("FPE”). All enquiries should be
directed to FPE.
We have prepared this report for the sole purposes of Cooroy Mountain Spring Water (“Client”) for the
specific purpose only for which it is supplied. This report is strictly limited to the Purpose and the facts
and matters stated in it and do not apply directly or indirectly and will not be used for any other
application, purpose, use or matter.
In preparing this report we have made certain assumptions. We have assumed that all information and
documents provided to us by the Client or as a result of a specific request or enquiry were complete,
accurate and up-to-date. Where we have obtained information from a government register or
database, we have assumed that the information is accurate. Where an assumption has been made,
we have not made any independent investigations with respect to the matters the subject of that
assumption. We are not aware of any reason why any of the assumptions are incorrect.
This report is presented without the assumption of a duty of care to any other person (other than the
Client) (“Third Party’). The report may not contain sufficient information for the purposes of a Third
Party or for other uses. Without the prior written consent of FPE:
(a) This report may not be relied on by a Third Party; and
(b) FPE will not be liable to a Third Party for any loss, damage, liability or claim arising out of
or incidental to a Third Party publishing, using or relying on the facts, content, opinions or
subject matter contained in this report.
If a Third Party uses or relies on the facts, content, opinions or subject matter contained in this report
with or without the consent of FPE, FPE disclaims all risk and the Third Party assumes all risk and
releases and indemnifies and agrees to keep indemnified FPE from any loss, damage, claim or liability
arising directly or indirectly from the use of or reliance on this report.
In this note, a reference to loss and damage includes past and prospective economic loss, loss of
profits, damage to property, injury to any person (including death) costs and expenses incurred in
taking measures to prevent, mitigate or rectify any harm, loss of opportunity, legal costs,
compensation, interest and any other direct, indirect, consequential or financial or other loss.
Signed on behalf of Date: 18" February 2014
Future-Plus Environmental
[lhe f
Paul Wood
Director
February 2014 Site & Soil Evaluation Report iti
Wastewater Treatment and Effluent Disposal
314 Cooroy Mountain Road, Cooroy Mountain
18
Page 21
72) > future-plus ENVIRONMENTAL 4377-131119-1.0 TABLE OF CONTENTS 1.0 INTRODUCTION....ssssssssssccsssseeesnneesssseesssnsees saaenainaREaITTERT aneaneesciueennaceniveeuite aisasusssansceseell 1.1 GENERAL. 1.2 SITE BACK' FIGURE 1:—SITE LOCATION PLAN (SOURCE — GOOGLE EARTH 1.3 OBJECTIVES OF THIS ASSESSMENT... 1.4 REGULATORY REQUIREMENTS ...... 2.0 SITE ASSESSMENT........ssesssssessees ica oaaauautneaesnnaaapnate Ss ia sosewccaanmcoaceareanaTTesbiTINY sconsaveiiaweed bn 2.1 GENERAL 2.2 PROPERTY DETAILS 2.3 EXISTING DEVELOPMENT 2.4 PROPOSED DEVELOPMENT... 2.5 TOPOGRAPHY....... 2.6 SITE HYDROLOGY 2.7 SUB-SURFACE CONDITION: 2.8 SOIL PERMEABILITY........s0v++ 2.8.1 Groundwater & Water Bores 3.0 EFFLUENT QUALITY AND QUANTITY .....sessssssssssssssecesssssesssssssnesessssses scbccsssansscsawwssiceawanunaaeNee ; 3.1 ASSESSMENT OF SOIL AND GROUNDWATER CONDITIONS . 3.2 SYSTEM SELECTION... 3.3 HYDRAULIC LOADING . 3.4 TREATMENT SYSTEM . 3.5 ADDITIONAL DESIGN C 4.0 RECOMMENDATIONS. .........ssees000+ issu snaueantaaiaccctnansuseati 4.1 EFFLUENT DISPOSAL... February 2014 Site & Soil Evaluation Report iv Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 19
Page 22
4377-131119-1.0 (Fp e) future-plus ENVIRONMENTAL LIST OF TABLES TABLE 1: QUALITY CRITERIA FOR SECONDARY AND ADVANCED SECONDARY TREATED EFFLUENT TABLE 2: PROPOSED POPULATION INTENSITIES TABLE 3: CALCULATED HYDRAULIC WASTEWATER FLOWS TABLE 4: MINIMUM REQUIRED IRRIGATION AREA TABLE 5: RECOMMENDED SETBACK DISTANCES FOR SECONDARY AND ADVANCED SECONDARY EFFLUENT LIST OF FIGURES FIGURE 1: SITE LOCALITY PLAN FIGURE 2: BOREHOLE LOCATION PLAN FIGURE 3: IRRIGATION AREA LOCATION PLAN FIGURE 4: IRRIGATION SYSTEM TYPICAL DESIGN LIST OF APPENDICES APPENDIX A: SoiL BOREHOLE Locs February 2014 Site & Soil Evaluation Report v Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 20
