Council archive · source document
06/2689 - Response to request for further Information [As Published] · 132006.2689
Very large file (19.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
9 July 2007 ken hicks AND ASSOCIATES Our Ref: 060642 Council Ref: 2006/2689 The Chief Executive Officer Noosa Shire Council PO Box 141 TEWANTIN QLD 4565 Attention: Nick Cooper Dear Nick RESPONSE TO REQUEST FOR FURTHER INFORMATION DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE (COMMERCIAL BUSINESS: TYPE 1 OFFICE) 247,249 & 253 DAVID LOW WAY, PEREGIAN BEACH LOTS 1 & 2 ON RP 903222 AND LOT 26 ON P9315 MORGAN & BEIERS PTY LTD COUNCIL FILE REFERENCE: 2006/2689 We refer to the above development application for material change of use and to Council correspondence dated 31 May 2007 requesting further information with respect of the application. In accordance with the Integrated Planning Act 1997 and on behalf of the applicant, Morgan and Beiers Pty Ltd, we hereby submit a response to the various issues raised by Council. Supporting documentation has been prepared by the applicant in order to address the issues contained within the information request and is attached to this response as described below. Attachment A — Proposal Plans prepared by Core Architects; Attachment B - Survey Plan prepared by Ken Hicks & Associates; Attachment C ~ Information Response & Traffic Impact Assessment prepared by Burchill VDM; Attachment D - Water & Services Report prepared by Barlow Gregg VDM; Attachment E - Stormwater Management Report prepared by Barlow Gregg VDM; ._Attachment F ~ Landscape Plan prepared by LandGraphics. Each Council request item is listed below together with the applicant's response to the particular item. LAND USE Item 1 a : Please amend plans or provide justifi ication with reference to > non-compliance with Scheme : requirements relating to: 1.1. Front Boundary Setbacks — please provide a greater setback from the front boundary, : : TOWN PLANNERS | CONSULTING SURVEYORS | URBAN DESIGNERS | PROJECT MANAGERS Ken Hicks & Associates Pty Ltd | [email protected] | A.C.N. 010278823 | A.B.N. 74308 405 611 Suite 7 Dalton Centre, |! Newspaper Place 4B/42 King Street 61-73 Sturt Street PO Box 6380, MAROOCHYDORE BC Qld 4558 PO Box 1712, CABOOLTURE, Qld 4510 PO Box 5027, TOWNSVILLE, Qld 4810 P 075443 2844 F 07 $443 7146 P 0754955318 =F 07 5495 5317 P 07 4721 3066 F 07 4721 3088
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 125 pages
Page 2
‘the proposed setback is considered inconsistent with existing front setbacks for the area. | Response Please refer to the amended proposal plans prepared by Ken Down Architects namely the Ground Floor Plan Drawing No. 2243 SDO3 Revision G which illustrates the proposed building setbacks from all property boundaries. It should be noted that the front boundary setback of the buildings, being the primary setback of concern to Council, has been increased by 1m to achieve a setback of 5.4m to the front building facade. The edge of proposed Building 2 is however within this 5.4m setback mainly due to the characteristics of the site and orientation of the individual buildings. In achieving this additional 1m setback from the frontage the landscaping provision on the rear property boundary has reduced. This has however promoted more significant opportunities for more substantial plantings along the David Low Way frontage. This design solution was discussed with Council’s Nick Cooper following the issue of the request for further information and was suggested as a satisfactory method of addressing Council’s concern. Item 2 Please provide further details of building materials / finishes proposed. Please note that the extensive use of glass finishing is considered to provide the buildings with a commercial appearance / nature. Where as the buildings should present a domestic form of architecture, rather than commercial. Response Please refer to the amended proposal plans prepared by Ken Down Architects namely the Elevations Drawing No. 2243 SDO5 Revision B & 2243 SD06 Revision B which illustrates the introduced architectural treatments to the building facades. The inclusion of painted FC cladding, custom orb sunhoods, aluminium louvers, custom orb roof sheets, selected weatherboards, and painted HWD timber posts significantly contributes to reducing the presence of a glass finish to the building facades. The individual buildings are considered to present a domestic form of architecture rather than commercial. The introduction of these architectural features were discussed with Council’s Nick Cooper following the issue of the request for further information and was suggested as a satisfactory method of addressing Council’s concern. LAND DEVELOPMENT Survey Item 3 It is noted that survey information has been supplied as part of the response to Council's initial Information Request, however the plan does not provide all_of the information that
Page 3
Council previously requested. 3.1. In this regard please arrange the licensed land surveyor to amend their plan by including the information that was previously requested but not provided. Specifically, the plan shall show all services (including their alignment, size, depth, invert level, etc), all vegetation, existing building structures (on the subject site and on the adjoining allotments), pathways, the edge of the frontage road (the David Low Way), topography of the site and surrounding land (with contours at 200mm intervals) and any other relevant information. 3.2. The amended plan should also show all existing vegetation within the road reserve and adjoining properties (including their girth, height and canopy cover). This information is required to assess whether their will be any impact to adjoining properties and vegetation particularly in light of the extensive earthworks proposed in order to construct the proposed basement carpark. All level information shall be to the Australian Height Datum (AHD).. Response Please refer to the revised survey plan prepared by Ken Hicks & Associates which has been amended to include the information requested by Council. Level Information “Item 4 ———_ It is noted that only some level information has been provided as part of the response to Council's initial Information Request. 4.1. In this regard it would be helpful to know the levels of the upper level carpark and driveway areas so that Council can establish the impacts to adjoining properties. Response Please refer to the amended proposal plans prepared by Ken Down Architects namely the Ground Floor Plan Drawing No. 2243 SDO3 Revision G which illustrates the proposed levels of the upper level car park and driveway areas. 4.2. It is also noted that the floor levels proposed for the building, as shown on the plans, are not consistent with the elevations where it appears that the floor to floor dimensions are proposed to be 2.8m, whereas the plan levels suggest a 2.7m floor to floor dimension. In this regard it is important to ensure that the plans and elevations accurately reflect what is being proposed and that the Council can establish the correct height of the proposed building in relation to the 8m-height limit. Response Please refer to the amended proposal plans prepared by Ken Down Architects namely the Elevations Drawing No. 2243 SD05 Revision B and 2243 SD06 Revision B which illustrates the floor to floor dimension being 2.8m. The proposed development is within the stipulated building height for the precinct of 8m.
Page 4
4,3. It is further noted that the driveway ramp grades need to be determined based on the inside radius of the ramp (i.e. where the ramp grades will be steeper) as opposed to the grade at the centre of the ramp. This is outlined in the Australian Standard for Off-Street Car Parking (AS2890.1) and will need to be addressed. _ Response Please refer to the traffic engineering response prepared by Burchill VDM which addresses this matter. The proposal plans prepared by Ken Down Architects namely the Basement/Site Plan Drawing No. 2243 SD02 Revision E has been revised in line with recommendations from the traffic engineering response. 4.4. Furthermore, the applicant will need to demonstrate in accordance with Specific Outcome 017 of Table 14-46 of the Driveways & Carparking Code that abasement level of RL7.1 (as presently proposed) can in fact drain by gravity means without the need for pumping. In this regard the applicant will need to arrange a surveyor to establish the invert levels of Council's existing drainage system and demonstrate how the basement will be drained to this drainage system. If this cannot be achieved the applicant will need to investigate the option of raising the basement level (to ensure the basement can drain by gravity means) and/or upgrading the existing Council drainage system such that it is at a level that can drain the basement carpark. These issues will need to be resolved prior to Council issuing a Development Permit for the proposed Material Change of Use as Council must be sure that the development is suitable and can actually work. Response Please refer to the Stormwater Management Report prepared by Barlow Gregg VDM which addresses this matter. Car Parking Item 5 Demonstrate that the proposed driveway and carparking area comply with all aspects of the Australian Standard (AS2890.1) for Parking Facilities, Part 9: Off Street Car Parking. 5.1. In this regard it is noted that the present proposal contains blind corners and blind aisles with no provision for vehicles to turn around. As such designated turning bays must be provided and it is recommended that they be at least 3m wide (to allow ease of access and departure) and at least 5.4m long. To this end: .One turning bay should be provided adjacent to the proposed stairs located at the south- eastern comer of the basement (space number 30), and .One turning bay should be provided on the eastern side of the basement immediately to _the north of the proposed tank (space number 22). Response Please refer to the traffic engineering response prepared by Burchill VDM which addresses this matter. The proposal plans prepared by Ken Down Architects namely the Basement/Site Plan Drawing No. 2243 SDO2 Revision E and Ground Floor Plan Drawing No. 2243 SD02 Revision
Page 5
G has been revised in line with recommendations from the traffic engineering response. "5.2. The proposed driveway ramp that provides access to the carpark needs to be amended as: . It appears that two laneways will need to be separated by a cental median, with each lane having a minimum width of 3.9m measured between kerbs. . The proposed ramp grades must be determined by the inside radius of the ramp (i.e. where the ramp grades will be steeper) not the middle of the ramp. .Headroom between the ramp and the entrance to the basement carpark must be designed such that vehicles will not hit the upper level as this will require changes to the upper level and/or the driveway grades. Response Please refer to the traffic engineering response prepared by Burchill VDM which addresses this matter. The proposal plans prepared by Ken Down Architects namely the Basement/Site Plan Drawing No. 2243 SD02 Revision E has been revised in line with recommendations from the traffic engineering response. 5.3. Amend the proposal plan such that clear access is available to all stairs cases. In this regard it is noted that clear access cannot be obtained to the proposed stair at the south- eastern comer of the upper level carpark. A clear passage of at least 1.5m in width should be available to the stairs, free of any carparking spaces or wheel-stops that would impede .pedestrian movements. Response Please refer to the amended proposal plans prepared by Ken Down Architects namely the Ground Floor Plan Drawing No. 2243 SDO2 Revision G which has been revised such that the proposed stair is clear of car parking and sufficient pedestrian movement is achieved. 5.4. Given the overall size of this development and the number of separate tenancies Proposed please provide at least 2-disabled car park spaces on site. Response Please refer to the amended proposal plans prepared by Ken Down Architects namely the Ground Aoor Plan Drawing No. 2243 SD02 Revision G which has been revised to include 2 disabled car parking spaces. Vehicle Access Item 6 The proposed separated entry and exit for the development, similar to that which exists for the existing house on site, is not suitable for a development of this scale and likely traffic generation and would result in countless conflicts between vehicles and pedestrians using the footpath especially given that the driveway has a width of approximately 25m which coincides with the pedestrian path. The angle of the entry and exit would also cause vehicles to enter and leave the site at faster speeds which is not conducive for pedestrian safety and nor are adequate sight lines available.
Page 6
In this regard a consolidated access needs to be provided with left-in/left-out access, and \ this driveway should not extend beyond the prolongation of the southern boundary of the | site (i.e. the driveway should be contained to the actual frontage of the development and _hot impede onto the frontage of adjoining properties). ___ 4 Response Please refer to the traffic engineering response prepared by Burchill VDM which addresses this matter. The proposal plans prepared by Ken Down Architects namely the Slip Way Design Plan Drawing No. 2243 SD12 Revision B has been revised in line with recommendations from the traffic engineering response. Item 7 Demonstrate that vehicles can safely enter, manoeuvre throughout the site, park on site, and leave the site without scraping and/or bottoming. This shall be undertaken for all types of vehicles expected to enter the site, with consideration given to the height of such vehicles and the headroom required under the building. This was previously requested by Council, but as the applicant has not provided any evidence to demonstrate that the proposal will work the information is still needed. Response Please refer to the traffic engineering response prepared by Burchill VDM which addresses this matter. Item 8 Iltustrate on the proposal plans that suitable sight distances can be achieved from the proposed access driveway to pedestrians on the pathway network and to vehicles on the David Low Way based on the 85-percentile design speed of the David Low Way, not the sign posted speed limit. In this regard a design speed of 70km/h would be more realistic and consideration should also be given to existing vegetation and/or proposed vegetation that may restrict these sight lines. Response Please refer to the traffic engineering response prepared by Burchill VDM which addresses this matter. End of Trip Facilities Item 9 Illustrate on the proposal plans all "end of trip facilities" such as bicycle storage lockers for staff, bicyde storage areas for customers, showers, change rooms, seating areas, drinking fountains, etc to cater for people who walk or cycle to the site. Response Please refer to the amended proposal plans prepared by Ken Down Architects namely the Ground Floor Plan Drawing No. 2243 SD02 Revision G which has been revised to include end of trip facilities within the unisex toilets in the individual buildings.
Page 7
Stormwater Drainage Item 10 Demonstrate that the site can be developed with no net increase in runoff from the site for storm events up to a 1 in 100 year Average Recurrence Interval. In this regard the stormwater drainage system designed for the site will need to incorporate an adequate detention system (holding tanks and rainwater tanks) to retain these flows, which can be utilised for irrigation, toilet flushing, hose down of paved surfaces, and ground water recharging. The present proposal and Stormwater Management Plan does not address this issue. In this regard additional flows into the existing drainage system in the David Low Way will not be supported. Response Please refer to the Stormwater Management Report prepared by Barlow Gregg VDM which addresses this matter. Item 11 Demonstrate that the site can be drained without the use of pumps in accordance with Specific Outcome 017 of Table 14-46 of the Driveways & Carparking Code. In this regard the basement proposal cannot be supported unless it can be drained by gravity means. The applicant is also advised that given stormwater from the carparking and driveway areas of will contain contaminants such as oil, grease, and fuel, all stormwater runoff will need to ! be collected and discharged through a suitable grease/oil arrestor and/or Gross Pollutant Traps to separate these contaminants and prevent them from entering Council's drainage system. Response Please refer to the Stormwater Management Report prepared by Barlow Gregg VDM which addresses this matter. Traffic Issues Item 12 The previously submitted traffic report shall be amended to reflect the new proposal plan (and any changes that may be generated as a result of this information request) and _tesubmitted for Council to review. Response Please refer to the amended traffic impact assessment prepared by Burchill VDM which reflects the proposal plans prepared by Ken Down Architects. Engineering Reports “Ttem 13 - Please arrange for all engineering design plans and engineering reports submitted with the application to be certified by an appropriately_qualified Registered Professional Engineer.
Page 8
- Queensland (RPEQ), as it is noted that none of the plans nor any of the engineering reports :
have been prepared, checked, and approved by an authorised person. In this regard none :
of the plans or the engineering reports will be assessed in detail until a RPEQ has authorised ;
them. Council therefore reserves the right to make a subsequent request for further
, information upon review and assessment of the authorised documentation with no ;
’ consequence to IDAS time lines set by the Integrated Planning Act.
4
; submitted may be forwarded to Council's own expert specialists and the cost of this |
The applicant and any consultants assisting in the preparation of this development proposal
are advised that an independent check of some or al! of the technical reports and plans ,
, independent review will be borne by the applicant.
Response
The Water & Sewerage Report and Stormwater Management Report prepared by Barlow
Gregg VDM are certified by an appropriately qualified Registered Professional Engineer
Queensland (RPEQ).
This response to Council's request for further information with respect to the proposed
Commercial Business: Type 1 Office at 247,249 & 253 David Low Way, Peregian Beach
and described as Lots 1 & 2 on RP 903222 and Lot 26 on P9315 for Morgan & Beiers Pty
Ltd provides Council with sufficient information in order to make a determination on the
application.
The design submitted with this response is considered to address all Council concerns
with respect to presenting as a domestic scale and appearance from the David Low
Way. The front boundary setbacks have been reduced to 5.4m in order to satisfy
Council. The proposed commercial development will have a positive outcome for this
precinct of Peregian Beach.
Submission of this response completes the Information and Referral Stage of the IDAS
process and accordingly we will proceed with the public notification of the application.
We trust that Council will duly consider this response and the grounds submitted in the
town planning report with respect to the proposal.
Should you have any queries with respect to the application please contact me on (07)
5443 2844.
Yours faithfully
KEN HICKS & ASSOCIATES
“ml Planner
Page 9
ATTACHMENT A PROPOSAL PLANS Ken Down Architects
Page 10
GADRAWINGS Unb, No2243 peregian cemmeraniC AD DOCUMENTSIOZ PLOTMAKER FILESI243 bok « 1223 PM - 8/07/2007
LEGEND
NUMBERS INDICATE THE
AMOUNT OF FLOORS TO
EACH STRUCTURE
O oad
i aooosadh NEW
/ COMMERICAL &
RESIDENTIAL
DEVELOPMENT
a8
Oss ge ORE
Rurous ST
PROPOSED FUTURE
™ Z i! USED a] =
RM, STE i ot r
=
af — tke a a a_
| PROPOSED
REV
1 SSUE FOR TOWN PLANO VG oar
4 ASSURE FORA ove on oao7
a GRINVEWAY ALTERED SUPMIAY SHOWN = BVG: 0507
c SLPWAY ALTERED AS PERRI evo Osa 7
cos
KEN DOWN
ARCHITECTS
‘ARCHIPELAGO’
‘+1 WALAN STREET MOOLOOLABA
POBOX 153 MOOLOOLABA 4557
PH 07 Saas 4511 FX 07 Saag 4969
Seite 7 “Tha Alte Professional Gentre’
400 SHUTE HARBOUR RD, AIRLIE BEACH
PH 07 4968 1433, FX. 07 4948 3633
ABN 61087 Bat 454
1 EMAIL [email protected]
wes www.kdacom.au
project
PROPOSED OFFICE DEVELOPMENT
for
MORGAN & BEIERS ATF
al
247 DAVID LOW WAY
PEREGIAN BEACH
drawing
LOCALITY PLAN
1:2000
dato MAR 07 drawn BVG scale @ AZ
dramngne 2243 S$D01 revision C
the exchaive
MEN GOWN ARCHITECTS PTY LTD
Reno! oop sancase
Conaraciors seu a very af omenrsoce: and lavels on
sta prot to commancay Repor! al aacepances
the Archie! Use fiuted eamenaone in preference
vealed
Page 11
REV
1
2
4
a
a
c
DRIVEWAY ALTERED, NOTES ADDED
DEVELOPMENT MOVED 900 TO WEST
DESCRIPTION ORA\
ISSUE TOLANSCAPE DESIGN eG
ISSUE FOA TOW: PLANING 3vG
LANOSCAPE ALTERED. avG
ISSUE FOR OA avG
avo
eve
ono
Une el Basomeni Carnark below
aA
+R.
4@ FSL. Frnsshed surtace leves
HARDSCAPE AREAS
AO ety es an en
aR Oa
Rar
payne
tS a
|
C—— Lanaiscaping to andscape |
QXSABLED RAMPS AL1
RAMP AN CURVED DRIVE ALTERED = BVG ore
LEGEND ADDED ANDLANOSCAPNG = BY. 9307 07|
‘SUPWAY TO TRAFFIC ENG DETAA, ava sonar
LEVELS SHOWN, LEGENO 00.07 07
(CD Provosed vogtnnon to landscape arcitets delats
oO Existing trees lo be retard
Existing tees 10 be removed
Landscaping te landscape archiects detall
Storm Water man hola
Enisting spot levels ip ground
DRIVEWAY AREA Mdm?
RAMP AREA 157m?
LSARPARKAREA 148m!
TOTAL
KEN DOWN
ARCHITECTS
"ARCHIPELAGO"
+1 WALAN STREET MGOLOOLABA
POBOX 159 MOOLOOLABA 4587
PH 07 5444 4511 FX 07 5444 4908
Suite? ‘The Alrhe Profassional Centre!
400 SHUTE HARBOUR RD, AIRLIE BEACH
PH 07 4948 1433 FX 07 4948 1833
ABN 81087 881 454
EMAIL, [email protected]
WEB [email protected]
PROPOSED OFFICE DEVELOPMENT
MORGAN & BEIERS ATF
247 DAVID LOW WAY
PEREGIAN BEACH
See SD13 for slipway--"~
desian and layout
GROUND FLOOR
1:200
date MARO7 = drawn BVG —seata @ A
F
¢
c
t
t
:
©
t
dramngno. 2243 SOD03 revision G
‘
‘
t
f
GROUND FLOOR
¢ } 1:200
GDRAWANGSUnb_Nol2243 penegian crmmercistCAD DOCUMEN TSW2 PLOTMAKER FHLESW2249 0k - 1144 AM- 6917/2007
Covynght of tres. cocumare remiang the excasene
‘propery of KE OOWN ARCHITECTS PTY LTD
ABN 61 007 BB 484
Contactors are to venty al cameron and level on
tite phox to commencing Rapor al awscrepances 10
the Architect Use fqurea emansions in preference
bw seatee,
Page 12
i
:
a
i
Grom angune M2248 pr
regian cammoruaRCAD DOCUMENTS\22 PLOTMAKER FILES;
10.200...
