9 July 2007 ken hicks

AND ASSOCIATES

Our Ref: 060642
Council Ref: 2006/2689

The Chief Executive Officer
Noosa Shire Council

PO Box 141

TEWANTIN QLD 4565

Attention: Nick Cooper

Dear Nick

RESPONSE TO REQUEST FOR FURTHER INFORMATION
DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
(COMMERCIAL BUSINESS: TYPE 1 OFFICE)

247,249 & 253 DAVID LOW WAY, PEREGIAN BEACH

LOTS 1 & 2 ON RP 903222 AND LOT 26 ON P9315

MORGAN & BEIERS PTY LTD

 

 

COUNCIL FILE REFERENCE: 2006/2689

We refer to the above development application for material change of use and to

Council correspondence dated 31 May 2007 requesting further information with respect
of the application.

In accordance with the Integrated Planning Act 1997 and on behalf of the applicant,
Morgan and Beiers Pty Ltd, we hereby submit a response to the various issues raised by
Council.

Supporting documentation has been prepared by the applicant in order to address the
issues contained within the information request and is attached to this response as
described below.

 

Attachment A — Proposal Plans prepared by Core Architects;

Attachment B - Survey Plan prepared by Ken Hicks & Associates;

Attachment C ~ Information Response & Traffic Impact Assessment prepared by Burchill VDM;

Attachment D - Water & Services Report prepared by Barlow Gregg VDM;

Attachment E - Stormwater Management Report prepared by Barlow Gregg VDM;
._Attachment F ~ Landscape Plan prepared by LandGraphics.

Each Council request item is listed below together with the applicant's response to the
particular item.

LAND USE
Item 1 a
: Please amend plans or provide justifi ication with reference to > non-compliance with Scheme
: requirements relating to:
1.1. Front Boundary Setbacks — please provide a greater setback from the front boundary, : :

 

TOWN PLANNERS | CONSULTING SURVEYORS | URBAN DESIGNERS | PROJECT MANAGERS
Ken Hicks & Associates Pty Ltd | [email protected] | A.C.N. 010278823 | A.B.N. 74308 405 611
Suite 7 Dalton Centre, |! Newspaper Place 4B/42 King Street 61-73 Sturt Street
PO Box 6380, MAROOCHYDORE BC Qld 4558 PO Box 1712, CABOOLTURE, Qld 4510 PO Box 5027, TOWNSVILLE, Qld 4810
P 075443 2844 F 07 $443 7146 P 0754955318 =F 07 5495 5317 P 07 4721 3066 F 07 4721 3088
Full text of the other 125 pages

Page 2

‘the proposed setback is considered inconsistent with existing front setbacks for the area. |

Response

Please refer to the amended proposal plans prepared by Ken Down Architects namely the
Ground Floor Plan Drawing No. 2243 SDO3 Revision G which illustrates the proposed
building setbacks from all property boundaries.

It should be noted that the front boundary setback of the buildings, being the primary
setback of concern to Council, has been increased by 1m to achieve a setback of 5.4m to
the front building facade. The edge of proposed Building 2 is however within this 5.4m
setback mainly due to the characteristics of the site and orientation of the individual
buildings.

In achieving this additional 1m setback from the frontage the landscaping provision on the
rear property boundary has reduced. This has however promoted more significant
opportunities for more substantial plantings along the David Low Way frontage.

This design solution was discussed with Council’s Nick Cooper following the issue of the
request for further information and was suggested as a satisfactory method of addressing
Council’s concern.

 

Item 2
Please provide further details of building materials / finishes proposed. Please note that the
extensive use of glass finishing is considered to provide the buildings with a commercial
appearance / nature. Where as the buildings should present a domestic form of
architecture, rather than commercial.

Response

Please refer to the amended proposal plans prepared by Ken Down Architects namely the
Elevations Drawing No. 2243 SDO5 Revision B & 2243 SD06 Revision B which illustrates
the introduced architectural treatments to the building facades.

The inclusion of painted FC cladding, custom orb sunhoods, aluminium louvers, custom
orb roof sheets, selected weatherboards, and painted HWD timber posts significantly
contributes to reducing the presence of a glass finish to the building facades.

The individual buildings are considered to present a domestic form of architecture rather
than commercial.

The introduction of these architectural features were discussed with Council’s Nick Cooper
following the issue of the request for further information and was suggested as a
satisfactory method of addressing Council’s concern.

LAND DEVELOPMENT

Survey

 

Item 3
It is noted that survey information has been supplied as part of the response to Council's
initial Information Request, however the plan does not provide all_of the information that

 

Page 3

Council previously requested.

3.1. In this regard please arrange the licensed land surveyor to amend their plan by
including the information that was previously requested but not provided. Specifically, the
plan shall show all services (including their alignment, size, depth, invert level, etc), all
vegetation, existing building structures (on the subject site and on the adjoining allotments),
pathways, the edge of the frontage road (the David Low Way), topography of the site and
surrounding land (with contours at 200mm intervals) and any other relevant information.

3.2. The amended plan should also show all existing vegetation within the road reserve and
adjoining properties (including their girth, height and canopy cover).

This information is required to assess whether their will be any impact to adjoining
properties and vegetation particularly in light of the extensive earthworks proposed in order
to construct the proposed basement carpark.

 

All level information shall be to the Australian Height Datum (AHD)..

 

Response
Please refer to the revised survey plan prepared by Ken Hicks & Associates which has been
amended to include the information requested by Council.

Level Information
“Item 4 ———_
It is noted that only some level information has been provided as part of the response to
Council's initial Information Request.

 

4.1. In this regard it would be helpful to know the levels of the upper level carpark and
driveway areas so that Council can establish the impacts to adjoining properties.

Response

Please refer to the amended proposal plans prepared by Ken Down Architects namely the
Ground Floor Plan Drawing No. 2243 SDO3 Revision G which illustrates the proposed levels
of the upper level car park and driveway areas.

 

4.2. It is also noted that the floor levels proposed for the building, as shown on the plans,
are not consistent with the elevations where it appears that the floor to floor dimensions are
proposed to be 2.8m, whereas the plan levels suggest a 2.7m floor to floor dimension. In
this regard it is important to ensure that the plans and elevations accurately reflect what is
being proposed and that the Council can establish the correct height of the proposed
building in relation to the 8m-height limit.

 

Response
Please refer to the amended proposal plans prepared by Ken Down Architects namely the

Elevations Drawing No. 2243 SD05 Revision B and 2243 SD06 Revision B which illustrates
the floor to floor dimension being 2.8m. The proposed development is within the stipulated
building height for the precinct of 8m.

Page 4

4,3. It is further noted that the driveway ramp grades need to be determined based on the
inside radius of the ramp (i.e. where the ramp grades will be steeper) as opposed to the
grade at the centre of the ramp. This is outlined in the Australian Standard for Off-Street
Car Parking (AS2890.1) and will need to be addressed. _

 

 

Response

Please refer to the traffic engineering response prepared by Burchill VDM which addresses this
matter. The proposal plans prepared by Ken Down Architects namely the Basement/Site Plan
Drawing No. 2243 SD02 Revision E has been revised in line with recommendations from the
traffic engineering response.

 

 

4.4. Furthermore, the applicant will need to demonstrate in accordance with Specific
Outcome 017 of Table 14-46 of the Driveways & Carparking Code that abasement level of
RL7.1 (as presently proposed) can in fact drain by gravity means without the need for
pumping.

In this regard the applicant will need to arrange a surveyor to establish the invert levels of
Council's existing drainage system and demonstrate how the basement will be drained to
this drainage system. If this cannot be achieved the applicant will need to investigate the
option of raising the basement level (to ensure the basement can drain by gravity means)
and/or upgrading the existing Council drainage system such that it is at a level that can
drain the basement carpark. These issues will need to be resolved prior to Council issuing a
Development Permit for the proposed Material Change of Use as Council must be sure that
the development is suitable and can actually work.

 

Response
Please refer to the Stormwater Management Report prepared by Barlow Gregg VDM which
addresses this matter.

Car Parking

 

Item 5
Demonstrate that the proposed driveway and carparking area comply with all aspects of the
Australian Standard (AS2890.1) for Parking Facilities, Part 9: Off Street Car Parking.

5.1. In this regard it is noted that the present proposal contains blind corners and blind
aisles with no provision for vehicles to turn around. As such designated turning bays must
be provided and it is recommended that they be at least 3m wide (to allow ease of access
and departure) and at least 5.4m long. To this end:

.One turning bay should be provided adjacent to the proposed stairs located at the south-
eastern comer of the basement (space number 30), and

.One turning bay should be provided on the eastern side of the basement immediately to
_the north of the proposed tank (space number 22).

 

 

 

Response

Please refer to the traffic engineering response prepared by Burchill VDM which addresses this
matter. The proposal plans prepared by Ken Down Architects namely the Basement/Site Plan
Drawing No. 2243 SDO2 Revision E and Ground Floor Plan Drawing No. 2243 SD02 Revision

Page 5

G has been revised in line with recommendations from the traffic engineering response.
"5.2. The proposed driveway ramp that provides access to the carpark needs to be amended
as:

. It appears that two laneways will need to be separated by a cental median, with each lane
having a minimum width of 3.9m measured between kerbs.

. The proposed ramp grades must be determined by the inside radius of the ramp (i.e.
where the ramp grades will be steeper) not the middle of the ramp.

.Headroom between the ramp and the entrance to the basement carpark must be designed
such that vehicles will not hit the upper level as this will require changes to the upper level
and/or the driveway grades.

Response
Please refer to the traffic engineering response prepared by Burchill VDM which addresses this
matter. The proposal plans prepared by Ken Down Architects namely the Basement/Site Plan
Drawing No. 2243 SD02 Revision E has been revised in line with recommendations from the
traffic engineering response.

5.3. Amend the proposal plan such that clear access is available to all stairs cases. In this
regard it is noted that clear access cannot be obtained to the proposed stair at the south-
eastern comer of the upper level carpark. A clear passage of at least 1.5m in width should
be available to the stairs, free of any carparking spaces or wheel-stops that would impede
.pedestrian movements.

 

 

 

Response

Please refer to the amended proposal plans prepared by Ken Down Architects namely the
Ground Floor Plan Drawing No. 2243 SDO2 Revision G which has been revised such that the
proposed stair is clear of car parking and sufficient pedestrian movement is achieved.

 

5.4. Given the overall size of this development and the number of separate tenancies
Proposed please provide at least 2-disabled car park spaces on site.

Response

Please refer to the amended proposal plans prepared by Ken Down Architects namely the
Ground Aoor Plan Drawing No. 2243 SD02 Revision G which has been revised to include 2
disabled car parking spaces.

Vehicle Access

Item 6

The proposed separated entry and exit for the development, similar to that which exists for
the existing house on site, is not suitable for a development of this scale and likely traffic
generation and would result in countless conflicts between vehicles and pedestrians using
the footpath especially given that the driveway has a width of approximately 25m which
coincides with the pedestrian path. The angle of the entry and exit would also cause
vehicles to enter and leave the site at faster speeds which is not conducive for pedestrian
safety and nor are adequate sight lines available.

 

 

 

Page 6

In this regard a consolidated access needs to be provided with left-in/left-out access, and \
this driveway should not extend beyond the prolongation of the southern boundary of the |
site (i.e. the driveway should be contained to the actual frontage of the development and
_hot impede onto the frontage of adjoining properties). ___ 4

Response
Please refer to the traffic engineering response prepared by Burchill VDM which

addresses this matter. The proposal plans prepared by Ken Down Architects namely the

Slip Way Design Plan Drawing No. 2243 SD12 Revision B has been revised in line with
recommendations from the traffic engineering response.

 

Item 7

Demonstrate that vehicles can safely enter, manoeuvre throughout the site, park on site,
and leave the site without scraping and/or bottoming. This shall be undertaken for all types
of vehicles expected to enter the site, with consideration given to the height of such vehicles
and the headroom required under the building. This was previously requested by Council,
but as the applicant has not provided any evidence to demonstrate that the proposal will
work the information is still needed.

Response

Please refer to the traffic engineering response prepared by Burchill VDM which
addresses this matter.
Item 8

Iltustrate on the proposal plans that suitable sight distances can be achieved from the
proposed access driveway to pedestrians on the pathway network and to vehicles on the
David Low Way based on the 85-percentile design speed of the David Low Way, not the
sign posted speed limit. In this regard a design speed of 70km/h would be more realistic
and consideration should also be given to existing vegetation and/or proposed vegetation
that may restrict these sight lines.

Response
Please refer to the traffic engineering response prepared by Burchill VDM which
addresses this matter.

End of Trip Facilities

 

Item 9

Illustrate on the proposal plans all "end of trip facilities" such as bicycle storage lockers for
staff, bicyde storage areas for customers, showers, change rooms, seating areas, drinking
fountains, etc to cater for people who walk or cycle to the site.

Response

Please refer to the amended proposal plans prepared by Ken Down Architects namely the
Ground Floor Plan Drawing No. 2243 SD02 Revision G which has been revised to include end
of trip facilities within the unisex toilets in the individual buildings.

Page 7

Stormwater Drainage

Item 10

Demonstrate that the site can be developed with no net increase in runoff from the site for
storm events up to a 1 in 100 year Average Recurrence Interval. In this regard the
stormwater drainage system designed for the site will need to incorporate an adequate
detention system (holding tanks and rainwater tanks) to retain these flows, which can be
utilised for irrigation, toilet flushing, hose down of paved surfaces, and ground water
recharging.

The present proposal and Stormwater Management Plan does not address this issue.

In this regard additional flows into the existing drainage system in the David Low Way will
not be supported.

 

Response
Please refer to the Stormwater Management Report prepared by Barlow Gregg VDM which
addresses this matter.

 

Item 11

Demonstrate that the site can be drained without the use of pumps in accordance with
Specific Outcome 017 of Table 14-46 of the Driveways & Carparking Code. In this regard
the basement proposal cannot be supported unless it can be drained by gravity means.

The applicant is also advised that given stormwater from the carparking and driveway areas
of will contain contaminants such as oil, grease, and fuel, all stormwater runoff will need to !
be collected and discharged through a suitable grease/oil arrestor and/or Gross Pollutant
Traps to separate these contaminants and prevent them from entering Council's drainage
system.

Response
Please refer to the Stormwater Management Report prepared by Barlow Gregg VDM which
addresses this matter.

Traffic Issues

 

Item 12
The previously submitted traffic report shall be amended to reflect the new proposal plan
(and any changes that may be generated as a result of this information request) and
_tesubmitted for Council to review.

 

 

 

Response
Please refer to the amended traffic impact assessment prepared by Burchill VDM which
reflects the proposal plans prepared by Ken Down Architects.

Engineering Reports

“Ttem 13 -
Please arrange for all engineering design plans and engineering reports submitted with the
application to be certified by an appropriately_qualified Registered Professional Engineer.

Page 8

- Queensland (RPEQ), as it is noted that none of the plans nor any of the engineering reports :
have been prepared, checked, and approved by an authorised person. In this regard none :
of the plans or the engineering reports will be assessed in detail until a RPEQ has authorised ;
them. Council therefore reserves the right to make a subsequent request for further

, information upon review and assessment of the authorised documentation with no ;

’ consequence to IDAS time lines set by the Integrated Planning Act.

4

; submitted may be forwarded to Council's own expert specialists and the cost of this |

The applicant and any consultants assisting in the preparation of this development proposal
are advised that an independent check of some or al! of the technical reports and plans ,

, independent review will be borne by the applicant.

 

Response

The Water & Sewerage Report and Stormwater Management Report prepared by Barlow
Gregg VDM are certified by an appropriately qualified Registered Professional Engineer
Queensland (RPEQ).

This response to Council's request for further information with respect to the proposed
Commercial Business: Type 1 Office at 247,249 & 253 David Low Way, Peregian Beach
and described as Lots 1 & 2 on RP 903222 and Lot 26 on P9315 for Morgan & Beiers Pty
Ltd provides Council with sufficient information in order to make a determination on the
application.

The design submitted with this response is considered to address all Council concerns
with respect to presenting as a domestic scale and appearance from the David Low
Way. The front boundary setbacks have been reduced to 5.4m in order to satisfy
Council. The proposed commercial development will have a positive outcome for this
precinct of Peregian Beach.

Submission of this response completes the Information and Referral Stage of the IDAS
process and accordingly we will proceed with the public notification of the application.

We trust that Council will duly consider this response and the grounds submitted in the
town planning report with respect to the proposal.

Should you have any queries with respect to the application please contact me on (07)
5443 2844.

Yours faithfully
KEN HICKS & ASSOCIATES

    

    
 

“ml Planner

Page 9

ATTACHMENT A

PROPOSAL PLANS
Ken Down Architects

 

Page 10

GADRAWINGS Unb, No2243 peregian cemmeraniC AD DOCUMENTSIOZ PLOTMAKER FILESI243 bok « 1223 PM - 8/07/2007

 

LEGEND

 

NUMBERS INDICATE THE
AMOUNT OF FLOORS TO
EACH STRUCTURE

 

 

 

 

 

O oad

i aooosadh NEW
/ COMMERICAL &
RESIDENTIAL
DEVELOPMENT

a8
Oss ge ORE

Rurous ST

    
  

PROPOSED FUTURE

™ Z i! USED a] =
RM, STE i ot r
=

af — tke a a a_
| PROPOSED

 

 

 

 

 

 

 

 

     
    

 

 

   

REV

1 SSUE FOR TOWN PLANO VG oar
4 ASSURE FORA ove on oao7
a GRINVEWAY ALTERED SUPMIAY SHOWN = BVG: 0507
c SLPWAY ALTERED AS PERRI evo Osa 7

cos

KEN DOWN
ARCHITECTS
‘ARCHIPELAGO’

‘+1 WALAN STREET MOOLOOLABA
POBOX 153 MOOLOOLABA 4557
PH 07 Saas 4511 FX 07 Saag 4969
Seite 7 “Tha Alte Professional Gentre’
400 SHUTE HARBOUR RD, AIRLIE BEACH
PH 07 4968 1433, FX. 07 4948 3633
ABN 61087 Bat 454
1 EMAIL [email protected]
wes www.kdacom.au

project
PROPOSED OFFICE DEVELOPMENT

for

MORGAN & BEIERS ATF

al

247 DAVID LOW WAY
PEREGIAN BEACH

 

drawing
LOCALITY PLAN

1:2000
dato MAR 07 drawn BVG scale @ AZ
dramngne 2243 S$D01 revision C

 
    
  
 

the exchaive
MEN GOWN ARCHITECTS PTY LTD

Reno! oop sancase

Conaraciors seu a very af omenrsoce: and lavels on

sta prot to commancay Repor! al aacepances

the Archie! Use fiuted eamenaone in preference

vealed

 

Page 11

REV
1
2
4
a

a

c

 

 

 

DRIVEWAY ALTERED, NOTES ADDED
DEVELOPMENT MOVED 900 TO WEST

DESCRIPTION ORA\
ISSUE TOLANSCAPE DESIGN eG
ISSUE FOA TOW: PLANING 3vG
LANOSCAPE ALTERED. avG
ISSUE FOR OA avG

avo

eve

    
 
  

 

  
 

ono

 

 

 

 

 

Une el Basomeni Carnark below

   
   
    
 
     
  

    

aA

    
 

 

 

+R.
4@ FSL. Frnsshed surtace leves

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 

HARDSCAPE AREAS

 

 

 

 

 

  
  

 

 

 

AO ety es an en

 

 

 

aR Oa

  
  

Rar
payne

tS a

 
  

 

 

 

 
 

 

 

 

 

 

 

 

 

 

  
    
     
 
    
     
     
  

 

|

 
   

 

 

 
  

  
 

 

C—— Lanaiscaping to andscape |

 

 

 

QXSABLED RAMPS AL1

RAMP AN CURVED DRIVE ALTERED = BVG ore

LEGEND ADDED ANDLANOSCAPNG = BY. 9307 07|

‘SUPWAY TO TRAFFIC ENG DETAA, ava sonar
LEVELS SHOWN, LEGENO 00.07 07

(CD Provosed vogtnnon to landscape arcitets delats

oO Existing trees lo be retard

Existing tees 10 be removed

 

Landscaping te landscape archiects detall

Storm Water man hola

Enisting spot levels ip ground

  

 
 

 

DRIVEWAY AREA Mdm?
RAMP AREA 157m?
LSARPARKAREA 148m!

TOTAL

  

  
   

KEN DOWN
ARCHITECTS

"ARCHIPELAGO"

+1 WALAN STREET MGOLOOLABA
POBOX 159 MOOLOOLABA 4587
PH 07 5444 4511 FX 07 5444 4908
Suite? ‘The Alrhe Profassional Centre!
400 SHUTE HARBOUR RD, AIRLIE BEACH
PH 07 4948 1433 FX 07 4948 1833
ABN 81087 881 454
EMAIL, [email protected]
WEB [email protected]

PROPOSED OFFICE DEVELOPMENT

 

MORGAN & BEIERS ATF

  

     
   

 

247 DAVID LOW WAY
PEREGIAN BEACH

 
 
 
 
 
 

See SD13 for slipway--"~
desian and layout

     

   

GROUND FLOOR

 

1:200

date MARO7 = drawn BVG —seata @ A

F
¢
c
t
t
:
©
t

dramngno. 2243 SOD03 revision G

‘
‘
t
f

 

 

  
 
   

GROUND FLOOR
¢ } 1:200

GDRAWANGSUnb_Nol2243 penegian crmmercistCAD DOCUMEN TSW2 PLOTMAKER FHLESW2249 0k - 1144 AM- 6917/2007

 

Covynght of tres. cocumare remiang the excasene
‘propery of KE OOWN ARCHITECTS PTY LTD
ABN 61 007 BB 484

Contactors are to venty al cameron and level on
tite phox to commencing Rapor al awscrepances 10
the Architect Use fqurea emansions in preference
bw seatee,

 

Page 12

i
:
a
i

Grom angune M2248 pr

  
  
    

regian cammoruaRCAD DOCUMENTS\22 PLOTMAKER FILES;

 

10.200...

