Skip to the record
Beware of cheap imitations.

Council archive · source document

Reference Document - Site Based Stormwater Management Plan · MCU21/0117.01

of 60

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                23098 - SBSMP/4
                                                                                       Page 13




                            Figure 5.3 – Post-Development Mitigated Model

5.3.7 Comparison of Peak Flows at Lawful Point of Discharge
The pre-development and post-development mitigated peak flow rates were compared for the
catchment and are shown in Table 5-6 and Table 5-7 below.

                                     Table 5-6 - Comparison of Peak Flows


                 Pre-Development Peak Flows Post-Development Peak Flows Post-Development Peak Flows
Property State          (Un-Mitigated)             (Un-Mitigated)                (Mitigated)
                            (m3/s)                     (m3/s)                      (m3/s)

   50% AEP
    (m3/s)
                            0.035                          0.055                  0.034
   20% AEP
    (m3/s)
                            0.058                          0.084                  0.048

   10% AEP
    (m3/s)
                            0.065                          0.094                  0.056

5% AEP (m3/s)               0.084                          0.110                  0.064

2% AEP (m3/s)               0.102                          0.135                  0.089

1% AEP (m3/s)               0.115                          0.155                  0.087


Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Used in these records

About this file

File size
5.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document - Site Based Stormwater Management Plan.pdf · 5.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.