Tenber peiing tence ===
Ce Pe Fee LES TR
VEGETATION TO
BUILDING FACADE
TENANCY 1 4 TENANCY 2
BUILDING 1
RANA
BUILDING 2.
as
Qe fe
“"BANKSIA TO B.
BE RETAINED 2
[
Speed bump.
See S013 for slipway---"
design atid layout
1 GROUND FLOOR
4:200
BANKSIA TO “
BERETANED —f-”
Oo
Ti Tree to be ramoves
for councd site bnes;
‘
'
'
‘
REV DESCRIPTION DRAWN DATE
Py ISSUE TO LANSCAPE DESIGN eva mm03 07
P2 ISSUE FOR TOWN PLANNING ovo 9204 G7
a ALTERED ava 040407
a ISSUE FOR DA. BVO 04 04 07
° ORIVEWAY ALTERED, NOTES ADDED © BVG. 0507
¢ STMOVED 90 TO WEST BVO 330007
STAM PARKING REVISED
RAMP GRADE AND LAYOUT ALTERED.
DISABLED RAMPS ALTERED
D RAMP AND CURVED DRIVE ALTERED VG 92.97 007
€ LEGEND ADDED AND LANOSCAPING = BVG, 039707]
REVISEG
SUIPWAY TO TRAFFIC ENG DETAL, eva 0s 07 07
(ocKers
LEGEND.
Propased vagytaton to landscape archiects deta
Enosing trees tn ba retamned.
Exasang tes 1 be removed.
“<1 Landscaping to landacape architects detail
© Sewermanots
——
KEN DOWN
ARCHITECTS
"ARCHIPELAGO!
11 WALAN STREET MOQLOOLABA
POBOX 155 MOOLOOLABA 4557
PH 07 Saad 4514 FX 07 5444 4960
Sulte 7 ‘The Aira Professional Centra’
400 SHUTE HARBOUR RD, AIRLIE BEACH
PM 07 4948 1433 FX O7 446 1893
ABN 61087 8Bt 454
EMAM. [email protected]
WEB www.kda,com.au
project
PROPOSED OFFICE DEVELOPMENT
for
MORGAN & BEIERS ATF
a
247 DAVID LOW WAY
PEREGIAN BEACH
drewing
GROUND FLOOR
1:200
date MAR OT = drm BVG scale @A
dramng ro. 2243 SDO3 revision F
Copyright of tes gocumert remoins the wxcksive
property of KEN DOWN ARCHITECTS PTY LTD
ABN 61 O87 B21 454
Contractors are to venty a imerisions and levels on
sate prior to conynenang, Repon ai rscrepancias 1
(he Archie Use figured chmenesone i preference
[re
Page 13
G*DRAWAGSU0b NolZ743 perecian commer BACAD DOCUMENTSN PLOTMAKER FRESI2243 Ok. 12 23 PAt - 5/07/2007
TENANCY 40
TENANCY 11
BUILDING 1
TENANCY
TENANCY 16
BUILDING 2
FIRST FLOOR PLAN
eS 1:200
TENANCY 17
BUILDING 3
RL. 12.9
cee
Louvre SCREEN
REV DESCRIPTION DRAWN DATE
PI ISSUE TOLANSCAPE DESIGN eve 20007
72 ISSUE FOR TOWN PLANING. BvG 20407
a ISSUE FOR DA, VG 040007
KEN DOWN
ARCHITECTS
'ARCHIPELAGO™
11_WALAN STREET MOOLOOLABA
POBOX 159 = MOOLOOLABA 4557
PH O7 5444 4511 FX 07 $444 4969
Suite 7 ‘The Aiche Protessional Centre’
400 SHUTE HARBOUR RD. AIRLIE BEACH
PH 07 4948 1433 EX 07 4948 1633
ABN 61087 881 454
EMAIL [email protected]
WEB www. kda.com.au
project
PROPOSED OFFICE DEVELOPMENT
for
MORGAN & BEIERS ATF
a
247 DAVID LOW WAY
PEREGIAN BEACH
drawang
FIRST FLOOR
1:200
dato MAR O07 drawn BVG scate @ AZ
drawingno, 2243 SDO04 revision A.
CCeoynght of ss socument ream te exchsive
Property of KEN DOWN ARCHITECTS PTY LTD
AABN 61 087 881 454
Conwactors ore to varty al cimenauprs and levels on
sn prey 10 Commenang Repo ob oscrepances 19
tha Architect Use fgured dimensions mi preferenca
Page 14
REV DESCRIPTION DRAWN DATE
PL TSSUEFOR TOWN PLoS BG ato
2 LANOSCAPE ALTERED NG 04 06 oF
A ISSUE FORDA eve 0404 07
@ —RAMPDESIGNALTEREDASPERRFI = BVG = (OSD OT
8.0m Bulking Hecht Limt
J Selected matat sheeting ‘Type &
~ wih glazed bekistrade above,
‘Ausra, framed lazng —
1 "Aur. framed gtanng —
DRIVEWAY : BUILDING 1 PUBLIC COURT BUILDING 2 i PUBLIC COURT | BUILDING 3
‘
' poe +400.
'
CARPARK
: pO:
(NORTH-WEST ELEV. BUILDING 1 (.\NORTH-WEST ELEV. BUILDING 2 yy
‘ YL 1:200 YZ 4:20 KEN DOWN
¥ tal tye ARCHITECTS
Selocand meta shoetng Type
- "ARCHIPELAGO"
Yo wih gland bahisrade above 8.0m Bung Honght Lait 11 WALAN STREET MOOLOOLABA
Baking Height Umit eee ee eee ee eee ee eee eee ee te eee eeeee eens POBOX 189 MOOLOOLABA 4857
PH 07 5444 4511 FX 07 S4aa 4969
Seloctnd metal sheeting Typo B°
ber Post ___wah gazed ba
Sulte 7 "The Airia Professional Centre’
: 400 SHUTE HARBOUR RD, AIRLIE BEACH
eamee ene cone = Wage eee ee meen seen ees ae tee “= = meee, PH 07 4949 1433 FX 07 4048 1633
ABN 81087 881 454
EMAIL sdmin@kda,com.au
WEB wwwWeKOS.COm. au
PROPOSED OFFICE DEVELOPMENT
ao ree i pone for
MORGAN & BEIERS ATF
247 DAVID LOW WAY
PEREGIAN BEACH
(_\NORTH-WEST ELEV. BUILDING 3 (_\SOUTH-EAST ELEV. BUILDING 3 : erawing
ay 4:200 a, 1200 ELEVATIONS
1:200
: dss MAROT = dawn BVG stale @ A
drawingno. 2243 SDOS reveaon B
h Copyright of ths cocumenk romans Bw exchtive
‘ Bropery of KEN DOWN ARCHITECTS PTY LTO
4 ‘NBN 69 087 883 abs
i Contractors are 10 very a dimensions and invela on
. ‘uta prot @ cammenang Renan all dcrepaneies 10
: the Arcivect lise Agure dimensions in preference
soxcaiog
——————————
(GADRAVANGSUo0_NolZ749 peraean coreercdsCAD OOCUMENTSY
Page 15
Buiding Height Limit
SS
GADRAWINGS\inb_No12243 nesegion commerciaCAD DOCUMENTSIOZ PLOTMAKER FILESI2249 ®k » 12 24 PM» SAIZ/2007
PUBLIC COURT
BUILDING 3
T ELEVATION
COVER STAR
/\SOUTH-EAST ELEV. BUILDING 1
4:200
TENANCY 10
(CTI
TENANCY 1
TENANCY 2
SITE SECTION A-A
1:200
Pavilod FE
Vogtaton o budding facade
BUILDING 2
TENANCY 12
TENANCY 13
CL]
TENANCY 4
TENANCY 3
TENANCY 5
| PUBLIC COURT BUILDING 1
‘
COVER REFUSE AREA .
— SOUTH-EAST ELEV. BUILDING 2
DESCRIPTION
REV DRAWN DATE
21 ISSUE FOR TOWN PLANNING 8G ober
P2 LANDSCAPE ALTERED RVG oADLOT
A ISSUE FOR OA Bvo a okaT
| B RAMP DESIGNALTEREDASPERRFI BVO (050767
| DRIVEWAY
© _ 80m Busing Heit Lint
Select woatherboards: -— Painted HWD posts
suthoods | Glazed
= See
KEN DOWN
ARCHITECTS
4:200
TENANCY 15
CI]
TENANCY 6
TENANCY
"ARCHIPELAGO"
8 WALAN STREET MOOLOOLABA
POBOX 159 MOOLOOLABA 4557
PH 07 $444 4511 FX O7 Saad 4909
Suita 7 "The Aistio Professional Centra’
400 SHUTE HARBOUR RD, AIRLIE BEACH
PH 07 4948 1433 EX 07 4948 1633
ABN 61087 881 454
EMAIL [email protected]
WEB www.kda.comau
project
PROPOSED OFFICE DEVELOPMENT
for
MORGAN & SEIERS ATF
TENANCY 18 a
247 DAVID LOW WAY
PEREGIAN BEACH
drawing
ELEVATIONS
1:200
data MARO7 = grawn BVG scale @ AS
vingno 2243 SDOG revision B
| Copyrigns of tue Socmere remsina ta excuse
propery Of KEN DOWN ARCHITECTS PTY LTO
ABI 087 881-454.
Contractors are to venty all mensions ons levels on
the prior to commencing. Report all orcrepancies to
tha Architect Use figured cmensiona in preferenca
bo senect
Page 16
GADRAWVRIGS cb NolZ240 pereqian enmmerasaACAD OOCUMENTS£02 PLOTMAKER FILESW2243 bk - 1224 PM 8107/2007
SITE BOUNDARY
(ep \ BOUNDARY SETBACK SECTION
‘SITE BOUNDARY
(c\_ BOUNDARY SETBACK SECTION
‘S09
rT i REV DESCRIPTION DRAWN DATE
a ISSUE FOR OA, ave 808 07
8 SECTIONS REFERENCED Bva 60707
TENANCY
TENANCY 6 DAVIO LOW WAY
(EY STREET SETBACK SECTION
\003/ 1:100
KEN DOWN
ARCHITECTS
“ARCHIPELAGO
11 WALAN STREET MOOLOOLABA
8 PO BOx 159 MOOLOOLABA 4557
— ” PH O7 S44 4511 FX 07 5444 4969
rower rere Le INN UPR ren Barend eeege eee
PH 07 4948 1433, FX 07 4048 1633
First Floor
IR | peepoprssrseses eee ABN 61087 681 454
EMAIL, [email protected]
iL WEB www.kda.com.au
q Pee
1 PROPOSED OFFICE DEVELOPMENT
were ALE TENANCY 7 tor
a) . eee ah RE IOB MORGAN & BEIERS ATF
a
247 DAVID LOW WAY
3 PEREGIAN BEACH
el
Basaran Conk over s q |
“ drawing
SECTIONS
1:200
dala MAROT = drawn BVG scale @ AS
drawingro. 2243 SD07 revision B
(D\, BOUNDARY SETBACK SECTION
\S03/ 1:100
of ts document temaine fw exchiatve
property of KEN DOWN ARCHITECTS PTY LTD
ABN 61 007 881 454
Contractors ace to vertty ah cimanaions anc lavels an
To.commencng Renan it descreDencans 10
Use Ogres
(F\_ BUILDING SEPARATION SECTION
‘gD07/ 4:100
Page 17
G\ORAWINGSUab_No12243 paroglan commarciaiCAD DOCUMENTS\02 PLOTHAKER FILESW743 bk - 12-24 PM - 5907/2007
‘REV DESCRIPTION ——CDRAWN DATE |
ove
1 RSSUE FOR TOWN PLANNING. one a7
A ISSUE FORA evo 080607
3 AREAS REVISED RE RFICHANGES = BVG Sor a7
GROSS FLOOR AREA
CAR PARKING
BASEMENT FLOOR LEVEL a8 CARS
GROUND FLOOR LEVEL 1OOARS,
HORS
GFA,
Ta
F, CAS CALIATED AT 120
ALOYONG 11000 POSSIBLE
i GROUND FLOOR GFA
YT 1: 200
KEN DOWN
ARCHITECTS
"ARCHIPELAGO
11 WALAN STREET MOOL
OOLABA
POBOX 159 MOOLOOLABA 4557
PH 07 S444 4511 FX 07 S444 A969
Suite 7 The Airfie Protessionel Centro’
400 SHUTE HARBOUR RO, AIRLIE BEACH
PH 07 4948 1433 Fx 07 4948 1633
ABN 61087 B81 454
EMAR [email protected]
WEB wwwikda.com.au
projact
PROPOSED OFFICE DEVELOPMENT
for
MORGAN & BEIERS ATF
at
247 DAVID LOW WAY
PEREGIAN BEACH
> FIRST FLOOR GFA
XS
1: 200
drawing
" GFA CALCULATIONS
1:200
date MAR 07° dawn BVG scale @A3
drwngno 2243 SDO8 revision B
Coprigh ata acairert omar be crane
. SeprtyantN Gown AnGrreeTS OTVLTO
Soho" or eb
' Cac rt very vine sao
Sapna werner Repo en escepancas
Becca Un tyres oncroote i pemreren
Sate
Page 18
ei OVERALL SITE AREA. 2021m* COVERED SITE AREA: 773m SITE AREA- y207 em —-— LANDSCAPING SITE AREA QD LANDSCAPE AREA. =a) LANDSCAPING GAORAWINGSUDb _NotZ243 perogean commerciahCAD DOCUMENTS? PLOTMAKER FILES2243 ik - 1224 PM- 50772007 vu Spee ee LANDSCAPE AREA REV DESCRIPTION Pr ISSUE FOR TOWN PLANNIONG. a ISSUE FOR DA. B DRIVEWAY ALTERED © LANDSCAPE AREA ALTERED RE REICHANGES ARCHITECTS "ARCHIPELAGO" 1 WALAN STREET PO BOX 189 = MOOLOOLABA PH 07 Sada 4514 Sulte 7 ‘The Airlia Professional Centre’ 400 SHUTE HARBOUR RD, AIRLIE BEACH FX O7 abaa 1633 PH 07 4948 1433 ABN EMAIL [email protected] www.kdo com. ou Wea project PROPOSED OFFICE DEVELOPMENT for MORGAN & BEIERS ATF ’ 287 DAVID LOW WAY ' PEREGIAN BEACH drawing SITE/LANDSCAPE AREAS date MAR 07" drawn BVG drawingno 2243 SDO9 Copyright cf thin document remains the axchusive propery of KEN DOWN ARCHITECTS PTY LTD. ‘ABN 61 O87 BBS 44 Contractors are 10 varty a denenisone an iavehs on. tra porto conrearan Rayo at oneneront 0 TS Bie Areca: ve Byres Gtnereors preter oveoed FX 07 5444 4969
Page 19
REV DESCRIPTION DRAWN DATE,
Pi ISSUE TO LANSCAPE DESGN BvG aco
2 ISSIRE FOR TOWN PLANING, avs ozosa7
2 LANOSCAPE ALTERED VG 040407
A ISSUE FOR DA. evs 940807
8 SUPWAY TO TRAFFIGENGDETANS «= BVG osarar
2
ce
he
PO
11.000
: 2000
PR PTR
BONG PACADE Tenancy 2 renaner 3 kw
( Of -- fondo edo pee fe noo
DRIVEWAY : 4 i
cot BUILDING 1 BUILOING
RL. 10.8
RL414
@
Cor
CROSSOVER
a Oe Pl
“BANKSIA TO
BE RETAINED
KEN OOWN
ARCHITECTS
‘ARCHIPELAGO’
14 WALAN STREET MOOLOOLABA
POBOX 159 — MOQLOOLABA 4557
PH O7 5484 4511 FX O7 Sada 4969
Sulte 7 ‘The Airte Professional Centra’
400 SHUTE HARBOUR RD, AIRLIE BEACH
Speed bump. PH 07 4948 1433. FX 07 4946 1639
FOOTPATH A aa 61007 881 434
EMAIL [email protected]
wes www kde compu
BANKSIA TO a
BERETANED —f-
we 7) a o project
PROPOSED OFFICE DEVELOPMENT
PROPOSED SLIP WAY
AS PER TRAFFIC ENGINEERS DETAIL for
MORGAN & BEIERS ATF
at
247 DAVID LOW WAY
PEREGIAN BEACH
orang
SLIP WAY DESIGN
1:200
dts MARO7 = dawn BVG scalp @A3
drewingno. 2243 SD12 revision B
| Copyngha of thes eocort romans the exctustve
propany ol KEN DOWN ARCHITECTS PTY LTD.
‘ABN 61 O87 881 a8
(Contractors or to verity a denentions and teveta on,
[ste pr te Commencang, Report all oscrepancies 12
fre Archaic Une fgwred dimensons in proference:
meealee
GYDRAWINGSUoh_WoA2243 peregaan commeraatGAD DOCUMENTSi&2 PLOTMAKER FILESIZ243 bk - 12 24 PM - S07
Page 20
SORAWRNGSUGD_No2243 perepan nommercEkCAD DOCUMENTS\O2 PLOTMAKER FALES243 8 - 12 24 PM - 5407/2007 6 spre (-\GROUND FLOOR SERVICES PLAN ey, eer nar ke SCALE NTS DAVID LOW WAY at Wie REV DESCRIPTION ORAWN DATE a ISSUE FOR DA, Ov = (oso7or project PROPOS'! for LEGEND Esising oes lo be rete. Existing traes w be removed Landscaping Wo lanchcape arctnets deta Sewer man hole Storm Water men hole KEN DOWN ARCHITECTS ‘ARCHIPELAGO™ 41 WALAN STREET MOOLOOLABA POBOX 159 MOOLOOLABA 487 PM 07 Saaa 4511 FX 07 5444 4969 Sulle 7 “The Airfia Protessionsl Centre’ 400 SHUTE HARBOUR RD, AIRLIE BEACH PH 07 4948 1433 FX 07 4948 1699 ABN 61087 881 454 EMAIL, [email protected] wee wwwokde.com.au ED OFFICE DEVELOPMENT MORGAN & BEIERS ATF a 247 DAVID LOW WAY PEREGIAN BEACH drawing GROUND FLOOR SERVICES PLAN date MAR 07 drawn BYG scate NTS deamngno, 2243 SD1I3 revision A 7~ KN ‘Cepyngnt of tres docurant remain te axchaive propery of KEN DOWN ARCHITECTS PTY LTD ‘ABN 61 087 881 454 Conmactors are to verty al manson and faves she pnas te commencing Rapon al dcrepances 10 ‘he Archoner Usa hgutec aimenaions in praference to scales Proposed vepitation to landscape architects detats
Page 21
[G*DRAWINGS\ob_Not2743 perogian commarcinCAD DOCUMENTS\O2 PLOTMAKER FILESW243 nu 12-24 PM - BAIT(Z007
Puaiay
Devens
tiny
ors CARPARK SERVICES PLAN
NTS
REV DESCRIPTION DRAWN DATE
a ISSUE FOR DA evG 080707
LEGEND
Proposed vagitstion to landscape architects details
Easing trees to bo retained.
Ensbng tees to bo removed
aretscapng to landscape archives detal
@ severmantale
®
‘Storm Water man nole
KEN DOWN
ARCHITECTS
"ARCHIPELAGO"
11_WALAN STREET MOOLOOLABA
PO BOX 159 — MOOLOOLABA 4557
PH 07 54444511 PX 07 5444 4969
Sulte 7 ‘Tha Aira Profeastonal Contra’
400 SHUTE HARBOUR RD, AIRLIE BEACH
PH 07 4948 1493 FX 07 4948 1633
ABN 61087 881 454
EMAIL [email protected]
WEB wwwokda,com.au
project
PROPOSED OFFICE DEVELOPMENT
for
MORGAN & BEIERS ATF
at
247 DAVID LOW WAY
PEREGIAN BEACH
dravang
BASEMENT CARPARK SERVICES PLAN
date MAR OT dawn BVG scale NTS
dravangno. 2243 SD14 revsion A
of ths documacn emasne tre exchalve
propery of KEN DOWN ARCHITECTS PTY CTD
ABN 61007 881 454
‘Contractors wre fo varity al dinanslons and hevatt on
Page 22
ATTACHMENT B SURVEY PLAN Ken Hicks & Associates
Page 23
3 ~)
| 5 eae?
| i {
il |
aint
Fes og ,
13 e a3
hs
WHEE 4
Begisete sce
+8 33 8
spleehy okt
Hetita go:
ashe 1
Pint 2
Buh al
ites ig ges Q
: point ot:
2 i28is sf
canta) oth
ad aeilld ana! Ha
lt
|
|
oP
a
3] |
I
5 LEVEL OATUM: Ano Associated Consultant: tigned/ i
am MORGAN & BEIERS PTY LTO nee ee ~~ soe KAY | See,
cals! CONTOUR AND DETAIL SURVEY nen 2 oe .