Tenber peiing tence ===

  

 

 

 

Ce Pe Fee LES TR

 

 

 

 

 

 

 

 

 

VEGETATION TO
BUILDING FACADE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TENANCY 1 4 TENANCY 2

BUILDING 1
RANA

 

BUILDING 2.

 

 

 

 

 

 

 

 

 

 

 

as
Qe fe
“"BANKSIA TO B.
BE RETAINED 2

 

 

[

Speed bump.

 

See S013 for slipway---"
design atid layout

 

1 GROUND FLOOR
4:200

 

  
  

     
     

 

   
 
   
  

BANKSIA TO “
BERETANED —f-”

 

 

 

Oo

Ti Tree to be ramoves
for councd site bnes;

‘
'
'

‘

    
   
      
 
   
  
  
 
    

 

REV DESCRIPTION DRAWN DATE
Py ISSUE TO LANSCAPE DESIGN eva mm03 07
P2 ISSUE FOR TOWN PLANNING ovo 9204 G7
a ALTERED ava 040407
a ISSUE FOR DA. BVO 04 04 07
° ORIVEWAY ALTERED, NOTES ADDED © BVG. 0507
¢ STMOVED 90 TO WEST BVO 330007

STAM PARKING REVISED

RAMP GRADE AND LAYOUT ALTERED.

DISABLED RAMPS ALTERED
D RAMP AND CURVED DRIVE ALTERED VG 92.97 007
€ LEGEND ADDED AND LANOSCAPING = BVG, 039707]

REVISEG

SUIPWAY TO TRAFFIC ENG DETAL, eva 0s 07 07

(ocKers

LEGEND.

Propased vagytaton to landscape archiects deta

Enosing trees tn ba retamned.

 

Exasang tes 1 be removed.
“<1 Landscaping to landacape architects detail
© Sewermanots

    

——

KEN DOWN
ARCHITECTS
"ARCHIPELAGO!

11 WALAN STREET MOQLOOLABA
POBOX 155 MOOLOOLABA 4557
PH 07 Saad 4514 FX 07 5444 4960
Sulte 7 ‘The Aira Professional Centra’
400 SHUTE HARBOUR RD, AIRLIE BEACH
PM 07 4948 1433 FX O7 446 1893
ABN 61087 8Bt 454
EMAM. [email protected]
WEB www.kda,com.au

project
PROPOSED OFFICE DEVELOPMENT

for

MORGAN & BEIERS ATF

a
247 DAVID LOW WAY
PEREGIAN BEACH

drewing
GROUND FLOOR

1:200
date MAR OT = drm BVG scale @A
dramng ro. 2243 SDO3 revision F

Copyright of tes gocumert remoins the wxcksive
property of KEN DOWN ARCHITECTS PTY LTD

ABN 61 O87 B21 454

Contractors are to venty a imerisions and levels on
sate prior to conynenang, Repon ai rscrepancias 1
(he Archie Use figured chmenesone i preference

[re

 

Page 13

G*DRAWAGSU0b NolZ743 perecian commer BACAD DOCUMENTSN PLOTMAKER FRESI2243 Ok. 12 23 PAt - 5/07/2007

 

 

 

 

 

 

 

 

 

TENANCY 40

   

  

    
 

TENANCY 11

BUILDING 1

 

TENANCY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TENANCY 16

BUILDING 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FIRST FLOOR PLAN
eS 1:200

 

TENANCY 17

BUILDING 3
RL. 12.9

cee

    
           
       
   
    
   
   

  

Louvre SCREEN

 

 

REV DESCRIPTION DRAWN DATE

PI ISSUE TOLANSCAPE DESIGN eve 20007
72 ISSUE FOR TOWN PLANING. BvG 20407
a ISSUE FOR DA, VG 040007

 

KEN DOWN
ARCHITECTS
'ARCHIPELAGO™

11_WALAN STREET MOOLOOLABA
POBOX 159 = MOOLOOLABA 4557
PH O7 5444 4511 FX 07 $444 4969
Suite 7 ‘The Aiche Protessional Centre’
400 SHUTE HARBOUR RD. AIRLIE BEACH
PH 07 4948 1433 EX 07 4948 1633
ABN 61087 881 454
EMAIL [email protected]
WEB www. kda.com.au

project

PROPOSED OFFICE DEVELOPMENT

for
MORGAN & BEIERS ATF

a

247 DAVID LOW WAY
PEREGIAN BEACH

 

drawang

FIRST FLOOR

1:200
dato MAR O07 drawn BVG scate @ AZ

drawingno, 2243 SDO04 revision A.

CCeoynght of ss socument ream te exchsive
Property of KEN DOWN ARCHITECTS PTY LTD
AABN 61 087 881 454

Conwactors ore to varty al cimenauprs and levels on
sn prey 10 Commenang Repo ob oscrepances 19
tha Architect Use fgured dimensions mi preferenca

 

 

 

 

 

Page 14

 
 
 
     
        
   

REV DESCRIPTION DRAWN DATE
PL TSSUEFOR TOWN PLoS BG ato
2 LANOSCAPE ALTERED NG 04 06 oF
A ISSUE FORDA eve 0404 07
@ —RAMPDESIGNALTEREDASPERRFI = BVG = (OSD OT
8.0m Bulking Hecht Limt

J Selected matat sheeting ‘Type &
~ wih glazed bekistrade above,

‘Ausra, framed lazng —
1 "Aur. framed gtanng —

DRIVEWAY : BUILDING 1 PUBLIC COURT BUILDING 2 i PUBLIC COURT | BUILDING 3
‘

' poe +400.
'

 

CARPARK

   

: pO:
(NORTH-WEST ELEV. BUILDING 1 (.\NORTH-WEST ELEV. BUILDING 2 yy
‘ YL 1:200 YZ 4:20 KEN DOWN

¥ tal tye ARCHITECTS
Selocand meta shoetng Type
- "ARCHIPELAGO"
Yo wih gland bahisrade above 8.0m Bung Honght Lait 11 WALAN STREET MOOLOOLABA
Baking Height Umit eee ee eee ee eee ee eee eee ee te eee eeeee eens POBOX 189 MOOLOOLABA 4857
PH 07 5444 4511 FX 07 S4aa 4969

 

 

  
   
     
   
  
 
 
 
  
  
 
 
 
 
 
  
 
   
  

Seloctnd metal sheeting Typo B°
ber Post ___wah gazed ba

     

Sulte 7 "The Airia Professional Centre’
: 400 SHUTE HARBOUR RD, AIRLIE BEACH
eamee ene cone = Wage eee ee meen seen ees ae tee “= = meee, PH 07 4949 1433 FX 07 4048 1633

ABN 81087 881 454
EMAIL sdmin@kda,com.au
WEB wwwWeKOS.COm. au

PROPOSED OFFICE DEVELOPMENT

ao ree i pone for

MORGAN & BEIERS ATF

247 DAVID LOW WAY
PEREGIAN BEACH

 

(_\NORTH-WEST ELEV. BUILDING 3 (_\SOUTH-EAST ELEV. BUILDING 3 : erawing
ay 4:200 a, 1200 ELEVATIONS
1:200

: dss MAROT = dawn BVG stale @ A

drawingno. 2243 SDOS reveaon B

 

 

h Copyright of ths cocumenk romans Bw exchtive

‘ Bropery of KEN DOWN ARCHITECTS PTY LTO

4 ‘NBN 69 087 883 abs

i Contractors are 10 very a dimensions and invela on
. ‘uta prot @ cammenang Renan all dcrepaneies 10
: the Arcivect lise Agure dimensions in preference
soxcaiog
——————————

(GADRAVANGSUo0_NolZ749 peraean coreercdsCAD OOCUMENTSY

 

 

Page 15

Buiding Height Limit

SS

GADRAWINGS\inb_No12243 nesegion commerciaCAD DOCUMENTSIOZ PLOTMAKER FILESI2249 ®k » 12 24 PM» SAIZ/2007

PUBLIC COURT

BUILDING 3

T ELEVATION

COVER STAR

/\SOUTH-EAST ELEV. BUILDING 1

 

4:200

TENANCY 10

(CTI

TENANCY 1

TENANCY 2

SITE SECTION A-A

1:200

Pavilod FE
Vogtaton o budding facade

 
     
 
 
   

BUILDING 2

  

TENANCY 12
TENANCY 13

CL]

TENANCY 4

TENANCY 3

TENANCY 5

| PUBLIC COURT BUILDING 1
‘

      
     

  
 

COVER REFUSE AREA .

— SOUTH-EAST ELEV. BUILDING 2

DESCRIPTION

  
 

REV DRAWN DATE

21 ISSUE FOR TOWN PLANNING 8G ober
P2 LANDSCAPE ALTERED RVG oADLOT
A ISSUE FOR OA Bvo a okaT

| B RAMP DESIGNALTEREDASPERRFI BVO (050767

| DRIVEWAY

© _ 80m Busing Heit Lint
Select woatherboards: -— Painted HWD posts
suthoods | Glazed
= See

KEN DOWN
ARCHITECTS

 

4:200

TENANCY 15

CI]

TENANCY 6
TENANCY

 

"ARCHIPELAGO"

8 WALAN STREET MOOLOOLABA
POBOX 159 MOOLOOLABA 4557
PH 07 $444 4511 FX O7 Saad 4909

Suita 7 "The Aistio Professional Centra’
400 SHUTE HARBOUR RD, AIRLIE BEACH

PH 07 4948 1433 EX 07 4948 1633

ABN 61087 881 454
EMAIL [email protected]
WEB www.kda.comau

project

PROPOSED OFFICE DEVELOPMENT

for

MORGAN & SEIERS ATF

TENANCY 18 a

247 DAVID LOW WAY
PEREGIAN BEACH

 

drawing
ELEVATIONS

1:200

data MARO7 = grawn BVG scale @ AS

vingno 2243 SDOG revision B

       
     
     
 

| Copyrigns of tue Socmere remsina ta excuse
propery Of KEN DOWN ARCHITECTS PTY LTO
ABI 087 881-454.

Contractors are to venty all mensions ons levels on

the prior to commencing. Report all orcrepancies to

tha Architect Use figured cmensiona in preferenca
bo senect

Page 16

GADRAWVRIGS cb NolZ240 pereqian enmmerasaACAD OOCUMENTS£02 PLOTMAKER FILESW2243 bk - 1224 PM 8107/2007

SITE BOUNDARY

 

(ep \ BOUNDARY SETBACK SECTION

 

 

‘SITE BOUNDARY

 

 

 

 

 

 

 

(c\_ BOUNDARY SETBACK SECTION

 

 

‘S09

rT i REV DESCRIPTION DRAWN DATE

        
      
    

a ISSUE FOR OA, ave 808 07
8 SECTIONS REFERENCED Bva 60707

TENANCY

TENANCY 6 DAVIO LOW WAY

 

(EY STREET SETBACK SECTION
\003/ 1:100

 

      

 

 

 

 

 

 

 

KEN DOWN
ARCHITECTS
“ARCHIPELAGO
11 WALAN STREET MOOLOOLABA
8 PO BOx 159 MOOLOOLABA 4557
— ” PH O7 S44 4511 FX 07 5444 4969
rower rere Le INN UPR ren Barend eeege eee
PH 07 4948 1433, FX 07 4048 1633
First Floor
IR | peepoprssrseses eee ABN 61087 681 454
EMAIL, [email protected]
iL WEB www.kda.com.au
q Pee
1 PROPOSED OFFICE DEVELOPMENT
were ALE TENANCY 7 tor
a) . eee ah RE IOB MORGAN & BEIERS ATF
a
247 DAVID LOW WAY
3 PEREGIAN BEACH
el
Basaran Conk over s q |
“ drawing
SECTIONS
1:200
dala MAROT = drawn BVG scale @ AS

 

 

drawingro. 2243 SD07 revision B

   
    

(D\, BOUNDARY SETBACK SECTION
\S03/ 1:100

of ts document temaine fw exchiatve
property of KEN DOWN ARCHITECTS PTY LTD
ABN 61 007 881 454
Contractors ace to vertty ah cimanaions anc lavels an
To.commencng Renan it descreDencans 10
Use Ogres

 

(F\_ BUILDING SEPARATION SECTION
‘gD07/ 4:100

 

 

Page 17

G\ORAWINGSUab_No12243 paroglan commarciaiCAD DOCUMENTS\02 PLOTHAKER FILESW743 bk - 12-24 PM - 5907/2007

‘REV DESCRIPTION ——CDRAWN DATE |
ove

1 RSSUE FOR TOWN PLANNING. one a7
A ISSUE FORA evo 080607
3 AREAS REVISED RE RFICHANGES = BVG Sor a7

   
   
       
    

 

GROSS FLOOR AREA

 

CAR PARKING

BASEMENT FLOOR LEVEL a8 CARS
GROUND FLOOR LEVEL 1OOARS,

 

  

HORS
GFA,

 

    

 

Ta
F, CAS CALIATED AT 120
ALOYONG 11000 POSSIBLE

     
 

 

 

 

 

 

i GROUND FLOOR GFA
YT 1: 200

 

 

 

KEN DOWN
ARCHITECTS

"ARCHIPELAGO

11 WALAN STREET MOOL

OOLABA
POBOX 159 MOOLOOLABA 4557
PH 07 S444 4511 FX 07 S444 A969

Suite 7 The Airfie Protessionel Centro’
400 SHUTE HARBOUR RO, AIRLIE BEACH
PH 07 4948 1433 Fx 07 4948 1633

 

 

 

ABN 61087 B81 454
EMAR [email protected]
WEB wwwikda.com.au

 

 

 

projact

PROPOSED OFFICE DEVELOPMENT

 

 

 

for
MORGAN & BEIERS ATF

at

247 DAVID LOW WAY
PEREGIAN BEACH

 

 

 

 

> FIRST FLOOR GFA
XS

1: 200

drawing

" GFA CALCULATIONS

1:200
date MAR 07° dawn BVG scale @A3

drwngno 2243 SDO8 revision B

Coprigh ata acairert omar be crane
. SeprtyantN Gown AnGrreeTS OTVLTO
Soho" or eb
' Cac rt very vine sao
Sapna werner Repo en escepancas
Becca Un tyres oncroote i pemreren
Sate

 

 

 

 

Page 18

 

ei

 

OVERALL SITE
AREA. 2021m*

COVERED SITE
AREA: 773m

SITE AREA-
y207 em

 

 

 

 

—-—
LANDSCAPING

 

 

 

 

SITE AREA

QD

 

 

 

 

 

 

LANDSCAPE AREA.
=a)

 

 

 

 

LANDSCAPING

GAORAWINGSUDb _NotZ243 perogean commerciahCAD DOCUMENTS? PLOTMAKER FILES2243 ik - 1224 PM- 50772007

 

  

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

vu

 

 

 

 

 

Spee ee

 

 

LANDSCAPE AREA

 

REV DESCRIPTION

Pr ISSUE FOR TOWN PLANNIONG.

a ISSUE FOR DA.

B DRIVEWAY ALTERED

© LANDSCAPE AREA ALTERED RE
REICHANGES

 

ARCHITECTS
"ARCHIPELAGO"
1 WALAN STREET
PO BOX 189 = MOOLOOLABA

PH 07 Sada 4514

Sulte 7 ‘The Airlia Professional Centre’
400 SHUTE HARBOUR RD, AIRLIE BEACH
FX O7 abaa 1633

PH 07 4948 1433

ABN

EMAIL [email protected]
www.kdo com. ou

Wea

project

PROPOSED OFFICE DEVELOPMENT

for
MORGAN & BEIERS ATF

’ 287 DAVID LOW WAY
' PEREGIAN BEACH

 

drawing

SITE/LANDSCAPE AREAS

date MAR 07" drawn BVG

drawingno 2243 SDO9

 

Copyright cf thin document remains the axchusive
propery of KEN DOWN ARCHITECTS PTY LTD.
‘ABN 61 O87 BBS 44

Contractors are 10 varty a denenisone an iavehs on.

tra porto conrearan Rayo at oneneront 0
TS Bie Areca: ve Byres Gtnereors preter
oveoed

 

 

FX 07 5444 4969

 

Page 19

 

    
   
 
  
  
  
 

REV DESCRIPTION DRAWN DATE,

Pi ISSUE TO LANSCAPE DESGN BvG aco
2 ISSIRE FOR TOWN PLANING, avs ozosa7
2 LANOSCAPE ALTERED VG 040407
A ISSUE FOR DA. evs 940807
8 SUPWAY TO TRAFFIGENGDETANS «= BVG osarar

2

 

 

ce

he

 

 

PO

11.000

 

 

 

 

 

 

: 2000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PR PTR

      

BONG PACADE Tenancy 2 renaner 3 kw
( Of -- fondo edo pee fe noo
DRIVEWAY : 4 i
cot BUILDING 1 BUILOING
RL. 10.8

    
  
  
  
    

 

  

RL414

 

 

 

@
Cor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CROSSOVER

 

a Oe Pl

“BANKSIA TO
BE RETAINED

 

KEN OOWN
ARCHITECTS

‘ARCHIPELAGO’

14 WALAN STREET MOOLOOLABA
POBOX 159 — MOQLOOLABA 4557
PH O7 5484 4511 FX O7 Sada 4969

 

Sulte 7 ‘The Airte Professional Centra’
400 SHUTE HARBOUR RD, AIRLIE BEACH
Speed bump. PH 07 4948 1433. FX 07 4946 1639
FOOTPATH A aa 61007 881 434

EMAIL [email protected]
wes www kde compu

  
  

BANKSIA TO a
BERETANED —f-

     

 

  

we 7) a o project

PROPOSED OFFICE DEVELOPMENT

 

 

PROPOSED SLIP WAY

AS PER TRAFFIC ENGINEERS DETAIL for

MORGAN & BEIERS ATF

 

at
247 DAVID LOW WAY
PEREGIAN BEACH

 

orang
SLIP WAY DESIGN

1:200
dts MARO7 = dawn BVG scalp @A3

drewingno. 2243 SD12 revision B

| Copyngha of thes eocort romans the exctustve
propany ol KEN DOWN ARCHITECTS PTY LTD.

‘ABN 61 O87 881 a8

(Contractors or to verity a denentions and teveta on,

[ste pr te Commencang, Report all oscrepancies 12

fre Archaic Une fgwred dimensons in proference:

meealee

 

GYDRAWINGSUoh_WoA2243 peregaan commeraatGAD DOCUMENTSi&2 PLOTMAKER FILESIZ243 bk - 12 24 PM - S07

 

 

Page 20

SORAWRNGSUGD_No2243 perepan nommercEkCAD DOCUMENTS\O2 PLOTMAKER FALES243 8 - 12 24 PM - 5407/2007

6
spre

(-\GROUND FLOOR SERVICES PLAN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ey,

eer nar ke

   

SCALE

NTS

DAVID LOW WAY

at
Wie

 

   

REV DESCRIPTION ORAWN DATE
a ISSUE FOR DA, Ov = (oso7or

  
 

 
 
 
 

project
PROPOS'!

for

LEGEND

Esising oes lo be rete.
Existing traes w be removed
Landscaping Wo lanchcape arctnets deta
Sewer man hole

 

Storm Water men hole

 

KEN DOWN
ARCHITECTS

‘ARCHIPELAGO™

41 WALAN STREET MOOLOOLABA
POBOX 159 MOOLOOLABA 487
PM 07 Saaa 4511 FX 07 5444 4969

Sulle 7 “The Airfia Protessionsl Centre’
400 SHUTE HARBOUR RD, AIRLIE BEACH
PH 07 4948 1433 FX 07 4948 1699

ABN 61087 881 454
EMAIL, [email protected]
wee wwwokde.com.au

ED OFFICE DEVELOPMENT

MORGAN & BEIERS ATF

a

247 DAVID LOW WAY
PEREGIAN BEACH

drawing

GROUND FLOOR SERVICES PLAN

 

date MAR 07 drawn BYG scate NTS

deamngno, 2243 SD1I3 revision A

 

7~

 

KN

‘Cepyngnt of tres docurant remain te axchaive
propery of KEN DOWN ARCHITECTS PTY LTD
‘ABN 61 087 881 454

Conmactors are to verty al manson and faves
she pnas te commencing Rapon al dcrepances 10
‘he Archoner Usa hgutec aimenaions in praference
to scales

 

Proposed vepitation to landscape architects detats

 

Page 21

[G*DRAWINGS\ob_Not2743 perogian commarcinCAD DOCUMENTS\O2 PLOTMAKER FILESW243 nu 12-24 PM - BAIT(Z007

  
     

Puaiay
Devens
tiny

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ors CARPARK SERVICES PLAN

NTS

 

 

REV DESCRIPTION DRAWN DATE
a ISSUE FOR DA evG 080707
LEGEND

Proposed vagitstion to landscape architects details
Easing trees to bo retained.

Ensbng tees to bo removed

 

aretscapng to landscape archives detal

@ severmantale
®

‘Storm Water man nole

KEN DOWN
ARCHITECTS

"ARCHIPELAGO"

11_WALAN STREET MOOLOOLABA
PO BOX 159 — MOOLOOLABA 4557
PH 07 54444511 PX 07 5444 4969

Sulte 7 ‘Tha Aira Profeastonal Contra’

400 SHUTE HARBOUR RD, AIRLIE BEACH
PH 07 4948 1493 FX 07 4948 1633

ABN 61087 881 454
EMAIL [email protected]
WEB wwwokda,com.au

project
PROPOSED OFFICE DEVELOPMENT

for
MORGAN & BEIERS ATF

at

247 DAVID LOW WAY
PEREGIAN BEACH

 

dravang

BASEMENT CARPARK SERVICES PLAN

date MAR OT dawn BVG scale NTS
dravangno. 2243 SD14 revsion A

of ths documacn emasne tre exchalve
propery of KEN DOWN ARCHITECTS PTY CTD
ABN 61007 881 454

‘Contractors wre fo varity al dinanslons and hevatt on

 

Page 22

ATTACHMENT B

SURVEY PLAN
Ken Hicks & Associates

 

Page 23

 

 

 

 

 

   
 

  
  
   
   
  
  

 
    
 

 

   

 

 

 

 

 

 

3 ~)
| 5 eae?
| i {
il |
aint
Fes og ,
13 e a3
hs
WHEE 4
Begisete sce
+8 33 8
spleehy okt
Hetita go:
ashe 1
Pint 2
Buh al
ites ig ges Q
: point ot:
2 i28is sf
canta) oth
ad aeilld ana! Ha
lt
|
|
oP
a
3] |
I
5 LEVEL OATUM: Ano Associated Consultant: tigned/ i
am MORGAN & BEIERS PTY LTO nee ee ~~ soe KAY | See,
cals! CONTOUR AND DETAIL SURVEY nen 2 oe .
OF LOTS 1 & 2 RPSO03222 & LOT 26 te,_4_Dote Amananen's _
see tevens OTP. MRAP! Drawing No. Amend.

