SUPERSEDED - Decision Notice RAL24 0003 · RAL24/0003
Fencing to Protected Land
8. A permanent fence must be constructed along the entire length of the interface of proposed
Lot 362 with the Vegetation Protection Covenant area. The fence must be constructed in
accordance with an Operational Works approval and must be to the following specifications:
a. Min 1.5 metres high
b. Dog proof
c. Constructed of fireproof materials
Bushfire Management – Reconfiguration Requirements
9. All reconfiguration works must be carried out in accordance with the Bushfire Management
Plan listed within this Decision Notice, with the exception of the following:
a. Figure 2 is to be updated to include the revised driveway location
b. Section 3.4 Emergency Access & Egress is to be updated to refer to the revised
driveway location and recommendations updated accordingly.
The report must be resubmitted to Council incorporating the above amendments prior to the
issue of any Development Permit for Operational Works.*
*(Refer Advisory Note)
10. Certification must be submitted to Council from a qualified person* which certifies that the
development has been constructed in accordance with the bushfire management conditions
of this Decision Notice.
*(Refer Advisory Note)
Bushfire Management – Future Dwelling Requirements
11. All future dwellings on the approved lots must be sited and constructed in accordance with
any building siting and construction requirements contained within the Bushfire Management
Plan for the development.
Frontage Works
12. The areas adjacent to the remediated landslide must be upgraded in a manner that does not
increase the risk of global slope instability. This applies to the remediated landslide area
located within the construction exclusion zone as identified by Tectonic Engineers.
The works must be undertaken in accordance with an Operational Works approval, adhere
to the recommendations contained in, but not limited to, section 6.1 of Tectonic Engineers’
Geo-Environmental Investigation (23099-001-Rev0) dated 22 May 2023 and any associated
addendum, and must include in particular:
a. the removal of existing track;
b. grading of ground surfaces to enable surface flow to freely drain into the existing
drainage line downslope;
c. avoid undermining the toe of the existing rock-filled embankment; and
d. written certification prepared by a suitably qualified Tectonic Engineers representative
certifying that the proposed works align the recommendations contained within the
aforementioned report.
Property Access and Driveways
13. A residential driveway must be constructed to Lot 362. The works must be undertaken in
accordance with an Operational Works approval and be generally in accordance with
Callaghan & Toth’s Layout Plan and Longitudinal Section (2251-02, Rev. A) dated 25
October 2023.
Page 3 of 8
Document Set ID: 23124970
Version: 2, Version Date: 25/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Decision Notice RAL24 0003.pdfRelated documentApplication case desk ↗
About this file
- File size
- 160 KB (small file)
- File type