OF LOTS 1 & 2 RPSO03222 & LOT 26 te,_4_Dote Amananen's _
see tevens OTP. MRAP! Drawing No. Amend.
ON P9315 - PARISH OF WEYBA
Dots
05” 07/ 2007
sdeat no, 1 ot I cheats
Computer Fite
Scole
£:200
Puilp Aket B.Tech. GOURP.
Gor ring LS Mrs
Grygs Honaen, G.APP.Sc (Survl
soo asf0ciaTes
Gavi Bexer LS. MLS,
ken hicks
AND ASSOCIATES
060602
Page 24
ATTACHMENT C INFORMATION RESPONSE & TRAFFIC IMPACT ASSESSMENT Burchill VOM
Page 25
PROPOSED COMMERCIAL BUSINESS PROJECT OFFICE 247 DAVID LOW WAY, PEREGIAN BEACH RESPONSE TO INFORMATION REQUEST FROM NOOSA COUNCIL July 2007 Job No: C3694 Report No: 4530-0 Prepared for: Morgan & Beier PTY LTD
Page 26
DOCUMENT CONTROL SHEET BURCHILL VDM PTY LIMITED Evandale Place Job No. C3694 142 Bundall Road SURFERS PARADISE QLD 4217 Report No. 4530-0 Telephone: +617 5574 0511 Original Date of Issue 5 July 2007 Fax: +61 7 5574 0011 Email: [email protected] Project Leader Dale Kleimeyer REPORT DETAILS Title: Proposed Commercial Business Project Office 247 David Low Way, Peregian Beach Response to Information Request from Noosa Council Author(s): Matt Murphy — Traffic Planner Client: Morgan & Beier Pty Ltd Client Contact: Client Reference: Erik Hipwood Synopsis: This report responds to part of the Information Request from Noosa Council, dated 31 May 2007, for the proposed Commercial Business Project Office, to be located at 247 David Low Way, Peregian Beach. REVISION/CHECKING HISTORY REVISION DATE CHECKED BY ISSUED BY DISTRIBUTION - NO. OF COPIES NUMBER Client Other BP 4530-0 5/07/07 OTK MJM 1 1 Report No. 4530-0 July 2006 vem BURCHILL VDM
Page 27
TABLE OF CONTENTS 1.0 — Introduction 1 i PP Dit == 01, <0 [06 | a6 ee EEE EEOC ETS TEESE OSESEO OSES SESESELOOSOOSSSSEOS 4 1.2 Information REQUESt .......... eee ccc ee cree rece ttneeeteeedeeretaeecneneecenieeeeneeeteasesieaseeeaees 1 2.0 Response to Information Request 2 2.1 Level Information ....... ee cece ceneeneeerncee neers en eases eneeeaeneeseeeeeeeeseeeeeeneeettees 2 2.2 Car Parking... cece ete ee ee nner e rn nee descr e rrr eter n Fenner ee 2 2.3 Vehicle ACCESS .....0. cs ecenereseeenrnneeeees 2.4 End of Trip Facilities... 2.5 Traffic ISSUCS ..0.... cc eccceceeeceeeseeceeeeeeneneeenenanesereeenaa diseeessnetererenes veceseeeneeess 7 3.0 Conclusions / Discussion 8 APPENDICES APPENDIX A — SITE LAYOUT APPENDIX B —- VEHICLE TURN PATHS APPENDIX C - SIGHT LINES APPENDIX D - INFORMATION REQUEST, NOOSA COUNCIL MeO vem BURCHILL VDM
Page 28
1.0 INTRODUCTION 1.1 BACKGROUND Burchill VDM Pty Ltd have been commissioned by Morgan and Beier Pty Ltd to provide a response to part of an Information Request (IR) from Noosa Council, dated 31 May 2007, for the proposed Commercial Business Project Office (the proposed development), to be located at 247 David Low Way, Peregian Beach (the subject site). 1.2 INFORMATION REQUEST Noosa Council have requested additional information in their IR in order to properly assess the Proposal. This report provides a response to the traffic related issues in the IR. The IR is shown in Appendix D. Points of the IR addressed in the this report are: Level Information Part 4.3 - Ramp Grades Car Parking Part 5.1 - Blind Aisles Part 5.2 — Ramp Widths Vehicle Access Part 6.0 - Access Part 7.0 — Manoeuvring Through the Site Part 8.0 — Sight Distance End of Trip Facilities Part 9.0 — End of Trip Facilities Traffic Issues Part 12.0 — Traffic Report juy2007 vem BURCHILL VDM
Page 29
2.0 RESPONSE TO INFORMATION REQUEST As discussed in Section 1.2, Noosa Council require further information in order to properly assess the Proposal. A response to the part of the IR, as described in Section 1.2, is provided in the following sections. 2.1 LEVEL INFORMATION 2.1.1 Response to Point 4.3 As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, the grade on curved ramps shall be measured at the inside edge of the curve, i.e. at the inside line marking. As per the standard, ramp grades on the inside edge of the curve will need to be no greater than 1 in 6, with Grade Transitions of 2.0m on length at the top and bottom of the ramp. Ramp grades on the inside edge of the curve will be the same as those shown on the middle of the ramp on Drawings 2243 SD02 and 2243 SD03 (Appendix A). These grades comply with the requirements of AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking. 2.2 CAR PARKING 2.2.1. Response to Point 5.1 As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section 2.4.2 (c), in car parks open to the public, the maximum length of a blind aisle shall be equal to the width of six 90 degree spaces plus 1m, unless provision is made for cars to turn around at the end and drive out forwards. The blind aisle in the basement parking area will be longer than six 90 degree spaces, therefore provision must me made for vehicles to turn around. Noosa Council have requested two spaces (space 30 and 22) be provided for this purpose at dimension 5.4m long by 3.0m wide in their IR, dated 31 May 2007. However, as the car park will only be used by employees and their clients and will not be open to the general public, one space is considered adequate for turning manoeuvres at the end of the blind aisle. Traffic generation for the site will also be low, so vehicles needing to turn around will be infrequent and it is not expected there will be conflicts with these vehicles. As part of the Proposal, space 30 will be provided as a turn around bay at the end of the blind aisle 5.4m long by 3.0m wide (as requested by Council) as shown on Drawing 2243 SD02, Appendix A. Turning paths showing this space is sufficient for a vehicles to turn around using space 30 is shown on Drawing C3694-002, or vem BURCHILL VDM
Page 30
Appendix 8. A drawing with turning paths will be provided showing a vehicle able to turn around using space 30. At the end of the blind aisle, the aisle is only extended 0.7m as opposed to the required 1.0m as per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking. However 0.7m is considered sufficient as the aisle is relatively wide at 6.9m allowing sufficient space for a vehicle to reverse out of the space, clear of the vehicle parked to its right, before needing to turn. This is shown to work with turning paths shown in Drawing C3694-004, Appendix B. 2.2.2 Response to Point 5.2 As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking the minimum ramp widths on the straights should be 5.5m. On the curves lane widths should be 3.9m with a central median of 0.6m giving a total width of 8.4m. Ramp widths on the straight at the top of the ramp will be approximately 5.6-5.9m, which complies with the standards. However, due to the physical restraints of the site, the widths on the curve of the ramp will be approximately 6.5-7.3m without a central median. However, as shown on Drawing C3694-004, Appendix B, there is sufficient space for a B85 and B99 vehicle to pass without conflicts on the ramp, as per AS 2890. 1:2004 Parking facilities, Part 1: Off-street car parking, Section 2.5.2(c). As shown in Drawing C3694-004, there will be conflicts on the straights where vehicles need to use the full width to negotiate the ramp, however this is considered adequate, as there is full vision for oncoming vehicles. Although the site does not qualify as a domestic property, the basement will only be used by employees and their clients and will not be open to the general public. Therefore traffic entering and exiting will be low and conflicts on the ramp would be rare. We could expect 18 trips to and from the basement in the peak hours. Assuming a 60/40 % split for in and out would mean 12 vehicles entering (1 every 5 minutes) and 6 vehicles exiting (1 every 10 minutes) or vice versa. Therefore there would be a low chance of opposing vehicles being on the ramp at the same time. Measures will also be undertaken to ensure the chance of conflict to opposing vehicles it kept to a minimum. These are: - Mirrors will be provided on walls at the ramp curve to allow vehicles to see if there is another coming vehicle. - Signage will be provided saying "Watch for Oncoming Vehicles” and "Keep Left". - Centre line marking will also be provided on the ramp to keep traffic as far to the left as possible. Ramp grades discussed in Section 4.1.1. Repo No. 4530-0 VPM. BURCHILL VDM
Page 31
As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section 5.3.1 the minimum height from the floor to any overhead obstruction (fire sprinkler, lighting, sign etc), allow for cars and light vans, should be 2.2m (2.3m if parking wil! be provided for people with disabilities, however as our disabled spaces will be on the ground level parking, 2.2m is considered sufficient for the basement). Headroom between the ramp and the entrance to the basement shall also be 2.2m however will be measured perpendicular to a chord of length equal to the wheelbase of the B99 vehicle located longitudinally such that the height is a minimum of 2.2m, as per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking Figure 5.3. The clearance from the floor to the ceiling in the basement will be 2.5m. This will allow for the installation of sprinklers, signs and lighting without reducing clearance to below the minimum 2.2m. The ramp terminates before entry to the basement and vehicles will enter on level ground. Therefore clearance at entry to the basement is considered adequate. Low Clearance signs (R6-16) to the basement will be provided as per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section 4.3.4(a). Flexible striker bars will also be provided in conjunction with these signs where the clearance will be less than 2.3m due to sprinklers, lighting or signs. 2.3 VEHICLE ACCESS 2.3.1. Response to Point 6 Single access with revised traffic volumes has been analysed. As per Section 3.2.1 of AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking the access classifies as a Class 2 Access Facility. This requires a 6m (minimum) wide combined non-separated driveway access. Access will be made via a 6.0m two way driveway on the southern end of the site and therefore complies with the standards. The location of the access is shown on plans in Appendix A. As Council propose to construct an unbroken raised median past the site between Woodland Drive and Herron Drive, future access to the site will be restricted to left in and teft out only. As there is no shoulder on David Low Way and therefore no provision for passing a turning vehicle, the warrants for turning lanes at the access, as per DMR’s Road Planning and Design Manual, Chapter 13 — Intersections at Grade (RPDM), Figure 13.23 was assessed. This shows an AUL(S) (short left turn treatment) is warranted on David Low Way into the access. eo vem BURCHILL VDM
Page 32
To accommodate this warrant, a AUL(S) will be provided on the existing gravel area to the south of the proposed access which is currently used by vehicles to pull of David Low Way. The AUL(S) will be provided by essentially paving this area being minor road widening entirely within the David Low Way road reserve. No kerb and gutter will be provided at the lane to ensure access to the domestic driveways is maintained. The lane will be accommodated within the existing gravel area and will be constructed as per DMR’s RPDM, Figure 13.73, being 25m long and 3.0m wide, including a taper of 15m. This lane will serve two purposes. The first will be to provide the warranted access to the site, and the second will be to improve safety for vehicles that currently use this area to pull off David Low Way to access domestic properties. A right turn treatment will not be provided as access will be restricted to left in and out only by way of the raised median shortly after opening. The access was also modelled using SIDRA 3.1 to determine capacity, delays and queuing. The scenarios modelled were 2008 all movements (no median in David Low Way), and 2018 left in and out only (with median in David Low Way). This shows all movements to be well below the acceptable limits with the intersection operating adequately. Minor queuing will be felt for southbound vehicles on David Low Way due to the lack of a turning !ane or shoulder for passing. However, this is only minor and is expected to be temporary until the median is constructed in David Low Way restricting the access to left in and out only. Modelling results are shown in the Traffic Impact Assessment for the Proposal. Eventually some vehicles will need to conduct U turns at the Woodland Drive and Herron Street roundabouts due to the site being restricted to left in and left out. The volume of vehicles performing these manoeuvres is low (between 3 and 8 in the peak hours) and the affect on these roundabouts is expected to be unnoticed. 2.3.2 Response to Point 7 Drawings C3694-002, C3694-003 and C3694-004, Appendix B show all vehicles can enter the site and park and leave in a forward direction. Vehicles expected to enter the site will be cars and light vans including service and delivery vehicles. Garbage trucks will service the site from David Low Way within the left turn lane so as to not obstruct through vehicles on David Low Way. As the ramp grades comply with AS 2890.1:2004 Parking facilities, Part 1: Off- street car parking vehicles are not expected to bottom or scrap on the ramp to the basement. There are no other sections throughout the site where vehicles could be expected to bottom or scrap. Vehicles expected to enter the basement will be cars and light vans. As discussed under Part 5.2, the minimum height from the floor to any overhead obstruction (fire Report No. 4530-0 vem BURCHILL VDM
Page 33
sprinkler, lighting, signs) should be 2.2m, which will allow for cars and light vans. This will be met by the Proposal 2.3.3 Response to Point 8 Sight distance to the pedestrian path fronting the site is suitable and free of obstructions in accordance with AS 2890.1:2004 Parking facilities, Part 1: Off- street car parking Section 3.2, Table 3.3, as shown in Drawing C3694-01 (Appendix C). Sight distance to vehicles in David Low Way from the access, in accordance with AS 2890. 1:2004 Parking facilities, Part 1: Off-street car parking Section 3.2, Figure 3.2 for a 70kmV/h speed limit, as requested in Councils RFI, is 97m and should be free of obstructions. Some vegetation existing within the sight line to the north of the access, as shown in Drawing C3694-01. This will be removed as part of the Proposal and will provided sight distance to the north of 200m, and south of 105m along David Low Way form the access. 2.4 END OF TRIP FACILITIES 2.4.1. Response to Point 9 End of Trips facilities for pedestrians and cyclists will be provided in accordance with the Noosa Plan 2006 — Part 14 Assessment Criteria for Development for a Stated Purpose or of a Stated Type — Driveways and Carparking Code, 015 and 815-1 to S15-5. As per the Noosa Plan 2006, 1 bicycle space per 50m? GFA be provided which equates to 24 bicycle spaces for the Proposal. Also as per the Noosa Plan 2006, 12 lockers (1 per 2 spaces), and 3 showers (1 per 10 spaces) be provided. Bicycle racks/spaces will be Class 3 as per AS/NZS 2890.3 Bicycle Parking Facilities. Class 3 spaces involve racks that support the whole bicycles that both wheels can be locked to in an area that is well lit and in a highly visible public area. As part of the Proposal, 24 spaces will be provided at the front of the site. 12 lockers (4 in each powder room) and 3 showers (1 in each powder room) will also be provided. Powder rooms will be unisex. This meets the requirements of the standards. Report No. 4530-0 vPpM. BURCHILL VDM
Page 34
2.5 TRAFFIC ISSUES 2.5.1. Response to Point 12 Traffic Impact Assessment will be updated to reflect the changes to the Proposal and to include the information requested by the RFI. Report No, 45909 vem BURCHILL VDM
Page 35
3.0 CONCLUSIONS / DISCUSSION This report addresses part of the Information Request from Noosa Council, dated 31 May 2007, for the proposed Commercial Business Project Office, at 247 David Low Way, Peregian Beach. As per point 5.1 of the Information Request, Council requested 2 spaces be allocated as turning bays within the basement. The Proposal will only provide one space, however, as explained in the report this is considered adequate. Widths at the curve of the ramp as required by Council are unable to be achieved due to the physical constraints of the site. However, the widths provided are expected to be adequate as shown in this report. Therefore, the Proposal is considered to adequately address the issues raised by Noosa Council as per Section 1.2 of this report. Matt Murphy Traffic Planner iay2007 vem BURCHILL VDM
Page 36
APPENDIX A SITE LAYOUT
Page 37
wa c \
\ }
‘D von foas fez ~*
IVR. Baa nee oli oe
oars
40014 ONNOND
as
Hovaa NYIOaNad
AM MOT OIAVG L9Z
div SU3138 ¥ NYONOW
AN3WdO TSAR 391440 G3SOdONd
oz t
40014 GNNOYS
rine
bonne
O
Page 38
APPENDIX B VEHICLE TURN PATHS
Page 39
CHUN ALA nOA TONNE AWOS O1 LON unowe SE WASBRK 7510) rvs es 4100 920920) wD mY 1490 9290 (0) ed ZAZ¥ PID ‘ompames mImyNG “PAR! HMPLNE ZH ARAN SHAANNONA OMLINSHOD HNL OTMLS Y WAC OSB.UWN Ald ‘S89 OF1 O10 NOV WA TuHOWng § iF + L3SHS as — ; — ONINYNL dW _3 | be | | | | HOvad NVIDSYAd AWM MO1 GIAWG Lez 401440 193f°Oud SSANISNE WIDYAWWOS gasodOud
Page 40
OSB.UWN Ald GAP 0 LO NOW WGA TuHOUng § @ LASHS ONINYNL dW HOWa NVIDSY3ad AWM MO7 OIAWG Lee 39144O LOAPOUd SSANISNG WISYAWWOS QaSOd0ud JIWOS OL LON
Page 41
NOT TO SCALE ‘i PROPOSED COMMERCIAL BUSINESS PROJECT OFFICE 247 DAVID LOW WAY PEREGIAN BEACH | | | | | | eo GENERATED. Nae MAY ONLY BE USED FORTH PURPOBE FOR WHICH THEY WERE INTE: rr RAMP TURNING SHEET 3 (8 Burcu, VDM AON 010 140.495 PTY LIMITED: (CIVIL. 8 STRUCTURAL CONSULTING ENGINEERS & PLANNERS 142 Bundall Road, Surfers Parada, Qid 4217 Prone (07) 86740611 Fax Ona (07) 8074 0011 an Fax Suucurm (07) 8874 0908 Emad rh@metedname — GRO! C3694.004 XK
Page 42
APPENDIX C SIGHT LINES
Page 43
ORUNT Ald REA TNS CANOMeY armen uve anew navn caNers30 ou my menage womy LAZ¥ PAD ‘emomums RIALING ;PHEY I SWANN 9 BHIBMIONT ONL INGO WNT CaLIWN Ald WGA THHOUNg § 0682 SV Yad SV LNSW3YINDOSAY JONVLSIG LHOIS TLL ONO 2) LMORHAdOO . | | | | | rriaven HOWV3d NVIDSYAd AYM MO1 OIAVO Lez —_ ah AVMHLVWd SH1L NO SNIVYLSSGAd OL JONVLSIC LHOIS IIWOS OL LON SNOILONYLSSO WOds 33y4 39 O1 VANV Aa AVM MO1 GIAVG NO SSTDIHSA OL JONVLSIG LHOIS
Page 44
APPENDIX D INFORMATION REQUEST NOOSA COUNCIL
Page 45
31/05 2007 16:19 FAX 61 7 54495354 Noosa Shire Council (4 0001/0006 lf ree honing or calling please ask for: Cooper, 07 5449 5108 email [email protected] Application Ref: 2006/2689 Your Ref: a x NOOSA 22 January 2007 Morgan & Beiers Pty Ltd CARE Ken Hicks & Associates Pty Ltd PO Box 6380 MAROOCHYDORE BC QLD 4558 Dear Sir or Madam, Re: Application for Commercial Business Type 1 - Office situated at 249 & 247 David Low Way Peregian Beach, described as Lot 1 & 2 on RP903222 | refer to the above application and advise that following preliminary examination of the plans, the following information is required to be submitted:- Land Use 1. Please amend plans or provide justification with reference to non-compliance with Scheme requirements relating to: 1.1. Front Boundary Setbacks — please provide a greater setback from the front boundary, the proposed setback is considered inconsistent with existing front setbacks for the area. 2. Please provide further details of building materials /finishes proposed. Please note that the extensive use of glass finishing is considered to provide the buildings with a commercial appearance / nature. Where as the buildings should present a domestic form of architecture, rather than commercial. Land Development Survey 3. It is noted that survey information has been supplied as part of the response to Council's initial Information Request, however the plan does not provide all of the information that Council previously requested. 3.1. In this regard please arrange the licensed land surveyor to amend their plan by including the information that was previously requested but not provided. Specifically, the pian shall show all services (including their alignment, size, depth, invert level, etc), all vegetation, existing building structures (on the subject site and on the adjoining allotments), pathways, the edge of the frontage road (the David Low Way), topography of the site and surrounding land (with contours at 200mm intervals) and any other relevant information. Award Winner - Australian Clean Beach Challenge 2004 Litter Prevention NOOSA COUNCIL ABN 97969216121 9 Pelican Street Tewantin PO Box 141 Tewantin Q 4565 Phone: 07 5449 5200 Fax: 07 5447 1062 Email: [email protected]
Page 46