ON P9315 - PARISH OF WEYBA

 

 

 

 

 

 

Dots

05” 07/ 2007

 

 

sdeat no, 1 ot I cheats

 

Computer Fite

 

Scole

£:200

 

Puilp Aket B.Tech. GOURP.
Gor ring LS Mrs

Grygs Honaen, G.APP.Sc (Survl
soo asf0ciaTes

Gavi Bexer LS. MLS,

 

ken hicks

AND ASSOCIATES

 

 

060602

 

 

 

Page 24

ATTACHMENT C

INFORMATION RESPONSE & TRAFFIC IMPACT ASSESSMENT
Burchill VOM

 

Page 25

 

PROPOSED COMMERCIAL
BUSINESS PROJECT OFFICE
247 DAVID LOW WAY,
PEREGIAN BEACH

RESPONSE TO INFORMATION
REQUEST FROM NOOSA COUNCIL

July 2007

Job No: C3694
Report No: 4530-0

Prepared for: Morgan & Beier PTY LTD

Page 26

DOCUMENT CONTROL SHEET

 

BURCHILL VDM PTY LIMITED

Evandale Place Job No. C3694

142 Bundall Road

SURFERS PARADISE QLD 4217 Report No. 4530-0
Telephone: +617 5574 0511 Original Date of Issue 5 July 2007
Fax: +61 7 5574 0011

Email: [email protected] Project Leader Dale Kleimeyer

 

REPORT DETAILS

 

 

Title: Proposed Commercial Business Project Office

247 David Low Way, Peregian Beach

Response to Information Request from Noosa Council
Author(s): Matt Murphy — Traffic Planner
Client: Morgan & Beier Pty Ltd

Client Contact:

Client Reference:

Erik Hipwood

 

 

Synopsis:

This report responds to part of the Information Request from Noosa
Council, dated 31 May 2007, for the proposed Commercial Business
Project Office, to be located at 247 David Low Way, Peregian Beach.

 

REVISION/CHECKING HISTORY

 

 

REVISION DATE CHECKED BY ISSUED BY DISTRIBUTION - NO. OF COPIES
NUMBER Client Other BP
4530-0 5/07/07 OTK MJM 1 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Report No. 4530-0
July 2006

vem BURCHILL VDM

 

 

Page 27

TABLE OF CONTENTS

 
 
 

1.0 — Introduction 1
i PP Dit == 01, <0 [06 | a6 ee EEE EEOC ETS TEESE OSESEO OSES SESESELOOSOOSSSSEOS 4
1.2 Information REQUESt .......... eee ccc ee cree rece ttneeeteeedeeretaeecneneecenieeeeneeeteasesieaseeeaees 1
2.0 Response to Information Request 2
2.1 Level Information ....... ee cece ceneeneeerncee neers en eases eneeeaeneeseeeeeeeeseeeeeeneeettees 2
2.2 Car Parking... cece ete ee ee nner e rn nee descr e rrr eter n Fenner ee 2
2.3 Vehicle ACCESS .....0. cs ecenereseeenrnneeeees
2.4 End of Trip Facilities...
2.5 Traffic ISSUCS ..0.... cc eccceceeeceeeseeceeeeeeneneeenenanesereeenaa diseeessnetererenes veceseeeneeess 7
3.0 Conclusions / Discussion 8
APPENDICES

APPENDIX A — SITE LAYOUT

APPENDIX B —- VEHICLE TURN PATHS

APPENDIX C - SIGHT LINES

APPENDIX D - INFORMATION REQUEST, NOOSA COUNCIL

 

MeO vem BURCHILL VDM

Page 28

 

1.0 INTRODUCTION

1.1 BACKGROUND

Burchill VDM Pty Ltd have been commissioned by Morgan and Beier Pty Ltd to
provide a response to part of an Information Request (IR) from Noosa Council,
dated 31 May 2007, for the proposed Commercial Business Project Office (the

proposed development), to be located at 247 David Low Way, Peregian Beach
(the subject site).

1.2 INFORMATION REQUEST
Noosa Council have requested additional information in their IR in order to
properly assess the Proposal. This report provides a response to the traffic

related issues in the IR.

The IR is shown in Appendix D. Points of the IR addressed in the this report are:

Level Information
Part 4.3 - Ramp Grades
Car Parking
Part 5.1 - Blind Aisles
Part 5.2 — Ramp Widths
Vehicle Access
Part 6.0 - Access
Part 7.0 — Manoeuvring Through the Site
Part 8.0 — Sight Distance

End of Trip Facilities

Part 9.0 — End of Trip Facilities

Traffic Issues

Part 12.0 — Traffic Report

 

juy2007 vem BURCHILL VDM

Page 29

 

2.0 RESPONSE TO INFORMATION REQUEST

As discussed in Section 1.2, Noosa Council require further information in order to
properly assess the Proposal. A response to the part of the IR, as described in
Section 1.2, is provided in the following sections.

2.1 LEVEL INFORMATION

2.1.1 Response to Point 4.3

As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, the grade
on curved ramps shall be measured at the inside edge of the curve, i.e. at the
inside line marking. As per the standard, ramp grades on the inside edge of the
curve will need to be no greater than 1 in 6, with Grade Transitions of 2.0m on
length at the top and bottom of the ramp.

Ramp grades on the inside edge of the curve will be the same as those shown on
the middle of the ramp on Drawings 2243 SD02 and 2243 SD03 (Appendix A).
These grades comply with the requirements of AS 2890.1:2004 Parking facilities,
Part 1: Off-street car parking.

2.2 CAR PARKING

2.2.1. Response to Point 5.1

As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section
2.4.2 (c), in car parks open to the public, the maximum length of a blind aisle shall
be equal to the width of six 90 degree spaces plus 1m, unless provision is made
for cars to turn around at the end and drive out forwards. The blind aisle in the
basement parking area will be longer than six 90 degree spaces, therefore
provision must me made for vehicles to turn around.

Noosa Council have requested two spaces (space 30 and 22) be provided for this
purpose at dimension 5.4m long by 3.0m wide in their IR, dated 31 May 2007.
However, as the car park will only be used by employees and their clients and will
not be open to the general public, one space is considered adequate for turning
manoeuvres at the end of the blind aisle. Traffic generation for the site will also be
low, so vehicles needing to turn around will be infrequent and it is not expected
there will be conflicts with these vehicles.

As part of the Proposal, space 30 will be provided as a turn around bay at the end
of the blind aisle 5.4m long by 3.0m wide (as requested by Council) as shown on
Drawing 2243 SD02, Appendix A. Turning paths showing this space is sufficient
for a vehicles to turn around using space 30 is shown on Drawing C3694-002,

 

or vem BURCHILL VDM

Page 30

 

Appendix 8. A drawing with turning paths will be provided showing a vehicle able
to turn around using space 30.

At the end of the blind aisle, the aisle is only extended 0.7m as opposed to the
required 1.0m as per AS 2890.1:2004 Parking facilities, Part 1: Off-street car
parking. However 0.7m is considered sufficient as the aisle is relatively wide at
6.9m allowing sufficient space for a vehicle to reverse out of the space, clear of
the vehicle parked to its right, before needing to turn. This is shown to work with
turning paths shown in Drawing C3694-004, Appendix B.

2.2.2 Response to Point 5.2

As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking the
minimum ramp widths on the straights should be 5.5m. On the curves lane widths
should be 3.9m with a central median of 0.6m giving a total width of 8.4m.

Ramp widths on the straight at the top of the ramp will be approximately 5.6-5.9m,
which complies with the standards. However, due to the physical restraints of the
site, the widths on the curve of the ramp will be approximately 6.5-7.3m without a
central median.

However, as shown on Drawing C3694-004, Appendix B, there is sufficient space
for a B85 and B99 vehicle to pass without conflicts on the ramp, as per AS
2890. 1:2004 Parking facilities, Part 1: Off-street car parking, Section 2.5.2(c). As
shown in Drawing C3694-004, there will be conflicts on the straights where
vehicles need to use the full width to negotiate the ramp, however this is
considered adequate, as there is full vision for oncoming vehicles.

Although the site does not qualify as a domestic property, the basement will only
be used by employees and their clients and will not be open to the general public.
Therefore traffic entering and exiting will be low and conflicts on the ramp would
be rare. We could expect 18 trips to and from the basement in the peak hours.
Assuming a 60/40 % split for in and out would mean 12 vehicles entering (1 every
5 minutes) and 6 vehicles exiting (1 every 10 minutes) or vice versa. Therefore
there would be a low chance of opposing vehicles being on the ramp at the same
time.

Measures will also be undertaken to ensure the chance of conflict to opposing
vehicles it kept to a minimum. These are:

- Mirrors will be provided on walls at the ramp curve to allow vehicles to see if
there is another coming vehicle.

- Signage will be provided saying "Watch for Oncoming Vehicles” and "Keep
Left".

- Centre line marking will also be provided on the ramp to keep traffic as far to
the left as possible.

Ramp grades discussed in Section 4.1.1.

 

Repo No. 4530-0 VPM. BURCHILL VDM

Page 31

 

As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section
5.3.1 the minimum height from the floor to any overhead obstruction (fire sprinkler,
lighting, sign etc), allow for cars and light vans, should be 2.2m (2.3m if parking
wil! be provided for people with disabilities, however as our disabled spaces will
be on the ground level parking, 2.2m is considered sufficient for the basement).
Headroom between the ramp and the entrance to the basement shall also be
2.2m however will be measured perpendicular to a chord of length equal to the
wheelbase of the B99 vehicle located longitudinally such that the height is a
minimum of 2.2m, as per AS 2890.1:2004 Parking facilities, Part 1: Off-street car
parking Figure 5.3.

The clearance from the floor to the ceiling in the basement will be 2.5m. This will
allow for the installation of sprinklers, signs and lighting without reducing
clearance to below the minimum 2.2m. The ramp terminates before entry to the
basement and vehicles will enter on level ground. Therefore clearance at entry to
the basement is considered adequate.

Low Clearance signs (R6-16) to the basement will be provided as per AS
2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section 4.3.4(a).
Flexible striker bars will also be provided in conjunction with these signs where
the clearance will be less than 2.3m due to sprinklers, lighting or signs.

2.3 VEHICLE ACCESS

2.3.1. Response to Point 6
Single access with revised traffic volumes has been analysed.

As per Section 3.2.1 of AS 2890.1:2004 Parking facilities, Part 1: Off-street car
parking the access classifies as a Class 2 Access Facility. This requires a 6m
(minimum) wide combined non-separated driveway access.

Access will be made via a 6.0m two way driveway on the southern end of the site
and therefore complies with the standards. The location of the access is shown on
plans in Appendix A.

As Council propose to construct an unbroken raised median past the site between
Woodland Drive and Herron Drive, future access to the site will be restricted to
left in and teft out only.

As there is no shoulder on David Low Way and therefore no provision for passing
a turning vehicle, the warrants for turning lanes at the access, as per DMR’s Road
Planning and Design Manual, Chapter 13 — Intersections at Grade (RPDM),
Figure 13.23 was assessed. This shows an AUL(S) (short left turn treatment) is
warranted on David Low Way into the access.

 

eo vem BURCHILL VDM

Page 32

 

To accommodate this warrant, a AUL(S) will be provided on the existing gravel
area to the south of the proposed access which is currently used by vehicles to
pull of David Low Way. The AUL(S) will be provided by essentially paving this
area being minor road widening entirely within the David Low Way road reserve.
No kerb and gutter will be provided at the lane to ensure access to the domestic
driveways is maintained. The lane will be accommodated within the existing
gravel area and will be constructed as per DMR’s RPDM, Figure 13.73, being
25m long and 3.0m wide, including a taper of 15m.

This lane will serve two purposes. The first will be to provide the warranted
access to the site, and the second will be to improve safety for vehicles that
currently use this area to pull off David Low Way to access domestic properties.

A right turn treatment will not be provided as access will be restricted to left in and
out only by way of the raised median shortly after opening.

The access was also modelled using SIDRA 3.1 to determine capacity, delays
and queuing. The scenarios modelled were 2008 all movements (no median in
David Low Way), and 2018 left in and out only (with median in David Low Way).

This shows all movements to be well below the acceptable limits with the
intersection operating adequately. Minor queuing will be felt for southbound
vehicles on David Low Way due to the lack of a turning !ane or shoulder for
passing. However, this is only minor and is expected to be temporary until the
median is constructed in David Low Way restricting the access to left in and out
only. Modelling results are shown in the Traffic Impact Assessment for the
Proposal.

Eventually some vehicles will need to conduct U turns at the Woodland Drive and
Herron Street roundabouts due to the site being restricted to left in and left out.
The volume of vehicles performing these manoeuvres is low (between 3 and 8 in
the peak hours) and the affect on these roundabouts is expected to be unnoticed.

2.3.2 Response to Point 7

Drawings C3694-002, C3694-003 and C3694-004, Appendix B show all vehicles
can enter the site and park and leave in a forward direction. Vehicles expected to
enter the site will be cars and light vans including service and delivery vehicles.
Garbage trucks will service the site from David Low Way within the left turn lane
so as to not obstruct through vehicles on David Low Way.

As the ramp grades comply with AS 2890.1:2004 Parking facilities, Part 1: Off-
street car parking vehicles are not expected to bottom or scrap on the ramp to the
basement. There are no other sections throughout the site where vehicles could
be expected to bottom or scrap.

Vehicles expected to enter the basement will be cars and light vans. As discussed
under Part 5.2, the minimum height from the floor to any overhead obstruction (fire

 

Report No. 4530-0 vem BURCHILL VDM

Page 33

 

sprinkler, lighting, signs) should be 2.2m, which will allow for cars and light vans.
This will be met by the Proposal

2.3.3 Response to Point 8

Sight distance to the pedestrian path fronting the site is suitable and free of
obstructions in accordance with AS 2890.1:2004 Parking facilities, Part 1: Off-
street car parking Section 3.2, Table 3.3, as shown in Drawing C3694-01
(Appendix C).

Sight distance to vehicles in David Low Way from the access, in accordance with
AS 2890. 1:2004 Parking facilities, Part 1: Off-street car parking Section 3.2, Figure
3.2 for a 70kmV/h speed limit, as requested in Councils RFI, is 97m and should be
free of obstructions.

Some vegetation existing within the sight line to the north of the access, as shown
in Drawing C3694-01. This will be removed as part of the Proposal and will
provided sight distance to the north of 200m, and south of 105m along David Low
Way form the access.

2.4 END OF TRIP FACILITIES

2.4.1. Response to Point 9

End of Trips facilities for pedestrians and cyclists will be provided in accordance
with the Noosa Plan 2006 — Part 14 Assessment Criteria for Development for a
Stated Purpose or of a Stated Type — Driveways and Carparking Code, 015 and
815-1 to S15-5.

As per the Noosa Plan 2006, 1 bicycle space per 50m? GFA be provided which
equates to 24 bicycle spaces for the Proposal. Also as per the Noosa Plan 2006,
12 lockers (1 per 2 spaces), and 3 showers (1 per 10 spaces) be provided.

Bicycle racks/spaces will be Class 3 as per AS/NZS 2890.3 Bicycle Parking
Facilities. Class 3 spaces involve racks that support the whole bicycles that both
wheels can be locked to in an area that is well lit and in a highly visible public
area.

As part of the Proposal, 24 spaces will be provided at the front of the site. 12
lockers (4 in each powder room) and 3 showers (1 in each powder room) will also
be provided. Powder rooms will be unisex. This meets the requirements of the
standards.

 

Report No. 4530-0 vPpM. BURCHILL VDM

Page 34

 

2.5 TRAFFIC ISSUES

2.5.1. Response to Point 12

Traffic Impact Assessment will be updated to reflect the changes to the Proposal
and to include the information requested by the RFI.

 

Report No, 45909 vem BURCHILL VDM

Page 35

 

3.0 CONCLUSIONS / DISCUSSION

This report addresses part of the Information Request from Noosa Council, dated
31 May 2007, for the proposed Commercial Business Project Office, at 247 David
Low Way, Peregian Beach.

As per point 5.1 of the Information Request, Council requested 2 spaces be
allocated as turning bays within the basement. The Proposal will only provide one
space, however, as explained in the report this is considered adequate.

Widths at the curve of the ramp as required by Council are unable to be achieved
due to the physical constraints of the site. However, the widths provided are
expected to be adequate as shown in this report.

Therefore, the Proposal is considered to adequately address the issues raised by
Noosa Council as per Section 1.2 of this report.

Matt Murphy
Traffic Planner

 

iay2007 vem BURCHILL VDM

Page 36

APPENDIX A

SITE LAYOUT

 

Page 37

 

wa c \
\ }
‘D von foas fez ~*
IVR. Baa nee oli oe
oars
40014 ONNOND

as
Hovaa NYIOaNad
AM MOT OIAVG L9Z

div SU3138 ¥ NYONOW

AN3WdO TSAR 391440 G3SOdONd

oz t

40014 GNNOYS

 

 

rine
bonne

 

 

 

 

 

 

 

 

 

 

 

                      

O

Page 38

APPENDIX B

VEHICLE TURN PATHS

 

Page 39

 

 

 

 

CHUN ALA nOA TONNE AWOS O1 LON

 

unowe SE
WASBRK 7510) rvs es

4100 920920) wD mY
1490 9290 (0) ed

ZAZ¥ PID ‘ompames mImyNG “PAR! HMPLNE ZH
ARAN  SHAANNONA OMLINSHOD HNL OTMLS Y WAC

OSB.UWN Ald ‘S89 OF1 O10 NOV

WA TuHOWng §

 

iF

+ L3SHS as — ; —
ONINYNL dW _3 |

 

be |
|
|
|

 

 

HOvad NVIDSYAd
AWM MO1 GIAWG Lez

 

401440
193f°Oud SSANISNE
WIDYAWWOS
gasodOud

 

 

 

 

Page 40

 

 

OSB.UWN Ald GAP 0 LO NOW

WGA TuHOUng §

 

 

@ LASHS
ONINYNL dW

HOWa NVIDSY3ad
AWM MO7 OIAWG Lee

39144O
LOAPOUd SSANISNG
WISYAWWOS
QaSOd0ud

 

 

 

JIWOS OL LON

 

 

 

 

 

Page 41

 

 

 

NOT TO SCALE

 

‘i

 

PROPOSED
COMMERCIAL
BUSINESS PROJECT
OFFICE

247 DAVID LOW WAY
PEREGIAN BEACH

 

|
|
|
|
|

| eo

GENERATED. Nae MAY ONLY BE USED
FORTH PURPOBE FOR WHICH THEY WERE INTE:
rr

RAMP TURNING
SHEET 3

 

(8 Burcu, VDM

AON 010 140.495 PTY LIMITED:

(CIVIL. 8 STRUCTURAL CONSULTING ENGINEERS & PLANNERS
142 Bundall Road, Surfers Parada, Qid 4217

Prone (07) 86740611
Fax Ona (07) 8074 0011 an
Fax Suucurm (07) 8874 0908

Emad rh@metedname — GRO!

 

 

 

C3694.004
XK

Page 42

APPENDIX C

SIGHT LINES

 

Page 43

 

 

ORUNT Ald REA TNS

 

CANOMeY
armen

uve anew
navn caNers30

ou my
menage
womy

   

LAZ¥ PAD ‘emomums RIALING ;PHEY I
SWANN 9 BHIBMIONT ONL INGO WNT

CaLIWN Ald

WGA THHOUNg §

 

0682 SV Yad
SV LNSW3YINDOSAY
JONVLSIG LHOIS

 

TLL ONO

 

2) LMORHAdOO

.
|
|
|
|
|

rriaven

HOWV3d NVIDSYAd
AYM MO1 OIAVO Lez

 

 

—_ ah

 

AVMHLVWd SH1L NO SNIVYLSSGAd OL JONVLSIC LHOIS

IIWOS OL LON

SNOILONYLSSO
WOds 33y4 39 O1 VANV

Aa

AVM MO1 GIAVG NO SSTDIHSA OL JONVLSIG LHOIS

 

 

 

Page 44

APPENDIX D

INFORMATION REQUEST
NOOSA COUNCIL

 

Page 45

31/05 2007 16:19 FAX 61 7 54495354 Noosa Shire Council (4 0001/0006

lf ree honing or calling please ask for:
Cooper, 07 5449 5108
email [email protected]
Application Ref: 2006/2689

Your Ref:

a x NOOSA

  

22 January 2007

Morgan & Beiers Pty Ltd

CARE Ken Hicks & Associates Pty Ltd
PO Box 6380

MAROOCHYDORE BC QLD 4558

Dear Sir or Madam,

Re: Application for Commercial Business Type 1 - Office situated at 249 & 247
David Low Way Peregian Beach, described as Lot 1 & 2 on RP903222

| refer to the above application and advise that following preliminary examination of the
plans, the following information is required to be submitted:-

Land Use

1. Please amend plans or provide justification with reference to non-compliance with
Scheme requirements relating to:

1.1. Front Boundary Setbacks — please provide a greater setback from the front
boundary, the proposed setback is considered inconsistent with existing
front setbacks for the area.

2. Please provide further details of building materials /finishes proposed. Please
note that the extensive use of glass finishing is considered to provide the
buildings with a commercial appearance / nature. Where as the buildings should
present a domestic form of architecture, rather than commercial.