Page 23
future-plus ENVIRONMENTAL 4377-131119-1.0 G& 1.0 INTRODUCTION 1.1 GENERAL Future-Plus Environmental (FPE) have been engaged by Cooroy Mountain Spring Water to carry out a Site & Soil Investigation for on-site sewage treatment/disposal. The report has been completed in response to the conditions stated in the Maroochydore Planning and Environment Court Order dated 2"! August 2010 REF. The investigation was undertaken to establish the design of an appropriate on-site sewage treatment facility and land application area to service the existing developments on land described as Lot 2 on SP 143409 and located at 314 Cooroy Mountain Road, Cooroy Mountain. A site locality plan is as shown in Figure 1 below. Specifically this Report addresses the items detailed in Attachment A, Conditions 18A-B of the Maroochydore Planning and Environment Court Order dated 2™ August 2010 and Concept Effluent Treatment & Disposal Strategy Report Completed by Gilbert & Sutherland dated November 2009. The Site and Soil Investigation Report and the system design have been carried out in accordance with the following: = Plumbing & Drainage Act 2002; » Plumbing & Drainage Regulation 2003; « AS/NZS 1547:2000 ‘On-site Domestic-Wastewater Management’; » Department of Local Government and Planning ‘Queensland Plumbing and Wastewater Code’ 2011; and = Relevant local Council guidelines. 1.2 SITE BACKGROUND The subject site is contained within one registered allotment described as Lot 2 SP143409 and has an area of approximately 481,700m’. The site is currently serviced by a septic tank and associated disposal trench. February 2014 Site & Soil Evaluation Report 1 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 21
Page 24
(Fe) future-plus ENVIRONMENTAL 4377-131119-1.0 It is understood that the owner proposes to upgrade the existing septic tank and trench system to an aerated sewerage treatment plant (STP) and effluent disposal area, to service the existing dwelling and daytime factory staff facilities as shown in the attached Site Layout Plan (refer Figure 2). As part of the upgrade of the on-site sewerage facilities, FPE was engaged to carry out an assessment of the on-site sewage treatment and potential disposal areas. This site and soil evaluation report presents the on-site sewage treatment and effluent disposal area required to cater for the existing development. The assessments and recommendations contained within this report are based on our site assessment, information provided by the Client and the recent geotechnical investigation carried out by Australian Soils Investigation (ASD). Figure 1: -Site Location Plan (Source — Google Earth) ‘5 : : Regional Location February 2014 Site & Soil Evaluation Report 2 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 22
Page 25
>, future-plus ENVIRONMENTAL 4377-131119-1.0 1.3 OBJECTIVES OF THIS ASSESSMENT = Assess the suitability of the subject site for on-site wastewater disposal to be undertaken in a sustainable manner, taking into account the climatic, topographical, edaphic, and geo-hydrological characteristics prevalent on the sites; = Identify any environmentally sensitive areas likely to be affected by wastewater treatment and disposal activities; = Identify the level of treatment necessary and method of disposal considered most suitable for the site; and = Identify and assess any potentially significant impacts on human health and the natural environment that may occur as a result of wastewater treatment and disposal options having regard to relevant legislative requirements. 1.4 REGULATORY REQUIREMENTS A number of legislative requirements relate to on-site wastewater treatment and disposal systems under Queensland legislation, along with various other standards and guidelines that may place constraints on the suitability of the site for on-site wastewater disposal. Those relevant to the proposed development include: = Sustainable Planning Act 2009; = Environmental Protection Act 1994; = Environmental Protection (Water) Policy 1997; = Plumbing and Drainage Act 2002; = Standard Plumbing and Drainage Regulation 2003; = AS/NZS 1547:2000 ‘On-site Domestic Wastewater Management’; = Department of Infrastructure and Planning ‘Queensland Plumbing and Wastewater Code’ 2011; and = Relevant local Council guidelines. February 2014 Site & Soil Evaluation Report 3 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 23
