Skip to the record
The only place to find full transcripts.

Council archive · source document

Reference Document - Site Based Stormwater Management Plan · MCU21/0117.01

of 60

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                               23098 - SBSMP/4
                                                                                       Page 20




                            Figure 6.1 - MUSIC Model Print Screen Schematic




                                   Figure 6.2 - MUSIC Modelling Results

The modelling results show that the pollutant reduction objectives are met for all contaminants
given in Section 6.

Should operational requirements change, this plan is required to be amended to suit. Substantial
changes may require resubmission to the local authority. Following completion of construction, this
plan is to be incorporated into the total-site management practices.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Used in these records

About this file

File size
5.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document - Site Based Stormwater Management Plan.pdf · 5.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.