Council archive · source document
Response to outstanding issues - Revised Geo-Environmental Investigation-compressed · MCU25/0020
Architectural drawings and publicly available information indicate that the ground surface across the
proposed building area typically varies between about RL 2 m and RL 2.5 m AHD, then drops down to
about RL 0 m to 1 m AHD adjacent to the canal.
Text Figures 3 to 6 below and overleaf illustrate site conditions at the time of the investigation.
Stormwater outlet
Text Figure 3: Oblique drone image of the site looking west, drilling borehole BH2
Text Figure 4: Oblique drone image of the site and surrounds, looking east
Geo-environmental Investigation Proposed Residence
4 June 2025 | 25040-001-Rev1 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to outstanding issues - Revised Geo-Environmental Investigation-compressed.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.