Council archive · source document
MCU11/0254 Response to information request
Very large file (39.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
-~-:~~:~F-?~, .;
124 DUPORlli AVENUE
~~ P.O. BOX 16
MAROOCHYDORE QlJ) 4558
AUST1WJA
PHONE (07)5443 7777
COVEY FAX (07) 5443 7577
E.mail: eogineersOcovay.com.Bu
Webslle: www.COvey.com.au
ASSOCIATES PTY LTD
ABN 59137305 992
Consulting CivIl, structural, Hydraulic,
;:)lf~!croR: KEVIN COVEY
Envirorunental & flre Engineers flE"Q CII["O 1ftA,JII.
~QW!I’II’fCi.FtM.
Project Management & Planning
MANAGER: CH;l.!~m (,AMp
Dt’QlUal RP[Q ~
-...,
28 March 2012
OFFICES AT:
TAMWORTH (02)6766 1944
Ref: AP:ET:111377-LA NARRABRI (021 6792 4277
ROCKHMIPTON (07)4922 2300
25506Ltr
PAPUA NEW GUINEA
Rural Operations Brisbane Region
PO Box 1425
BRISBANE OLD 4006
Attention: Superintendent Bernard Trembath
Council Ref: MCU11/0254
Dear Sir
Re: Bushfire Management
At: 60 Hoffmann Drive, Noosaville
For: Canto Holdings Pty Ltd
Further to our discussions on-site and your correspondence dated 9th February 2012 we
wish to advise that the proposed site plan for the abovementioned development is being
amended to further assist in providing effective bushfire mitigation measures. The following
amendments have / will be made to the plan of development:
. The provision of an additional access for fire fighters between units 13 and 14. This
has been achieved by providing a break between these units and moving units 8 to
13 to the north by 2 metres. The path between these units will be constructed of
concrete / pavers and will provide an additional access point and means of escape
for fire fighters working on the fire control line;
. Fire hydrants are nominated for installation adjoining designated OFRS vehicle
deployment points. A total of 4 on-site hydrants are proposed. These will allow a
steady supply of water along the fire control line for the use of fire fighters;
Provision of gates to the courtyards of units from the fire control line; and
The fire control line to the west of unit 25 has been straightened to improve
functionality and visibility along the control line for fire fighters.
The proposed plan of development provides alternative but superior bushfire management
solutions to those endorsed by OFRS and Council in the Fire Management Plan (Nov.2007)
prepared by James Warren Associates applicable to the site. The following table outlines the
difference in the proposed solution and the currently approved solution for bushfire
management of the site:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU11/0254 Response to information requestRelated documentApplication case desk ↗
About this file
- File size
- 39.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.