Reference Document - Site Based Stormwater Management Plan · MCU21/0117.01

of 60

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                             23098 - SBSMP/4
                                                                                                   Page 11




5.3.5 Post-Development Model
The post-development catchment model utilises the following values in Table 5-5. The sub
catchment area taken into account for the post-development catchment is 0.2275ha. Refer to
Figure 5.2 below for a screenshot of the pre-development model.

              Table 5-5 – Post-Development Catchment Characteristics for Catchment
                                                            Effective         Remaining
                                                                                                Pervious Area
              IL-CL Hydrological Model                     Impervious       Impervious Area
                                                                                                    (PA)
                                                            Area (EIA)           (RIA)

 Post-Development
                           Percentage of area (%)                51               25                 24
    Catchment
                       Time of Concentration (mins)              5                 5                  5




                                  Figure 5.2 – Post-Development Model

5.3.6 Post-Development Mitigated Model – On-site Detention Tank
The post-development mitigated catchment model utilises the following values in Table 5-6. The
sub catchment area taken into account for the post-development mitigated roof catchments are
0.0335ha, 0.0214ha, and 0.0258ha, respectively. The sub catchment area taken into account for
the post-development mitigated ground catchment bypassing to the lawful point of discharge is
0.0258ha.

        Table 5-6 – Post-Development Mitigated Catchment Characteristics for Catchment
                                                                               Remaining
                                                Effective Impervious Area                       Pervious Area
          IL-CL Hydrological Model                                             Impervious
                                                           (EIA)                                    (PA)
                                                                                Area (RIA)
Post-Development Percentage of area (%)                    100                      0                 0
Mitigated – Building
                     Time of Concentration
   1 Catchment
                             (mins)
                                                            5                       0                 0

Post-Development Percentage of area (%)                    100                      0                 0
Mitigated – Building
                     Time of Concentration
   2 Catchment
                             (mins)
                                                            5                       0                 0

Post-Development Percentage of area (%)                    100                      0                 0
Mitigated – Building
                     Time of Concentration
   3 Catchment
                             (mins)
                                                            5                       1                 1

 Post-Development     Percentage of area (%)                0                      56                44
   Bypass Ground
                      Time of Concentration
    Catchment
                              (mins)
                                                            0                       5                 5


Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Used in these records

About this file

File size
5.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document - Site Based Stormwater Management Plan.pdf · 5.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.