Land Development

Survey

3. It is noted that survey information has been supplied as part of the response to
Council's initial Information Request, however the plan does not provide all of the
information that Council previously requested.

3.1. In this regard please arrange the licensed land surveyor to amend their
plan by including the information that was previously requested but not
provided. Specifically, the pian shall show all services (including their
alignment, size, depth, invert level, etc), all vegetation, existing building
structures (on the subject site and on the adjoining allotments), pathways,
the edge of the frontage road (the David Low Way), topography of the site
and surrounding land (with contours at 200mm intervals) and any other
relevant information.

Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention NOOSA COUNCIL ABN 97969216121
9 Pelican Street Tewantin PO Box 141 Tewantin Q 4565
Phone: 07 5449 5200 Fax: 07 5447 1062
Email: [email protected]

Page 46

31/05 2007 16:19 FAX 61 7 54495354 Noosa Shire Council 0002/0006

3.2. The amended plan should also show all existing vegetation within the road
reserve and adjoining properties (including their girth, height and canopy
cover).

This information is required to assess whether their will be any impact to
adjoining properties and vegetation particularly in light of the extensive
earthworks proposed in order to construct the proposed basement carpark.

All level information shall be to the Australian Height Datum (AHD).
Level information

4. It is noted that only some level information has been provided as part of the
response to Council's initial Information Request.

4.1. In this regard it would be helpful to know the levels of the upper level
carpark and driveway areas so that Council can establish the impacts to
adjoining properties.

4.2. Itis also noted that the floor levels proposed for the building, as shown on
the plans, are not consistent with the elevations where it appears that:the
floor to floor dimensions are proposed to be 2.8m, whereas the plan levels
suggest a 2.7m floor to floor.dimension. In this regard it is important to
ensure that the plans and elevations accurately reflect what is being
proposed and that the Council can establish the correct height of the
proposed building in relation to the 8m- -height limit.

4.3. It is further noted that the driveway ramp grades need to be determined
based on the inside radius of the ramp (i.e. where the ramp grades will be
steeper) as opposed to the grade at the centre of the ramp. This is outlined
in the Australian Standard for Off-Street Car Parking (AS2890.1) and will
need to be addressed.

4.4. Furthermore, the applicant will need to demonstrate in accordance with
Specific Outcome O17 of Table 14-46 of the Driveways & Carparking Code,
that a basement level of RL7. 1 (as presently proposed) can in fact drain by
gravity means without the need for pumping.

In this regard the applicant will need to arrange a surveyor to establish the
invert levels of Council’s existing drainage system and demonstrate how
the basement will be drained to this drainage system. If this cannot be
achieved the applicant will need to investigate the option of raising the
basement level (to ensure the basement can drain by gravity means)
and/or upgrading the existing Council drainage system such that it is at a
level that can drain the basement carpark. These issues will need to be
resolved prior to Council issuing a Development Permit for the proposed
Material Change of Use, as Council must be sure that the development is
suitable and-can actually work.

Car Parking ,

5. _ Demonstrate that the proposed driveway and carparking area comply with all
aspects of the Australian Standard 1 (AS2890. 1) for Parking Facilities, Part 1: Off
’ Street Car Parking.

Award Winner - Australian Clean Beach
Challenge. 2004 Litter Prevention

Page 47

31/05 2007 16:19 FAX 61 7 54495354 Noosa Shire Council (0003/0006

5.1. In this regard it is noted that the present proposal contains, blind comers
and blind aisles with no provision for vehicles to turn around. As such,
designated turning bays must be provided and it is recommended that they
be at least 3m wide (to allow ease of-access and departure) and at least
5.4m long. To this end:

Q One turing bay should be provided adjacent to the proposed
stairs located at the south-eastern corner of the basement (space
number 30), and

a One turning bay should be provided on the eastern side of the
basement, immediately to the north of the proposed tank (space
number 22).

5.2. The proposed driveway ramp that provides access to the carpark needs to
be amended as:

a It appears that two laneways will need to be separated by a cental
median, with each lane having a minimum width of 3.9m measured
between kerbs.

Q The proposed ramp grades must be determined by the inside radius of
the ramp (i.e. where the ramp grades will be steeper) not the middle of.
the ramp.

Q Headroom between the ramp and the entrance to the basement
carpark must be designed such that vehicles will not hit the upper
level, as this will require changes to the upper level and/or the
driveway grades.

5,3. Amend the proposal plan such that clear access is available to all stairs

- Gases. In this regard it is noted that clear access cannot be obtained to the

proposed stair at the south-eastern corner of the upper level carpark. A

clear passage of at least 1.5m in width should be available to the stairs,

free of any carparking spaces or wheel-stops that would impede pedestrian
movements.

5.4. Given the overall size of this development and the number of separate
tenancies proposed, please provide at least 2-disabled car park spaces on
site.

The abovementioned issues outline some of the problems that have been noted
and in this regard the applicant will need to review AS2890.1 in detail to ensure
the car park and driveway ramps are designed correctly.

Vehicle Access

6.

The proposed separated entry. and exit for the development, similar to that which
exists for the existing house on site, is not suitable for a development of this scale
and likely traffic generation and would result in countless conflicts between
vehicles and pedestrians using the footpath especially given that the driveway
has a width of approximately 25m, which coincides with the pedestrian path. The
angle of the entry and exit would also cause vehicles to enter and leave the site
at faster speeds, which is not conducive for pedestrian safety and nor are
adequate sight lines available.

Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention :

Page 48

31/05 2007 16:19 FAX 61 7 54495354 Noosa Shire Council . 0004/0006

In this regard a consolidated access needs to be provided with left-in/left-out
access, and this driveway should not extend beyond the prolongation of the
southern boundary of the site (i.e. the driveway should be contained to the actual
frontage of the development and not impede onto the frontage of adjoining
properties).

7. Demonstrate that vehicles can safely enter, manoeuvre throughout the site, park
on site, and leave the site without scraping and/or bottoming. This shall be
undertaken for all types of vehicles expected to enter the site, with consideration
given to the height of such vehicles and the headroom required under the
building. This was previously requested by Council, but as the applicant has not
provided any evidence to demonstrate that the proposal will work the information
is still needed.

8. Illustrate on the proposal plans that suitable sight distances can be achieved from
the proposed access driveway to pedestrians on the pathway network and to
vehicles on the David Low Way based on the 85-percentile design speed of the
David Low Way, not the sign posted speed limit. In this regard a design speed of
70km/h would be more realistic and consideration should also be given to
existing vegetation and/or proposed vegetation that may restrict these sight lines.

End of Trip Facilities

9. Illustrate on the proposal plans all “end of trip facilities’, such as bicycle storage
lockers for staff, bicycle storage areas for customers, showers, change rooms,
seating areas, drinking fountains, etc to cater for people who walk or cycle to the
site.

Stormwater Drainage

10. Demonstrate that the site can be developed with no_net increase in runoff from
the site for storm events up to a 1 in 100 year Average Recurrence Interval. In
this regard the stormwater drainage system designed for the site will need to
incorporate an adequate detention system (holding tanks and rainwater tanks) to
retain these flows, which can be utilised for irrigation, toilet flushing, hose down of
paved surfaces, and ground water recharging.

The present praposal and Stormwater Management Plan does not address this
issue. : : :

In this regard additional flows into the existing drainage system in the David Low
Way will not be supported.

11. Demonstrate that the site can be drained without the use of pumps in accordance
with Specific Outcome O17 of Table 14-46 of the Driveways & Carparking Code.
In this regard the basement proposal cannot be supported unless it can be
drained by gravity means. ,

The applicant is also advised that given stormwater from the carparking and -
driveway areas of will contain contaminants such as oil, grease, and fuel, alf
stormwater runoff will need to be collected and discharged through a suitable
grease/oil arrestor and/or Gross Pollutant Traps to separate these contaminants
and prevent them from entering Council’s drainage system.

Traffic issues

Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention

Page 49

31/05 2007 16:20 FAX 61 7 54495354 Noosa Shire Council 0005/0006

12. The previously submitted traffic report shall be amended -to reflect the new
proposal plan (and any changes that may be generated as a result of this
_ information request) and resubmitted for Council to review.

Engineering Reports

13. Please arrange for all engineering design plans and engineering reports
submitted with the application to be certified by an appropriately qualified
Registered Professional Engineer Queensiand (RPEQ), as it is noted that none of
the plans nor any of the engineering reports have been prepared, checked, and
approved by an authorised person. In this regard none of the pians or the
engineering reports will be assessed in detail until a RPEQ has authorised them.
Council therefore reserves the right to make a subsequent request for further
information upon review and assessment of the authorised documentation with
no consequence to IDAS time lines set by the integrated Planning Act.

The applicant and any consultants assisting in the preparation of this
development proposal are advised that an independent check of some or all of
the technical reports and plans submitted may be forwarded to Council's own
expert specialists, and. the cost of this independent review will be borne by the
applicant.

Please provide four (4) copies of all information that you are providing. In addition, it
would assist Council if you could also provide an electronic copy of your response.

Please be aware that under Section 3.2.12 of the Integrated Planning Act, the applicant
is to respond to any information request within 12 months of the request or otherwise,
the application lapses.

Under the provisions of the Integrated Planning Act 1997, you as the applicant, have
three options available in response to this information Request. You may give the
assessment manager (in this instance Council) and each referral agency (if any):-

4. all of the information requested; or

2. part of the information requested together with. a letter asking the assessment
manager and each referral agency to proceed with the assessment of the
application; or

3. a letter:-

3.1. stating that you do not intend to supply any of the information requested;
and

3.2, -asking the assessment manager and each referral agency to proceed with
the assessment of the application.

The above information is required to be submitted, prior to assessment of the
application. If any further matters arise as part of assessment of this application, you
will be advised accordingly.

Should you have any further queries in relation to the above, please do not hesitate to
contact on the above number.

Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention

Page 50

31/05 2007 16:20 FAX 61 7 54495354 Noosa Shire Council

- Yours faithfully,
Nick. Cooper
PLANNING OFFICER

Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention

{2 0006/0006

Page 51

 

PROPOSED COMMERCIAL
BUSINESS PROJECT OFFICE
247 DAVID LOW WAY,
PEREGIAN BEACH

TRAFFIC IMPACT ASSESSMENT

July 2007

Job No: C3694
Report No: 4284-1

Prepared for: Morgan & Beier PTY LTD

Page 52

DOCUMENT CONTROL SHEET

 

BURCHILL VDM PTY LIMITED

Evandale Place Job No. C3694

142 Bundall Road

SURFERS PARADISE QLD 4217 Report No. 4284-1
Telephone: +617 5574 0511 Original Date of Issue |st December 2006
Fax: +61 7 5574 0011

Email: [email protected] Project Leader Dale Kleimeyer

 

REPORT DETAILS

 

Title: Proposed Commercial Business Project Office
247 David Low Way, Peregian Beach
Traffic Impact Assessment

Author(s): Matt Murphy — Traffic Planner

 

Client: Morgan & Beier Pty Ltd
Client Contact: Erik Hipwood

Client Reference:

 

 

Synopsis: This report assesses the traffic impacts of the proposed Commercial
Business Project Office on the surrounding road network, and assesses
the internal adequacy of the site in terms of vehicle movement.

 

REVISION/CHECKING HISTORY

 

 

 

REVISION DATE CHECKED BY ISSUED BY DISTRIBUTION - NO. OF COPIES

NUMBER Client Other BP
4284-0 1/12/06 DTK 1412/06 MJM 1 1
4284-1 05/07/07 DTK 05/07/07 MJM 1 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Neo vem BURCHILL VDM

Page 53

1.0

2.0

3.0

4.0

5.0

6.0

TABLE OF CONTENTS

 

Introduction 1
1.1 Background 00.0... ee cece cee ener renee ceri ee penne a nnn dade r ese ceria eeeerreeeeneaeeenen 1
1.2 Report Objectives

Description Proposed Development 2
2.1 Subject Site oo. ccc cee ceree cts cee eeteeneecensesteseseneesseeesseecnausenaesesaeeeees 2
2.2 Proposed Development .........0 cece eres eernaneernsresestesceseerseeeserneeesetaees 2
2.3 Site LOCALION .. 2... ccc cere tr reer rere nn nn E ane ceee ree rre eee eeH FEE peer asaaaHeeeeeeesenenneea 3
2.4 Future Development ..........ccccceceeceecececeeeeeeeeneceeeeseesenseaeeeeeeecesevenenaaeeeeesesesneeared 3
2.5 Road Network 0... cccccccccccccceeeesseeeseessseeessescsescssecesesenseessssseeessseseeeeerseesieeee na 4
Traffic Data 6
3.4 Background Data... ccceccc ee ree cereree creer eri nneeeninaeeseeneeccnrieseenienerenneeeeeees 6
3.2 Development Traffic 0.00... eee ccceeetiereeceeeteecretneesennieeeteeieetenieeeesnnireeseeniveneea 7
Access

4.1 Proposed Access

 

4.2 Access Analysis.......

4.3 Access Sight LIN@S 00... cece cece ccsseerteeseesssseesstseesasesesseersesieenasseeeeasenes 11
4.4 Roadway Capacity... cccccecsecseeeescceeccneresensccenescceessiscsescerenseneersseees 11
Internal Analysis 13
Fo 170) 6) EEE EE SESES SOLES SSSESSSESSSSOSSSSOOSIOONIO® 13
5.1 Parking oo. cece ecceceseeecesceseeeseescaeesecsssaecsseseseeesseesaeesseaseesescsasstsaesesesenasenaee 14
5.2 Service VENICICS 0... cee cece ccc ee rene eee eee EEG Eee eee c enn A TER EEE EERE GEE EE eee eee erage 16
5.3 Pedestrians... ccceccene eee seeeteeeseeeeres cece nese essssenesseesesseeccessensenauaneenagenss 16
Conclusions / Discussion 17

LIST OF TABLES

Table 3.1 — Traffic Data Projections 6
Table 4.1 — SIDRA Results, Site Access Without Upgrades to David Low Way 10
Table 4.2 — SIDRA Results, Site Access With Upgrades to David Low Way 10
Table 4.3 — Carriageway Capacity 11

 

‘yor “ew BURCHILL VDM

Page 54

LIST OF FIGURES

Figure 2.1 — Site Location
Figure 2.2 — Gravel Area

Figure 4.1 — Access Location

APPENDICES

APPENDIX A ~ SITE PLANS AND PEREGIAN BEACH MASTER PLAN
APPENDIX B - TRAFFIC CENSUS DATA

APPENDIX C - ANALYSIS VOLUMES

APPENDIX D - SIRDA OUTPUT

APPENDIX E — VEHICLE TURN PATHS

APPENDIX F - SIGHT LINES

APPENDIX G — INFORMATION REQUEST, NOOSA COUNCIL

 

On vem BURCHILL VDM

Page 55

 

1.0 INTRODUCTION

1.1 BACKGROUND

Burchill VDM Pty Ltd have been commissioned by Morgan and Beier Pty Ltd to
conduct a Traffic Impact Assessment (TIA) of the proposed Commercial Business
Project Office (the proposed development), to be located at 247 David Low Way,
Peregian Beach (the subject site).

1.2 REPORT OBJECTIVES

The objectives of this TIA are to:
1. Review background traffic volumes on the surrounding road network.

2. Calculate daily and peak hour traffic generation of the proposed
development and determine its distribution.

3. Examine the access requirements of the site.
4. Determine parking requirements and assess the internal layout.

5. On the basis of the above, examine the traffic impact of the proposed
development.

 

yoo vem BURCHILL VDM

Page 56

 

2.0 DESCRIPTION PROPOSED DEVELOPMENT

2.1 SUBJECT SITE

Peregian Beach is a smail coastal town within the Noosa Council Local
Government Area.

The proposed development is to be located at 247 David Low Way, Peregian
Beach, between Woodland Drive and Herron Street. The site location map is
presented in Figure 2.1. The area of the subject site is 1,180m?.

The site is currently undeveloped and is partially covered with vegetation. An
informal gravel access currently exists to the site.

Surrounding the site is residential development to the south and lawn bowl greens
to the west. The land to the north of the site is undeveloped. David Low Way
fronts the site to the east.

2.2 PROPOSED DEVELOPMENT

The proposed development consists of an 18 tenancy office space development
and associated car parking including basement parking and associated ramp.
Key components proposed include:

° 18 Office Space Tenancies
Ground Floor Tenancies 1,2 & 3 (210m? GFA)
Tenancies 4,5 & 6 (210m? GFA)
Tenancies 7,8 & 9 (170m’ GFA)
First Floor Tenancies 10,11 & 12 (205m? GFA)
Tenancies 13,14 & 15 (205m? GFA)
Tenancies 16,17 & 18 (180m? GFA)
° 58 Car Parking Spaces
Basement 48 spaces
Ground Floor 10 spaces
Access to the site will be provided via a single driveway access from David Low

Way at the southern end of the lot.

Plans of the Proposal are shown in Appendix A, Drawings 2243 SD01 through
2243 SD04.

 

TOOT vee BURCHILL VDM

Page 57

 

2.3 SITE LOCATION

Peregian Beach is located on the coastline between Noosa and Maroochydore.
Figure 2.1 shows the location of the proposed development.

 

 

 

 

 

Figure 2.1 — Site Location

2.4 FuTURE DEVELOPMENT

Noosa Council currently have a Master Plan for the central business area of
Peregian Beach. This outlines extensive possible development for the area and is
shown in Appendix A, inset a and inset b from the Peregian Beach Village
Master Plan.

Several developments within this area are already proposed as shown in
Appendix A, Drawing 2243 SD01.

 

Or vem BURCHILL VDM

Page 58

 

2.5 ROAD NETWORK

2.5.1. David Low Way

David Low Way runs north south along the coastline connecting to
Maroochydore to the south and Sunshine Beach to the north. Through
Peregian Beach and north, Noosa City Concil controis David Low Way.
Further south, past the site, it is a state controlled road under the control of
the Department of Main Roads (DMR).

In the vicinity of the site it is a 2 way 2 lane arterial road with a narrow
sealed shoulder and no kerb and guttering. Further north painted and
raised medians are provided as well as kerb and guttering. Small gaps and
turning lanes are provided for turning traffic.

A gravel area exists on the road reserve to the south of the access. This is
shown in Figure 2.2. This is currently used for vehicles to pull off David
Low Way to access domestic driveways and basically acts a short turning
Jane. No kerb and gutter exists in this section allowing vehicles to pull off
David Low Way easily.

 

Figure 2.2 — Gravel Area

 

Report No. 4284-1 ver BURCHILL VDM

July 2007

Page 59

 

2.5.2. Road Upgrades

Council proposed to upgrade the section of David Low Way between
Herron Street and Woodland Drive at address traffic issues associated with
the expected development as per the Peregian Beach Master Plan.

This included the construction of a roundabout at the David Low Way /
Woodland Drive / Ibis Street intersection and a raised median extending
from the roundabout to Herron Street. This will restrict turns at driveways
along the section to left in / left out. Vehicles wishing to turn right will need
to conduct U turns at either the Herron Street roundabout or Woodland
Drive roundabout.

The roadway will also be upgraded to 3.5m travel lanes with a 1.5-2.0m
cycle lane in each direction and kerb and gutter on both sides. No on-street
parking will be provided.

A crossing point for pedestrians is likely to also be provided midway
between the two roundabouts.

Planning for these upgrades is currently underway with construction of the
roundabout at Woodland Drive envisaged for 2008. For analysis purposes,
construction of the remaining upgrades is also assumed for 2008.

Council have advised contributions towards these upgrades will likely be
sort from developers.

 

een ves. BURCHILL VDM

Juty 2007

Page 60

 

3.0 TRAFFIC DATA

3.1 BACKGROUND DATA

Background traffic data along David Low Way has been obtained from Noosa
Council. This showed a 2006 AADT past the site of 13,500 vehicles. A growth rate
of 3.0% per annum has been derived from Council's Coastal Area Traffic and
Transport to 2016 and Coastal Major Road Network Infrastructure Changes Plan
documents. This growth rate corresponds with historic data from the DMR
permanent counting station south of the site, which is shown in Appendix B.

The future predicted AADT’s are shown in Table 3.1 below.

Table 3.1 - Traffic Data Projections

 

 

Year Growth Volume AADT
2006 3% - 13500
2007 3% 405 13905
2008 3% 417 14322
2009 3% 430 14752
2010 3% 443 15194
2011 3% 456 15650
2012 3% 470 16120
2013 3% 484 16603
2014 3% 498 17101
2015 3% 513 17614
2016 3% 528 18143
2017 3% 544 18687
2018 3% 561 19248

 

 

 

 

 

 

Peak hour traffic volumes past the site are shown in Appendix C, Figures 3.1 and
3.2. To account for the expected future development in the area an additional 20
peak hour vehicles have been added to David Low Way in each direction for
2008, and 100 vehicles in each direction for 2018.

Traffic volumes may be higher at the site during holiday periods, which occur for
approximately 20% of the year.

 

oor vere BURCHILL VDM

Page 61

 

3.2 DEVELOPMENT TRAFFIC

Traffic generation for the proposed office development has been determined
using the rates outlined in the RTA’s Guide to Traffic Generating Developments.
The rate given for office space is:

Peak Hour Trips 2 trips per 100m? GFA
Daily Trips 10 trips per 100m? GFA

The total office space GFA of the Proposal is 1,180m*. Using the rates above this
gives a total traffic generation for the site of:

Peak Hour Trips 24 trips
Daily Trips 118 trips

The assignment of these trips has been based on:
In Out Split

AM 60% IN / 40% OUT
PM 40% IN/60% OUT

- North South Split - Obtained from Permanent Counting Station

AM 40% Southbound / 60% Northbound
PM 45% Southbound / 55% Northbound

 

Report No. 4284-1 MEM BURCHILL VDM

Page 62

 

4.0 ACCESS

4.1 PROPOSED ACCESS

As per Section 3.2.1 of AS/NZS 2890.1:2004 Parking facilities, Part 1: Off-street
car parking the access classifies as a Class 2 Access Facility. This requires a 6m
(minimum) wide combined non-separated driveway access.

