5.1.5 Peak Flows
Refer to Table 5-3 for a summary of the predicted minor and major discharge rates for pre and
post development conditions and Appendix E for the Rational Method calculations.
Table 5-3 – Pre and Post Development Peak Flows
Property State Q2 (m3/s) Q5 (m3/s) Q10 (m3/s) Q20 (m3/s) Q50 (m3/s) Q100 (m3/s)
Pre development 0.045 0.068 0.083 0.099 0.125 0.143
Post development 0.062 0.094 0.116 0.139 0.176 0.199
As shown in Table 5-3, an increase in impervious surface areas will consequently increase
stormwater runoff peak flow rates from the proposed development.
Hence, it is proposed to utilise a series of on-site above ground detention tanks to mitigate the
stormwater runoff of the proposed development prior to discharging to the Lawful Point of
Discharge, northeast of the site.
Refer to Appendix E for the Rational Method Calculations, Appendix F for the Concept Site Levels
and Drainage Plans and Section 6 for the Stormwater Quality Management Plan.
5.2 Proposed Development Drainage
The proposed development drainage intent is as follows:
Development Catchment:
1. Runoff from the roof catchments will flow via downpipes to aboveground detention tanks
combined with rainwater reuse for mitigation prior to discharging to the lawful point of
discharge, northeast of the site.
2. Runoff from the ground catchment will be directed to the bioretention basin and level
spreader located in the north eastern corner of the site prior to discharging to the lawful
point of discharge, northeast of the site.
External Catchment:
1. Runoff from the external ground catchment, southwest of the site, will be collected by a
positive drainage system and directed to the lawful point of discharge, northeast of the
site.
Refer to Appendix F for the Concept Site Levels and Drainage Plans.
5.3 DRAINS Modelling Assessment
In order to ensure the proposed development will not discharge stormwater runoff greater than
pre-development flow rates, a detailed detention analysis was undertaken to determine what
detention mitigation is required for the proposed development to meet the requirements outlined
in Noosa Shire Council’s planning scheme policy. The IL-CL hydrological model has been used to
calculate the peak discharges from the site under the existing (pre-development) and proposed
(post development) conditions.
Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document - Site Based Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.