Council archive · source document
Reference Document - Site Based Stormwater Management Plan · MCU21/0117.01
Plans and drawings: the text below has words only, no drawings.
Rational Method Peak Flow Calculations Job No: 23098 MORGAN CONSULTING Job Type: Proposed Townhouse Development ENGINEERS PTY LTD Address: 5 Pearl Street, Cooroy 1 GREAT GEORGE STREET Council: NSC PADDINGTON QLD 4064 IFD Data: 26.4125 (S),152.9125 (E) Minor Storm: Q10 Designed: WB 1 I10 70mm/hr Major Storm: Q100 Checked: HM Pre Development Post Development Time of Concentration Standard Inlet Time Standard Inlet Time Standard Inlet Time mins Standard Inlet Time 5 mins Sheet Flow (Friends Equation) Sheet Flow (Friends Equation) Sheet flow length (L) 57 m Sheet flow length (L) m roughness (n) 0.03 short grass roughness (n) 0.014 Concrete Fall of NSL 1.89 m Fall of NSL 0.29 m Slope of Surface (S) 3.3 % Slope of Surface (S) % total 9.7 mins total 0.0 mins Concentrated Overland Flow Concentrated Overland Flow Flow distance 0 m Flow distance m velocity 0.7 m/s velocity 0.7 m/s mins 0.0 mins mins 0.0 mins Surface type multiplier 3.0 Surface type multiplier 4.0 total 0.0 mins total 0.0 mins Total tc 9.7 mins Total tc 5.0 mins Runoff Volume Calculations Name Area (ha) tc fi C10 Name Area (ha) tc fi C10 0.228 0.27 0.75 0.228 0.76 0.85 Total 0.228 9.7 0.75 Total 0.228 5.0 0.85 Frequency Frequency ARI Cy Iy Qy ARI Cy Iy Qy Factor A (Ha) Factor A (Ha) (years) (Fy*C10) (mm/h) (m3/s) (years) (Fy*C10) (mm/h) (m3/s) (Fy) (Fy) 3 mth 0.019 3 mth 0.026 1 0.800 0.603 99 0.228 0.038 1 0.800 0.682 120 0.228 0.052 2 0.850 0.641 111 0.228 0.045 2 0.850 0.724 135 0.228 0.062 5 0.950 0.716 150 0.228 0.068 5 0.950 0.809 183 0.228 0.094 10 1.000 0.754 174 0.228 0.083 10 1.000 0.852 215 0.228 0.116 20 1.050 0.792 199 0.228 0.099 20 1.050 0.895 245 0.228 0.139 50 1.150 0.867 228 0.228 0.125 50 1.150 0.980 285 0.228 0.176 100 1.200 0.905 251 0.228 0.143 100 1.200 1.000 315 0.228 0.199 Page 1 of 1 14/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document - Site Based Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.