31/05 2007 16:19 FAX 61 7 54495354 Noosa Shire Council 0002/0006 3.2. The amended plan should also show all existing vegetation within the road reserve and adjoining properties (including their girth, height and canopy cover). This information is required to assess whether their will be any impact to adjoining properties and vegetation particularly in light of the extensive earthworks proposed in order to construct the proposed basement carpark. All level information shall be to the Australian Height Datum (AHD). Level information 4. It is noted that only some level information has been provided as part of the response to Council's initial Information Request. 4.1. In this regard it would be helpful to know the levels of the upper level carpark and driveway areas so that Council can establish the impacts to adjoining properties. 4.2. Itis also noted that the floor levels proposed for the building, as shown on the plans, are not consistent with the elevations where it appears that:the floor to floor dimensions are proposed to be 2.8m, whereas the plan levels suggest a 2.7m floor to floor.dimension. In this regard it is important to ensure that the plans and elevations accurately reflect what is being proposed and that the Council can establish the correct height of the proposed building in relation to the 8m- -height limit. 4.3. It is further noted that the driveway ramp grades need to be determined based on the inside radius of the ramp (i.e. where the ramp grades will be steeper) as opposed to the grade at the centre of the ramp. This is outlined in the Australian Standard for Off-Street Car Parking (AS2890.1) and will need to be addressed. 4.4. Furthermore, the applicant will need to demonstrate in accordance with Specific Outcome O17 of Table 14-46 of the Driveways & Carparking Code, that a basement level of RL7. 1 (as presently proposed) can in fact drain by gravity means without the need for pumping. In this regard the applicant will need to arrange a surveyor to establish the invert levels of Council’s existing drainage system and demonstrate how the basement will be drained to this drainage system. If this cannot be achieved the applicant will need to investigate the option of raising the basement level (to ensure the basement can drain by gravity means) and/or upgrading the existing Council drainage system such that it is at a level that can drain the basement carpark. These issues will need to be resolved prior to Council issuing a Development Permit for the proposed Material Change of Use, as Council must be sure that the development is suitable and-can actually work. Car Parking , 5. _ Demonstrate that the proposed driveway and carparking area comply with all aspects of the Australian Standard 1 (AS2890. 1) for Parking Facilities, Part 1: Off ’ Street Car Parking. Award Winner - Australian Clean Beach Challenge. 2004 Litter Prevention
Page 47
31/05 2007 16:19 FAX 61 7 54495354 Noosa Shire Council (0003/0006 5.1. In this regard it is noted that the present proposal contains, blind comers and blind aisles with no provision for vehicles to turn around. As such, designated turning bays must be provided and it is recommended that they be at least 3m wide (to allow ease of-access and departure) and at least 5.4m long. To this end: Q One turing bay should be provided adjacent to the proposed stairs located at the south-eastern corner of the basement (space number 30), and a One turning bay should be provided on the eastern side of the basement, immediately to the north of the proposed tank (space number 22). 5.2. The proposed driveway ramp that provides access to the carpark needs to be amended as: a It appears that two laneways will need to be separated by a cental median, with each lane having a minimum width of 3.9m measured between kerbs. Q The proposed ramp grades must be determined by the inside radius of the ramp (i.e. where the ramp grades will be steeper) not the middle of. the ramp. Q Headroom between the ramp and the entrance to the basement carpark must be designed such that vehicles will not hit the upper level, as this will require changes to the upper level and/or the driveway grades. 5,3. Amend the proposal plan such that clear access is available to all stairs - Gases. In this regard it is noted that clear access cannot be obtained to the proposed stair at the south-eastern corner of the upper level carpark. A clear passage of at least 1.5m in width should be available to the stairs, free of any carparking spaces or wheel-stops that would impede pedestrian movements. 5.4. Given the overall size of this development and the number of separate tenancies proposed, please provide at least 2-disabled car park spaces on site. The abovementioned issues outline some of the problems that have been noted and in this regard the applicant will need to review AS2890.1 in detail to ensure the car park and driveway ramps are designed correctly. Vehicle Access 6. The proposed separated entry. and exit for the development, similar to that which exists for the existing house on site, is not suitable for a development of this scale and likely traffic generation and would result in countless conflicts between vehicles and pedestrians using the footpath especially given that the driveway has a width of approximately 25m, which coincides with the pedestrian path. The angle of the entry and exit would also cause vehicles to enter and leave the site at faster speeds, which is not conducive for pedestrian safety and nor are adequate sight lines available. Award Winner - Australian Clean Beach Challenge 2004 Litter Prevention :
Page 48
31/05 2007 16:19 FAX 61 7 54495354 Noosa Shire Council . 0004/0006 In this regard a consolidated access needs to be provided with left-in/left-out access, and this driveway should not extend beyond the prolongation of the southern boundary of the site (i.e. the driveway should be contained to the actual frontage of the development and not impede onto the frontage of adjoining properties). 7. Demonstrate that vehicles can safely enter, manoeuvre throughout the site, park on site, and leave the site without scraping and/or bottoming. This shall be undertaken for all types of vehicles expected to enter the site, with consideration given to the height of such vehicles and the headroom required under the building. This was previously requested by Council, but as the applicant has not provided any evidence to demonstrate that the proposal will work the information is still needed. 8. Illustrate on the proposal plans that suitable sight distances can be achieved from the proposed access driveway to pedestrians on the pathway network and to vehicles on the David Low Way based on the 85-percentile design speed of the David Low Way, not the sign posted speed limit. In this regard a design speed of 70km/h would be more realistic and consideration should also be given to existing vegetation and/or proposed vegetation that may restrict these sight lines. End of Trip Facilities 9. Illustrate on the proposal plans all “end of trip facilities’, such as bicycle storage lockers for staff, bicycle storage areas for customers, showers, change rooms, seating areas, drinking fountains, etc to cater for people who walk or cycle to the site. Stormwater Drainage 10. Demonstrate that the site can be developed with no_net increase in runoff from the site for storm events up to a 1 in 100 year Average Recurrence Interval. In this regard the stormwater drainage system designed for the site will need to incorporate an adequate detention system (holding tanks and rainwater tanks) to retain these flows, which can be utilised for irrigation, toilet flushing, hose down of paved surfaces, and ground water recharging. The present praposal and Stormwater Management Plan does not address this issue. : : : In this regard additional flows into the existing drainage system in the David Low Way will not be supported. 11. Demonstrate that the site can be drained without the use of pumps in accordance with Specific Outcome O17 of Table 14-46 of the Driveways & Carparking Code. In this regard the basement proposal cannot be supported unless it can be drained by gravity means. , The applicant is also advised that given stormwater from the carparking and - driveway areas of will contain contaminants such as oil, grease, and fuel, alf stormwater runoff will need to be collected and discharged through a suitable grease/oil arrestor and/or Gross Pollutant Traps to separate these contaminants and prevent them from entering Council’s drainage system. Traffic issues Award Winner - Australian Clean Beach Challenge 2004 Litter Prevention
Page 49
31/05 2007 16:20 FAX 61 7 54495354 Noosa Shire Council 0005/0006 12. The previously submitted traffic report shall be amended -to reflect the new proposal plan (and any changes that may be generated as a result of this _ information request) and resubmitted for Council to review. Engineering Reports 13. Please arrange for all engineering design plans and engineering reports submitted with the application to be certified by an appropriately qualified Registered Professional Engineer Queensiand (RPEQ), as it is noted that none of the plans nor any of the engineering reports have been prepared, checked, and approved by an authorised person. In this regard none of the pians or the engineering reports will be assessed in detail until a RPEQ has authorised them. Council therefore reserves the right to make a subsequent request for further information upon review and assessment of the authorised documentation with no consequence to IDAS time lines set by the integrated Planning Act. The applicant and any consultants assisting in the preparation of this development proposal are advised that an independent check of some or all of the technical reports and plans submitted may be forwarded to Council's own expert specialists, and. the cost of this independent review will be borne by the applicant. Please provide four (4) copies of all information that you are providing. In addition, it would assist Council if you could also provide an electronic copy of your response. Please be aware that under Section 3.2.12 of the Integrated Planning Act, the applicant is to respond to any information request within 12 months of the request or otherwise, the application lapses. Under the provisions of the Integrated Planning Act 1997, you as the applicant, have three options available in response to this information Request. You may give the assessment manager (in this instance Council) and each referral agency (if any):- 4. all of the information requested; or 2. part of the information requested together with. a letter asking the assessment manager and each referral agency to proceed with the assessment of the application; or 3. a letter:- 3.1. stating that you do not intend to supply any of the information requested; and 3.2, -asking the assessment manager and each referral agency to proceed with the assessment of the application. The above information is required to be submitted, prior to assessment of the application. If any further matters arise as part of assessment of this application, you will be advised accordingly. Should you have any further queries in relation to the above, please do not hesitate to contact on the above number. Award Winner - Australian Clean Beach Challenge 2004 Litter Prevention
Page 50
31/05 2007 16:20 FAX 61 7 54495354 Noosa Shire Council
- Yours faithfully,
Nick. Cooper
PLANNING OFFICER
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
{2 0006/0006
Page 51
PROPOSED COMMERCIAL BUSINESS PROJECT OFFICE 247 DAVID LOW WAY, PEREGIAN BEACH TRAFFIC IMPACT ASSESSMENT July 2007 Job No: C3694 Report No: 4284-1 Prepared for: Morgan & Beier PTY LTD
Page 52
DOCUMENT CONTROL SHEET BURCHILL VDM PTY LIMITED Evandale Place Job No. C3694 142 Bundall Road SURFERS PARADISE QLD 4217 Report No. 4284-1 Telephone: +617 5574 0511 Original Date of Issue |st December 2006 Fax: +61 7 5574 0011 Email: [email protected] Project Leader Dale Kleimeyer REPORT DETAILS Title: Proposed Commercial Business Project Office 247 David Low Way, Peregian Beach Traffic Impact Assessment Author(s): Matt Murphy — Traffic Planner Client: Morgan & Beier Pty Ltd Client Contact: Erik Hipwood Client Reference: Synopsis: This report assesses the traffic impacts of the proposed Commercial Business Project Office on the surrounding road network, and assesses the internal adequacy of the site in terms of vehicle movement. REVISION/CHECKING HISTORY REVISION DATE CHECKED BY ISSUED BY DISTRIBUTION - NO. OF COPIES NUMBER Client Other BP 4284-0 1/12/06 DTK 1412/06 MJM 1 1 4284-1 05/07/07 DTK 05/07/07 MJM 1 1 Neo vem BURCHILL VDM
Page 53
1.0 2.0 3.0 4.0 5.0 6.0 TABLE OF CONTENTS Introduction 1 1.1 Background 00.0... ee cece cee ener renee ceri ee penne a nnn dade r ese ceria eeeerreeeeneaeeenen 1 1.2 Report Objectives Description Proposed Development 2 2.1 Subject Site oo. ccc cee ceree cts cee eeteeneecensesteseseneesseeesseecnausenaesesaeeeees 2 2.2 Proposed Development .........0 cece eres eernaneernsresestesceseerseeeserneeesetaees 2 2.3 Site LOCALION .. 2... ccc cere tr reer rere nn nn E ane ceee ree rre eee eeH FEE peer asaaaHeeeeeeesenenneea 3 2.4 Future Development ..........ccccceceeceecececeeeeeeeeneceeeeseesenseaeeeeeeecesevenenaaeeeeesesesneeared 3 2.5 Road Network 0... cccccccccccccceeeesseeeseessseeessescsescssecesesenseessssseeessseseeeeerseesieeee na 4 Traffic Data 6 3.4 Background Data... ccceccc ee ree cereree creer eri nneeeninaeeseeneeccnrieseenienerenneeeeeees 6 3.2 Development Traffic 0.00... eee ccceeetiereeceeeteecretneesennieeeteeieetenieeeesnnireeseeniveneea 7 Access 4.1 Proposed Access 4.2 Access Analysis....... 4.3 Access Sight LIN@S 00... cece cece ccsseerteeseesssseesstseesasesesseersesieenasseeeeasenes 11 4.4 Roadway Capacity... cccccecsecseeeescceeccneresensccenescceessiscsescerenseneersseees 11 Internal Analysis 13 Fo 170) 6) EEE EE SESES SOLES SSSESSSESSSSOSSSSOOSIOONIO® 13 5.1 Parking oo. cece ecceceseeecesceseeeseescaeesecsssaecsseseseeesseesaeesseaseesescsasstsaesesesenasenaee 14 5.2 Service VENICICS 0... cee cece ccc ee rene eee eee EEG Eee eee c enn A TER EEE EERE GEE EE eee eee erage 16 5.3 Pedestrians... ccceccene eee seeeteeeseeeeres cece nese essssenesseesesseeccessensenauaneenagenss 16 Conclusions / Discussion 17 LIST OF TABLES Table 3.1 — Traffic Data Projections 6 Table 4.1 — SIDRA Results, Site Access Without Upgrades to David Low Way 10 Table 4.2 — SIDRA Results, Site Access With Upgrades to David Low Way 10 Table 4.3 — Carriageway Capacity 11 ‘yor “ew BURCHILL VDM
Page 54
LIST OF FIGURES Figure 2.1 — Site Location Figure 2.2 — Gravel Area Figure 4.1 — Access Location APPENDICES APPENDIX A ~ SITE PLANS AND PEREGIAN BEACH MASTER PLAN APPENDIX B - TRAFFIC CENSUS DATA APPENDIX C - ANALYSIS VOLUMES APPENDIX D - SIRDA OUTPUT APPENDIX E — VEHICLE TURN PATHS APPENDIX F - SIGHT LINES APPENDIX G — INFORMATION REQUEST, NOOSA COUNCIL On vem BURCHILL VDM
Page 55
1.0 INTRODUCTION 1.1 BACKGROUND Burchill VDM Pty Ltd have been commissioned by Morgan and Beier Pty Ltd to conduct a Traffic Impact Assessment (TIA) of the proposed Commercial Business Project Office (the proposed development), to be located at 247 David Low Way, Peregian Beach (the subject site). 1.2 REPORT OBJECTIVES The objectives of this TIA are to: 1. Review background traffic volumes on the surrounding road network. 2. Calculate daily and peak hour traffic generation of the proposed development and determine its distribution. 3. Examine the access requirements of the site. 4. Determine parking requirements and assess the internal layout. 5. On the basis of the above, examine the traffic impact of the proposed development. yoo vem BURCHILL VDM
Page 56
2.0 DESCRIPTION PROPOSED DEVELOPMENT 2.1 SUBJECT SITE Peregian Beach is a smail coastal town within the Noosa Council Local Government Area. The proposed development is to be located at 247 David Low Way, Peregian Beach, between Woodland Drive and Herron Street. The site location map is presented in Figure 2.1. The area of the subject site is 1,180m?. The site is currently undeveloped and is partially covered with vegetation. An informal gravel access currently exists to the site. Surrounding the site is residential development to the south and lawn bowl greens to the west. The land to the north of the site is undeveloped. David Low Way fronts the site to the east. 2.2 PROPOSED DEVELOPMENT The proposed development consists of an 18 tenancy office space development and associated car parking including basement parking and associated ramp. Key components proposed include: ° 18 Office Space Tenancies Ground Floor Tenancies 1,2 & 3 (210m? GFA) Tenancies 4,5 & 6 (210m? GFA) Tenancies 7,8 & 9 (170m’ GFA) First Floor Tenancies 10,11 & 12 (205m? GFA) Tenancies 13,14 & 15 (205m? GFA) Tenancies 16,17 & 18 (180m? GFA) ° 58 Car Parking Spaces Basement 48 spaces Ground Floor 10 spaces Access to the site will be provided via a single driveway access from David Low Way at the southern end of the lot. Plans of the Proposal are shown in Appendix A, Drawings 2243 SD01 through 2243 SD04. TOOT vee BURCHILL VDM
Page 57
2.3 SITE LOCATION Peregian Beach is located on the coastline between Noosa and Maroochydore. Figure 2.1 shows the location of the proposed development. Figure 2.1 — Site Location 2.4 FuTURE DEVELOPMENT Noosa Council currently have a Master Plan for the central business area of Peregian Beach. This outlines extensive possible development for the area and is shown in Appendix A, inset a and inset b from the Peregian Beach Village Master Plan. Several developments within this area are already proposed as shown in Appendix A, Drawing 2243 SD01. Or vem BURCHILL VDM
Page 58
2.5 ROAD NETWORK 2.5.1. David Low Way David Low Way runs north south along the coastline connecting to Maroochydore to the south and Sunshine Beach to the north. Through Peregian Beach and north, Noosa City Concil controis David Low Way. Further south, past the site, it is a state controlled road under the control of the Department of Main Roads (DMR). In the vicinity of the site it is a 2 way 2 lane arterial road with a narrow sealed shoulder and no kerb and guttering. Further north painted and raised medians are provided as well as kerb and guttering. Small gaps and turning lanes are provided for turning traffic. A gravel area exists on the road reserve to the south of the access. This is shown in Figure 2.2. This is currently used for vehicles to pull off David Low Way to access domestic driveways and basically acts a short turning Jane. No kerb and gutter exists in this section allowing vehicles to pull off David Low Way easily. Figure 2.2 — Gravel Area Report No. 4284-1 ver BURCHILL VDM July 2007
Page 59
2.5.2. Road Upgrades Council proposed to upgrade the section of David Low Way between Herron Street and Woodland Drive at address traffic issues associated with the expected development as per the Peregian Beach Master Plan. This included the construction of a roundabout at the David Low Way / Woodland Drive / Ibis Street intersection and a raised median extending from the roundabout to Herron Street. This will restrict turns at driveways along the section to left in / left out. Vehicles wishing to turn right will need to conduct U turns at either the Herron Street roundabout or Woodland Drive roundabout. The roadway will also be upgraded to 3.5m travel lanes with a 1.5-2.0m cycle lane in each direction and kerb and gutter on both sides. No on-street parking will be provided. A crossing point for pedestrians is likely to also be provided midway between the two roundabouts. Planning for these upgrades is currently underway with construction of the roundabout at Woodland Drive envisaged for 2008. For analysis purposes, construction of the remaining upgrades is also assumed for 2008. Council have advised contributions towards these upgrades will likely be sort from developers. een ves. BURCHILL VDM Juty 2007
Page 60
3.0 TRAFFIC DATA 3.1 BACKGROUND DATA Background traffic data along David Low Way has been obtained from Noosa Council. This showed a 2006 AADT past the site of 13,500 vehicles. A growth rate of 3.0% per annum has been derived from Council's Coastal Area Traffic and Transport to 2016 and Coastal Major Road Network Infrastructure Changes Plan documents. This growth rate corresponds with historic data from the DMR permanent counting station south of the site, which is shown in Appendix B. The future predicted AADT’s are shown in Table 3.1 below. Table 3.1 - Traffic Data Projections Year Growth Volume AADT 2006 3% - 13500 2007 3% 405 13905 2008 3% 417 14322 2009 3% 430 14752 2010 3% 443 15194 2011 3% 456 15650 2012 3% 470 16120 2013 3% 484 16603 2014 3% 498 17101 2015 3% 513 17614 2016 3% 528 18143 2017 3% 544 18687 2018 3% 561 19248 Peak hour traffic volumes past the site are shown in Appendix C, Figures 3.1 and 3.2. To account for the expected future development in the area an additional 20 peak hour vehicles have been added to David Low Way in each direction for 2008, and 100 vehicles in each direction for 2018. Traffic volumes may be higher at the site during holiday periods, which occur for approximately 20% of the year. oor vere BURCHILL VDM
Page 61
3.2 DEVELOPMENT TRAFFIC Traffic generation for the proposed office development has been determined using the rates outlined in the RTA’s Guide to Traffic Generating Developments. The rate given for office space is: Peak Hour Trips 2 trips per 100m? GFA Daily Trips 10 trips per 100m? GFA The total office space GFA of the Proposal is 1,180m*. Using the rates above this gives a total traffic generation for the site of: Peak Hour Trips 24 trips Daily Trips 118 trips The assignment of these trips has been based on: In Out Split AM 60% IN / 40% OUT PM 40% IN/60% OUT - North South Split - Obtained from Permanent Counting Station AM 40% Southbound / 60% Northbound PM 45% Southbound / 55% Northbound Report No. 4284-1 MEM BURCHILL VDM
Page 62
