Council archive · source document
132006.268.03 - Amended Court Approval - Attachment 2
future-plus ENVIRONMENTAL 4377-131119-1.0 G Alarms and Early Warning Systems It is recommended that a high level and failure alarms with battery backup be considered as part of the overall design for the pump station and STP. Service and Maintenance The service and maintenance provide must attend and complete the required service, maintenance and monitoring of the STP on a minimum 3 monthly basis. Grease Trap The existing grease trap is to be inspected by a suitable qualified person to ensure the integrity of the unit, as it is recommended that pre-treatment of the effluent be undertaken, given the nature of the wastewater likely to be generated by the development. The grease trap should then be adopted as part of the operation and maintenance of the facility and require regular inspection, service and maintenance. February 2014 Site & Soil Evaluation Report 9 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain ra
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132006.268.03 - Amended Court Approval - Attachment 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.