Access will be made via a 6.0m two way driveway on the southern end of the site
and therefore complies with the standards. The location of the access is shown in
Figure 4.1 and on plans in Appendix A.

 

Figure 4.1 — Access Location

 

As Council propose to construct an unbroken raised median past the site between
Woodland Drive and Herron Drive, future access to the site will be restricted to
left in and left out only.

As there is no shoulder on David Low Way and therefore no provision for passing
a turning vehicle, the warrants for turning lanes at the access, as per DMR’s Road
Planning and Design Manual, Chapter 13 - Intersections at Grade (RPDM),

 

Report No. 4284-1 “em™. BURCHILL VDM

Page 63

 

Figure 13.23 was assessed. This shows an AUL(S) (short left turn treatment) is
warranted on David Low Way into the access.

To accommodate this warrant, a AUL(S) will be provided on the existing gravel
area to the south of the proposed access which is currently used by vehicles to
pull of David Low Way. The AUL(S) will be provided by essentially paving this
area being minor road widening entirely within the David Low Way road reserve.
No kerb and gutter will be provided at the lane to ensure access to the domestic
driveways is maintained. The lane will be accommodated within the existing
gravel area and will be constructed as per DMR’s RPDM, Figure 13.73, being
25m long and 3.0m wide, including a taper of 15m.

This lane will serve two purposes. The first will be to provide the warranted
access to the site, and the second will be to improve safety for vehicles that
currently use this area to pull off David Low Way to access domestic properties.

A right turn treatment will not be provided as access will be restricted to left in and
out only by way of the raised median shortly after opening.

4.2 ACCESS ANALYSIS

The access has been analysed at full upgrade of David Low Way with the left in
and left out only from the development site at the expected design year of 2018.

The access has also been analysed for existing conditions in 2008 without any
upgrades to David Low Way. This was not assessed for 2018 as it is assumed the
upgrade of David Low Way will be complete by this time.

The performance of the access was analysed using the SIDRA 3.0 traffic
modelling software.

For priority controlled intersections (Give-Way or Stop control), a Degree of
Saturation (DOS), which is the ratio of flow to capacity, greater then 80% is
considered over capacity. Above this value, performance deteriorates quickly and
operation becomes poor.

Council's Coastal Major Road Network Infrastructure Changes Plan states that in
order for design systems to operate adequately in peak holiday times (i.e. 20% of
the year) it is necessary for the network to operate within the Level of Service
(LOS) B to C range with give way intersections having a DOS of 70% or less.

The critical gap and follow-up headway parameters used for the model were
derived from Austroads (2002) Urban Road Design Guide.

The traffic volumes considered in this analysis are illustrated in Appendix C,
Figures 3.1 and 3.2. The results of this analysis are summarised and discussed

 

eeOr vem BURCHILL VDM

Page 64

10

 

below. The Movement Summary table provided by SIDRA are supplied in
Appendix D.

Table 4.1 — SIDRA Results, Site Access Without Upgrades to David Low Way

 

 

 

 

 

 

 

2008 Without Upgrades
AM PM
Paeesae [Faas [veces [Paes ee” [oat [_Acoms
DOS (%) 31.5 30.4 2.8 36.5 43.3 8.6
Delay (s) 0.1 3.9 16.1 0 6.3 24.6
Queue (m) 0 31 1 0 66 2
Los A A c A A c

 

 

 

 

 

 

 

 

 

Table 4.2 — SIDRA Results, Site Access With Upgrades to David Low Way

 

 

 

 

 

 

 

2018 With Upgrades
AM PM
David pow Way Access David on Way Access
DOS (%) 46.4 1.8 53 4.3
Delay (s) 0.1 13.9 01 15.7
Queue (m) 0 1 0 1
LOS A B A Cc

 

 

 

 

 

 

 

The modelling shows that the access will operate adequately for existing
conditions on David Low Way with minor queuing and delays to southbound
vehicles on David Low Way. This will be due to vehicles waiting to turn right into
the site.

Modelling for the future upgraded conditions on David Low Way shows the
intersection will operate adequately without restriction traffic flow on David Low
Way. Acceptable delays of up to 15.7 seconds can be expected for vehicles
exiting the site in 2018 with queue lengths of up to one vehicle.

There is a maximum DOS of 53% to through traffic on David Low Way, which is
well below the acceptable value of 80% as stated above.

The intersection is also expected to operate adequately during holiday periods.
The worst LOS is “C” and highest DOS is 53%, which is well within the acceptable
parameters as stated in Council's Coastal Major Road Network Infrastructure
Changes Plan.

 

Raper Ne 421 vem BURCHILL VDM

Page 65

11

 

Eventually some vehicles will need to conduct U turns at the Woodland Drive and
Herron Street roundabouts due to the site being restricted to left in and left out.
The volume of vehicles performing these manoeuvres is low (between 3 and 8 in
the peak hours) and the affect on these roundabouts is expected to be unnoticed.

4.3 ACCESS SIGHT LINES

Sight distance to the pedestrian path fronting the site is suitable and free of
obstructions in accordance with AS 2890.1:2004 Parking facilities, Part 1: Off-
street car parking Section 3.2, Table 3.3, as shown in Drawing C3694-01,
Appendix F.

Sight distance to vehicles in David Low Way from the access, in accordance with
AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking Section 3.2, Figure
3.2 for a 70km/h speed limit, as requested by Noosa Council, in there Information
Request, dated 31 May 2007, Appendix G, is 97m and should be free of
obstructions.

Some vegetation existing within the sight line to the north of the access, as shown
in Drawing C3694-01. This will be removed as part of the Proposal and will
provided sight distance to the north of 200m, and south of 105m along David Low
Way form the access.

4.4 ROADWAY CAPACITY

The desirable maximum roadway capacity standard for Noosa Council is given in
Council's Coastal Major Road Network Infrastructure Changes Plan and is shown
in Table 4.3.

Table 4.3 - Carriageway Capacity
(table 5.1 from Council's Coastal Major Road Network infrastructure Changes Plan)

TABLE 5.1 URBAN ROAD STANDARD DESIGK GUIDELINES

 

 

FOR NOOSA SHIRE
TYPE OF ROAD DESIRABLE MAXIMUM STANDARD
Two-way twotane road 16,000-20,000 vehicles per day
Four tane divided road 35,000-40,000 vehicles per day

Degree of saturation of 0.70

Intersecting flows of 16,000 vehicles per day and 4,000 vehicles per day
Degree of saturation of 0.70

Intersecting flows of 16,000 vehicles per day and 8,000 vehicles per day
Degree of saturation of 0.70

Intersecting flows of 35,000 vehicles per day and 16,000 vehicles per day

Large two4ane roundabout (with Degree of saturation of 0.70
separate left tum lanes) Intersecting flows of 40,000 vehicles per day and 16,000 vehicles per day

Unsignalised T-junction

Single fane roundabout

Two-lane roundabout

 

 

 

 

Rete eel vem BURCHILL VDM

Page 66

12

 

David Low Way past the development site is a two way two lane road, and from
Table 4.3, has a desirable maximum capacity of 20,000 vehicles per day. From
Table 3.1, traffic volumes in 2018 on David Low Way past the site can be
expected to be approximately 19,248 vehicles per day, which is within this limit.

The proposed development will not have a major impact on these volumes (up to
118 daily vehicles). However, past 2018 and with additional development
associated with the Peregian Beach Master Plan, volumes may increase to over
20,000 vehicles per day. This may also be the case for holiday periods. Further
upgrading of David Low Way or the redirection of traffic to bypass Peregian
Beach may be required further into the future past 2018.

 

Neon ver BURCHILL VDM

Page 67

13

 

5.0

INTERNAL ANALYSIS

5.1 LAYouT

A two way, 6.0m wide driveway access will be constructed as per AS 2890.1:
2004 Parking facilities — Off-street car parking, and Council's Noosa Plan 2006 —
Part 14 Assessment Criteria for Development for a Stated Purpose or of a Stated
Type and is considered adequate for the site.

The internal road layout will provide access from the driveway to the ground level
parking and the basement parking area via ramp.

Drawings C3694-002, C3694-003 and C3694-004, Appendix E shows all vehicles
can enter the site and park and leave in a forward direction. Vehicles expected to
enter the site will be cars and light vans including service and delivery vehicles.
Garbage trucks will service the site from David Low Way within the left turn lane
so as to not obstruct through vehicles on David Low Way.

As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, the grade
on curved ramps shall be measured at the inside edge of the curve, i.e. at the
inside line marking. As per the standard, ramp grades on the inside edge of the
curve will need to be no greater than 1 in 6, with Grade Transitions of 2.0m on
length at the top and bottom of the ramp.

Ramp grades on the inside edge of the curve will be the same as those shown on
the middle of the ramp on Drawings 2243 SD02 and 2243 SDO3 (Appendix A).
These grades comply with the requirements of AS 2890.1:2004 Parking facilities,
Part 1: Off-street car parking.

As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking the
minimum ramp widths on the straights should be 5.5m. On the curves lane widths
should be 3.9m with a central median of 0.6m giving a total width of 8.4m.

Ramp widths on the straight at the top of the ramp will be approximately 5.6-5.9m,
which complies with the standards. However, due to the physical restraints of the
site, the widths on the curve of the ramp will be approximately 6.5-7.3m without a
central median.

However, as shown on Drawing C3694-004, Appendix E, there is sufficient space
for a B85 and B99 vehicle to pass without conflicts on the ramp, as per AS
2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section 2.5.2(c). As
shown in Drawing C3694-004, there will be conflicts on the straights where
vehicles need to use the full width to negotiate the ramp, however this is
considered adequate, as there is full vision for oncoming vehicles.

Although the site does not qualify as a domestic property, the basement will only
be used by employees and their clients and will not be open to the general public.

 

Rep No. 4284-1 “eM BURCHILL VDM

Page 68

14

 

Therefore traffic entering and exiting will be low and conflicts on the ramp would
be rare. We could expect 18 trips to and from the basement in the peak hours.
Assuming a 60/40 % split for in and out would mean 12 vehicles entering (1 every
5 minutes) and 6 vehicles exiting (1 every 10 minutes) or vice versa. Therefore
there would be a low chance of opposing vehicles being on the ramp at the same
time.

Measures will also be undertaken to ensure the chance of conflict to opposing
vehicles it kept to a minimum. These are:

- Mirrors will be provided on walls at the ramp curve to allow vehicles to see if
there is another coming vehicle.

- Signage will be provided saying "Watch for Oncoming Vehicles" and "Keep
Left".

- Centre line marking will also be provided on the ramp to keep traffic as far to
the left as possible.

The internal layout is shown in Appendix A.

5.1 PARKING

As per Council's Noosa Plan 2006 — Part 14 Assessment Criteria for Development
for a Stated Purpose or of a Stated Type — Driveways and Carparking Code, 1 car
parking space per 20m? GFA is required. The Proposal will be 1,180m? GFA,
which equates to a requirement of 59 spaces.

58 spaces, including 2 disabled spaces (as requested from Noosa Council) will be
provided as part of the Proposal. This falls short of the required 59 spaces by 1
space. As per Council's Noosa Plan 2006 -— Part 14 Assessment Criteria for
Development for a Stated Purpose or of a Stated Type ~— Driveways and
Carparking Code, if insufficient carparking spaces are provided on-site a
monetary contribution is made to Council in accordance with section 6 of Planning
Scheme Policy 13 (PSP13) Contributions in lieu of provision for off-street
carparking.

As per PSP13, the subject site is located within an area where contributions in
lieu of parking are acceptable. The Proposal also meets the requirements of
Section 1.1 of the Policy for parking contributions. Therefore it is considered a
contribution of $11,800, as per PSP73, in lieu of provision of one parking space
be sufficient for the parking shortfall.

As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section
2.4.2 (c), in car parks open to the public, the maximum length of a blind aisle shall
be equal to the width of six 90 degree spaces plus 1m, unless provision is made
for cars to turn around at the end and drive out forwards. The blind aisle in the
basement parking area will be longer than six 90 degree spaces, therefore
provision must me made for vehicles to turn around.

 

MOF vem BURCHILL VDM

Page 69

15

 

Noosa Council have requested two spaces (space 30 and 22) be provided for this
purpose at dimension 5.4m long by 3.0m wide in their Information Request, dated
31 May 2007, Appendix G. However, as the car park will only be used by
employees and their clients and will not be open to the general public, one space
is considered adequate for turning manoeuvres at the end of the blind aisle.
Traffic generation for the site will also be low, so vehicles needing to turn around
will be infrequent and it is not expected there will be conflicts with these vehicles.

As part of the Proposal, space 30 will be provided as a turn around bay at the end
of the blind aisle 5.4m long by 3.0m wide (as requested by Council) as shown on
Drawing 2243 SD02, Appendix A. Turning paths showing this space is sufficient
for a vehicles to turn around using space 30 is shown on Drawing C3694-002,
Appendix B. A drawing with turning paths will be provided showing a vehicle able
to turn around using space 30.

At the end of the blind aisle, the aisle is only extended 0.7m as opposed to the
required 1.0m as per AS 2890.1:2004 Parking facilities, Part 1: Off-street car
parking. However 0.7m is considered sufficient as the aisle is relatively wide at
6.9m allowing sufficient space for a vehicle to reverse out of the space, clear of
the vehicle parked to its right, before needing to turn. This is shown to work with
turning paths shown in Drawing C3694-004, Appendix B.

As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section
5.3.1 the minimum height from the floor to any overhead obstruction (fire sprinkler,
lighting, sign etc), allow for cars and light vans, should be 2.2m (2.3m if parking
will be provided for people with disabilities, however as our disabled spaces will
be on the ground level parking, 2.2m is considered sufficient for the basement).
Headroom between the ramp and the entrance to the basement shall also be
2.2m however will be measured perpendicular to a chord of length equal to the
wheelbase of the B99 vehicle located longitudinally such that the height is a
minimum of 2.2m, as per AS 2890.1:2004 Parking facilities, Part 1: Off-street car
parking Figure 5.3.

The clearance from the floor to the ceiling in the basement will be 2.5m. This will
allow for the installation of sprinklers, signs and lighting without reducing
clearance to below the minimum 2.2m. The ramp terminates before entry to the
basement and vehicles will enter on level ground. Therefore clearance at entry to
the basement is considered adequate.

Low Clearance signs (R6-16) to the basement will be provided as per AS
2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section 4.3.4(a).
Flexible striker bars will also be provided in conjunction with these signs where
the clearance will be less than 2.3m due to sprinklers, lighting or signs.

As per the Noosa Plan 2006, 1 bicycle space per 50m’? GFA be provided which
equates to 24 bicycle spaces for the Proposal. Also as per the Noosa Plan 2006,
12 lockers (1 per 2 spaces), and 3 showers (1 per 10 spaces) be provided.

 

Fer No. 406 vem BURCHILL VDM

Page 70

16

 

Bicycle racks/spaces will be Class 3 as per AS/NZS 2890.3 Bicycle Parking
Facilities. Class 3 spaces involve racks that support the whole bicycles that both
wheels can be locked to in an area that is well lit and in a highly visible public
area.

As part of the Proposal, 24 spaces will be provided at the front of the site. 12
lockers (4 in each powder room) and 3 showers (1 in each powder room) will also
be provided. Powder rooms will be unisex. This meets the requirements of the
standards.

5.2. SERVICE VEHICLES

Vehicles likely to service an office development will be delivery vans, small
maintenance vehicles, emergency vehicles (ambulance), and garbage trucks
accessing the site on an irregular basis.

Garbage collection will be from the frontage of the site via wheelie bins. This will
likely occur at the ieft turn lane into the site to avoid obstructing traffic on David
Low Way.

Casual parking for the delivery, maintenance and emergency vehicles has been
accommodated in the parking rate specified in the Noosa Plan 2006. The
basement parking area will be suitable for these types of vehicles to enter as per
the requirements of AS/NZS 2890.1: 2004 Parking facilities — Off-street car
parking.

5.3. PEDESTRIANS

Sufficient pedestrian facilities are provided so pedestrians can move freely and
safely throughout the site.

Sealed pedestrian paths are currently provided along either side of David Low
Way. A pedestrian crossing midway between Herron Street and Woodland Drive
is expected to be constructed as part of Council's upgrade of David Low Way.
This will provide safe access for pedestrians accessing the central business area
to and from the site.

 

eo vem BURCHILL VDM

Page 71

17

 

6.0 CONCLUSIONS / DISCUSSION

The proposed Commercial Business Project Office at 247 David Low Way,
Peregian Beach, is likely to generate up to 24 trips in the morning and peak
hours.

Before the proposed upgrade of David Low Way the access is expected to
operate adequately with minor delays to northbound traffic on David Low Way.
However, it is expected an unbroken median will be constructed in David Low
Way fronting the site shortly after opening of the Proposal as per Councils
planned roadworks for the area, restricting access to left in and out only.

An AUL(S) will be provided on the existing gravel area to the south of the
proposed access which is currently used by vehicles to pull of David Low Way.
The AUL(S) will be provided by essentially paving this area being minor road
widening entirely within the David Low Way road reserve. No kerb and gutter will
be provided at the lane to ensure access to the domestic driveways is maintained.

This lane will serve two purposes. The first will be to provide the warranted
access to the site, and the second will be to improve safety for vehicles that
currently use this area to pull off David Low Way to access domestic properties.

A right turn treatment will not be provided as access will be restricted to left in and
out only by way of the raised median shortly after opening.

By 2018 David Low Way will approach the maximum desirable carrying capacity
of a two way two lane road as per Noosa Council’s guidelines. However, the
proposed office development will only add a relatively minor volume of traffic to
the road compared to the backgraound traffic volumes, therefore it is not expected
to have an impact on the carrying capacity of David Low Way.

The internal operation of the site is considered adequate for the volume and type
of vehicles entering the site.

The traffic impacts of the proposed office development on the external road
network are expected to be minimal. There are no reasons in terms of traffic
impacts that the Proposal should be refused.

Matt Murphy
Traffic Planner

 

Rar No. A260 vem BURCHILL VDM

Page 72

APPENDIX A

SITE PLANS AND PEREGIAN
BEACH MASTER PLAN

 

Page 73

B JOSUI

 

 

uoyeaas
Bunedies

Seamer, @
SPAN] OPES

Aine sseursna

apou Aj unuiw09

NeaepuNd: pasodosd

 

Page 74

 

village square

community node

business actrvry Pi

shade trees.

fecrwalion

 

 

master plan

 

Page 75

 

Sy

TE POI —
Wd
es

erin tig

 

 

    
 
  
    
     
   
     
  
 
   

 

11.200

  

ih

VEGETATION 7

a0
ei
|

 

A) esis 3006
La
DRIVEWAY

 

® FSL 11.200

 

 

{Line of Basement Carpark below

 

o~ Ss
Fei
.

 

 

 

 

INE OF DECK OVER
ECE DECK OVER

 

   

 

 

     

Lot boundary

 

 

 

Speed bump

PLOTMAKER FILES'2240 hh 1744 AM a

emmarcit AD 0

 

Jeb hini2248 permanan

ean

(

@ FS 11 100

  

 

    

See SD13 for slipway
design anid layout

 

STOP

GROUND FLOOR

1:200

 

  

   
    
 
   
 
 

REV DESCRIPTION
Py) ISSUE TO LANSCAPE DE
®

LEGEND

CQ Presa mgtteroarascape aeranc on

CO) taster et

Existing bees to be removed

Landscaping to landscape architects deta

Storm Water mar tole

Exostng spor levels to groune

  

SL Finished surtace levels

HARDSCAPE AREAS
DRIVE Es
RAMP AREA 187
CAR PARK AREA asm

TOTAL

  
  
 
   
   

  
 

TENANCY &

 

BUILDING 3
RL. 10.1

  
  
  
   
    
  
 
 
   
      
   

 

 

KEN DOWN
ARCHITECTS

‘ARCHIPELAGO’

1). WALAN STREET MOOLOO!