4.0 ACCESS 4.1 PROPOSED ACCESS As per Section 3.2.1 of AS/NZS 2890.1:2004 Parking facilities, Part 1: Off-street car parking the access classifies as a Class 2 Access Facility. This requires a 6m (minimum) wide combined non-separated driveway access. Access will be made via a 6.0m two way driveway on the southern end of the site and therefore complies with the standards. The location of the access is shown in Figure 4.1 and on plans in Appendix A. Figure 4.1 — Access Location As Council propose to construct an unbroken raised median past the site between Woodland Drive and Herron Drive, future access to the site will be restricted to left in and left out only. As there is no shoulder on David Low Way and therefore no provision for passing a turning vehicle, the warrants for turning lanes at the access, as per DMR’s Road Planning and Design Manual, Chapter 13 - Intersections at Grade (RPDM), Report No. 4284-1 “em™. BURCHILL VDM
Page 63
Figure 13.23 was assessed. This shows an AUL(S) (short left turn treatment) is warranted on David Low Way into the access. To accommodate this warrant, a AUL(S) will be provided on the existing gravel area to the south of the proposed access which is currently used by vehicles to pull of David Low Way. The AUL(S) will be provided by essentially paving this area being minor road widening entirely within the David Low Way road reserve. No kerb and gutter will be provided at the lane to ensure access to the domestic driveways is maintained. The lane will be accommodated within the existing gravel area and will be constructed as per DMR’s RPDM, Figure 13.73, being 25m long and 3.0m wide, including a taper of 15m. This lane will serve two purposes. The first will be to provide the warranted access to the site, and the second will be to improve safety for vehicles that currently use this area to pull off David Low Way to access domestic properties. A right turn treatment will not be provided as access will be restricted to left in and out only by way of the raised median shortly after opening. 4.2 ACCESS ANALYSIS The access has been analysed at full upgrade of David Low Way with the left in and left out only from the development site at the expected design year of 2018. The access has also been analysed for existing conditions in 2008 without any upgrades to David Low Way. This was not assessed for 2018 as it is assumed the upgrade of David Low Way will be complete by this time. The performance of the access was analysed using the SIDRA 3.0 traffic modelling software. For priority controlled intersections (Give-Way or Stop control), a Degree of Saturation (DOS), which is the ratio of flow to capacity, greater then 80% is considered over capacity. Above this value, performance deteriorates quickly and operation becomes poor. Council's Coastal Major Road Network Infrastructure Changes Plan states that in order for design systems to operate adequately in peak holiday times (i.e. 20% of the year) it is necessary for the network to operate within the Level of Service (LOS) B to C range with give way intersections having a DOS of 70% or less. The critical gap and follow-up headway parameters used for the model were derived from Austroads (2002) Urban Road Design Guide. The traffic volumes considered in this analysis are illustrated in Appendix C, Figures 3.1 and 3.2. The results of this analysis are summarised and discussed eeOr vem BURCHILL VDM
Page 64
10 below. The Movement Summary table provided by SIDRA are supplied in Appendix D. Table 4.1 — SIDRA Results, Site Access Without Upgrades to David Low Way 2008 Without Upgrades AM PM Paeesae [Faas [veces [Paes ee” [oat [_Acoms DOS (%) 31.5 30.4 2.8 36.5 43.3 8.6 Delay (s) 0.1 3.9 16.1 0 6.3 24.6 Queue (m) 0 31 1 0 66 2 Los A A c A A c Table 4.2 — SIDRA Results, Site Access With Upgrades to David Low Way 2018 With Upgrades AM PM David pow Way Access David on Way Access DOS (%) 46.4 1.8 53 4.3 Delay (s) 0.1 13.9 01 15.7 Queue (m) 0 1 0 1 LOS A B A Cc The modelling shows that the access will operate adequately for existing conditions on David Low Way with minor queuing and delays to southbound vehicles on David Low Way. This will be due to vehicles waiting to turn right into the site. Modelling for the future upgraded conditions on David Low Way shows the intersection will operate adequately without restriction traffic flow on David Low Way. Acceptable delays of up to 15.7 seconds can be expected for vehicles exiting the site in 2018 with queue lengths of up to one vehicle. There is a maximum DOS of 53% to through traffic on David Low Way, which is well below the acceptable value of 80% as stated above. The intersection is also expected to operate adequately during holiday periods. The worst LOS is “C” and highest DOS is 53%, which is well within the acceptable parameters as stated in Council's Coastal Major Road Network Infrastructure Changes Plan. Raper Ne 421 vem BURCHILL VDM
Page 65
11 Eventually some vehicles will need to conduct U turns at the Woodland Drive and Herron Street roundabouts due to the site being restricted to left in and left out. The volume of vehicles performing these manoeuvres is low (between 3 and 8 in the peak hours) and the affect on these roundabouts is expected to be unnoticed. 4.3 ACCESS SIGHT LINES Sight distance to the pedestrian path fronting the site is suitable and free of obstructions in accordance with AS 2890.1:2004 Parking facilities, Part 1: Off- street car parking Section 3.2, Table 3.3, as shown in Drawing C3694-01, Appendix F. Sight distance to vehicles in David Low Way from the access, in accordance with AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking Section 3.2, Figure 3.2 for a 70km/h speed limit, as requested by Noosa Council, in there Information Request, dated 31 May 2007, Appendix G, is 97m and should be free of obstructions. Some vegetation existing within the sight line to the north of the access, as shown in Drawing C3694-01. This will be removed as part of the Proposal and will provided sight distance to the north of 200m, and south of 105m along David Low Way form the access. 4.4 ROADWAY CAPACITY The desirable maximum roadway capacity standard for Noosa Council is given in Council's Coastal Major Road Network Infrastructure Changes Plan and is shown in Table 4.3. Table 4.3 - Carriageway Capacity (table 5.1 from Council's Coastal Major Road Network infrastructure Changes Plan) TABLE 5.1 URBAN ROAD STANDARD DESIGK GUIDELINES FOR NOOSA SHIRE TYPE OF ROAD DESIRABLE MAXIMUM STANDARD Two-way twotane road 16,000-20,000 vehicles per day Four tane divided road 35,000-40,000 vehicles per day Degree of saturation of 0.70 Intersecting flows of 16,000 vehicles per day and 4,000 vehicles per day Degree of saturation of 0.70 Intersecting flows of 16,000 vehicles per day and 8,000 vehicles per day Degree of saturation of 0.70 Intersecting flows of 35,000 vehicles per day and 16,000 vehicles per day Large two4ane roundabout (with Degree of saturation of 0.70 separate left tum lanes) Intersecting flows of 40,000 vehicles per day and 16,000 vehicles per day Unsignalised T-junction Single fane roundabout Two-lane roundabout Rete eel vem BURCHILL VDM
Page 66
12 David Low Way past the development site is a two way two lane road, and from Table 4.3, has a desirable maximum capacity of 20,000 vehicles per day. From Table 3.1, traffic volumes in 2018 on David Low Way past the site can be expected to be approximately 19,248 vehicles per day, which is within this limit. The proposed development will not have a major impact on these volumes (up to 118 daily vehicles). However, past 2018 and with additional development associated with the Peregian Beach Master Plan, volumes may increase to over 20,000 vehicles per day. This may also be the case for holiday periods. Further upgrading of David Low Way or the redirection of traffic to bypass Peregian Beach may be required further into the future past 2018. Neon ver BURCHILL VDM
Page 67
13 5.0 INTERNAL ANALYSIS 5.1 LAYouT A two way, 6.0m wide driveway access will be constructed as per AS 2890.1: 2004 Parking facilities — Off-street car parking, and Council's Noosa Plan 2006 — Part 14 Assessment Criteria for Development for a Stated Purpose or of a Stated Type and is considered adequate for the site. The internal road layout will provide access from the driveway to the ground level parking and the basement parking area via ramp. Drawings C3694-002, C3694-003 and C3694-004, Appendix E shows all vehicles can enter the site and park and leave in a forward direction. Vehicles expected to enter the site will be cars and light vans including service and delivery vehicles. Garbage trucks will service the site from David Low Way within the left turn lane so as to not obstruct through vehicles on David Low Way. As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, the grade on curved ramps shall be measured at the inside edge of the curve, i.e. at the inside line marking. As per the standard, ramp grades on the inside edge of the curve will need to be no greater than 1 in 6, with Grade Transitions of 2.0m on length at the top and bottom of the ramp. Ramp grades on the inside edge of the curve will be the same as those shown on the middle of the ramp on Drawings 2243 SD02 and 2243 SDO3 (Appendix A). These grades comply with the requirements of AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking. As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking the minimum ramp widths on the straights should be 5.5m. On the curves lane widths should be 3.9m with a central median of 0.6m giving a total width of 8.4m. Ramp widths on the straight at the top of the ramp will be approximately 5.6-5.9m, which complies with the standards. However, due to the physical restraints of the site, the widths on the curve of the ramp will be approximately 6.5-7.3m without a central median. However, as shown on Drawing C3694-004, Appendix E, there is sufficient space for a B85 and B99 vehicle to pass without conflicts on the ramp, as per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section 2.5.2(c). As shown in Drawing C3694-004, there will be conflicts on the straights where vehicles need to use the full width to negotiate the ramp, however this is considered adequate, as there is full vision for oncoming vehicles. Although the site does not qualify as a domestic property, the basement will only be used by employees and their clients and will not be open to the general public. Rep No. 4284-1 “eM BURCHILL VDM
Page 68
14 Therefore traffic entering and exiting will be low and conflicts on the ramp would be rare. We could expect 18 trips to and from the basement in the peak hours. Assuming a 60/40 % split for in and out would mean 12 vehicles entering (1 every 5 minutes) and 6 vehicles exiting (1 every 10 minutes) or vice versa. Therefore there would be a low chance of opposing vehicles being on the ramp at the same time. Measures will also be undertaken to ensure the chance of conflict to opposing vehicles it kept to a minimum. These are: - Mirrors will be provided on walls at the ramp curve to allow vehicles to see if there is another coming vehicle. - Signage will be provided saying "Watch for Oncoming Vehicles" and "Keep Left". - Centre line marking will also be provided on the ramp to keep traffic as far to the left as possible. The internal layout is shown in Appendix A. 5.1 PARKING As per Council's Noosa Plan 2006 — Part 14 Assessment Criteria for Development for a Stated Purpose or of a Stated Type — Driveways and Carparking Code, 1 car parking space per 20m? GFA is required. The Proposal will be 1,180m? GFA, which equates to a requirement of 59 spaces. 58 spaces, including 2 disabled spaces (as requested from Noosa Council) will be provided as part of the Proposal. This falls short of the required 59 spaces by 1 space. As per Council's Noosa Plan 2006 -— Part 14 Assessment Criteria for Development for a Stated Purpose or of a Stated Type ~— Driveways and Carparking Code, if insufficient carparking spaces are provided on-site a monetary contribution is made to Council in accordance with section 6 of Planning Scheme Policy 13 (PSP13) Contributions in lieu of provision for off-street carparking. As per PSP13, the subject site is located within an area where contributions in lieu of parking are acceptable. The Proposal also meets the requirements of Section 1.1 of the Policy for parking contributions. Therefore it is considered a contribution of $11,800, as per PSP73, in lieu of provision of one parking space be sufficient for the parking shortfall. As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section 2.4.2 (c), in car parks open to the public, the maximum length of a blind aisle shall be equal to the width of six 90 degree spaces plus 1m, unless provision is made for cars to turn around at the end and drive out forwards. The blind aisle in the basement parking area will be longer than six 90 degree spaces, therefore provision must me made for vehicles to turn around. MOF vem BURCHILL VDM
Page 69
15 Noosa Council have requested two spaces (space 30 and 22) be provided for this purpose at dimension 5.4m long by 3.0m wide in their Information Request, dated 31 May 2007, Appendix G. However, as the car park will only be used by employees and their clients and will not be open to the general public, one space is considered adequate for turning manoeuvres at the end of the blind aisle. Traffic generation for the site will also be low, so vehicles needing to turn around will be infrequent and it is not expected there will be conflicts with these vehicles. As part of the Proposal, space 30 will be provided as a turn around bay at the end of the blind aisle 5.4m long by 3.0m wide (as requested by Council) as shown on Drawing 2243 SD02, Appendix A. Turning paths showing this space is sufficient for a vehicles to turn around using space 30 is shown on Drawing C3694-002, Appendix B. A drawing with turning paths will be provided showing a vehicle able to turn around using space 30. At the end of the blind aisle, the aisle is only extended 0.7m as opposed to the required 1.0m as per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking. However 0.7m is considered sufficient as the aisle is relatively wide at 6.9m allowing sufficient space for a vehicle to reverse out of the space, clear of the vehicle parked to its right, before needing to turn. This is shown to work with turning paths shown in Drawing C3694-004, Appendix B. As per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section 5.3.1 the minimum height from the floor to any overhead obstruction (fire sprinkler, lighting, sign etc), allow for cars and light vans, should be 2.2m (2.3m if parking will be provided for people with disabilities, however as our disabled spaces will be on the ground level parking, 2.2m is considered sufficient for the basement). Headroom between the ramp and the entrance to the basement shall also be 2.2m however will be measured perpendicular to a chord of length equal to the wheelbase of the B99 vehicle located longitudinally such that the height is a minimum of 2.2m, as per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking Figure 5.3. The clearance from the floor to the ceiling in the basement will be 2.5m. This will allow for the installation of sprinklers, signs and lighting without reducing clearance to below the minimum 2.2m. The ramp terminates before entry to the basement and vehicles will enter on level ground. Therefore clearance at entry to the basement is considered adequate. Low Clearance signs (R6-16) to the basement will be provided as per AS 2890.1:2004 Parking facilities, Part 1: Off-street car parking, Section 4.3.4(a). Flexible striker bars will also be provided in conjunction with these signs where the clearance will be less than 2.3m due to sprinklers, lighting or signs. As per the Noosa Plan 2006, 1 bicycle space per 50m’? GFA be provided which equates to 24 bicycle spaces for the Proposal. Also as per the Noosa Plan 2006, 12 lockers (1 per 2 spaces), and 3 showers (1 per 10 spaces) be provided. Fer No. 406 vem BURCHILL VDM
Page 70
16 Bicycle racks/spaces will be Class 3 as per AS/NZS 2890.3 Bicycle Parking Facilities. Class 3 spaces involve racks that support the whole bicycles that both wheels can be locked to in an area that is well lit and in a highly visible public area. As part of the Proposal, 24 spaces will be provided at the front of the site. 12 lockers (4 in each powder room) and 3 showers (1 in each powder room) will also be provided. Powder rooms will be unisex. This meets the requirements of the standards. 5.2. SERVICE VEHICLES Vehicles likely to service an office development will be delivery vans, small maintenance vehicles, emergency vehicles (ambulance), and garbage trucks accessing the site on an irregular basis. Garbage collection will be from the frontage of the site via wheelie bins. This will likely occur at the ieft turn lane into the site to avoid obstructing traffic on David Low Way. Casual parking for the delivery, maintenance and emergency vehicles has been accommodated in the parking rate specified in the Noosa Plan 2006. The basement parking area will be suitable for these types of vehicles to enter as per the requirements of AS/NZS 2890.1: 2004 Parking facilities — Off-street car parking. 5.3. PEDESTRIANS Sufficient pedestrian facilities are provided so pedestrians can move freely and safely throughout the site. Sealed pedestrian paths are currently provided along either side of David Low Way. A pedestrian crossing midway between Herron Street and Woodland Drive is expected to be constructed as part of Council's upgrade of David Low Way. This will provide safe access for pedestrians accessing the central business area to and from the site. eo vem BURCHILL VDM
Page 71
17 6.0 CONCLUSIONS / DISCUSSION The proposed Commercial Business Project Office at 247 David Low Way, Peregian Beach, is likely to generate up to 24 trips in the morning and peak hours. Before the proposed upgrade of David Low Way the access is expected to operate adequately with minor delays to northbound traffic on David Low Way. However, it is expected an unbroken median will be constructed in David Low Way fronting the site shortly after opening of the Proposal as per Councils planned roadworks for the area, restricting access to left in and out only. An AUL(S) will be provided on the existing gravel area to the south of the proposed access which is currently used by vehicles to pull of David Low Way. The AUL(S) will be provided by essentially paving this area being minor road widening entirely within the David Low Way road reserve. No kerb and gutter will be provided at the lane to ensure access to the domestic driveways is maintained. This lane will serve two purposes. The first will be to provide the warranted access to the site, and the second will be to improve safety for vehicles that currently use this area to pull off David Low Way to access domestic properties. A right turn treatment will not be provided as access will be restricted to left in and out only by way of the raised median shortly after opening. By 2018 David Low Way will approach the maximum desirable carrying capacity of a two way two lane road as per Noosa Council’s guidelines. However, the proposed office development will only add a relatively minor volume of traffic to the road compared to the backgraound traffic volumes, therefore it is not expected to have an impact on the carrying capacity of David Low Way. The internal operation of the site is considered adequate for the volume and type of vehicles entering the site. The traffic impacts of the proposed office development on the external road network are expected to be minimal. There are no reasons in terms of traffic impacts that the Proposal should be refused. Matt Murphy Traffic Planner Rar No. A260 vem BURCHILL VDM
Page 72
APPENDIX A SITE PLANS AND PEREGIAN BEACH MASTER PLAN
Page 73
B JOSUI uoyeaas Bunedies Seamer, @ SPAN] OPES Aine sseursna apou Aj unuiw09 NeaepuNd: pasodosd
Page 74
village square community node business actrvry Pi shade trees. fecrwalion master plan
Page 75
Sy
TE POI —
Wd
es
erin tig
11.200
ih
VEGETATION 7
a0
ei
|
A) esis 3006
La
DRIVEWAY
® FSL 11.200
{Line of Basement Carpark below
o~ Ss
Fei
.
INE OF DECK OVER
ECE DECK OVER
Lot boundary
Speed bump
PLOTMAKER FILES'2240 hh 1744 AM a
emmarcit AD 0
Jeb hini2248 permanan
ean
(
@ FS 11 100
See SD13 for slipway
design anid layout
STOP
GROUND FLOOR
1:200
REV DESCRIPTION
Py) ISSUE TO LANSCAPE DE
®
LEGEND
CQ Presa mgtteroarascape aeranc on
CO) taster et
Existing bees to be removed
Landscaping to landscape architects deta
Storm Water mar tole
Exostng spor levels to groune
SL Finished surtace levels
HARDSCAPE AREAS
DRIVE Es
RAMP AREA 187
CAR PARK AREA asm
TOTAL
TENANCY &
BUILDING 3
RL. 10.1
KEN DOWN
ARCHITECTS
‘ARCHIPELAGO’
1). WALAN STREET MOOLOO!
POBOX1S9 — MOOLOOLABA
PH 07 Sada 4517 FX 07 baad
\ Power Pole
The Airhe Protesmional Centre
E HARBOUR RD. AJRLIE BEACH
PH 07 4948 1433 FX 07 4948 1633
ABN 61067 BA? 454
EMAIL admin@kda com au
WEB www ke@ com ou
Project
PROPOSED OFFICE DEVELOPMENT
for
MORGAN & BEIERS ATF
a
247 DAVID LOW WAY
PEREGIAN BEACH
orawing
GROUND FLOOR
1:200
cate MAR 07° craw BVG scare @AZ
cawngre 2243 SDO3 kevin G
Page 76
APPENDIX B TRAFFIC CENSUS DATA
Page 77
g§ Queensland Government
Orpartner of Mala tts
See
Traffic Analysis and Reporting System
PERMANENT SITE REPORT
strict NORTH COAST HINTERLAND DISTRICT Road Section 133 MAROOCHYDORE-NOOSAROAD~ | ——*‘Tdst | 23.476 alae
(09 TRACS Ped Xing Coolum Beach SLSC ‘Site Stream {All Site Streams i pease
Year 2005 AADT 14,890 Growth last year — -0.83
: Average Week Day. 15,058 Growth last 5 yrs | 1.79
Average Weekend Day 14,594 Growth last 10 yrs 2.44 |
Weekly Pattern AADT Pattern
120 — - ——F — 18000 —
110 i .