Page 26
> future-plus ENVIRONMENTAL 4377-131119-1.0 2.0 SITE ASSESSMENT 2.1 GENERAL The assessment and recommendations contained in this report have been based on the recent geotechnical investigations carried out and our recent site assessment of the existing sewage infrastructure on-site. 2.2 PROPERTY DETAILS The subject site is contained within registered allotment described as Lots 2 SP143409 and is located at 314 Cooroy Mountain Road, Cooroy Mountain within the Sunshine Coast Regional Council local government area. The area of the allotment is approximately 481 ,700m?. 2.3 EXISTING DEVELOPMENT The site consists of an existing five (5) bedroom dwelling and the Cooroy Mountain Spring Water bottling factory, which is utilised by five (5) daytime staff only. The site also contains a series of free standing sheds. 2.4 PROPOSED DEVELOPMENT The owner proposes to direct all wastewater generated by the existing dwelling and factory office facilities to a centralised STP and effluent disposal area. 2.5 TOPOGRAPHY The subject allotment is situated over a varying topography with a slope of 5-20% from east to west, towards the existing creek located in the western portion of the property. The Sunshine Coast Regional Council online mapping facilities illustrate a site elevation between 110 to 280m AHD. 2.6 SITE HYDROLOGY It is likely that the majority of rainfall on the site will be absorbed into the soil. However, during extended periods of heavy rainfall, excess rainfall not adsorbed into the soil profile is likely to flow towards the watercourse located in the western portion of the property, running parallel with Cooroy Mountain Road. 2.7 SUB-SURFACE CONDITIONS A preliminary geotechnical investigation for effluent disposal assessment including percolation testing was recently carried out within the locations indicated on the Borehole February 2014 Site & Soil Evaluation Report 4 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 24
Page 27
@> future-plus ENVIRONMENTAL 4377-131119-1.0 Location Plan (Figure 2). A total of two (2) boreholes were advanced across the site to a depth of 2.0metres below the existing ground level (refer Appendix A). Based on the geotechnical investigation, it is noted that the soil profile encountered within the site generally consisted of 700mm of moderately structured Silty Clay (Category 4-5) overlying strongly structured Silty Clay (Category 6) to termination depth at 2.0m. 2.8 SOIL PERMEABILITY In addition to the soil borehole logs, one (1) permeability test was undertaken within one of the two boreholes and in accordance with the AS/NZS 1547:2000 to determine the actual permeability of the site soils. The recorded KSAT value was 0.0213m/day which indicates that the site soils are subject to very low permeability. 2.8.1 Groundwater & Water Bores During the site investigations, no permanent water table or seepage was encountered within the boreholes. However, groundwater table represents local groundwater accumulations that typically fluctuate between seasons. Therefore groundwater separation distances based on the local water table depths needs to be considered during the design of on-site sewage systems. February 2014 Site & Soil Evaluation Report 5 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 25
Page 28