POBOX1S9 — MOOLOOLABA

PH 07 Sada 4517 FX 07 baad

 

\ Power Pole

 

The Airhe Protesmional Centre
E HARBOUR RD. AJRLIE BEACH

 

PH 07 4948 1433 FX 07 4948 1633
ABN 61067 BA? 454
EMAIL admin@kda com au
WEB www ke@ com ou

Project

PROPOSED OFFICE DEVELOPMENT

for

MORGAN & BEIERS ATF

  
 
   
 
 

a

247 DAVID LOW WAY
PEREGIAN BEACH

orawing

GROUND FLOOR

1:200
cate MAR 07° craw BVG scare @AZ
cawngre 2243 SDO3 kevin G

 

Page 76

APPENDIX B

TRAFFIC CENSUS DATA

 

Page 77

g§ Queensland Government

Orpartner of Mala tts

 

See

 

  

Traffic Analysis and Reporting System
PERMANENT SITE REPORT

 

 

 

 

 

 

 

 

 

  

 

strict NORTH COAST HINTERLAND DISTRICT Road Section 133 MAROOCHYDORE-NOOSAROAD~ | ——*‘Tdst | 23.476 alae
(09 TRACS Ped Xing Coolum Beach SLSC ‘Site Stream {All Site Streams i pease
Year 2005 AADT 14,890 Growth last year — -0.83
: Average Week Day. 15,058 Growth last 5 yrs | 1.79
Average Weekend Day 14,594 Growth last 10 yrs 2.44 |
Weekly Pattern AADT Pattern
120 — - ——F — 18000 —
110 i .
16000 ——- — Sei —YRI
ame we YRS
% ™ ms 5 — ay YRIO
AADT 14000 —
AADT, - :
12000 —
“ Jan Feb Mar Aor May dun Jul Aug ae Oct Nov Dec Jan -
10000
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
ie Daily Pattern a Hourly Pattern
110 _——— 8
105 -— — —
%
AADToo E
95
0 L : zz
Mon Tue Wed Thu Fri Sat Sun

TAR350

 

Page 33 of 104 Printed on 03-Feb-2006 at 14:00

Page 78

00:h1 18 9002-484-E0 UO peut . 0} 10 pe abe

OSéHVL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a JC] ESA | | | (wn)ua's
boro: | Bris } bso: } pores | Sezor ' lees | bzes | bose] eghea
(gro Eo ert | Sou B50 Leo} bro feo | [ pace
Ore eco ft eek | oes Ta “or | ueo 82:0 62-22
ze") 6E'L 0e'2 “sz 10'e 1b | Bot eae 22-42
Bp'2 02 6g'2 1zs aL v2 ee “ek 12-08
oe eve ze'p Loy 6 1S'e lee wore 02-61
gp's web 6's Leg beg lov's los's go'p 61-81
bed 61'9 ShZ oz'2 sez | Bgz SZ '9e'9 Bk-Zb
BL 08'9 6b e's Bs; Ole pbs eld Zi-91
gue ee * fez 228 ore leg'g Ze'8 128 91-1] |
kore StL | $6Z Zug 182 Sb'Z eg'L civil |
ped wd 60's ByL 969 ord 08'9 heo | | per
oz o's 1s'8 byO'L eZ 92'2 02d G22 ea

+ bLL $29 o's Ld eS'Z bed B62 ShL Zb-bt
1 (ISZ 68'Z 02'8 1S'Z ba'L gorz Bed ers bL-OL
6e'9 b9'9 koe @0'2 y8'9 19 06'9 69'9 01-60
19'9 ees | seg phd eeL oo"z Yorn “9 60-80
OZ'b ive lave zg $e's pis a's hey 80-40
Lee ket hoz | ee! bee gue eL'e Ze 20-90
hh 82°0 00° let 821 ‘eek 2'L ue'h 90-S0
2e'0 620 seo ee Leo kero 2€°0 £€'0 S0-¥0
sro €z'0 820 ero} ‘OVo O10 loro zL'0 0-£0
sro | eo loco LO ra [Leo | fete ‘O10 £0-20
ez‘o ke'o 9r'0 gto bro bio {uvo si0 20-40
peo ovo | szo_ | seo } szo_ | eo } sro | kzo 10-00}
feq uns es ud nu poem any uow snoH

abeleay
LAV $0 % Si0joR4 18g 1NOH

 

 

 

 

 

 

OVOH WSOON - SHOGAHDOOUWW EI} UORDeS pEoY
LYdOd3Y SLIS LNANVWHAd

 

 

 

 

we}shg Gujyodey pue siskjeuy oer

OSTs yoreg wnjoo9 Burx ped SOVUL 6000g CHS

 

LONLSIC GNVIYSLNIH LS¥O9 HLYON Z0NsiC

roerReuacrng

WUBURUDADD PULTSUSIAD NN

Page 79

Q queensland Government Traffic Analysis and Reporting System

ae PERMANENT SITE REPORT

District NORTH COAST HINTERLAND DISTRICT Road Section f i
Site 20009 TRACS Ped Xing Coolum Beach SLSC i "A

 

 

 

| pay Set by Week Set Matrix and Week Set Factors % of AADT
Week Start Date Thu Fri Sat Sun Mon Tue Wed Wk Set Week Start Date Thu Sat Sun Mon Tue Wed Wk Set

[ _1]30-DEC-04 | : 116.88 124.18 119. 49 104. 56 109.37 113.43 114: 11430, [ 28 O7-JUL-05 I 101. 164.49 ares 103.76 90. = 94.97, “50 99.06 99. id
a = —— rae
A PEIAN-05 111.84) 118.82 114.34] 100.05 104.66 108.54 109.16 109. oe [29 29,14-JUL-05 0a 106.461 102.44 89.64 93.77, 97.2: 5 97.85 Si 97: 99

{_S/SJAN-05 110.94 117.88 113.42" 99.25 103.87] 107.67) 108.28 108.49: [3027-005 aa ay 100.2 aris 91-79 95.1 95.74 95.93

[4 20-JAN-05 "103.07, 109.50 105.97 92.20 96.45 100.02 10060 100.79 [St 28-JUL-05 102.74 “109.15 105.05 91.9] 96.1 99.74] 100.28 100.47,
fm : 50) . an i ed
[5 27JAN-05 104.47, 110.89" 106.80 93.48 97.76 101.38 101.97 102.16 [agoeaueos -AUG-05 00.47 106.74 102.77 $8. a8 84, 89.68 04.02 S750 98.06 98.25
6,03-FEB-05 104.49 11 oF 106.83 93.47, 97.78 101.49 108 ara ar 102.18, [ 33.97-AUG-05 7] ae 105.84 1 7.84 80.12 “S322 96.68 87.29 -97.48
aor -FEB-05 103.517 109. oF 05.8% 926096. 6.85 100.45 101.05 101.28 [B4peAUG-0S [101.89 10825 104.16 oF 95.55 «S88 «90.48 99.64,
Cs 17-FEB-05 104-76 114.25 107.05 93.71 98. OF” 101.65 102.25 102.44} [38 -AUG-05 [| 100.58 106. a 102.79 89.95 94.09 97.55 98.14 98.59
mete 102.16 108.5% 104. ag 91.39 9559 89. .14 99.71] 99.90 [35p1-SEP-05 ~[_ 101-99 108.38 04.27 91.24" 95.4q 98.98 85.55 O74
08) 100: [SipeSEPOS | 9667, 10474 10087 a waa 95.7 86259643
i fOMAR-05 [| 10155 10787 10582 S0ee 95.09 "98.56 99. a 99.31] (38 [i5-SEP-05 102.39 108.68 10458 S159 O5.7F 88. 26 99.85 100.04
1 [1a{17-MAR-05 Tea 78 1 75 110.24 108.08 92. as 97.19 100-7 101.28 101.47 (39225 -SEP-05 104.07] 110.50" 108. 93.04.97. 00354, 101.52 100.71
: _—_—— rn -
[1324-MaAR-05 iesag is Os.0F 111.67 107.39 93.98 50 i078 V025F 102.73 [40 29-SEPOS 107.0 04 113.74, 108. e 95.75 100.16 103.8 j 108.67] 104.47 =
LMSRARSS 98.55 104.70 100,75 88.16 92.22 95.64 96.19 ~—«96.G7, «= 41106-OCT-05 | 105.70 : 945 9) 102.57 103.19 103: 38
1 S15, 07-APR-05 97-59 103.59 99.6 87.25 Je 34.65 85.17, 95.58 [42 /13-OCT. 05 V0i5T 107.85 103.7890. 8] 94.99 98.52 99.08 99.27,
TOS-APR-05 103.24 | 109.6 105.54 "92.26" 96.81] 100.19 100.7) 100.86 © [ 4920-OCT-05 | 103.68 "110. 811018 105.99 92.75, 97.02 100. 7.02 100.64 tor2¢) 707 “39
= = + =
{17,21-APR-05 100.34" 108.60 102.57, 88:76 93.89 "97.97, 97.95 88:12 = [44.27-OCT05 [104.1] Oey 106.49 93197. ies VO1.0F T0162 107-81
[1e2e-APR-05 [ 98.5G 104.74 100.75 88.20 92.25 SS.0R «OHA 88.4 [48 05-NOV-057] 108.27 os6s 108.51 100.16 100.74" 700.83
Lo ——— I
{79 05-MAY-05 [ 91.68 97.34 93.67, 87.97, 85.74 Be.eq 89.45 89.60 © [4BIO-NOV-OS 7 10410 060 10649 931F 97.41 104 01 104.67] 107.80 |
(20 12-May-05 963 69 102.72 98.84 86.49 90.47 98.89 94.97, 8455 (4aji7-Nov-os T1606 "NOV-05 [106.47] 113.05" 108.78) 98. 1 99:58" 105.27, 103-85 104.06 |
[2a -MAY-05 T 98.04 104.19 — 779 91.74 95.14 95.69 $5.87) [48 24Novas [108 -05 OSI TS 10753 94.10) 98.437" 102.08 102.66 102.88
(SR 36MAV 05 7 r 6 ae r 01: rT
[22 26-MAY-05 97.09 109.14 99.25 8bBS BOBS 94.27 Oa 7A 94.94 =| AOI-DECOS | 107 7a W414 10585 96.1 10059 104.26 104.867 105.04

pq a7e I ; 74 10752 9409" ad
23 02-JUN-05 | 94.61] 100.51] 96.7; 84.64 88.53 91.82 $2.34] 92.52 { 50 08-DEC-05 | 105.17) 411. 74 107.52, 94. 09 = 98. 42 102.07, 102. 102.85,

j . 5 x .95, ; . 84) . 57 a .
| 24 08-JUN-05 j 98.7 104 91 100.95 88, 34 92.41) 95.84 96.39) 96.57) [sis DEC-OS 108. 51] 11528 110.95 87. 07 101! 54 105.30, 105.91 106.1 i}

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

  
 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7 e rT "7 . | 7
[ 25 16-JUN-65 94.72 10063 96.84 8474 BBGG OOF 9245 SRT 6 | SARADECOS | 107.26 Tag 109.65, 235 100.377 104.08 04.64 104.69
+ [26 23JUN-05 92.21 97.96 94.26 82.45 86.28 89.48 90.00 90.17, [ S3ASDECOS | 11682 124s] 119.43 104.51 109.39 119.97“ 194.05_ 114.24
: [2A B0-JUN-05 96.95 10299 88.09 86.7] 90.70 S407 FET 84.79 |

 

 

 

TAR350 Page 35 of 104 Printed on 03-Feb-2006 at 14:00

Page 80

Qoovertznsconnen Traffic Analysis and Reporting System
Pinner PERMANENT SITE REPORT

 
 

 

District? NORTH COAST HINTERLAND DISTRICT } Road Section [133 MAROOCHYDORE - NOOSA ROAD — __Teist{ 23.476
Site 20009 TRACS Ped Xing Coolum Beach SLSC All Si ms

AADT History
Year AADT Growth Pe tyr Growth Pe 5yr Growth Pe 10yr Year AADT GrowthPc lyr Growth Pc 5yr Growth Pe 10yr

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| 2005 14899 (_ -83 [179 2.44
| 2004) = 15014 185 2.55] 2.8
; 2003, { 14742 OL 2747 ~ 29 { |
2002 { 14345 4.52 3.38 _ i
(200 f 13725 248 [_ 3.35 [7 _|
{2000 { 13401] 32 {327 —
' [1999 | [ 13444 [ 589 [ 3.47, }
1998) 12696 [ _ 7g - LE
1997 11832 ff
1996 [ 17420 (__:2.89 _ |
1995 11760 [_ 2.56 _ L |
[1984 [12069 a L |

 

 

 

 

 

 

 

TAR350 , ~~ Page 36 of 104 , “Printed on 03-Feb-2006 at 14:00

Page 81

APPENDIX C

ANALYSIS VOLUMES

 

Page 82

MORNING (AM) PEAK

 

David Low
Way

 

 

 

6 552

J 4

 

Site Access

 

fall

ot

584

 

 

David Low
Way

 

 

 

 

AFTERNOON (PM) PEAK

 

David Low
Way

 

 

 

ot 3. 796
Jf

 

 

David Low
Way

 

 

 

 

C3694 - Office Development Peregian Beach

Fi 3.1 |
2008. Traffic Volumes, Existing Road Layout BURCHILL VDM

with Development Traffic

Page 83

MORNING (AM) PEAK

 

David Low
Way

 

 

 

9 —f

“TT |

 

 

 

 

 

14 859
'
I
David Low
Way

 

 

 

 

AFTERNOON (PM) PEAK

 

David Low
Way

le }
vt

Site Access 1142

Vth |

7 981

 

 

 

 

 

 

 

 

3

_#J

David Low
Way

 

 

 

 

 

 

C3694 - Office Development Peregian Beach

Fi 3.2
2018. Traffic Volumes With Development BURCHILL VDM

and Road Upgrades

Page 84

APPENDIX D

SIDRA MODEL OUTPUT
SUMMARIES

 

Page 85

Movement Summary Page | of 1

SIDRA =
INTERSECTION

Movement Summary

Access, All Movements, No Upgrade to David Low Way

2008 AM, Full Development, Proposed Layout
Give-way

Vehicle Movements

 

 

 

 

 

95%
Deg of Aver Aver
MovID Turn veoh yh). HV Satn Delay Level of Gacuel Quote 4 Eff. Stop Speed
(v/c) (sec) (m) (km/h)
David Low Way Sth
2 L 8 0.0 0.004 8.2 LOS A 0 0.00 0.67 49.0
1 T 615 0.0 0.315 0.0 LOS A 0 0.00 0.00 60.0
Approach 623 0.0 0.315 0.1 LOSA 0.00 0.01 59.8
David Low Way Nth
6 T S581 0.0 0.304 3.8 LOS A 31 0.72 0.00 51.3
S R 6 0.0 0.300 12.2 Los B 31 0.72 0.90 44,8
Approach 587 0.0 0,304 3.9 LOSA 31 0.72 0.01 51.2
Access
4 L 6 0.0 0.028 16.1 Los c 1 0.66 0.75 41.5
3 R 4 0.0 0.028 16.2 LOS C 1 0.66 0.89 41.4
Approach 10 0.0 0.028 16.2 Los c 1 0.66 0.81 41.5
All Vehicle 1220 0.0 0.315 2.0 Not 31 0.35 0.02 55.2
icles 5 "Applicable . . .

 

Symbols which may appear in this table:

Following Degree of Saturation
# x = 1.00 for Short Lane with resulting Excess Flow
* x = 1,00 due to minimum capacity

Following LOS
# - Based on density for continuous movements

Following Queue
# - Density for continuous movement

+

SIDRA SOLUTIONS

Site: 2008 AM No Upgrade
H:\C3694\Traffic\SIDRA\Access & David Low Way.aap
Processed Jun 26, 2007 04:25:29PM

A0463, Burchill VDM Pty Limited, Large Office

Produced by SIDRA Intersection 3.1.061208.34
Copyright 2000-2006 Akcelik and Associates Pty Ltd
www, sidrasolutions.com

about:blank 5/07/2007

Page 86

Movement Summary Page | of |

SIDRA ial
INTERSECTION

Movement Summary

Access, All Movements, No Upgrade to David Low Way

2008 PM, Full Development, Proposed Layout
Give-way

Vehicle Movements

 

95%

 

 

 

 

Deg of Aver Aver
MovID Turn ovan/n )  HY Para taney Service Queue. queued erate Coca
(m)
David Low Way Sth
2 L 4 0.0 0.002 8.2 LOS A 0 0.00 0.67 49.0
1 T 712 0.0 0.365 0.0 LOS A 0 0.00 0.00 60.0
Approach 716 0.0 0.365 0.0 LOS A 0.00 0.00 59.9
David Low Way Nth
6 T 838 0.0 0.433 6.3 LOS A 66 0.90 0.00 49.6
5 R 3 0.0 0.429 14.7 Los B 66 0.90 1.09 42.6
Approach 841 0.0 0.433 6.3 LOSA 66 0.90 0.00 49.5
Access
4 L 9 0.0 0.086 24.5 Los Cc 2 0.80 0.88 35.8
3 R 8 0.0 0.086 24.6 LOS C 2 0.80 0.94 35.7
Approach 17 0.0 0.086 24.6 Los c 2 0.80 0.91 35.7
1 Not
All Vehicles 1574 0.0 0.433 3.7 Applicable 66 0.49 0.01 53.5

 

Symbols which may appear in this table:

Following Degree of Saturation
# X = 1.00 for Short Lane with resulting Excess Flow
* x = 1.00 due to minimum capacity

Following LOS
# - Based on density for continuous movements

Following Queue
# - Density for continuous movement

+

SIDRA SOLUTIONS

Site: 2008 PM No Upgrade
H:\C3694\Traffic\SIDRA\Access & David Low Way.aap
Processed Jun 26, 2007 04:27:34PM

A0463, Burchill VDM Pty Limited, Large Office

Produced by SIDRA Intersection 3.1.061208.34
Copyright 2000-2006 Akcelik and Associates Pty Ltd

about:blank 5/07/2007

Page 87

Movement Summary

SIDRA =
INTERSECTION

Movement Summary

Access, Left In/Out Only, With Upgrade to David Low Way

2018 AM, Full Development, Proposed Layout
Give-way

Vehicle Movements

Page 1 of 1

 

95%

 

 

 

 

Deg of Aver Aver
Dem Flow Level of Back of Prop. Eff. Stop
Mov ID Turn %HV Satn Delay - Speed
(veh/h) (v/c) (sec) Service en) Queued Rate (km/h)
David Low Way Sth
2 L 15 0.0 0.008 8.2 LOS A 9 0.00 0.67 49.0
1 T 904 0.0 0.464 0.0 LOS A 0 0.00 0.00 60.0
Approach 919 0.0 0.464 O1 LOS A 0.00 0.01 59.8
Access
3 L 9 0.0 0.018 13.9 LOS B 1 0.65 0.80 43.4
Approach 9 0.0 0.018 13.9 Los B 0.65 0.80 43.4
; Not
All Vehicles 928 0.0 0.464 0.3 Applicable 1 0.01 0.02 59.6
Symbols which may appear In this table:
Following Degree of Saturation
# x = 1,00 for Short Lane with resulting Excess Flow
* x = 1,00 due to minimum capacity
Following LOS
# - Based on density for continuous movements
Following Queue
# - Density for continuous movement
SIDRA SOLUTIONS
Site: 2018 AM With Upgrade
H:\C3694\Traffic\SIDRA\Access & David Low Way.aap
Processed Jun 26, 2007 04:30:54PM
A0463, Burchill VDM Pty Limited, Large Office
Produced by SIDRA Intersection 3.1.061208.34
Copyright 2000-2006 Akcelik and Associates Pty Ltd
www, sidrasolutions.com
about:blank 5/07/2007

Page 88

Movement Summary Page | of |

SIDRA =
INTERSECTION

Movement Summary

Access, Left In/Out Only, With Upgrade to David Low Way

2018 PM, Full Development, Proposed Layout
Give-way

Vehicle Movements

 

95%

 

 

 

Deg of Aver Aver
Mov ID Turn ne reh/R). %HV Satn Delay Level of Gacue, Queue d eff strep Speed
(v/c) (sec) (m) (km/h)
David Low Way Sth
2 L 7 0.0 0.004 8.2 LOS A 0 0.00 0.67 49.0
1 T 1033 0.0 0.530 0.0 LOS A 0 0.00 0.00 60.0
Approach 1040 0.0 0.530 0.1 LOSA 0.00 0.00 59.9
Access
3 L 18 0.0 0.043 15.7 tosc 1 0.72 0.90 41.9
Approach 18 0.0 0.043 15.7 LOS C 1 0.72 0.90 41.9
Not
All Vehicles 1058 0.0 0.530 0.3 Applicable 1 0.01 0.02 59.5

Symbols which may appear in this table:

Following Degree of Saturation
#x = 1,00 for Short Lane with resulting Excess Flow
* x = 1.00 due to minimum capacity

Following LOS
# - Based on density for continuous movements

Following Queue
# - Density for continuous movement

+

SIDRA SOLUTIONS

Site: 2018 PM With Upgrade
H:\C3694\Traffic\SIDRA\Access & David Low Way.aap
Processed Jun 26, 2007 04:31:55PM

A0463, Burchill VOM Pty Limited, Large Office

Produced by SIDRA Intersection 3.1.061208.34

Copyright 2000-2006 Akcelik and Associates Pty Ltd
7 luti

about:blank 5/07/2007

Page 89

APPENDIX D

DMR’S ROAD PLANNING
AND DESIGN MANUAL,
CHAPTER 13 — INTERSECTIONS

AT GRADE FIGURES

 

Page 90

— =a _— _— _—

 

 

 

 

# For setting out details of the left tum geometry, use vehicle tuming path templates and/or Figuee 13.70.

=f

 

 

 

 

 

 

 

 

 

 

 

 

Design Speed of Diverge/Deceleration | Taper Length
Major Road Length D Tay)”:
Approach (km/h) (m)"?
50 15 5
60 25 By
0 38 20
80 45 20
90 55 25
(1) Based on 9 20% reduction in through road speed at the start
of the taper anda value of deceleration of 3 Sm/s”, Adjust for
grade using the 'Correction to Grade! table ia Figure 13.42.
(2) Based on a turn lane width of 3.00

 

 

Ww Nominal through lane width (mm) (inch. widening for curves)

 

Wr= Nominal width of turn Jane (m) (inel, widening for curves based on the design burning vehicle). Desirable
minimum = 3.0m, absolute minimum = 2.8m.

T= — Taper length (im) = Osis Vas

V= Design speed of major road approach (knw)

Note: Approaches to Ieft turn slip lanes can create hazardous situations between cyclists and left-tumning mater
vehicles. Treatments to reduce the mumber of potential conflicts at left turn slip lanes are given in Austroads (19996),

Figure 13.73 Auxiliary Left Tun Treatment [AUL(S)] on the Major Leg of an Urban Road

Page 91

APPENDIX E

VEHICLE TURN PATHS

 

Page 92

 

 

         
     

 

>

ONG
XO
NC

Q
GS

g
S
2s

,
‘BAOev ONICTANG 30 BN

MK |

i Ni Wj NW Wp

ND

 

 

S

8

| fen SETBACK LINE

LEAL EET LTGULESTRUTSAI ERASERS ARE
'?SYUYKYSYSV YS
YAOAAVAIAAAA

 

Nag

 

 

10.25

PROPOSED
COMMERCIAL
BUSINESS PROJECT
OFFICE

247 DAVID LOW WAY
PEREGIAN BEACH

 

 

AREA/STAGE

 

 

   
 
 
 
 

SS

23

oS

 

 

   

 

DATE DESCRIPTION APPR.

 

 

 

AMENOMENTS

 

 

 

 

SOLS
WS
SATA

 

 

COPYRIGHT C

THESE DESIGNS AND DRAWINGS ARE COPYRIGHT AND
ARE NOT TO BE USED OR REPRODUCED WITHOUT THE
WRITTEN PERMISSION OF BURCHILL VDM PTY LIMITED.
THE CONTENTS OF THIS DRAWING ARE ELECTRONICALLY
GENERATED, ARE  AND MAY ONLY BE USED
FOR THE PURPOSE FOR WHICH THEY WERE INTENDED
THIS IS AN UNCONTROLLED DOCUMENT ISSUED FOR
INFORMATION PURPOSES ONLY, UNLESS THE CHECKED
SECTIONS ARE SIGNED AND APPROVED.