16000 ——- — Sei —YRI
ame we YRS
% ™ ms 5 — ay YRIO
AADT 14000 —
AADT, - :
12000 —
“ Jan Feb Mar Aor May dun Jul Aug ae Oct Nov Dec Jan -
10000
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
ie Daily Pattern a Hourly Pattern
110 _——— 8
105 -— — —
%
AADToo E
95
0 L : zz
Mon Tue Wed Thu Fri Sat Sun
TAR350
Page 33 of 104 Printed on 03-Feb-2006 at 14:00
Page 78
00:h1 18 9002-484-E0 UO peut . 0} 10 pe abe
OSéHVL
a JC] ESA | | | (wn)ua's
boro: | Bris } bso: } pores | Sezor ' lees | bzes | bose] eghea
(gro Eo ert | Sou B50 Leo} bro feo | [ pace
Ore eco ft eek | oes Ta “or | ueo 82:0 62-22
ze") 6E'L 0e'2 “sz 10'e 1b | Bot eae 22-42
Bp'2 02 6g'2 1zs aL v2 ee “ek 12-08
oe eve ze'p Loy 6 1S'e lee wore 02-61
gp's web 6's Leg beg lov's los's go'p 61-81
bed 61'9 ShZ oz'2 sez | Bgz SZ '9e'9 Bk-Zb
BL 08'9 6b e's Bs; Ole pbs eld Zi-91
gue ee * fez 228 ore leg'g Ze'8 128 91-1] |
kore StL | $6Z Zug 182 Sb'Z eg'L civil |
ped wd 60's ByL 969 ord 08'9 heo | | per
oz o's 1s'8 byO'L eZ 92'2 02d G22 ea
+ bLL $29 o's Ld eS'Z bed B62 ShL Zb-bt
1 (ISZ 68'Z 02'8 1S'Z ba'L gorz Bed ers bL-OL
6e'9 b9'9 koe @0'2 y8'9 19 06'9 69'9 01-60
19'9 ees | seg phd eeL oo"z Yorn “9 60-80
OZ'b ive lave zg $e's pis a's hey 80-40
Lee ket hoz | ee! bee gue eL'e Ze 20-90
hh 82°0 00° let 821 ‘eek 2'L ue'h 90-S0
2e'0 620 seo ee Leo kero 2€°0 £€'0 S0-¥0
sro €z'0 820 ero} ‘OVo O10 loro zL'0 0-£0
sro | eo loco LO ra [Leo | fete ‘O10 £0-20
ez‘o ke'o 9r'0 gto bro bio {uvo si0 20-40
peo ovo | szo_ | seo } szo_ | eo } sro | kzo 10-00}
feq uns es ud nu poem any uow snoH
abeleay
LAV $0 % Si0joR4 18g 1NOH
OVOH WSOON - SHOGAHDOOUWW EI} UORDeS pEoY
LYdOd3Y SLIS LNANVWHAd
we}shg Gujyodey pue siskjeuy oer
OSTs yoreg wnjoo9 Burx ped SOVUL 6000g CHS
LONLSIC GNVIYSLNIH LS¥O9 HLYON Z0NsiC
roerReuacrng
WUBURUDADD PULTSUSIAD NN
Page 79
Q queensland Government Traffic Analysis and Reporting System
ae PERMANENT SITE REPORT
District NORTH COAST HINTERLAND DISTRICT Road Section f i
Site 20009 TRACS Ped Xing Coolum Beach SLSC i "A
| pay Set by Week Set Matrix and Week Set Factors % of AADT
Week Start Date Thu Fri Sat Sun Mon Tue Wed Wk Set Week Start Date Thu Sat Sun Mon Tue Wed Wk Set
[ _1]30-DEC-04 | : 116.88 124.18 119. 49 104. 56 109.37 113.43 114: 11430, [ 28 O7-JUL-05 I 101. 164.49 ares 103.76 90. = 94.97, “50 99.06 99. id
a = —— rae
A PEIAN-05 111.84) 118.82 114.34] 100.05 104.66 108.54 109.16 109. oe [29 29,14-JUL-05 0a 106.461 102.44 89.64 93.77, 97.2: 5 97.85 Si 97: 99
{_S/SJAN-05 110.94 117.88 113.42" 99.25 103.87] 107.67) 108.28 108.49: [3027-005 aa ay 100.2 aris 91-79 95.1 95.74 95.93
[4 20-JAN-05 "103.07, 109.50 105.97 92.20 96.45 100.02 10060 100.79 [St 28-JUL-05 102.74 “109.15 105.05 91.9] 96.1 99.74] 100.28 100.47,
fm : 50) . an i ed
[5 27JAN-05 104.47, 110.89" 106.80 93.48 97.76 101.38 101.97 102.16 [agoeaueos -AUG-05 00.47 106.74 102.77 $8. a8 84, 89.68 04.02 S750 98.06 98.25
6,03-FEB-05 104.49 11 oF 106.83 93.47, 97.78 101.49 108 ara ar 102.18, [ 33.97-AUG-05 7] ae 105.84 1 7.84 80.12 “S322 96.68 87.29 -97.48
aor -FEB-05 103.517 109. oF 05.8% 926096. 6.85 100.45 101.05 101.28 [B4peAUG-0S [101.89 10825 104.16 oF 95.55 «S88 «90.48 99.64,
Cs 17-FEB-05 104-76 114.25 107.05 93.71 98. OF” 101.65 102.25 102.44} [38 -AUG-05 [| 100.58 106. a 102.79 89.95 94.09 97.55 98.14 98.59
mete 102.16 108.5% 104. ag 91.39 9559 89. .14 99.71] 99.90 [35p1-SEP-05 ~[_ 101-99 108.38 04.27 91.24" 95.4q 98.98 85.55 O74
08) 100: [SipeSEPOS | 9667, 10474 10087 a waa 95.7 86259643
i fOMAR-05 [| 10155 10787 10582 S0ee 95.09 "98.56 99. a 99.31] (38 [i5-SEP-05 102.39 108.68 10458 S159 O5.7F 88. 26 99.85 100.04
1 [1a{17-MAR-05 Tea 78 1 75 110.24 108.08 92. as 97.19 100-7 101.28 101.47 (39225 -SEP-05 104.07] 110.50" 108. 93.04.97. 00354, 101.52 100.71
: _—_—— rn -
[1324-MaAR-05 iesag is Os.0F 111.67 107.39 93.98 50 i078 V025F 102.73 [40 29-SEPOS 107.0 04 113.74, 108. e 95.75 100.16 103.8 j 108.67] 104.47 =
LMSRARSS 98.55 104.70 100,75 88.16 92.22 95.64 96.19 ~—«96.G7, «= 41106-OCT-05 | 105.70 : 945 9) 102.57 103.19 103: 38
1 S15, 07-APR-05 97-59 103.59 99.6 87.25 Je 34.65 85.17, 95.58 [42 /13-OCT. 05 V0i5T 107.85 103.7890. 8] 94.99 98.52 99.08 99.27,
TOS-APR-05 103.24 | 109.6 105.54 "92.26" 96.81] 100.19 100.7) 100.86 © [ 4920-OCT-05 | 103.68 "110. 811018 105.99 92.75, 97.02 100. 7.02 100.64 tor2¢) 707 “39
= = + =
{17,21-APR-05 100.34" 108.60 102.57, 88:76 93.89 "97.97, 97.95 88:12 = [44.27-OCT05 [104.1] Oey 106.49 93197. ies VO1.0F T0162 107-81
[1e2e-APR-05 [ 98.5G 104.74 100.75 88.20 92.25 SS.0R «OHA 88.4 [48 05-NOV-057] 108.27 os6s 108.51 100.16 100.74" 700.83
Lo ——— I
{79 05-MAY-05 [ 91.68 97.34 93.67, 87.97, 85.74 Be.eq 89.45 89.60 © [4BIO-NOV-OS 7 10410 060 10649 931F 97.41 104 01 104.67] 107.80 |
(20 12-May-05 963 69 102.72 98.84 86.49 90.47 98.89 94.97, 8455 (4aji7-Nov-os T1606 "NOV-05 [106.47] 113.05" 108.78) 98. 1 99:58" 105.27, 103-85 104.06 |
[2a -MAY-05 T 98.04 104.19 — 779 91.74 95.14 95.69 $5.87) [48 24Novas [108 -05 OSI TS 10753 94.10) 98.437" 102.08 102.66 102.88
(SR 36MAV 05 7 r 6 ae r 01: rT
[22 26-MAY-05 97.09 109.14 99.25 8bBS BOBS 94.27 Oa 7A 94.94 =| AOI-DECOS | 107 7a W414 10585 96.1 10059 104.26 104.867 105.04
pq a7e I ; 74 10752 9409" ad
23 02-JUN-05 | 94.61] 100.51] 96.7; 84.64 88.53 91.82 $2.34] 92.52 { 50 08-DEC-05 | 105.17) 411. 74 107.52, 94. 09 = 98. 42 102.07, 102. 102.85,
j . 5 x .95, ; . 84) . 57 a .
| 24 08-JUN-05 j 98.7 104 91 100.95 88, 34 92.41) 95.84 96.39) 96.57) [sis DEC-OS 108. 51] 11528 110.95 87. 07 101! 54 105.30, 105.91 106.1 i}
7 e rT "7 . | 7
[ 25 16-JUN-65 94.72 10063 96.84 8474 BBGG OOF 9245 SRT 6 | SARADECOS | 107.26 Tag 109.65, 235 100.377 104.08 04.64 104.69
+ [26 23JUN-05 92.21 97.96 94.26 82.45 86.28 89.48 90.00 90.17, [ S3ASDECOS | 11682 124s] 119.43 104.51 109.39 119.97“ 194.05_ 114.24
: [2A B0-JUN-05 96.95 10299 88.09 86.7] 90.70 S407 FET 84.79 |
TAR350 Page 35 of 104 Printed on 03-Feb-2006 at 14:00
Page 80
Qoovertznsconnen Traffic Analysis and Reporting System
Pinner PERMANENT SITE REPORT
District? NORTH COAST HINTERLAND DISTRICT } Road Section [133 MAROOCHYDORE - NOOSA ROAD — __Teist{ 23.476
Site 20009 TRACS Ped Xing Coolum Beach SLSC All Si ms
AADT History
Year AADT Growth Pe tyr Growth Pe 5yr Growth Pe 10yr Year AADT GrowthPc lyr Growth Pc 5yr Growth Pe 10yr
| 2005 14899 (_ -83 [179 2.44
| 2004) = 15014 185 2.55] 2.8
; 2003, { 14742 OL 2747 ~ 29 { |
2002 { 14345 4.52 3.38 _ i
(200 f 13725 248 [_ 3.35 [7 _|
{2000 { 13401] 32 {327 —
' [1999 | [ 13444 [ 589 [ 3.47, }
1998) 12696 [ _ 7g - LE
1997 11832 ff
1996 [ 17420 (__:2.89 _ |
1995 11760 [_ 2.56 _ L |
[1984 [12069 a L |
TAR350 , ~~ Page 36 of 104 , “Printed on 03-Feb-2006 at 14:00
Page 81
APPENDIX C ANALYSIS VOLUMES
Page 82
MORNING (AM) PEAK David Low Way 6 552 J 4 Site Access fall ot 584 David Low Way AFTERNOON (PM) PEAK David Low Way ot 3. 796 Jf David Low Way C3694 - Office Development Peregian Beach Fi 3.1 | 2008. Traffic Volumes, Existing Road Layout BURCHILL VDM with Development Traffic
Page 83
MORNING (AM) PEAK David Low Way 9 —f “TT | 14 859 ' I David Low Way AFTERNOON (PM) PEAK David Low Way le } vt Site Access 1142 Vth | 7 981 3 _#J David Low Way C3694 - Office Development Peregian Beach Fi 3.2 2018. Traffic Volumes With Development BURCHILL VDM and Road Upgrades
Page 84
APPENDIX D SIDRA MODEL OUTPUT SUMMARIES
Page 85
Movement Summary Page | of 1 SIDRA = INTERSECTION Movement Summary Access, All Movements, No Upgrade to David Low Way 2008 AM, Full Development, Proposed Layout Give-way Vehicle Movements 95% Deg of Aver Aver MovID Turn veoh yh). HV Satn Delay Level of Gacuel Quote 4 Eff. Stop Speed (v/c) (sec) (m) (km/h) David Low Way Sth 2 L 8 0.0 0.004 8.2 LOS A 0 0.00 0.67 49.0 1 T 615 0.0 0.315 0.0 LOS A 0 0.00 0.00 60.0 Approach 623 0.0 0.315 0.1 LOSA 0.00 0.01 59.8 David Low Way Nth 6 T S581 0.0 0.304 3.8 LOS A 31 0.72 0.00 51.3 S R 6 0.0 0.300 12.2 Los B 31 0.72 0.90 44,8 Approach 587 0.0 0,304 3.9 LOSA 31 0.72 0.01 51.2 Access 4 L 6 0.0 0.028 16.1 Los c 1 0.66 0.75 41.5 3 R 4 0.0 0.028 16.2 LOS C 1 0.66 0.89 41.4 Approach 10 0.0 0.028 16.2 Los c 1 0.66 0.81 41.5 All Vehicle 1220 0.0 0.315 2.0 Not 31 0.35 0.02 55.2 icles 5 "Applicable . . . Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1,00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: 2008 AM No Upgrade H:\C3694\Traffic\SIDRA\Access & David Low Way.aap Processed Jun 26, 2007 04:25:29PM A0463, Burchill VDM Pty Limited, Large Office Produced by SIDRA Intersection 3.1.061208.34 Copyright 2000-2006 Akcelik and Associates Pty Ltd www, sidrasolutions.com about:blank 5/07/2007
Page 86
Movement Summary Page | of | SIDRA ial INTERSECTION Movement Summary Access, All Movements, No Upgrade to David Low Way 2008 PM, Full Development, Proposed Layout Give-way Vehicle Movements 95% Deg of Aver Aver MovID Turn ovan/n ) HY Para taney Service Queue. queued erate Coca (m) David Low Way Sth 2 L 4 0.0 0.002 8.2 LOS A 0 0.00 0.67 49.0 1 T 712 0.0 0.365 0.0 LOS A 0 0.00 0.00 60.0 Approach 716 0.0 0.365 0.0 LOS A 0.00 0.00 59.9 David Low Way Nth 6 T 838 0.0 0.433 6.3 LOS A 66 0.90 0.00 49.6 5 R 3 0.0 0.429 14.7 Los B 66 0.90 1.09 42.6 Approach 841 0.0 0.433 6.3 LOSA 66 0.90 0.00 49.5 Access 4 L 9 0.0 0.086 24.5 Los Cc 2 0.80 0.88 35.8 3 R 8 0.0 0.086 24.6 LOS C 2 0.80 0.94 35.7 Approach 17 0.0 0.086 24.6 Los c 2 0.80 0.91 35.7 1 Not All Vehicles 1574 0.0 0.433 3.7 Applicable 66 0.49 0.01 53.5 Symbols which may appear in this table: Following Degree of Saturation # X = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: 2008 PM No Upgrade H:\C3694\Traffic\SIDRA\Access & David Low Way.aap Processed Jun 26, 2007 04:27:34PM A0463, Burchill VDM Pty Limited, Large Office Produced by SIDRA Intersection 3.1.061208.34 Copyright 2000-2006 Akcelik and Associates Pty Ltd about:blank 5/07/2007
Page 87
Movement Summary SIDRA = INTERSECTION Movement Summary Access, Left In/Out Only, With Upgrade to David Low Way 2018 AM, Full Development, Proposed Layout Give-way Vehicle Movements Page 1 of 1 95% Deg of Aver Aver Dem Flow Level of Back of Prop. Eff. Stop Mov ID Turn %HV Satn Delay - Speed (veh/h) (v/c) (sec) Service en) Queued Rate (km/h) David Low Way Sth 2 L 15 0.0 0.008 8.2 LOS A 9 0.00 0.67 49.0 1 T 904 0.0 0.464 0.0 LOS A 0 0.00 0.00 60.0 Approach 919 0.0 0.464 O1 LOS A 0.00 0.01 59.8 Access 3 L 9 0.0 0.018 13.9 LOS B 1 0.65 0.80 43.4 Approach 9 0.0 0.018 13.9 Los B 0.65 0.80 43.4 ; Not All Vehicles 928 0.0 0.464 0.3 Applicable 1 0.01 0.02 59.6 Symbols which may appear In this table: Following Degree of Saturation # x = 1,00 for Short Lane with resulting Excess Flow * x = 1,00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement SIDRA SOLUTIONS Site: 2018 AM With Upgrade H:\C3694\Traffic\SIDRA\Access & David Low Way.aap Processed Jun 26, 2007 04:30:54PM A0463, Burchill VDM Pty Limited, Large Office Produced by SIDRA Intersection 3.1.061208.34 Copyright 2000-2006 Akcelik and Associates Pty Ltd www, sidrasolutions.com about:blank 5/07/2007
Page 88
Movement Summary Page | of | SIDRA = INTERSECTION Movement Summary Access, Left In/Out Only, With Upgrade to David Low Way 2018 PM, Full Development, Proposed Layout Give-way Vehicle Movements 95% Deg of Aver Aver Mov ID Turn ne reh/R). %HV Satn Delay Level of Gacue, Queue d eff strep Speed (v/c) (sec) (m) (km/h) David Low Way Sth 2 L 7 0.0 0.004 8.2 LOS A 0 0.00 0.67 49.0 1 T 1033 0.0 0.530 0.0 LOS A 0 0.00 0.00 60.0 Approach 1040 0.0 0.530 0.1 LOSA 0.00 0.00 59.9 Access 3 L 18 0.0 0.043 15.7 tosc 1 0.72 0.90 41.9 Approach 18 0.0 0.043 15.7 LOS C 1 0.72 0.90 41.9 Not All Vehicles 1058 0.0 0.530 0.3 Applicable 1 0.01 0.02 59.5 Symbols which may appear in this table: Following Degree of Saturation #x = 1,00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: 2018 PM With Upgrade H:\C3694\Traffic\SIDRA\Access & David Low Way.aap Processed Jun 26, 2007 04:31:55PM A0463, Burchill VOM Pty Limited, Large Office Produced by SIDRA Intersection 3.1.061208.34 Copyright 2000-2006 Akcelik and Associates Pty Ltd 7 luti about:blank 5/07/2007
Page 89
APPENDIX D DMR’S ROAD PLANNING AND DESIGN MANUAL, CHAPTER 13 — INTERSECTIONS AT GRADE FIGURES
Page 90
— =a _— _— _— # For setting out details of the left tum geometry, use vehicle tuming path templates and/or Figuee 13.70. =f Design Speed of Diverge/Deceleration | Taper Length Major Road Length D Tay)”: Approach (km/h) (m)"? 50 15 5 60 25 By 0 38 20 80 45 20 90 55 25 (1) Based on 9 20% reduction in through road speed at the start of the taper anda value of deceleration of 3 Sm/s”, Adjust for grade using the 'Correction to Grade! table ia Figure 13.42. (2) Based on a turn lane width of 3.00 Ww Nominal through lane width (mm) (inch. widening for curves) Wr= Nominal width of turn Jane (m) (inel, widening for curves based on the design burning vehicle). Desirable minimum = 3.0m, absolute minimum = 2.8m. T= — Taper length (im) = Osis Vas V= Design speed of major road approach (knw) Note: Approaches to Ieft turn slip lanes can create hazardous situations between cyclists and left-tumning mater vehicles. Treatments to reduce the mumber of potential conflicts at left turn slip lanes are given in Austroads (19996), Figure 13.73 Auxiliary Left Tun Treatment [AUL(S)] on the Major Leg of an Urban Road
Page 91
APPENDIX E VEHICLE TURN PATHS
Page 92
>
ONG
XO
NC
Q
GS
g
S
2s
,
‘BAOev ONICTANG 30 BN
MK |
i Ni Wj NW Wp
ND
S
8
| fen SETBACK LINE
LEAL EET LTGULESTRUTSAI ERASERS ARE
'?SYUYKYSYSV YS
YAOAAVAIAAAA
Nag
10.25
PROPOSED
COMMERCIAL
BUSINESS PROJECT
OFFICE
247 DAVID LOW WAY
PEREGIAN BEACH
AREA/STAGE
SS
23
oS
DATE DESCRIPTION APPR.
AMENOMENTS
SOLS
WS
SATA
COPYRIGHT C
THESE DESIGNS AND DRAWINGS ARE COPYRIGHT AND
ARE NOT TO BE USED OR REPRODUCED WITHOUT THE
WRITTEN PERMISSION OF BURCHILL VDM PTY LIMITED.