(Foey future-plus ENVIRONMENTAL 4377-131119-1.0 3.0 EFFLUENT QUALITY AND QUANTITY 3.1 ASSESSMENT OF SOIL AND GROUNDWATER CONDITIONS The soil and percolation test results indicate that the soils at the site are relatively impermeable but is however still suitable for on-site sewage treatment and effluent disposal. Groundwater or seepage was not observed within the boreholes carried out during the recent site investigation. Given the relatively poor permeability of the site soils and the presence of medium to heavy clay soils which are more representative of Category 6 soils, the on-site wastewater assessment for this site is based on Category 6 soils although the Borehole logs indicate the presence of Category 5 top soils. 3.2 SYSTEM SELECTION In order to minimise potential impacts on local water quality and to maximise the potential reuse of treated effluent, it is recommended that all wastewater generated from the development be treated to a minimum secondary standard. It is understood that all wastewater generated from the dwelling and factory office facilities will be diverted to the existing septic tank located geographically downslope of the waste generating facilities. It is proposed that the existing septic tank will be converted to a pump station, with all collected wastewater to be pumped to a STP capable of treating the wastewater to a minimum secondary standard. Typical quality criteria for secondary and advanced secondary treated effluent nominated in the Department of Infrastructure and Planning, Queensland Plumbing and Wastewater Code are summarised in the following table: Table 1: Quality Criteria for Secondary and Advanced Secondary Treated Effluent Advanced Secondary Teter a aCe OU BEE Le re WCE pocebiable Ent Acceptable Limit Suspended Solids mg/L BODS5 mg/L 20 10 Faecal Coliforms cfu/100mL 200 10 February 2014 Site & Soil Evaluation Report 6 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain
Page 29
4377-131119-1.0 @& future-plus CC > ENVIRONMENTAL 3.3 HYDRAULIC LOADING The hydraulic loading for this site was calculated based on the anticipated population intensities within the factory office facilities and the five (5) bedrooms contained with the existing dwelling, as provided by the Client (refer Table 2 below). Table 2: Proposed Population Intensities for the subject site Sec) Proposed Population 5 persons per day (during standard daytime operating hours) Five (5) Bedroom Dwelling 8 persons Factory Office Facility The hydraulic loading associated with the proposed development intensity mentioned above can be calculated using Appendix 4.2D of AS/NZS 1547:2000 based on a typical wastewater flow allowances generated from rural factories and domestic dwelling. For rural factories this typically ranges from 30L/P/day for on-site roof tank water supply to S5OL/P/day for reticulated community water or bore water supply as per AS/NZS 1547:2000. The typical wastewater flow allowances for a domestic dwelling with bore water supply and standard water reduction fixtures is typically 145L/P/day as per AS/NZS 1547:2000. The estimated hydraulic loading associated with the development intensity has been calculated in the table below: Table 3: Calculated Hydraulic Wastewater Flows From Appendix 4.2D AS/NZS1547:2000 Allowance based on Bore Source Estimated Populations eats 1 (STM LEN} Factory Office Facility § 50* 250 Five (5) Bedroom Dwelling 8 145 1,160 Total Estimated Daily Flows 1,410 Based on the above, a total maximum hydraulic loading of 1,410 litres (8 Equivalent Persons - EP) per day may be generated from the combined use of the facilities on-site. Based on the estimated daily flow of 1,410 litres (8 EP) per day, the site does not trigger an application for an Environmental Relevant Activity 63(1)(a)(i) identified as; February 2014 Site & Soil Evaluation Report 7 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 27
Page 30