DO NOT SCALE FROM THIS DRAWING.

VERIFY DIMENSIONS PRIOR TO COMMENCING ANY WORKS.

FULL SIZE A3

 

  

 

NOT TO SCALE

DRAWING TITLE

RAMP TURNING
SHEET 1

 

[5 BurcHILL VDM

ACN 010 140 495 PTY LIMITED

CIVIL & STRUCTURAL CONSULTING ENGINEERS & PLANNERS
142 Bundall Road, Surfers Paradise, Qld. 4217

Phone (07) 5574 0511

Fax Civil (07) 5574 0011

Fax Structural (07) 5574 0505

Member of the

 

Email [email protected] GROUP
DESIGNED : DRAWN :

CHECKED DATE

PRENAME: = \cs694\T/cttic\Romo Tu Rom

 

APPROVED FOR AND ON BEHALF OF
BURCHILL VDM PTY LIMITED

RP.EQ.No.

 

 

 

DRAWING No. : AMENDMENT
C3694-002

 

Page 93

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOT TO SCALE

 

 

PROPOSED
COMMERCIAL
BUSINESS PROJECT
OFFICE

247 DAVID LOW WAY
PEREGIAN BEACH

 

AREA/STAGE

 

 

 

 

 

 

 

COPYRIGHT C

THESE DESIGNS AND DRAWINGS ARE COPYRIGHT AND
ARE NOT TO BE USED OR REPRODUCED WITHOUT THE
WRITTEN PERMISSION OF BURCHILL VDM PTY LIMITED.
THE CONTENTS OF THIS DRAWING ARE ELECTRONICALLY
GENERATED, ARE  AND MAY ONLY BE USED
FOR THE PURPOSE FOR WHICH THEY WERE INTENDED
THIS 1S AN UNCONTROLLED DOCUMENT ISSUED FOR
INFORMATION PURPOSES ONLY, UNLESS THE CHECKED
SECTIONS ARE SIGNED AND APPROVED.

DO NOT SCALE FROM THIS DRAWING.

VERIFY DIMENSIONS PRIOR TO COMMENCING ANY WORKS.

FULL SIZE: A3.

 

DRAWING TITLE :

RAMP TURNING
SHEET 2

 

[5 BurcHILL VDM

ACN 010 140 495 PTY LIMITED

CIVIL & STRUCTURAL CONSULTING ENGINEERS & PLANNERS
142 Bundall Road, Surfers Paradise, Qid. 4217

Phone (07) 5574 0511

Fax Civil (07) 5574 0011

Fax Structural (07) 5574 0505

Member of the

 

Email [email protected] GROUP
DESIGNED DRAWN :
CHECKED DATE

 

APPROVED FOR AND ON BEHALF OF
BURCHILL VDM PTY LIMITED

RP.E.Q. No.

 

 

DRAWING No. » AMENDMENT

 

 

3694-003
694-003

Page 94

 

 

PROPOSED
COMMERCIAL
BUSINESS PROJECT

vem v OFFICE

 
    
 
 

  
   

 
    
 

   

 

 

 

 

 

 

 

 

10.200
"0g g 247 DAVID LOW WAY
som 7 -
esis MOK wee eo s s PEREGIAN BEACH
SYST Allee. 4 IS
Apuegee “i Ky SVE
1009p AG LS
Lo om 10600
a
a
SY
10, KA = =
- - _ _ a -
NOTE: B
‘entirely within setbacks e = — = -
~~ _ = —
1,000 _ _
[> T7 -
‘ sf
= = - =
+ a, DATE DESCRIPTION APPR
_- _ aes =
fx AMENOMENTS
> = = :
2 8 1g COPYRIGHT (C
=_ _ | - THESE DESIGNS AND DRAWINGS ARE COPYRIGHT ANO

ARE NOT TO BE USED OR REPRODUCED WITHOUT THE
WRITTEN PERMISSION OF BURCHILL VDM PTY LIMITED.

s THE CONTENTS OF THIS DRAWING ARE ELECTRONICALLY
GENERATED, ARE  AND MAY ONLY BE USED
FOR THE PURPOSE FOR WHICH THEY WERE INTENDED.
THIS IS AN UNCONTROLLED DOCUMENT ISSUED FOR
INFORMATION PURPOSES ONLY, UNLESS THE CHECKED
SECTIONS ARE SIGNED AND APPROVED.

DO NOT SCALE FROM THIS DRAWING.
VERIFY DIMENSIONS PRIOR TO COMMENCING ANY WORKS.

 

 

| og

RF
ro o4
-_ \ | tHE

 

 

(
{
{
{
(
'
(
t
{

          
   

   

 

 

 

 

aR
%§ LET TELNET RS FTI RGR TF RT TFA FT ARIF RI RST FGF TIT TTD RT TRF IRI RTE TET RTF RGR TI RPR GF ROR IR EAS ep FULL SIZE: A3
S WIZZ SZ—IZRSITZK’WY,ASSYAS TASKS YSRDDIRDYS BSE YS STASIS RYDER r
i k 5 ’ —<s RAMP TURNING
—_— alll SHEET 3
Bir ibe
of a
»
TELSTRA
3
Power
Pe
=

 

(8 BurcHILL VDM

ACN 010 140 495 PTY LIMITED

CIVIL & STRUCTURAL CONSULTING ENGINEERS & PLANNERS
142 Bundall Road, Surfers Paradise, Qid. 4217

Phone (07) 5574 0511

Fax Civil (07) 5574 0014

Fax Structural (07) 5574 0505

Member of the

 

Email [email protected] GROUP
DESIGNED DRAWN

CHECKED DATE

FILENAME ERA THEHEAROnG. Ture PoInE\Rame: Turh F

 

APPROVED FOR AND ON BEHALF OF

NOT TO SCALE BURCHILL VDM PTY LIMITED
RPEQ No
DRAWING No. AMENDMENT
C3694-004

 

 

 

 

Page 95

APPENDIX F

SIGHT LINES

 

Page 96

 

 

 

 

 

 

—
PROPOSED
COMMERCIAL
BUSINESS PROJECT
OFFICE
247 DAVID LOW WAY
PEREGIAN BEACH
AREA/STAGE
:
Wy
| |
|
|
| }
t ; .
] }
| |
| |
{ |
SS
DATE DESCRIPTION | APPR.
| AweNOMENTS oo

 

 

 

KEY

AREA TO BE FREE FROM
OBSTRUCTIONS

FOOTPATH

 

See SD13 for slipway
/ design and layout

 

PROPOSED SLIP WAY

STOP

NOT TO SCALE

SIGHT DISTANCE TO PEDESTRAINS ON THE PATHWAY

COPYRIGHT C

THESE DESIGNS AND DRAWINGS ARE COPYRIGHT AND
ARE NOT TO BE USED OR REPRODUCED WITHOUT THE
WRITTEN PERMISSION OF BURCHILL VDM PTY LIMITED
THE CONTENTS OF THIS DRAWING ARE ELECTRONICALLY
GENERATED, ARE  AND MAY ONLY BE USED
FOR THE PURPOSE FOR WHICH THEY WERE INTENDED
THIS IS AN UNCONTROLLED DOCUMENT ISSUED FOR
INFORMATION PURPOSES ONLY, UNLESS THE CHECKED
SECTIONS ARE SIGNED AND APPROVED.

DO NOT SCALE FROM THIS DRAWING.
VERIFY DIMENSIONS PRIOR TO COMMENCING ANY WORKS

FULL SIZE: A3

 

DRAWING TITLE

SIGHT DISTANCE
REQUIREMENT AS
PER AS 2890.1

 

 

[5 BurcHILL VDM

PTY LIMITED

CIVIL & STRUCTURAL CONSULTING ENGINEERS & PLANNERS
142 Bundall Road, Surfers Paradise, Qid. 4217

Phone (07) 5574 0511

Fax Civil (07) 5574 0011

Fax Structural (07) 5574 0505
Email —[email protected]

ACN 010 140 495

Member of the

VBM

GROUP

 

DESIGNED DRAWN
CHECKED DATE
FILENAME

 

APPROVED FOR AND ON BEHALF OF
BURCHILL VDM PTY LIMITED

RP.E.Q No.

 

DRAWING No.
C3694-001

AMENDMENT

 

 

Page 97

ATTACHMENT D

WATER & SERVICES REPORT
Barlow Gregg VDM

 

Page 98

 

WATER AND SEWERAGE
SERVICES REPORT

 

PROPOSED OFFICE
DEVELOPMENT
at
DAVID LOW WAY,
PEREGIAN BEACH

for
MORGAN & BREIERS

Amended July 2007
M3087

BARLOW GREGG VDM

Consulting Civil and Structural Engineers

 

 

'24 WALAN STREET MOOLOOLABA PO BOX 200 MOOLOOLABA QLD 4557
PHONE: (07) 54440400 FACSIMILE: (07) 54440536
EMAIL: [email protected]

 

Fa

ES OMERENG BONERS °

Boo 5 3S
folwes PLR?

Page 99

 

WATER AND SEWERAGE SERVICES REPORT

 

TABLE OF CONTENTS

PART A

1.0 INTRODUCTION

1.1 Description of Development
1.2 Pre Development Site

2.0 SUMMARY

PART B

DRAWING M3087-W&S-01A
Water & Sewerage Services Layout Plan

 

Page 100

1.0 INTRODUCTION

1.1

1.2

Description of Development
The proposed site is subject to an application for a material change of use at Lots

1 & 2 RP903222, and Lot 26 P9315 David Low Way, Peregian Beach. The
development will involve the construction of 18 office tenancies with ground level
and basement carparking.

Pre Development Site
The proposed site is currently undeveloped. A small number of trees are on the

site and the land falls to the north. An existing water main is located in David Low
Way adjacent the subject site.

A sewer main enters the subject site at the north western corner and extends
approx 15m into the site along the rear boundary. It appears from council records
that multiple service connections are available. An additional sewer connection
point is available at the south western comer of the site. The site is adequately
serviced with sewerage reticulation.

2.0 SUMMARY

A water connection shall be provided from the reticulation main in David Low
Way. This would be the most appropriate connection point for a water service to
the site. Council advise that the current infrastructure is adequate for the
proposed redevelopment of the site.

The preferred existing sewer service connection will be maintained and the
remainder to be capped and sealed at the service point. Council advise that the
current infrastructure is adequate for the proposed redevelopment of the site.

Existing services referred in the aforementioned have been obtained from Noosa
Councils Geographic Information System.

Refer attached drawing M3087-W&S-01A for details of both water and sewerage
connection details.

 

Page 101

PART B - DRAWINGS

 

TABLE OF CONTENTS

PART B

DRAWING M3087-W&S-01A
Water & Sewerage Services Layout Pian

 

Page 102

”

TO
NOOSA Be ; ,
oes ee UL

ea ®

  

   
 
   
  
    

  
     
   
  

 
  
  
 
       

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

= en \ / PROPOSED: \ nd ‘
7 \ oS oo \ Ba tH / PROPOSED SToRMWATER _ — —_ \
PTTTTIVA oR RENE EES | O\ ge ee \
Stitt ty} . XY < Som eam \ aan 8 \ \,
at \
| Ly \ / i XY eee aT \ ser \
Zi oe \ \ \ _
1 4 \ . _ \,
a 1 | \ \ ee
aaa \ \ ae
on { \ ao \ ‘
. poy: TER Ley a
eo) wore seia Big 3
é | DICL WATER MAIN iy \
7 } \ a" vf
—f | OCEAN \ Ce \ /
\ er | \ » \ POSSIBLE SEWER ae
FP j \ CONNECTION LOCATION \ x
HD j \ \ AT EXISTING MANHOLE \ /
| ARB | \ “g i \ _— \ /
TN \ \z i SOWLS CLUB \ eo \ /
hp ! \
ji \ \ wan | ‘A’ e \ eo 4
Hf \ \ = I \%, \
Ty \ \3 | <8 \ \ ,
LS | “ \% ao"\ /
! \ 1 < \ oO Vom
-! \ | __
[im ri 1} \ a | 5 foo xX
BE =a \ | aay
—] pHa] id | , 1 POSSIBLE SEWER a \ / \
/ 1 wo | CONNECTION LOCATION \ \ / \
3 / ' AT EXISTING MANHOLE \ . \
_ j 5 / \ \ \ ( \
QS | ; Bo pO
“ — | | < \ .
To | ° |
‘ £ \
1 S i |
\ ° i |
' | L | = i
i fon i en = |
LOCALITY PLAN i i| 8 | | ~
NOT TO SCALE | We {a 7% = 1 }
a ' '
| 1 fi { t | | i
SERVICES LAYOUT PLAN
a Ss 0 SB 20 % 300
SCALE 1:$00 at Al
WATER SERVICE NOTES: SEWER NOTES: NOTES
1. _ EXISTING SERVICES SHOWN ARE FROM AUTHORITIES PLANS AND 1. REFER HYDRAULIC CONSULTANT FOR RAINWATER TANK AND
1, WATER SERVICE CONNECTION LOCATION IS SHOWN FOR DETAILED SURVEY INFORMATION. ANY OMISSIONS REGARDING PLUMBING DETAILS.
OESIGN PURPOSES ONLY AND SHALL BE FULLY INFORMATION SHOWN OR DISCREPANCIES SHALL BE CONFIRMED WITH RAINWATER TANKS SHALL BE CONFIRMED WITH ARCHITECTURAL
DETAILED AT OPERATIONAL WORKS APPLICATION. NOOSA SHIRE COUNCIL IN THE FIRST INSTANCE PRIOR TO DESIGN, DRAWINGS,
CONSTRUCTION OF WATER CONNECTION SERVICES
HA ARRIED OUT BY NOOSA SHIRE COUNCIL
SHALL BE 2. MORK ON EXISTING MAINS SHALL BE PERFORMED BY THE COUNCIL 2. REFER LANDSCAPE CONSULTANTS DRAWINGS FOR PLANTING AND
SS DIRECTED OTHERWISE. |
5S. _ EXISTING WATER MAINS SHOWN ARE FROM AUTHORITIES TURFING OETAILS.
PLANS AND DETAILEO SURVEY INFORMATION. ANY 3. ALL WORK SHALL COMPLY WITH CURRENT COUNCIL SPECIFICATIONS
OMISSIONS REGARDING INFORMATION SHOWN OR AND_GUIDELINES. wae - —
DISCREPANCIES SHALL BE CONFIRMED WITH NOOSA
SHIRE COUNCIL WATER IN THE FIRST INSTANCE PRIOR TO 4%. PREFERRED SEWER CONNECTION LOCATION SHALE BE CONFIRMED WITH
DESIGN, NOOSA SHIRE COUNCIL WATER & SEWERAGE BRANCH.
NOTES: BARLOW GREGG AND ASSOCIATES TITLE: PROJECT: DATE: APRIL 2007 | sca: AS SHOWN
This the property ot the egos. nd any sot | ENS Sana oe ap oan oon WATER & SEWAGE PROPOSED OFFICE aor wRT_| orn,
Se ane Ss OGL ORT ae | SERVICE LAYOUT PLAN DEVELOPMENT at DAVID LOW | cs nT
Infringement in ony woy may result i teal artion, PH ito Ses ST as WAY, PEREGIAN BEACH ‘oecxen. area” 7 3 30
1. Figured dimensions tate precedence over scaled. A bes Ta, CORAL COAST: ASSOCIATED COMSLA TANTS fi RGAN & BREIER PROJECT -SUBSET-SHEET-REVISION
A] REVISED LAYOUT 174707 [MR 1 Verity afl on site. en ute free 17 ee KEN DOWN ARCHITECTS or MO $
No. Amendment Onte |By}No Amendment Date {By Prone 107) 496 U4It Ph: (07) S644 4511 Fax: (07) 4968 1633 M3087 - W&S - D1A

 

 

 

Page 103

ATTACHMENT E

STORMWATER MANAGEMENT REPORT
Barlow Gregg VDM

 

Page 104

 

STORMWATER MANAGEMENT
REPORT

 

PROPOSED OFFICE
DEVELOPMENT
DAVID LOW WAY,
PEREGIAN BEACH

FOR
MORGAN & BREIERS

Amended July 2007
Job No. M3087

BARLOW GREGG VDM

Consulting Civil and Structural Engineers

177-181 BRISBANE ROAD, MOOLOOLABA
PO BOX 200 MOOLOOLABA QLD 4557
PHONE: (07) 54440400 FACSIMILE: (07) 54440536
EMAIL: [email protected]

RY
(Is > BARLOW GREGG WHA,
aad CONSULTING ENGINEERS:

(bobo RPE® 1330

Page 105

STORMWATER MANAGEMENT REPORT

 

TABLE OF CONTENTS

SECTION

1.0 INTRODUCTION

1.1 Description of Development
1.2 Pre-Development Site

2.0 STORMWATER MANAGEMENT STRATEGY

2.1 Hydrology

2.2 Proposed Stormwater Drainage
2.3 Flows from Driveways

2.4 Stormwater Quality

2.5 Stormwater Detention

2.6 Flood Protection

2.7 Construction Phase

3.0 MAINTENANCE

3.1 Construction Phase
3.2 Operational Stage

4.0 SUMMARY
APPENDICES

APPENDIX A - DRAWING No M3087-SWMP-01B
APPENDIX B —- Proposed Basement Pump Detail
APPENDIX C - XP-STORM Pre Development Output
APPENDIX D — XP_STORM Post Development Output

Page 106

1.0 INTRODUCTION

1.1

1.2

Description of Development

The proposed site is subject to an application for a material change of use at Lots
1 & 2 RP903222, and Lot 26 P9315 David Low Way, Peregian Beach. The
development will involve the construction of 18 office tenancies with ground level
and basement carparking.

Pre-Development Site
The subject site is currently undeveloped, is sparsely vegetated and falls gently
to the north. It is located in the Eastern Beaches precinct of Noosa Shire.

2.0 STORMWATER MANAGEMENT STRATEGY

2.1

2.2

Hydrology

The site is located on the David Low Way, Peregian Beach, adjacent to the
Peregian Beach Bowls Club. The site is generally flat with surface levels ranging
from RL 10.0 m AHD to RL 11.0 m AHD. The proposed use of the site will not
alter existing catchments or detrimentally redirect surface flows.

Proposed Stormwater Drainage
The stormwater drainage system for the proposed development will be designed
in accordance with QUDM and AS3500 Part 5.

Runoff from as much of the external area of the development as is practicable
will be conveyed to landscaped areas for infiltration.

Runoff from the site will be discharged into a proposed new stormwater gully pit
to be located at the frontage of the site. From there a stormwater pipe will convey
discharge into the existing stormwater manhole to the north of the site on the
David Low Way as noted on drawing M3087-SWMP-01B. The location and
alignment of this stormwater infrastructure will be detailed at the operational
works stage of design. As this system is under Council control it is proposed that
this is a lawful point of discharge.

Page 107

2.3

2.4

2.5

Flows from Driveways

The runoff from the driveway will be directed onto adjacent unpaved areas where
practicable to allow for infiltration. The use of a grated drain constructed at the
bottom of the ramp will catch runoff from the ramp before it flows into the
basement. Water collected in the basement will be pumped to a pit at ground
level with a system of Atlantis cells allowing the injection of the water back into
the water table. It will be designed to allow 90% of the water to soak away into
the sand, and only in times of heavy rain would the water bypass this and be
connected to the councils storm water system. Further details of this system will
be provided at the operational works phase of design.

Stormwater Qualit

It is proposed that low flows collected from the driveway will be dissipated over
unpaved areas for infiltration as much as practicable. Where runoff enters the
proposed grated drain, it will be treated by a gross pollutant trap prior to
discharge to the proposed stormwater pit at the frontage of the site.

The quality of the runoff from the development would meet the requirements of
Environmental Protection (Water) Policy ANZECC standards and Council's Code
for Waterways and Wetlands.

Stormwater Detention

In order to ensure that the site can be developed with no net increase in runoff,
an XP-STORM model was created to determine pre and post development flows.
Average recurrence intervals of 1 in 10, 20 and 100 year storm events were
analysed. It was decided that a stormwater detention tank to be located in the
basement would be used to attenuate post development flows.

2.5.1 Methodology
The hydrology and hydraulics of the Q10, Q20, and Q100 scenarios was
analysed using the XP-STORM stormwater management model with storm
patterns derived from Australian Rainfall and Runoff publication and rainfall
intensities derived for the Peregian area. To accurately determine
maximum flows, storm durations of 10, 20, 25, 30 ,45, 60, 75, 90 and 180
minutes were investigated.

2.5.2 Selection of Modelling Parameters

Page 108

XP-STORM modelling parameters were assessed from layout drawings,
contours, QUDM (Queensland Urban Drainage Manual) and considering
the extent of proposed development within the catchment.

2.5.3 Impervious Areas
After inspecting the site, it was decided that an impervious area of 20%
would be used for the pre development case. In accordance with the post-
developed situation, 90% of impervious ground area was used in the post
development model.

2.5.4 Manning's ‘n’
Values for the dimensionless Manning’s ‘n’ coefficient for open channel and
piped flows were assigned according to Table 2.1 in accordance with
QUDM.

Table 2.1: Study Manning's ‘n’

 

 

 

 

Conduit Condition Manning’s ‘n’
Grassed, Landscaped 0.045
Swales
Reinforced Concrete 0.014

 

 

 

2.5.5 Energy Loss Coefficients
Entrance and exit loss coefficients were utilised according to Table 2.2 in
general accordance with QUDM.

Table 2.2: Pipe Energy Loss Coefficients

 

 

 

 

 

 

 

Energy Loss Loss Coefficient
Entry Loss 0.5
Exit Loss 0.2
2.5.6 Results

The following table shows maximum stormwater flows generated in the pre
development case.