THE CONTENTS OF THIS DRAWING ARE ELECTRONICALLY
GENERATED, ARE AND MAY ONLY BE USED
FOR THE PURPOSE FOR WHICH THEY WERE INTENDED
THIS IS AN UNCONTROLLED DOCUMENT ISSUED FOR
INFORMATION PURPOSES ONLY, UNLESS THE CHECKED
SECTIONS ARE SIGNED AND APPROVED.
DO NOT SCALE FROM THIS DRAWING.
VERIFY DIMENSIONS PRIOR TO COMMENCING ANY WORKS.
FULL SIZE A3
NOT TO SCALE
DRAWING TITLE
RAMP TURNING
SHEET 1
[5 BurcHILL VDM
ACN 010 140 495 PTY LIMITED
CIVIL & STRUCTURAL CONSULTING ENGINEERS & PLANNERS
142 Bundall Road, Surfers Paradise, Qld. 4217
Phone (07) 5574 0511
Fax Civil (07) 5574 0011
Fax Structural (07) 5574 0505
Member of the
Email [email protected] GROUP
DESIGNED : DRAWN :
CHECKED DATE
PRENAME: = \cs694\T/cttic\Romo Tu Rom
APPROVED FOR AND ON BEHALF OF
BURCHILL VDM PTY LIMITED
RP.EQ.No.
DRAWING No. : AMENDMENT
C3694-002
Page 93
NOT TO SCALE PROPOSED COMMERCIAL BUSINESS PROJECT OFFICE 247 DAVID LOW WAY PEREGIAN BEACH AREA/STAGE COPYRIGHT C THESE DESIGNS AND DRAWINGS ARE COPYRIGHT AND ARE NOT TO BE USED OR REPRODUCED WITHOUT THE WRITTEN PERMISSION OF BURCHILL VDM PTY LIMITED. THE CONTENTS OF THIS DRAWING ARE ELECTRONICALLY GENERATED, ARE AND MAY ONLY BE USED FOR THE PURPOSE FOR WHICH THEY WERE INTENDED THIS 1S AN UNCONTROLLED DOCUMENT ISSUED FOR INFORMATION PURPOSES ONLY, UNLESS THE CHECKED SECTIONS ARE SIGNED AND APPROVED. DO NOT SCALE FROM THIS DRAWING. VERIFY DIMENSIONS PRIOR TO COMMENCING ANY WORKS. FULL SIZE: A3. DRAWING TITLE : RAMP TURNING SHEET 2 [5 BurcHILL VDM ACN 010 140 495 PTY LIMITED CIVIL & STRUCTURAL CONSULTING ENGINEERS & PLANNERS 142 Bundall Road, Surfers Paradise, Qid. 4217 Phone (07) 5574 0511 Fax Civil (07) 5574 0011 Fax Structural (07) 5574 0505 Member of the Email [email protected] GROUP DESIGNED DRAWN : CHECKED DATE APPROVED FOR AND ON BEHALF OF BURCHILL VDM PTY LIMITED RP.E.Q. No. DRAWING No. » AMENDMENT 3694-003 694-003
Page 94
PROPOSED
COMMERCIAL
BUSINESS PROJECT
vem v OFFICE
10.200
"0g g 247 DAVID LOW WAY
som 7 -
esis MOK wee eo s s PEREGIAN BEACH
SYST Allee. 4 IS
Apuegee “i Ky SVE
1009p AG LS
Lo om 10600
a
a
SY
10, KA = =
- - _ _ a -
NOTE: B
‘entirely within setbacks e = — = -
~~ _ = —
1,000 _ _
[> T7 -
‘ sf
= = - =
+ a, DATE DESCRIPTION APPR
_- _ aes =
fx AMENOMENTS
> = = :
2 8 1g COPYRIGHT (C
=_ _ | - THESE DESIGNS AND DRAWINGS ARE COPYRIGHT ANO
ARE NOT TO BE USED OR REPRODUCED WITHOUT THE
WRITTEN PERMISSION OF BURCHILL VDM PTY LIMITED.
s THE CONTENTS OF THIS DRAWING ARE ELECTRONICALLY
GENERATED, ARE AND MAY ONLY BE USED
FOR THE PURPOSE FOR WHICH THEY WERE INTENDED.
THIS IS AN UNCONTROLLED DOCUMENT ISSUED FOR
INFORMATION PURPOSES ONLY, UNLESS THE CHECKED
SECTIONS ARE SIGNED AND APPROVED.
DO NOT SCALE FROM THIS DRAWING.
VERIFY DIMENSIONS PRIOR TO COMMENCING ANY WORKS.
| og
RF
ro o4
-_ \ | tHE
(
{
{
{
(
'
(
t
{
aR
%§ LET TELNET RS FTI RGR TF RT TFA FT ARIF RI RST FGF TIT TTD RT TRF IRI RTE TET RTF RGR TI RPR GF ROR IR EAS ep FULL SIZE: A3
S WIZZ SZ—IZRSITZK’WY,ASSYAS TASKS YSRDDIRDYS BSE YS STASIS RYDER r
i k 5 ’ —<s RAMP TURNING
—_— alll SHEET 3
Bir ibe
of a
»
TELSTRA
3
Power
Pe
=
(8 BurcHILL VDM
ACN 010 140 495 PTY LIMITED
CIVIL & STRUCTURAL CONSULTING ENGINEERS & PLANNERS
142 Bundall Road, Surfers Paradise, Qid. 4217
Phone (07) 5574 0511
Fax Civil (07) 5574 0014
Fax Structural (07) 5574 0505
Member of the
Email [email protected] GROUP
DESIGNED DRAWN
CHECKED DATE
FILENAME ERA THEHEAROnG. Ture PoInE\Rame: Turh F
APPROVED FOR AND ON BEHALF OF
NOT TO SCALE BURCHILL VDM PTY LIMITED
RPEQ No
DRAWING No. AMENDMENT
C3694-004
Page 95
APPENDIX F SIGHT LINES
Page 96
—
PROPOSED
COMMERCIAL
BUSINESS PROJECT
OFFICE
247 DAVID LOW WAY
PEREGIAN BEACH
AREA/STAGE
:
Wy
| |
|
|
| }
t ; .
] }
| |
| |
{ |
SS
DATE DESCRIPTION | APPR.
| AweNOMENTS oo
KEY
AREA TO BE FREE FROM
OBSTRUCTIONS
FOOTPATH
See SD13 for slipway
/ design and layout
PROPOSED SLIP WAY
STOP
NOT TO SCALE
SIGHT DISTANCE TO PEDESTRAINS ON THE PATHWAY
COPYRIGHT C
THESE DESIGNS AND DRAWINGS ARE COPYRIGHT AND
ARE NOT TO BE USED OR REPRODUCED WITHOUT THE
WRITTEN PERMISSION OF BURCHILL VDM PTY LIMITED
THE CONTENTS OF THIS DRAWING ARE ELECTRONICALLY
GENERATED, ARE AND MAY ONLY BE USED
FOR THE PURPOSE FOR WHICH THEY WERE INTENDED
THIS IS AN UNCONTROLLED DOCUMENT ISSUED FOR
INFORMATION PURPOSES ONLY, UNLESS THE CHECKED
SECTIONS ARE SIGNED AND APPROVED.
DO NOT SCALE FROM THIS DRAWING.
VERIFY DIMENSIONS PRIOR TO COMMENCING ANY WORKS
FULL SIZE: A3
DRAWING TITLE
SIGHT DISTANCE
REQUIREMENT AS
PER AS 2890.1
[5 BurcHILL VDM
PTY LIMITED
CIVIL & STRUCTURAL CONSULTING ENGINEERS & PLANNERS
142 Bundall Road, Surfers Paradise, Qid. 4217
Phone (07) 5574 0511
Fax Civil (07) 5574 0011
Fax Structural (07) 5574 0505
Email —[email protected]
ACN 010 140 495
Member of the
VBM
GROUP
DESIGNED DRAWN
CHECKED DATE
FILENAME
APPROVED FOR AND ON BEHALF OF
BURCHILL VDM PTY LIMITED
RP.E.Q No.
DRAWING No.
C3694-001
AMENDMENT
Page 97
ATTACHMENT D WATER & SERVICES REPORT Barlow Gregg VDM
Page 98
WATER AND SEWERAGE SERVICES REPORT PROPOSED OFFICE DEVELOPMENT at DAVID LOW WAY, PEREGIAN BEACH for MORGAN & BREIERS Amended July 2007 M3087 BARLOW GREGG VDM Consulting Civil and Structural Engineers '24 WALAN STREET MOOLOOLABA PO BOX 200 MOOLOOLABA QLD 4557 PHONE: (07) 54440400 FACSIMILE: (07) 54440536 EMAIL: [email protected] Fa ES OMERENG BONERS ° Boo 5 3S folwes PLR?
Page 99
WATER AND SEWERAGE SERVICES REPORT TABLE OF CONTENTS PART A 1.0 INTRODUCTION 1.1 Description of Development 1.2 Pre Development Site 2.0 SUMMARY PART B DRAWING M3087-W&S-01A Water & Sewerage Services Layout Plan
Page 100
1.0 INTRODUCTION 1.1 1.2 Description of Development The proposed site is subject to an application for a material change of use at Lots 1 & 2 RP903222, and Lot 26 P9315 David Low Way, Peregian Beach. The development will involve the construction of 18 office tenancies with ground level and basement carparking. Pre Development Site The proposed site is currently undeveloped. A small number of trees are on the site and the land falls to the north. An existing water main is located in David Low Way adjacent the subject site. A sewer main enters the subject site at the north western corner and extends approx 15m into the site along the rear boundary. It appears from council records that multiple service connections are available. An additional sewer connection point is available at the south western comer of the site. The site is adequately serviced with sewerage reticulation. 2.0 SUMMARY A water connection shall be provided from the reticulation main in David Low Way. This would be the most appropriate connection point for a water service to the site. Council advise that the current infrastructure is adequate for the proposed redevelopment of the site. The preferred existing sewer service connection will be maintained and the remainder to be capped and sealed at the service point. Council advise that the current infrastructure is adequate for the proposed redevelopment of the site. Existing services referred in the aforementioned have been obtained from Noosa Councils Geographic Information System. Refer attached drawing M3087-W&S-01A for details of both water and sewerage connection details.
Page 101
PART B - DRAWINGS TABLE OF CONTENTS PART B DRAWING M3087-W&S-01A Water & Sewerage Services Layout Pian
Page 102
”
TO
NOOSA Be ; ,
oes ee UL
ea ®
= en \ / PROPOSED: \ nd ‘
7 \ oS oo \ Ba tH / PROPOSED SToRMWATER _ — —_ \
PTTTTIVA oR RENE EES | O\ ge ee \
Stitt ty} . XY < Som eam \ aan 8 \ \,
at \
| Ly \ / i XY eee aT \ ser \
Zi oe \ \ \ _
1 4 \ . _ \,
a 1 | \ \ ee
aaa \ \ ae
on { \ ao \ ‘
. poy: TER Ley a
eo) wore seia Big 3
é | DICL WATER MAIN iy \
7 } \ a" vf
—f | OCEAN \ Ce \ /
\ er | \ » \ POSSIBLE SEWER ae
FP j \ CONNECTION LOCATION \ x
HD j \ \ AT EXISTING MANHOLE \ /
| ARB | \ “g i \ _— \ /
TN \ \z i SOWLS CLUB \ eo \ /
hp ! \
ji \ \ wan | ‘A’ e \ eo 4
Hf \ \ = I \%, \
Ty \ \3 | <8 \ \ ,
LS | “ \% ao"\ /
! \ 1 < \ oO Vom
-! \ | __
[im ri 1} \ a | 5 foo xX
BE =a \ | aay
—] pHa] id | , 1 POSSIBLE SEWER a \ / \
/ 1 wo | CONNECTION LOCATION \ \ / \
3 / ' AT EXISTING MANHOLE \ . \
_ j 5 / \ \ \ ( \
QS | ; Bo pO
“ — | | < \ .
To | ° |
‘ £ \
1 S i |
\ ° i |
' | L | = i
i fon i en = |
LOCALITY PLAN i i| 8 | | ~
NOT TO SCALE | We {a 7% = 1 }
a ' '
| 1 fi { t | | i
SERVICES LAYOUT PLAN
a Ss 0 SB 20 % 300
SCALE 1:$00 at Al
WATER SERVICE NOTES: SEWER NOTES: NOTES
1. _ EXISTING SERVICES SHOWN ARE FROM AUTHORITIES PLANS AND 1. REFER HYDRAULIC CONSULTANT FOR RAINWATER TANK AND
1, WATER SERVICE CONNECTION LOCATION IS SHOWN FOR DETAILED SURVEY INFORMATION. ANY OMISSIONS REGARDING PLUMBING DETAILS.
OESIGN PURPOSES ONLY AND SHALL BE FULLY INFORMATION SHOWN OR DISCREPANCIES SHALL BE CONFIRMED WITH RAINWATER TANKS SHALL BE CONFIRMED WITH ARCHITECTURAL
DETAILED AT OPERATIONAL WORKS APPLICATION. NOOSA SHIRE COUNCIL IN THE FIRST INSTANCE PRIOR TO DESIGN, DRAWINGS,
CONSTRUCTION OF WATER CONNECTION SERVICES
HA ARRIED OUT BY NOOSA SHIRE COUNCIL
SHALL BE 2. MORK ON EXISTING MAINS SHALL BE PERFORMED BY THE COUNCIL 2. REFER LANDSCAPE CONSULTANTS DRAWINGS FOR PLANTING AND
SS DIRECTED OTHERWISE. |
5S. _ EXISTING WATER MAINS SHOWN ARE FROM AUTHORITIES TURFING OETAILS.
PLANS AND DETAILEO SURVEY INFORMATION. ANY 3. ALL WORK SHALL COMPLY WITH CURRENT COUNCIL SPECIFICATIONS
OMISSIONS REGARDING INFORMATION SHOWN OR AND_GUIDELINES. wae - —
DISCREPANCIES SHALL BE CONFIRMED WITH NOOSA
SHIRE COUNCIL WATER IN THE FIRST INSTANCE PRIOR TO 4%. PREFERRED SEWER CONNECTION LOCATION SHALE BE CONFIRMED WITH
DESIGN, NOOSA SHIRE COUNCIL WATER & SEWERAGE BRANCH.
NOTES: BARLOW GREGG AND ASSOCIATES TITLE: PROJECT: DATE: APRIL 2007 | sca: AS SHOWN
This the property ot the egos. nd any sot | ENS Sana oe ap oan oon WATER & SEWAGE PROPOSED OFFICE aor wRT_| orn,
Se ane Ss OGL ORT ae | SERVICE LAYOUT PLAN DEVELOPMENT at DAVID LOW | cs nT
Infringement in ony woy may result i teal artion, PH ito Ses ST as WAY, PEREGIAN BEACH ‘oecxen. area” 7 3 30
1. Figured dimensions tate precedence over scaled. A bes Ta, CORAL COAST: ASSOCIATED COMSLA TANTS fi RGAN & BREIER PROJECT -SUBSET-SHEET-REVISION
A] REVISED LAYOUT 174707 [MR 1 Verity afl on site. en ute free 17 ee KEN DOWN ARCHITECTS or MO $
No. Amendment Onte |By}No Amendment Date {By Prone 107) 496 U4It Ph: (07) S644 4511 Fax: (07) 4968 1633 M3087 - W&S - D1A
Page 103
ATTACHMENT E STORMWATER MANAGEMENT REPORT Barlow Gregg VDM
Page 104
STORMWATER MANAGEMENT REPORT PROPOSED OFFICE DEVELOPMENT DAVID LOW WAY, PEREGIAN BEACH FOR MORGAN & BREIERS Amended July 2007 Job No. M3087 BARLOW GREGG VDM Consulting Civil and Structural Engineers 177-181 BRISBANE ROAD, MOOLOOLABA PO BOX 200 MOOLOOLABA QLD 4557 PHONE: (07) 54440400 FACSIMILE: (07) 54440536 EMAIL: [email protected] RY (Is > BARLOW GREGG WHA, aad CONSULTING ENGINEERS: (bobo RPE® 1330
Page 105
STORMWATER MANAGEMENT REPORT TABLE OF CONTENTS SECTION 1.0 INTRODUCTION 1.1 Description of Development 1.2 Pre-Development Site 2.0 STORMWATER MANAGEMENT STRATEGY 2.1 Hydrology 2.2 Proposed Stormwater Drainage 2.3 Flows from Driveways 2.4 Stormwater Quality 2.5 Stormwater Detention 2.6 Flood Protection 2.7 Construction Phase 3.0 MAINTENANCE 3.1 Construction Phase 3.2 Operational Stage 4.0 SUMMARY APPENDICES APPENDIX A - DRAWING No M3087-SWMP-01B APPENDIX B —- Proposed Basement Pump Detail APPENDIX C - XP-STORM Pre Development Output APPENDIX D — XP_STORM Post Development Output
Page 106
1.0 INTRODUCTION 1.1 1.2 Description of Development The proposed site is subject to an application for a material change of use at Lots 1 & 2 RP903222, and Lot 26 P9315 David Low Way, Peregian Beach. The development will involve the construction of 18 office tenancies with ground level and basement carparking. Pre-Development Site The subject site is currently undeveloped, is sparsely vegetated and falls gently to the north. It is located in the Eastern Beaches precinct of Noosa Shire. 2.0 STORMWATER MANAGEMENT STRATEGY 2.1 2.2 Hydrology The site is located on the David Low Way, Peregian Beach, adjacent to the Peregian Beach Bowls Club. The site is generally flat with surface levels ranging from RL 10.0 m AHD to RL 11.0 m AHD. The proposed use of the site will not alter existing catchments or detrimentally redirect surface flows. Proposed Stormwater Drainage The stormwater drainage system for the proposed development will be designed in accordance with QUDM and AS3500 Part 5. Runoff from as much of the external area of the development as is practicable will be conveyed to landscaped areas for infiltration. Runoff from the site will be discharged into a proposed new stormwater gully pit to be located at the frontage of the site. From there a stormwater pipe will convey discharge into the existing stormwater manhole to the north of the site on the David Low Way as noted on drawing M3087-SWMP-01B. The location and alignment of this stormwater infrastructure will be detailed at the operational works stage of design. As this system is under Council control it is proposed that this is a lawful point of discharge.
Page 107
2.3 2.4 2.5 Flows from Driveways The runoff from the driveway will be directed onto adjacent unpaved areas where practicable to allow for infiltration. The use of a grated drain constructed at the bottom of the ramp will catch runoff from the ramp before it flows into the basement. Water collected in the basement will be pumped to a pit at ground level with a system of Atlantis cells allowing the injection of the water back into the water table. It will be designed to allow 90% of the water to soak away into the sand, and only in times of heavy rain would the water bypass this and be connected to the councils storm water system. Further details of this system will be provided at the operational works phase of design. Stormwater Qualit It is proposed that low flows collected from the driveway will be dissipated over unpaved areas for infiltration as much as practicable. Where runoff enters the proposed grated drain, it will be treated by a gross pollutant trap prior to discharge to the proposed stormwater pit at the frontage of the site. The quality of the runoff from the development would meet the requirements of Environmental Protection (Water) Policy ANZECC standards and Council's Code for Waterways and Wetlands. Stormwater Detention In order to ensure that the site can be developed with no net increase in runoff, an XP-STORM model was created to determine pre and post development flows. Average recurrence intervals of 1 in 10, 20 and 100 year storm events were analysed. It was decided that a stormwater detention tank to be located in the basement would be used to attenuate post development flows. 2.5.1 Methodology The hydrology and hydraulics of the Q10, Q20, and Q100 scenarios was analysed using the XP-STORM stormwater management model with storm patterns derived from Australian Rainfall and Runoff publication and rainfall intensities derived for the Peregian area. To accurately determine maximum flows, storm durations of 10, 20, 25, 30 ,45, 60, 75, 90 and 180 minutes were investigated. 2.5.2 Selection of Modelling Parameters
Page 108
XP-STORM modelling parameters were assessed from layout drawings, contours, QUDM (Queensland Urban Drainage Manual) and considering the extent of proposed development within the catchment. 2.5.3 Impervious Areas After inspecting the site, it was decided that an impervious area of 20% would be used for the pre development case. In accordance with the post- developed situation, 90% of impervious ground area was used in the post development model. 2.5.4 Manning's ‘n’ Values for the dimensionless Manning’s ‘n’ coefficient for open channel and piped flows were assigned according to Table 2.1 in accordance with QUDM. Table 2.1: Study Manning's ‘n’ Conduit Condition Manning’s ‘n’ Grassed, Landscaped 0.045 Swales Reinforced Concrete 0.014 2.5.5 Energy Loss Coefficients Entrance and exit loss coefficients were utilised according to Table 2.2 in general accordance with QUDM. Table 2.2: Pipe Energy Loss Coefficients Energy Loss Loss Coefficient Entry Loss 0.5 Exit Loss 0.2 2.5.6 Results The following table shows maximum stormwater flows generated in the pre development case.