@> future-plus ENVIRONMENTAL 4377-131119-1.0 Operating sewage treatment works, other than no-release works, with a total daily peak design capacity of 21 to 100 EP if treated effluent is discharged to an infiltration trench or irrigation scheme. If additional people are using the site and/or water conservation is not being practiced within the building and additional flow is being generated, enlargement of the STP and irrigation area may be required. This will be additional cost to the owner. 3.4 TREATMENT SYSTEM Treatment of wastewater must achieve a minimum of secondary or advanced secondary effluent quality in accordance with the Queensland Plumbing and Wastewater Code 2011. Treated Wastewater shall comply with the following quality criteria specified in Table 1.1 of the Queensland Plumbing and Wastewater Code, which are as follows: » BODs < 20mg/L » SS <30mg/L » Thermotolerant Coliform (org/100mL) < 200 3.5 ADDITIONAL DESIGN CONSIDERATIONS A number of other design considerations should be made in relation to the following key elements associated with this project. Peak Flows and Low Flows The wastewater treatment plant must be able to cope with periods of sustained high or peak loads and also periods of very low influent. During these times, appropriate flow balancing may be necessary in order to buffer against such extreme variable conditions. Effluent Quality & Concentration Developments with mixed uses produce (Factory Office Facility) a different type of wastewater when compared to traditional domestic effluent. Typically, this effluent can be more concentrated and require specific design considerations. February 2014 Site & Soil Evaluation Report 8 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 28
Page 31
future-plus ENVIRONMENTAL 4377-131119-1.0 G Alarms and Early Warning Systems It is recommended that a high level and failure alarms with battery backup be considered as part of the overall design for the pump station and STP. Service and Maintenance The service and maintenance provide must attend and complete the required service, maintenance and monitoring of the STP on a minimum 3 monthly basis. Grease Trap The existing grease trap is to be inspected by a suitable qualified person to ensure the integrity of the unit, as it is recommended that pre-treatment of the effluent be undertaken, given the nature of the wastewater likely to be generated by the development. The grease trap should then be adopted as part of the operation and maintenance of the facility and require regular inspection, service and maintenance. February 2014 Site & Soil Evaluation Report 9 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain ra
Page 32
D> future-plus ENVIRONMENTAL 4377-131119-1.0 4.0 RECOMMENDATIONS 4.1 EFFLUENT DISPOSAL It is recommended that the application of effluent on-site via surface irrigation be adopted. Contained in Figure 3 of this report is the proposed location of the effluent application areas and the irrigation system design detail. Assuming a hydraulic loading of 1,410 litres per day and a DIR of 15mm/week based on Table 4.2 A4 of AS1547:2000 (Category 6 soils), a minimum application area of 658m? is required. Table 4: Minimum Required Irrigation Area Irrigation Area PSS EL versie To) || as Determined Category by Table CPO Seen Subject Site Slope Lot 2 SP143409 Soil Category 6 Based on the Table above and presence of Category 4-5 soils to 700mm, an effluent irrigation area of 625m? is required for the site. A typical design detail of the irrigation system is shown in Figure 4. It is noted that the site has sufficient space available for a 100% reserve area and is shown in Figure 4. The application area shall be installed in accordance with the following: 1) All plumbing and drainage work is to be carried out by licensed persons and strictly in accordance with the AS/NZ 3500:2003, AS/NZS 1547:2000 and Plumbing and Drainage Act 2002; 2) Lilac stripe poly pipe is to be buried a minimum of 150mm below ground level from the treatment plant to the irrigation area; 3) Sprinklers are to be used to irrigate the treated effluent within the designated area after 150mm of mulch or turf has been applied; February 2014 Site & Soil Evaluation Report 10 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 30
Page 33
