Council archive · source document
132006.268.03 - Amended Court Approval - Attachment 2
Septic/
Pump Well
Domestic
Dwelling
Waste
Fi
Factory
The wastewater generated by the Domestic Dwelling and Factory Office Facilities is
to be diverted to the existing Septic tank. The existing Septic tank is to be convert-
ed to a pump station. All collected waste is to be pumped to the new STP.
Distribution
Valve
Office Check Valve
acilities
Waste
| I
\<——>*
. 2.5m 2.5m *
: 4 ? ea e ? .
| il 5m 1 |
ae "s
G* 5m *e
2 |S
A 3
zt ¢ ? © r’ e :s
8 [3
5 | é
2. 8
- © « © ¢ ¢ :
. e e e e e :
| Sprinkler |
Cooroy Mountain Spring Water—trrigation Layout Plan
future-plus
& ENVIRONMENTAL Location: 314 Cooroy Mountain Road, Scale: Not to Scale
Cooroy Mountain
FPE Reference Number: 4377-131119-1.0
Figure Measurements to Take
Client: Cooroy Mountain Spring Water Pty Ltd
Precedence Over Scale Measurements
40
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132006.268.03 - Amended Court Approval - Attachment 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.