Council archive · source document
132006.268.03 - Amended Court Approval - Attachment 2
4377-131119-1.0 @& future-plus Cu? > ENVIRONMENTAL Wastewater Treatment Treatment Standard: ery ue) All wastewater generated from the dwelling and factory office facilities are to be diverted to the existing septic tank located geographically downslope of the waste generating facilities. The existing septic tank is to be converted to a pump station, with all collected wastewater pump to an STP capable of treating the wastewater to a Secondary or Advanced Secondary standard. Land Application System: Surface (heavy droplet) Irrigation System Land Application Area: 500m? irrigation area Setback distances: In accordance with those contained within the Queensland Plumbing and Wastewater Code System Recommendations: A diversion drain/bund and/or cut-off drain is to be constructed up slope of the land application area in order to intercept both surface and sub-surface water prior to entering the land application area. A retention mound is to be constructed downslope of the land application area to prevent any surface water from exiting the designated disposal area. Grease trap to be installed. Existing Septic System to be converted to a pump station. Effluent to be pumped to the new STP. Locate sanitary drainage line from office facilities / toilets and plumb to pump station. February 2014 Site & Soil Evaluation Report 14 Wastewater Treatment and Effluent Disposal 314 Cooroy Mountain Road, Cooroy Mountain 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132006.268.03 - Amended Court Approval - Attachment 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.