4377-131119-1.0 future-plus © ENVIRONMENTAL 4) Any depressions within the surface application area are to be filled with soils of same category at horizon A. 5) Effluent warning signs must be clearly displayed in at least two places beside all application areas. The required setback distances as nominated in the Queensland Plumbing and Wastewater Code 2011 have been summarised in Table 5 of this report. 4,2 MEDLI ASSESSMENT Based on the resent investigation under by Future-Plus Environmental, in accordance with the relevant legislation and guidelines, it was deemed unnecessary to undertake a MEDLI assessment for the site. Rather the detailed site assessment has been undertaken in accordance with the QLD Plumbing and Wastewater Code and AS:NZS1547:2000. 4.3 SETBACK DISTANCES The setback distances from the effluent disposal area shall comply with the Queensland Plumbing and Wastewater Code which is summarised below: Table 5: Recommended Setback Distances for Secondary and Advanced Secondary Effluent Feature Footings or Buildings Recommended Separation Distance Boundaries of land application areas should be positioned at least 2.0m down slope or 4.0m up slope from the footing or where the site is flat, 2.0m from any point of the building footing Property boundaries, pedestrian paths and walkways, recreation areas Boundaries of land application areas should be positioned at least 2.0m down slope, or 4.0m up slope or where the site is flat, 2.0m from any point Retaining wall footing Boundaries of land application areas should be positioned at least 2.0m down slope, or 4.0m up slope from the retaining wall footing or where the site is flat, 2.0m from any point of the building footing In ground swimming pool Boundaries of land application areas should be positioned at least 6.0m down slope, or 6.0m up slope from the pool or where the site is flat, 6.0m from any point In ground potable water tank 6m from the boundary of the land application area Top bank of a permanent watercourse; Top bank of intermittent watercourse; Top bank of a lake; Top water level of a surface water source used for agriculture, aquaculture or stock 30m for secondary, 10m for advanced secondary February 2014 Site & Soil Evaluation Report Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 11 31
Page 34
4377-131119-1.0 future-plus ENVIRONMENTAL € Feature purposes; Easement boundary of unlined open stormwater drainage channel or drain Recommended Separation Distance Bore or a dam used or likely to be used for human and or domestic consumption 30m for secondary, 10m for advanced secondary Unsaturated soil depth to a permanent water table 0.6m (vertical) for secondary, 0.3m (vertical) for advanced secondary Note: Surface spray irrigation system must be located at least 10m from any habitable area 4.4 STORMWATER DRAINAGE Issues relating to surface flows may become prevalent within the disposal areas during extended periods of rainfall. Accordingly, it is recommended that a cut-off drain or diversion drain/mound is constructed upslope of the disposal areas to collect and divert any surface/subsurface waters away from the disposal area. A retention mound is to be constructed downslope of the land application area to prevent any surface water from exiting the designated disposal area. All stormwater runoff from the roof of buildings and pavement areas associated with the development on the site should not be discharged in a concentrated form onto the effluent disposal areas. February 2014 Site & Soil Evaluation Report 12 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 32
Page 35
future-plus ENVIRONMENTAL 4377-131119-1.0 5.0 CONCLUSION This report presents recommendations on the sizing of an effluent disposal system (surface irrigation) to cater for the combined use of the existing development and the population intensities associated with this. The assessments and recommendations are based on our site assessment and the geotechnical investigation carried out. On the basis of the geotechnical investigations and assessment of the flow rates, the subject allotment is considered suitable for on-site sewage operations within the site. An effluent irrigation area of approximately 500m? will be required to adequately dispose the treated wastewater generated from the development intensity. Provided the on-site sewerage facility is installed in accordance with the recommendations provided and relevant