Page 109

Table 2.3: Maximum Pre Development Stormwater Flows

 

 

 

 

 

ARI Storm Duration Maximum Flow (m*/s)
10 25 0.082

20 25 0.103

100 25 0.125

 

 

 

 

Appendix C contains XP-STORM output graphs for the pre developed case.

Table 2.4 contains maximum stormwater flows from the post development

site with the inclusion of a 45m’ detention tank.

Table 2.4: Maximum Post Development Stormwater Flows

 

 

 

 

 

ARI Storm Duration Maximum Flow (m7/s)
10 25 0.079

20 25 0.094

100 25 0.122

 

 

 

 

Appendix D contains XP-STORM output graphs for the post developed
case.

These results compare favourably to the pre development stormwater
runoff flows, and indicate that non-worsening of stormwater runoff can be
achieved by installing a 45m’ detention tank. This tank is to be located in
the south eastern comer of the basement with a base R.L. of 8.5m to
enable in to drain under gravity to the external stormwater network.

2.6 Elood Protection

The proposed access driveway to the basement will meet QUDM flood protection
requirements by rising above the Q100 level, before ramping down into the
basement.

2.7 Construction Phase
A Sediment and Erosion Management Plan (SEMP) will be included as part of a
future Operational Works Development Application. The SEMP would implement
measures in accordance with the Engineering Guidelines for Queensland
Construction Sites and Council’s guidelines to ensure that sediment would not
enter the waterways or cause nuisance to adjoining properties or the public.

Page 110

3.0 MAINTENANCE

3.1 Construction Phase
The SEMP will be implemented by the Project Managers and maintained until
completion of building works and the establishment of landscaping.

3.2 Operational Stage
The permanent stormwater treatment devices will be inspected and maintained

on a regular basis by the manager of the development on behalf of the Body
Corporate in accordance with the manufacturer's recommendations.

4.0 SUMMARY

The implementation of this Stormwater Management Plan will ensure that the
proposed development would not create a nuisance to other landowners, or
degradation of the environment due to its effects on the hydraulics and hydrology
of the site.

Page 111

APPENDIX A
DRAWING No M3087-SWMP-01B

Page 112

 

 

 

 

—_—_—
600 x 600
FOX BOPCT.

 

 

 

 

 

 

 

 

oa

 

 

   

 

 

600 x 600
FOX SGPCT.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STORMWATER TANK,
BASE RL. 8.50m

 

 

  

 
  
    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pe ee LL LL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LEVEL.

 

 

4d
CREST TO BE ABOVE Qt00

 

 

 

 

 

 

 

 

 

 

 

 

 

/

 

INVERT RL. 8.460

 

NEW STORMWATER
PIT, INVERT R.L. B.20m

ow —™

   

  

 
   
   
 
  

EXISTNG COUNCK
STORMWATER PIT

  
  

 

 

 

 

 

 

 

 

 

 

 

 

 

5 R Al NT_P!
a NOTE: LEVELS INDICATED ARE Nat eS
NEW STORMWATER —_—— sv PRELIMINARY ONLY.
PIT. wa SCALE 1.100 AT At
NOTES: TITLE: PROJECT: are: BAY 2007 | scar: AS SHOWN
1 se mary of te mae ct oy mt | I BARLOW GREGG MaRmaWA| STORMWATER MANAGEMENT | PROPOSED OFFICE ae | mF
aud te npr omnean ot Rocce > an 774 3 Ae DoD PLAN DEVELOPMENT at DAVID LOW [an« eR €
Infringement in ony wey aay res! in fegel ection GD ppd PAS OS WAY, PEREGIAN BEACH Sect. wee (3 30
flaersins take Se ore 0 92 bem, . 7 PROJECT-SUBSET-SHEET -REVISION
tases carer Sele lwhdemeete [U7 = RE Es [KEN DOWN ARCHITECTS for MORGAN & BREIERS 3087 >
No. ‘Amendment Date [By|No “Amendment Date [By eowepen at merenineuT | Ph: {071 S666 4511 __ Fox: (07) 6968 1633 - SWMP - 01B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 113

APPENDIX B
Proposed Basement Pump Detail

Page 114

U-bro- HOT OPPED GALVAMZED
a ~~ STEPTREADS BY HUMES

coer eS OR EQUAL,

no
xP Se Se

SK

SKS

Soe RSS
£4

POOL

    
   
  

   

         
     

\ \ CAST ROM COVER 600458
\ HEDUM QUTY.- VEHICULAR

    
 

 

 

   
 

| IsuemerseLe PUPS - DUTY
1 14S paMCATED IY SCHEDULE

———=!] - -— “Sn TOTAL te OF PUMPS TWO)

worl

 

 

 

 

 

 

 

 

 

 

   
  
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TS DETAIL IS. AN INDICATION
ONLY OF THE ARRANGEMENT
OF PIPES AMD FITTINGS,
BSTAILATIN THE CONTRACTOR
ALLA
PLAN VIEW SHALL ALLOW FOR ADOITIONAL
PRES AND FITTINGS TO ALLOW
THE SATISFACTORY BSTALLATION
1 LONG BADUS ELEC 600 x 650 OF ALL PUMPS AS INDICATED ON
CAST RON COVER & FRAME THE OOCUMENTS, INCLUOING, THE
SERVE AS SLEVE FOR PRESSURE
POLY PUMPOUT LINE. SLEVE MEDIUM DUTY - VEHICULAR FLOOR PLANS.

FLANGE. TO BE SEALED AT FLOOR LEVEL ‘me S/S BOLT -— PUMPS TO HAVE ALTERNATING
AND AT THE WALL OF THE PUMP ith ALL S/S wen 5/5 BOT OUTY AND BE WIRED 10 HAVE
CHAMBER TO. ENSURE WATER STRAP FXG Wee S/S BOL THE SECOND PUMP RUN
TIGHT JOINTS, SIULTANEOUSLY WITH PUMP Mo 1

miruir —— SHOULO THAT DEMAND BE REQ.

" TOR \
. FLANGE, A
\ . “i
SSS Ss EH Z) HOT OPPED GAL BRACKET
ieee 7 BOLTED TO SIDE OF HLA.
GRADE eam HIGH LEVEL REGULATOR
JL
eon lw Toray ENCLOSED IN PVE
‘ ‘7 ee l
ALL S/S WORM
DRIVE CLAMP L__ 300 900 Lt PRECAST sEvERHARO-
HEAVY DUTY
LAYRLAT
PUMPOUT UNE.
L PUMP No 2 CUT
wvert 10 = GALVANIZED MLO
eM STEEL CHAIN,
’ PUPP Wo 1 CUT I.
ALL S/S WORM
DRIVE CLAMP
TE: +-— PUMP CUT DUT.
PUPS MOKCATED < <
SEWAYS FOR ERR REE HDG, PED i
CLARITY REFER 10 MC HICK
Plan FoR ACTUAL

 

 

POSITION OF PUMPS.

SECTIONAL ELEVATION
SCALE N.T.S,

 

& Associates “ausca
HYDRAULIC CONSULTANTS
CABRINIPTY LTD ABN 53 494 887 081
BSA LICENCE NO. 887442
P.O. Box 646, COTTON TREE, Qid 4558
10/43 The Esplanade Maroochydore
Phone: 0/7 5443 1000
Fox: 07 5443 1136
Email: [email protected]

b Brian Bumett gy

 

 

 

 

 

 

 

Page 115

APPENDIX C
XP-STORM Pre Development Output

Page 116

Q10 Pre Development Max Flow

=_—) SS === omen) ae2e2
10 min [Max 0.041] 15 min [Max 0.059] 20 min [Max 0.059] 25 min [Max 0.082]
=

acme — —
30 min [Max 0.072] 45 min [Max 0.051] 60 min [Max 0.070} 90 min [Max 0.063]

0.08

0.07

0.05

Flow

0.03

0.02

0.01

 

0.00 od =
1 Sat 0:30 1:00 1:30 2:00
Jan 2000 Time

 

 

 

 

Page 117

Q20 Pre Development Max Flow

—_—_———_ scent] S225

==
10 min [Max 0.053] 15 min [Max 0.082] 20 min [Max 0.079] 25 min [Max 0.103]

EE _—_ =,
30 min [Max 0.093] 45 min [Max 0.067] 60 min [Max 0.093] 90 min [Max 0.079]

Flow
°
2
a

°
®

0.01

 

 

0.00

 

 

 

1 Sat 0:30 1:00 1:30 2:00
Jan 2000 Time

Page 118

Q100 Pre Development Max Flow

a eenses| = =_—_—— s22=>
10min [Max 0.085] 15min [Max 0.116] 20min [Max 0.115] 25min [Max 0.125]

(neal =—= =e,

ws 30min [Max 0.116] 45min [Max 0.103] 60min [Max 0.125]

0.12

0.11-
0.10
0.09
0.08
z 0.07
0.06
0.05
0.04
0.03
0.02

0.01

 

0.00—" sn
1 Sat
Jan 2000

 

 

Page 119

APPENDIX D
XP-STORM Post Development Output

Page 120

Q10 Post Development Max Flow

LJ =—_ sop] 2225
10 min [Max 0.042] 15 min [Max 0.065] 20 min [Max 0.064] 25 min [Max 0.078]
Cae =—=—_ ers =
30 min [Max 0.073] 45 min [Max 0.055] 60 min [Max 0.074] 90 min [Max 0.067]

 

0.03
0.02

0.01

Jan 2000 Tine

 

Page 121

Q20 Post Development Max Flow

sete] ee Es eee sa232353
10 min [Max 0.056] 15 min [Max 0.079] 20 min [Max 0.078] 25 min [Max 0.094]

(eae === —,

30 min [Max 0.087] 45 min [Max 0.070] 60 min [Max 0.088] 90 min [Max 0.078}
0.09
0.08
0.07
0.06
3 0.05

iL

0.04
0.03
0.02

0.01

0.00 —s =
1 Sat 0:30 1:00 1:30 2:00
Jan 2000 Time

 

 

 

Page 122

Q100 Post Development Max Flow

—I ———— =e) a4 44

_} en
10min [Max 0.083] 15min [Max 0.103] 20min [Max 0.103] 25min [Max 0.114]
=z

a | =

30min [Max 0.105] 45min [Max 0.094] 60min [Max 0.110]
0.11
0.10
0.09
0.08
0.07
3 0.06

wL

0.05
0.04
0.03
0.02

0.01

 

0.00

 

1 Sat 0:30 1:00 1:30 2:00
Jan 2000 Time

Page 123

ATTACHMENT F

LANDSCAPE PLAN
LandGraphics

 

Page 124

 

Lan¢scaping using a combination of shrubs and to

 

LEGEND

Proposed Office Development - Peregan Beach

 

 

soften and improve the visual amenity of the side and
rear Soundanes anc in integration with the locality.

TIMBER PALING FENCE TO BOUNDARY’ *

 

Hardscape

Ee] DRIVEWAY AND CARPARK
Es] BUILDING PAVEMENT

Softscape

EXISTING TREES
TO BE RETAINED

 

 

 

XISTING TREES
TO BE REMOVED (refer Survey)

 

Planting to incorporate a framework of
predominantly endemic species with the addition of
. | some other natives to contribute further textural TO

interest. The selected ’species are reliable and NT
appropriate for the locatiort, space and orientation of BASEME
the planting areas. *

STREET FRONTAGE TREES
SCREENING SHRUBS ‘ Nee bak isle Peas
* OF VARIED SPECIES AND HEIGHT.”
ALONG BOUNDARY
& (MIN. 1m AND MAX 8m HIGH)

LARGE SHADE TREES
‘Cotton Tree’

 

 

 

SMALL SHADE TREE
‘Coastal Banksia’

¥ : ee SCREENING SHRUBS
3 ¥ vax | SHRUBS AND GROUNDCOVERS
4 4 yack
¥ / " \ ' LAWN AREAS

{ | : t PROPOSED ARSORS
OVER TIMBER'SEATS

fofecsketoh shes LA 2) = v—
i | 5

Tatiey 4

 

 

 

 

 

PROPOSED
PLANTING UNDER
STAIRS

Tenan cy9

Tenancy 1. | Tenancy 2] Tenancy 3 Tenancy.5| Tenancy 6 Tenancy 7 \Tehancy 8
; ! if PROPOSED Bangaiow .”
Palms IN RAISED

PLANTERS : row.

\ IN VALLEY BETWEEN

t : A ! BUILDINGS
( x ; EXISTING: EXISTING ’

EXISTING Banksia intagrfolia r Araucaria spp
Melaleuca species TO BE RETAINED +| | TOBE RETAINED
TO BE RETAINED 4

   

8
ISSUED FOR DEVELOPMENT APPROVAL | cB
AMENOED N RESPONSE 70 8 ct
37 | AMENOED N ACCORDANCE WITH SURVEY wets

 

 

 

|
|

DRIVEWAY

 

 

Soe G 3 i ‘ 5 3 ne: 7 a
1 ead : i ; | LANDGRAPHICS
3—— 3 : 3

WwW 1 Hi s ss Te ANDSCAPE ARCHITECTS
ge 0 , t ; d a
TO BE RETAINED. : : : i —

    

 

 

| Proposed oF tow wey

ice Peregian Beach

| Development

| MORGAN & BEIERS

 

 

LANDSCAPE DESIGN APPROACH

Ses Se eae ‘ : PLANTS hava bpen saloctec to achotve combination plantings anprognats to
nt se tho Porogian locality Nominated plants that are both lcaly artabie and iz ee
sj tolerart o¢ cal ¢rvironmantal ‘actors wil enhance he uncon anc .
ianly >! te Lhvelopmert. The plrtng aye bfagaian fis peje wey | KEN DOWN ARCHITECTS
tho Davis Low Vay sreotscape and wice grasses staat are ofthe
particular ‘rontage. Tall trees croat visual Dreaks mn the bull avation
Softening tho overall facade. Plant selection is ganaraly in accordance wit)
The Noosa Plan Landscaping Code and Noosa Planning Schare Potry
Landscaping Plants & Guitlnas

SPEED BUMP.

 

 

 

 

- rraweng Te
LANDSCAPE CONCEPT
- Overall Layout

 

 

PHOTO 4

 

SCREENING to side boundaries consists of dense shrub plantings. Many |

large trees wil bp incorporated around the budding to soften the buat torr arc

omphasise the architectural design and streetscape regration Parting | “
|

PHOTO 3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

‘bination are aimed at producing a untied lancscaping thame wrest — =
Landscaping contributes to the ate mabe cto taal bai a ob a ue
existing streetscape continuity using ~" —— a
LANDSCAPE CONCEPT FOR DEVELOPMENT APPROVAL the locally identifiable species lappy rl Ltpreae li cae | waar
1 . & Guicolines “oe recognised and preferred specios ‘or amanily plantings sea 1200 @ Aa
Proposed Office Development - Peregian Beach Sir vase Romesmenroceramreyeeme | PS
eric epee assert a

 

 

 

 

EEE re

Page 125

PROPOSED PLANT SPECIES FOR INCLUSION

Trees & Palms

Botanical Name Common Name

Gmecce ecu cam SPECIES FOR INCLUSION
Banksia integriofa Coastal Banksia | N ST R E ET F RO NTAG E

Hibiscus tiliaceus Cotton Wood

Pongamia pinnata Indian Beech LANDSCAPING

 

 

INDICATIVE PHOT!

Tecomanthe hillli over arbor
Gympie Terrace, Noosaville

 

 

Shrubs & Accents

    
       
  

   

 

 

Botanical Name Common Name

Banksa ‘Coastal Cushion’

Crinum pedunculatum ‘Swamp Lily

Dianella brevipeduncedeta Flax Liy Hibiscus tillaceus ok
Isolepsis nodosa Knobbly Club Rush ‘Cotton Tree’

Leptospermum flavascens ‘Cardwell’ = mf
Saipan wae Magenta Chery Callitris columellaris ones i

Syzygium ‘Elite’ Elite ‘Noosa-Cooloola Callitris’ Coas' ushion

Westringea fruitocosa Coastal Rosemary hibberia scandens

Ni Dianella species Snake Vine
" ‘Flax Lily’
. Banksia integrifolia

Groundcover/Climber ree rlgeeoes

Botanical Name Common Name

Hibbertia scandens Snake Vine Laide pot star ban lies acl ells ltd Myoporum ellipticum

Aubrpnepttietel eerste wep eee PROPOSED ARBOR

Myoporum ellipticum Coastal Myoporum PLANTS L'STED MAY UE IMCORPORATED ADDITIONAL SPECES:

Tecomanih hit "Roaring Meg PLuAT SOM OUE WLC PREPARED TOT RAL ORHAT ONAL OVER TIMBER SEAT

Cantileverd timber arbor provides structure for climber over seating

 

 

WORKS DRAWINGS

 

INDICATIVE PHOTO
Timber ‘box’ seat under ‘Cotton Tree’
Peregian Shopping Centre

 

 

AMENDMENTS

os [oer]

 

 

 

 

raya
8 | oooeo7
¢ | 06-007 | ISSUED FOR DEVELOPMENT APPROVAL | all
© | 4.07.7 | AMENOED & RESPONSE TO f cs
| 0507.07 | AMENDED 'N ACCORDANCE WITH SURVEY] Ma

   

 

 

 

 

 

 

 

¢ a a
LANDGRAPHICS

     

 

ee ee

 

 

 

  
 
 

aa Proposed ,7"
PHOTO 1 Offlea Becta

Panorama of existing site frontage from David Low Way

Development |
MORGAN & BEIERS ~

PHOTO 4 cn cows aoa

EN DOWN ARCHITECT!
Existing Melaleuca spp. street ree to be removed be RCHITECTS

 

THE SITE (S DENSELY VEGETATED
ALTHOUGH MOST NATIVE TREES HAVE
REACHED THEIR LIFE SPAN AND HAVE
BEGUN TO DECAY AND UNDERGROWTH

|S GENERALLY UNDERSIREABLE

WEED SPECIES. THESE INCLUDE

Camphor Laural, Balsam, Mother in Laws Tounge
AND Mothor of Millions. THE SITE WILL BE
CLEARED WITH WEED MATERIAL CAREFULLY
DISPOSED OF.

LANDSCAPE CONCEPT
- Elevation, Photos...

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

aaa) a
View of current site frontage =
PHOTO:2 [a |e
View from neighbouring mone ae ten me
site LGKH 1180] Lco2 02 OF 02 E

 

 

 

Page 126

joelolg

  
 
     
    
 
  
    
 
  
 
  
  
 
 
 
 
 
  
  
 
 
 
 
  
 
 
 
 
 
 
  
  
 
  
   
  
  
 
  
 

Hundred Metres
Ten Metres
Five Metres
Metres

OS Matres
0-25 Metres
Storm Woter
Sewer

Gas

Telecom
Electricity
Under Ground
Water

Elec Box Electric Power Box
© PP Power Pole

Oo ELP Electric Light Pole

© Lamp Lamp - Light on Pole
O FH Fire Hydrant

OG Gas Valve / Line

‘ Sewerage Manhole

95

SPIZ7431

  

DP86 8259

ASAUAS WYLIG GNY UWAOLNOSD
Gij Ald SUsdd 8 NVSYON =

eR ce ts es a else
@ Tap

VGAIM JO HSlWVd - GlE6d NO

9% LOI 8 Z2ceosdd NO @ BL SL1O1 30

ip
Ditele Pit Telstra Pit
WMT Water Meter
eawy Water Valve
MmcT Gully Trap

Tree

Tree Trunk Diameter
Tree Spread

Permenent Survey Mark

Temporary Bench Mark
SPIS7431 Traverse Statian
Peg - New

Peg - Original

fron Pin

Trafic Controle Light

PSM 138003 Other Features noted on Face of Plan
RL: 10-235 AHD

             
    
    

 

“ON

S;UaWpuEwYy
Sd}ON

3409

GHY l€5'42 “14 WSd
L£8%bb WSd ‘NINO 13A37
GHY ‘WhLVa 13A37

Screw In Conc
RL:10-666 AHD

S}Uaulpusuy

 
  

RP903222 3
c

 

MELALUCA
80-3

FiG TREE \
02
Ht BO

  

  
 
 
  
  
  
     

Re
Spd 15-0

 
  
    

  

 
 

MOOP PINE
BANKSIA ioe
on oe Spd 6-0
Ht 16-0 >
oO" Spa 4-0 oS
A + © a

     
 

8/ 2

MCH3786

Spd 12-0

  

‘ou jaeys

S}UD}jNSUOD pajoloossy

  
      
   
    
    
   
 

2 storey brick house
First floor tevel i290
Sacond tloor level {3-99

BANKSIA
206

Ht 6-0
Spd 9-0

a4 4Jeyndwog

       
      

pefaains
/poublsag

IS92345
POZIS

            
      
   

L002 / 20 /S0
ry

 

 

 

 

 

 

    

 

OM DTOVrPYG OMNDVDVEAE
8m 243355 FrayFoaop DISCLAIMER
£2 $229m Fe"S os _,2
ag oo 22=2.8a75Ean
a2 -ipia gr S* 235 8 The title boundaries as shown hereon were not marked at the time
op FSF ud wo ~Swe me of survey arti have been determined by plan dimensions only and
58 g@ ago & g-ess S not by field survey. Services shown hereon have been located
ro ? hos 3 pg °ao where possible by field survey, If not abie ta do so, located
wo? @ 36 2 “5 aam services have been plotted from the records of relevant
“xa b =8 om 3 24 oe authoritles where available, and have been noted accordingly on
=o 3° 2 $ 33 ® this plan Where such records either do not exist or are
o» w oa = - inod te, a notation has been made hereon,
o ww : inadequate,
. ° on a b
ce a
@ Dz 6 Prior to any demolition, excavation or construction on the site,
=< DD 8 the relevant authority shoutd be contacted for possible location
~ > a of further underground services and detailed locations of all
2 services.
>
z—
o
>_—_.
o =,
eo)
°
oA,
> G3 Hel
nm ° 5 10 20 30 Metres
2

Original Scale [:200

 

‘ON GulmDdig

3
3
2

 

Used in these records

About this file

File size
19.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_2689 - Response to request for further Information [As Published].pdf · 19.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.