Council archive · source document
Response to outstanding issues - Revised Geo-Environmental Investigation-compressed · MCU25/0020
8.2.2 Record Keeping ..................................................................................................................................... 23
8.3 Management of Groundwater & In Situ ASS ............................................................................................... 23
8.4 Water Quality Management ............................................................................................................................... 24
9. Limitations ............................................................................................................................................................ 24
Tables
Table 1: Summary of Subsurface Profiles............................................................................................................................... 8
Table 2: Summary of Groundwater Monitoring.................................................................................................................... 8
Table 3: Summary of Aggressivity Laboratory Results ....................................................................................................... 9
Table 4: Retaining Structure Design Parameters ................................................................................................................ 14
Table 5: Estimated Settlements Under Raft Slab ................................................................................................................ 15
Table 6: Water Quality Release Criteria .................................................................................................................................. 24
Text Figures
Text Figure 1: Proposed layout plan (upper) and cross-sectional view (lower) courtesy CCD ........................... 2
Text Figure 2: 2025 aerial image of the site and surrounds (courtesy of Nearmap imagery) ............................. 3
Text Figure 3: Oblique drone image of the site looking west, drilling borehole BH2 ............................................ 4
Text Figure 4: Oblique drone image of the site and surrounds, looking east........................................................... 4
Text Figure 5: Views along the existing revetment wall crest, looking south (LHS) and north (RHS) .............. 5
Text Figure 6: Easterly view of the site, drilling borehole BH1 ........................................................................................ 5
Text Figure 7: Extract from Laguna Bay Surface Geology Map ....................................................................................... 7
Text Figure 8: Settle 3D output of Total Settlement ......................................................................................................... 15
Text Figure 9: Zone of influence diagrams – footings to be founded below these lines.................................... 17
Text Figure 10: Extract from Redcliffe to Teewah Acid Sulfate Soils Map 2 (NR&M-SEA-I-A0 3261) ............ 20
Appendices
Appendix A Borehole Logs & Explanatory Notes
Appendix B ASS Summary Table B1 & Environmental Laboratory Test Certificates
Appendix C Limitations
Figures
Figure 1: Site Plan
Geo-environmental Investigation Proposed Residence
4 June 2025 | 25040-001-Rev1 iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to outstanding issues - Revised Geo-Environmental Investigation-compressed.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.