codes and standards aforementioned in this report, there will be minimal risk of environmental impact to the site and surrounding areas. The on-site STP and effluent disposal area will need to be managed intensively to minimise potential human health risks and thereby protect and enhance the quality of human health and the environment in the long term. The system must be operated and maintained in compliance with the manufacturer’s guidelines (information should be sought from the treatment system manufacturer), to ensure this risk is appropriately managed. All wastewater should be treated to a minimum secondary or advanced secondary level to reduce any potential environmental impacts. Details of the wastewater treatment plant and land application system are summarised below; February 2014 Site & Soil Evaluation Report 13 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 33
Page 36
4377-131119-1.0 @& future-plus Cu? > ENVIRONMENTAL Wastewater Treatment Treatment Standard: ery ue) All wastewater generated from the dwelling and factory office facilities are to be diverted to the existing septic tank located geographically downslope of the waste generating facilities. The existing septic tank is to be converted to a pump station, with all collected wastewater pump to an STP capable of treating the wastewater to a Secondary or Advanced Secondary standard. Land Application System: Surface (heavy droplet) Irrigation System Land Application Area: 500m? irrigation area Setback distances: In accordance with those contained within the Queensland Plumbing and Wastewater Code System Recommendations: A diversion drain/bund and/or cut-off drain is to be constructed up slope of the land application area in order to intercept both surface and sub-surface water prior to entering the land application area. A retention mound is to be constructed downslope of the land application area to prevent any surface water from exiting the designated disposal area. Grease trap to be installed. Existing Septic System to be converted to a pump station. Effluent to be pumped to the new STP. Locate sanitary drainage line from office facilities / toilets and plumb to pump station. February 2014 Site & Soil Evaluation Report 14 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 34
Page 37
4377-131119-1.0 > FIGURE 1 SITE LOCATION PLAN (Refer to page 2) future-plus ENVIRONMENTAL February 2014 Site & Soil Evaluation Report Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 15 35
Page 38
4377-131119-1.0 FIGURE 2 BOREHOLE LOCATION PLAN future-plus _ ENVIRONMENTAL February 2014 Site & Soil Evaluation Report Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 16 36
Page 39
C= ENVIRONMENTAL Slope Cooroy Mountain Spring Water—Borehole Location Plan Location: 314 Cooroy Mountain Road, Cooroy Mountain Scale: Not to Scale FPE Reference Number: 4377-131119-1.0 Client: Cooroy Mountain Spring Water Figure Measurements to Take Precedence Over Scale Measurements ST
Page 40
4377-131119-1.0 @ FIGURE 3 IRRIGATION AREA LOCATION PLAN future-plus ENVIRONMENTAL February 2014 Site & Soil Evaluation Report Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 17 38
Page 41
Proposed Irrigation
Area= 625m2
The wastewater generated by the Domestic
Dwelling and Factory Office Facilities is to be
Septic tank is to be converted to a pump station.
All collected wastewater is to be pumped to the
Location
Factory Office
facility
Proposed STP = [
Slope
Cooroy Mountain Spring Water—Irrigation Layout Plan
Location: 314 Cooroy Mountain Road,
Cooroy Mountain
Scale: Not to Scale
FPE Reference Number: 4377-131119-1.0
Client: Cooroy Mountain Spring Water Pty Ltd
Figure Measurements to Take
Precedence Over Scale Measurements
Page 42
Septic/
Pump Well
Domestic
Dwelling
Waste
Fi
Factory
The wastewater generated by the Domestic Dwelling and Factory Office Facilities is
to be diverted to the existing Septic tank. The existing Septic tank is to be convert-
ed to a pump station. All collected waste is to be pumped to the new STP.
Distribution
Valve
Office Check Valve
acilities
Waste
| I
\<——>*
. 2.5m 2.5m *
: 4 ? ea e ? .
| il 5m 1 |
ae "s
G* 5m *e
2 |S
A 3
zt ¢ ? © r’ e :s
8 [3
5 | é
2. 8
- © « © ¢ ¢ :
. e e e e e :
| Sprinkler |
Cooroy Mountain Spring Water—trrigation Layout Plan
future-plus
& ENVIRONMENTAL Location: 314 Cooroy Mountain Road, Scale: Not to Scale
Cooroy Mountain
FPE Reference Number: 4377-131119-1.0
Figure Measurements to Take
Client: Cooroy Mountain Spring Water Pty Ltd
Precedence Over Scale Measurements
40
Page 43
4377-131119-1.0 FIGURE 4 IRRIGATION SYSTEM TYPICAL DESIGN DETAIL future-plus ENVIRONMENTAL February 2014 Site & Soil Evaluation Report Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 18 41
Page 44
010% Slope Sloping Ste - greeter then 1:10 Where sope @cnsads 10%arhiceis tobe sought fromFPE picr to installation >10% Slope Standard Drawing future-plus Surface Iniaati Syst >> ENVIRONMENTAL pean Cooroy Mountain Spring FPE Ref. 4377-131119-1.0Scale: NA Retention Drain/ Mound Installation Notes: 1) This drawing must be read in conjunction with the corresponding Future - Plus Environmental report. 2) All work must comply with AS/NZ 1547, Queensland Plumbing, and Wastewater Code, Standard Plumbing and Drainage Regulation 2003,Plumbing and Drainage Act 2002 and Local Council guidelines 3) The wastewater generated by the Domestic Dwelling and Factory Office Facilities is to be diverted to the existing Septic tank. The existing Septic tank is to be converted to a pump station. Alll collected wastewater is to be pumped to the new STP. 4) Delivery pipe should be lilac stripe 25mm or similar poly pipe and buried to a minimum of 150mm 5) A filter is to be installed on the delivery line to prevent clogging of the sprinklers 6) Acheck valve is to be installed on the delivery pipe 7) A distribution valve is to be installed (located upslope of the irrigation area) to provide even distribution to the irrigation areas and to the laterals 8) Any depressions within the irrigation area are to be filled with soil of same category as horizon A 9) Laterals must be laid parallel with the natural contours of the land 10) Control valves are to be placed on each sprinkler to ensure even distribution 11) Sprinklers should be spaced Sm apart and no less than 2.5m from the irrigation area boundary 12) A diversion drain/mound is to be constructed upslope of the irrigation area 13) Aretention mound is to be constructed downslope of the irrigation area 14) All stormwater is to be diverted away from the proposed irrigation area 15) Where not already established introduce suitable, non-invasive, vegetation that is tolerant to wet conditions and has a high evapo-transpiration capacity. Seek advice from your local nursery 16) Where not already established turf or mulch is to be applied to the irrigation area 17) All vehicles and hooved animals are to be kept off the irrigation area 18) A minimum of two warning signs should be placed within each irrigation area Noninvesive, trees, shrubs, ground covers and turf suited to wet conditions and the uptate of nutrients are to be used in the iigation area
Page 45
future-plus ENVIRONMENTAL 4377-131119-1.0 APPENDIX A SoiL BOREHOLE Locs Site & Soil Evaluation Report 19 February 2014 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 43
Page 46
Australian Soil Investigations Client : Future-Plus Environmental Location :... 314 Cooroy Mountain Road, Cooroy. Date: LOG SECTIONS Ref No.130185 25-11-13 Depth TEST SITE No1 Depth TEST SITE No 2 100 Silty Clay CH 100 Silty Clay CH 200 Med to heavy clay, orange 200 Med to heavy clay, top soil 300 Brown, moist, moderate 300 Orange brown traces of fine 400 Structure.(Cat 5) 400 To large gravel & cobbles 500 500 Roots, moist, moderate 600 600 Structure. (Cat 4-5) 700 700 800 Silty Clay CH 800 Silty Clay CH 900 Heavy clay, dark orange 900 Heavy clay, dark orange 1000 Brown, moist, strongly 1000 Brown, moist, strongly 1100 Structured.(Cat 6) 1100 Structured.(Cat 6) 1200 1200 1300 1300 1400 1400 1500 1500 1600 1600 1700 1700 1800 1800 1900 1900 2000 End 2000 End 2100 2100 2200 2200 2300 2300 2400 2400 2500 2500 2600 2600 2700 2700 2800 2800 2900 2900 3000 3000 3100 3100 44
Used in these records
132006.268.03 - Amended Court Approval - Attachment 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.