Page 109
Table 2.3: Maximum Pre Development Stormwater Flows ARI Storm Duration Maximum Flow (m*/s) 10 25 0.082 20 25 0.103 100 25 0.125 Appendix C contains XP-STORM output graphs for the pre developed case. Table 2.4 contains maximum stormwater flows from the post development site with the inclusion of a 45m’ detention tank. Table 2.4: Maximum Post Development Stormwater Flows ARI Storm Duration Maximum Flow (m7/s) 10 25 0.079 20 25 0.094 100 25 0.122 Appendix D contains XP-STORM output graphs for the post developed case. These results compare favourably to the pre development stormwater runoff flows, and indicate that non-worsening of stormwater runoff can be achieved by installing a 45m’ detention tank. This tank is to be located in the south eastern comer of the basement with a base R.L. of 8.5m to enable in to drain under gravity to the external stormwater network. 2.6 Elood Protection The proposed access driveway to the basement will meet QUDM flood protection requirements by rising above the Q100 level, before ramping down into the basement. 2.7 Construction Phase A Sediment and Erosion Management Plan (SEMP) will be included as part of a future Operational Works Development Application. The SEMP would implement measures in accordance with the Engineering Guidelines for Queensland Construction Sites and Council’s guidelines to ensure that sediment would not enter the waterways or cause nuisance to adjoining properties or the public.
Page 110
3.0 MAINTENANCE 3.1 Construction Phase The SEMP will be implemented by the Project Managers and maintained until completion of building works and the establishment of landscaping. 3.2 Operational Stage The permanent stormwater treatment devices will be inspected and maintained on a regular basis by the manager of the development on behalf of the Body Corporate in accordance with the manufacturer's recommendations. 4.0 SUMMARY The implementation of this Stormwater Management Plan will ensure that the proposed development would not create a nuisance to other landowners, or degradation of the environment due to its effects on the hydraulics and hydrology of the site.
Page 111
APPENDIX A DRAWING No M3087-SWMP-01B
Page 112
—_—_—
600 x 600
FOX BOPCT.
oa
600 x 600
FOX SGPCT.
STORMWATER TANK,
BASE RL. 8.50m
Pe ee LL LL
LEVEL.
4d
CREST TO BE ABOVE Qt00
/
INVERT RL. 8.460
NEW STORMWATER
PIT, INVERT R.L. B.20m
ow —™
EXISTNG COUNCK
STORMWATER PIT
5 R Al NT_P!
a NOTE: LEVELS INDICATED ARE Nat eS
NEW STORMWATER —_—— sv PRELIMINARY ONLY.
PIT. wa SCALE 1.100 AT At
NOTES: TITLE: PROJECT: are: BAY 2007 | scar: AS SHOWN
1 se mary of te mae ct oy mt | I BARLOW GREGG MaRmaWA| STORMWATER MANAGEMENT | PROPOSED OFFICE ae | mF
aud te npr omnean ot Rocce > an 774 3 Ae DoD PLAN DEVELOPMENT at DAVID LOW [an« eR €
Infringement in ony wey aay res! in fegel ection GD ppd PAS OS WAY, PEREGIAN BEACH Sect. wee (3 30
flaersins take Se ore 0 92 bem, . 7 PROJECT-SUBSET-SHEET -REVISION
tases carer Sele lwhdemeete [U7 = RE Es [KEN DOWN ARCHITECTS for MORGAN & BREIERS 3087 >
No. ‘Amendment Date [By|No “Amendment Date [By eowepen at merenineuT | Ph: {071 S666 4511 __ Fox: (07) 6968 1633 - SWMP - 01B
Page 113
APPENDIX B Proposed Basement Pump Detail
Page 114
U-bro- HOT OPPED GALVAMZED
a ~~ STEPTREADS BY HUMES
coer eS OR EQUAL,
no
xP Se Se
SK
SKS
Soe RSS
£4
POOL
\ \ CAST ROM COVER 600458
\ HEDUM QUTY.- VEHICULAR
| IsuemerseLe PUPS - DUTY
1 14S paMCATED IY SCHEDULE
———=!] - -— “Sn TOTAL te OF PUMPS TWO)
worl
TS DETAIL IS. AN INDICATION
ONLY OF THE ARRANGEMENT
OF PIPES AMD FITTINGS,
BSTAILATIN THE CONTRACTOR
ALLA
PLAN VIEW SHALL ALLOW FOR ADOITIONAL
PRES AND FITTINGS TO ALLOW
THE SATISFACTORY BSTALLATION
1 LONG BADUS ELEC 600 x 650 OF ALL PUMPS AS INDICATED ON
CAST RON COVER & FRAME THE OOCUMENTS, INCLUOING, THE
SERVE AS SLEVE FOR PRESSURE
POLY PUMPOUT LINE. SLEVE MEDIUM DUTY - VEHICULAR FLOOR PLANS.
FLANGE. TO BE SEALED AT FLOOR LEVEL ‘me S/S BOLT -— PUMPS TO HAVE ALTERNATING
AND AT THE WALL OF THE PUMP ith ALL S/S wen 5/5 BOT OUTY AND BE WIRED 10 HAVE
CHAMBER TO. ENSURE WATER STRAP FXG Wee S/S BOL THE SECOND PUMP RUN
TIGHT JOINTS, SIULTANEOUSLY WITH PUMP Mo 1
miruir —— SHOULO THAT DEMAND BE REQ.
" TOR \
. FLANGE, A
\ . “i
SSS Ss EH Z) HOT OPPED GAL BRACKET
ieee 7 BOLTED TO SIDE OF HLA.
GRADE eam HIGH LEVEL REGULATOR
JL
eon lw Toray ENCLOSED IN PVE
‘ ‘7 ee l
ALL S/S WORM
DRIVE CLAMP L__ 300 900 Lt PRECAST sEvERHARO-
HEAVY DUTY
LAYRLAT
PUMPOUT UNE.
L PUMP No 2 CUT
wvert 10 = GALVANIZED MLO
eM STEEL CHAIN,
’ PUPP Wo 1 CUT I.
ALL S/S WORM
DRIVE CLAMP
TE: +-— PUMP CUT DUT.
PUPS MOKCATED < <
SEWAYS FOR ERR REE HDG, PED i
CLARITY REFER 10 MC HICK
Plan FoR ACTUAL
POSITION OF PUMPS.
SECTIONAL ELEVATION
SCALE N.T.S,
& Associates “ausca
HYDRAULIC CONSULTANTS
CABRINIPTY LTD ABN 53 494 887 081
BSA LICENCE NO. 887442
P.O. Box 646, COTTON TREE, Qid 4558
10/43 The Esplanade Maroochydore
Phone: 0/7 5443 1000
Fox: 07 5443 1136
Email: [email protected]
b Brian Bumett gy
Page 115
APPENDIX C XP-STORM Pre Development Output
Page 116
Q10 Pre Development Max Flow =_—) SS === omen) ae2e2 10 min [Max 0.041] 15 min [Max 0.059] 20 min [Max 0.059] 25 min [Max 0.082] = acme — — 30 min [Max 0.072] 45 min [Max 0.051] 60 min [Max 0.070} 90 min [Max 0.063] 0.08 0.07 0.05 Flow 0.03 0.02 0.01 0.00 od = 1 Sat 0:30 1:00 1:30 2:00 Jan 2000 Time
Page 117
Q20 Pre Development Max Flow —_—_———_ scent] S225 == 10 min [Max 0.053] 15 min [Max 0.082] 20 min [Max 0.079] 25 min [Max 0.103] EE _—_ =, 30 min [Max 0.093] 45 min [Max 0.067] 60 min [Max 0.093] 90 min [Max 0.079] Flow ° 2 a ° ® 0.01 0.00 1 Sat 0:30 1:00 1:30 2:00 Jan 2000 Time
Page 118
Q100 Pre Development Max Flow a eenses| = =_—_—— s22=> 10min [Max 0.085] 15min [Max 0.116] 20min [Max 0.115] 25min [Max 0.125] (neal =—= =e, ws 30min [Max 0.116] 45min [Max 0.103] 60min [Max 0.125] 0.12 0.11- 0.10 0.09 0.08 z 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00—" sn 1 Sat Jan 2000
Page 119
APPENDIX D XP-STORM Post Development Output
Page 120
Q10 Post Development Max Flow LJ =—_ sop] 2225 10 min [Max 0.042] 15 min [Max 0.065] 20 min [Max 0.064] 25 min [Max 0.078] Cae =—=—_ ers = 30 min [Max 0.073] 45 min [Max 0.055] 60 min [Max 0.074] 90 min [Max 0.067] 0.03 0.02 0.01 Jan 2000 Tine
Page 121
Q20 Post Development Max Flow sete] ee Es eee sa232353 10 min [Max 0.056] 15 min [Max 0.079] 20 min [Max 0.078] 25 min [Max 0.094] (eae === —, 30 min [Max 0.087] 45 min [Max 0.070] 60 min [Max 0.088] 90 min [Max 0.078} 0.09 0.08 0.07 0.06 3 0.05 iL 0.04 0.03 0.02 0.01 0.00 —s = 1 Sat 0:30 1:00 1:30 2:00 Jan 2000 Time
Page 122
Q100 Post Development Max Flow —I ———— =e) a4 44 _} en 10min [Max 0.083] 15min [Max 0.103] 20min [Max 0.103] 25min [Max 0.114] =z a | = 30min [Max 0.105] 45min [Max 0.094] 60min [Max 0.110] 0.11 0.10 0.09 0.08 0.07 3 0.06 wL 0.05 0.04 0.03 0.02 0.01 0.00 1 Sat 0:30 1:00 1:30 2:00 Jan 2000 Time
Page 123
ATTACHMENT F LANDSCAPE PLAN LandGraphics
Page 124
Lan¢scaping using a combination of shrubs and to
LEGEND
Proposed Office Development - Peregan Beach
soften and improve the visual amenity of the side and
rear Soundanes anc in integration with the locality.
TIMBER PALING FENCE TO BOUNDARY’ *
Hardscape
Ee] DRIVEWAY AND CARPARK
Es] BUILDING PAVEMENT
Softscape
EXISTING TREES
TO BE RETAINED
XISTING TREES
TO BE REMOVED (refer Survey)
Planting to incorporate a framework of
predominantly endemic species with the addition of
. | some other natives to contribute further textural TO
interest. The selected ’species are reliable and NT
appropriate for the locatiort, space and orientation of BASEME
the planting areas. *
STREET FRONTAGE TREES
SCREENING SHRUBS ‘ Nee bak isle Peas
* OF VARIED SPECIES AND HEIGHT.”
ALONG BOUNDARY
& (MIN. 1m AND MAX 8m HIGH)
LARGE SHADE TREES
‘Cotton Tree’
SMALL SHADE TREE
‘Coastal Banksia’
¥ : ee SCREENING SHRUBS
3 ¥ vax | SHRUBS AND GROUNDCOVERS
4 4 yack
¥ / " \ ' LAWN AREAS
{ | : t PROPOSED ARSORS
OVER TIMBER'SEATS
fofecsketoh shes LA 2) = v—
i | 5
Tatiey 4
PROPOSED
PLANTING UNDER
STAIRS
Tenan cy9
Tenancy 1. | Tenancy 2] Tenancy 3 Tenancy.5| Tenancy 6 Tenancy 7 \Tehancy 8
; ! if PROPOSED Bangaiow .”
Palms IN RAISED
PLANTERS : row.
\ IN VALLEY BETWEEN
t : A ! BUILDINGS
( x ; EXISTING: EXISTING ’
EXISTING Banksia intagrfolia r Araucaria spp
Melaleuca species TO BE RETAINED +| | TOBE RETAINED
TO BE RETAINED 4
8
ISSUED FOR DEVELOPMENT APPROVAL | cB
AMENOED N RESPONSE 70 8 ct
37 | AMENOED N ACCORDANCE WITH SURVEY wets
|
|
DRIVEWAY
Soe G 3 i ‘ 5 3 ne: 7 a
1 ead : i ; | LANDGRAPHICS
3—— 3 : 3
WwW 1 Hi s ss Te ANDSCAPE ARCHITECTS
ge 0 , t ; d a
TO BE RETAINED. : : : i —
| Proposed oF tow wey
ice Peregian Beach
| Development
| MORGAN & BEIERS
LANDSCAPE DESIGN APPROACH
Ses Se eae ‘ : PLANTS hava bpen saloctec to achotve combination plantings anprognats to
nt se tho Porogian locality Nominated plants that are both lcaly artabie and iz ee
sj tolerart o¢ cal ¢rvironmantal ‘actors wil enhance he uncon anc .
ianly >! te Lhvelopmert. The plrtng aye bfagaian fis peje wey | KEN DOWN ARCHITECTS
tho Davis Low Vay sreotscape and wice grasses staat are ofthe
particular ‘rontage. Tall trees croat visual Dreaks mn the bull avation
Softening tho overall facade. Plant selection is ganaraly in accordance wit)
The Noosa Plan Landscaping Code and Noosa Planning Schare Potry
Landscaping Plants & Guitlnas
SPEED BUMP.
- rraweng Te
LANDSCAPE CONCEPT
- Overall Layout
PHOTO 4
SCREENING to side boundaries consists of dense shrub plantings. Many |
large trees wil bp incorporated around the budding to soften the buat torr arc
omphasise the architectural design and streetscape regration Parting | “
|
PHOTO 3
‘bination are aimed at producing a untied lancscaping thame wrest — =
Landscaping contributes to the ate mabe cto taal bai a ob a ue
existing streetscape continuity using ~" —— a
LANDSCAPE CONCEPT FOR DEVELOPMENT APPROVAL the locally identifiable species lappy rl Ltpreae li cae | waar
1 . & Guicolines “oe recognised and preferred specios ‘or amanily plantings sea 1200 @ Aa
Proposed Office Development - Peregian Beach Sir vase Romesmenroceramreyeeme | PS
eric epee assert a
EEE re
Page 125
PROPOSED PLANT SPECIES FOR INCLUSION
Trees & Palms
Botanical Name Common Name
Gmecce ecu cam SPECIES FOR INCLUSION
Banksia integriofa Coastal Banksia | N ST R E ET F RO NTAG E
Hibiscus tiliaceus Cotton Wood
Pongamia pinnata Indian Beech LANDSCAPING
INDICATIVE PHOT!
Tecomanthe hillli over arbor
Gympie Terrace, Noosaville
Shrubs & Accents
Botanical Name Common Name
Banksa ‘Coastal Cushion’
Crinum pedunculatum ‘Swamp Lily
Dianella brevipeduncedeta Flax Liy Hibiscus tillaceus ok
Isolepsis nodosa Knobbly Club Rush ‘Cotton Tree’
Leptospermum flavascens ‘Cardwell’ = mf
Saipan wae Magenta Chery Callitris columellaris ones i
Syzygium ‘Elite’ Elite ‘Noosa-Cooloola Callitris’ Coas' ushion
Westringea fruitocosa Coastal Rosemary hibberia scandens
Ni Dianella species Snake Vine
" ‘Flax Lily’
. Banksia integrifolia
Groundcover/Climber ree rlgeeoes
Botanical Name Common Name
Hibbertia scandens Snake Vine Laide pot star ban lies acl ells ltd Myoporum ellipticum
Aubrpnepttietel eerste wep eee PROPOSED ARBOR
Myoporum ellipticum Coastal Myoporum PLANTS L'STED MAY UE IMCORPORATED ADDITIONAL SPECES:
Tecomanih hit "Roaring Meg PLuAT SOM OUE WLC PREPARED TOT RAL ORHAT ONAL OVER TIMBER SEAT
Cantileverd timber arbor provides structure for climber over seating
WORKS DRAWINGS
INDICATIVE PHOTO
Timber ‘box’ seat under ‘Cotton Tree’
Peregian Shopping Centre
AMENDMENTS
os [oer]
raya
8 | oooeo7
¢ | 06-007 | ISSUED FOR DEVELOPMENT APPROVAL | all
© | 4.07.7 | AMENOED & RESPONSE TO f cs
| 0507.07 | AMENDED 'N ACCORDANCE WITH SURVEY] Ma
¢ a a
LANDGRAPHICS
ee ee
aa Proposed ,7"
PHOTO 1 Offlea Becta
Panorama of existing site frontage from David Low Way
Development |
MORGAN & BEIERS ~
PHOTO 4 cn cows aoa
EN DOWN ARCHITECT!
Existing Melaleuca spp. street ree to be removed be RCHITECTS
THE SITE (S DENSELY VEGETATED
ALTHOUGH MOST NATIVE TREES HAVE
REACHED THEIR LIFE SPAN AND HAVE
BEGUN TO DECAY AND UNDERGROWTH
|S GENERALLY UNDERSIREABLE
WEED SPECIES. THESE INCLUDE
Camphor Laural, Balsam, Mother in Laws Tounge
AND Mothor of Millions. THE SITE WILL BE
CLEARED WITH WEED MATERIAL CAREFULLY
DISPOSED OF.
LANDSCAPE CONCEPT
- Elevation, Photos...
aaa) a
View of current site frontage =
PHOTO:2 [a |e
View from neighbouring mone ae ten me
site LGKH 1180] Lco2 02 OF 02 E
Page 126
joelolg
Hundred Metres
Ten Metres
Five Metres
Metres
OS Matres
0-25 Metres
Storm Woter
Sewer
Gas
Telecom
Electricity
Under Ground
Water
Elec Box Electric Power Box
© PP Power Pole
Oo ELP Electric Light Pole
© Lamp Lamp - Light on Pole
O FH Fire Hydrant
OG Gas Valve / Line
‘ Sewerage Manhole
95
SPIZ7431
DP86 8259
ASAUAS WYLIG GNY UWAOLNOSD
Gij Ald SUsdd 8 NVSYON =
eR ce ts es a else
@ Tap
VGAIM JO HSlWVd - GlE6d NO
9% LOI 8 Z2ceosdd NO @ BL SL1O1 30
ip
Ditele Pit Telstra Pit
WMT Water Meter
eawy Water Valve
MmcT Gully Trap
Tree
Tree Trunk Diameter
Tree Spread
Permenent Survey Mark
Temporary Bench Mark
SPIS7431 Traverse Statian
Peg - New
Peg - Original
fron Pin
Trafic Controle Light
PSM 138003 Other Features noted on Face of Plan
RL: 10-235 AHD
“ON
S;UaWpuEwYy
Sd}ON
3409
GHY l€5'42 “14 WSd
L£8%bb WSd ‘NINO 13A37
GHY ‘WhLVa 13A37
Screw In Conc
RL:10-666 AHD
S}Uaulpusuy
RP903222 3
c
MELALUCA
80-3
FiG TREE \
02
Ht BO
Re
Spd 15-0
MOOP PINE
BANKSIA ioe
on oe Spd 6-0
Ht 16-0 >
oO" Spa 4-0 oS
A + © a
8/ 2
MCH3786
Spd 12-0
‘ou jaeys
S}UD}jNSUOD pajoloossy
2 storey brick house
First floor tevel i290
Sacond tloor level {3-99
BANKSIA
206
Ht 6-0
Spd 9-0
a4 4Jeyndwog
pefaains
/poublsag
IS92345
POZIS
L002 / 20 /S0
ry
OM DTOVrPYG OMNDVDVEAE
8m 243355 FrayFoaop DISCLAIMER
£2 $229m Fe"S os _,2
ag oo 22=2.8a75Ean
a2 -ipia gr S* 235 8 The title boundaries as shown hereon were not marked at the time
op FSF ud wo ~Swe me of survey arti have been determined by plan dimensions only and
58 g@ ago & g-ess S not by field survey. Services shown hereon have been located
ro ? hos 3 pg °ao where possible by field survey, If not abie ta do so, located
wo? @ 36 2 “5 aam services have been plotted from the records of relevant
“xa b =8 om 3 24 oe authoritles where available, and have been noted accordingly on
=o 3° 2 $ 33 ® this plan Where such records either do not exist or are
o» w oa = - inod te, a notation has been made hereon,
o ww : inadequate,
. ° on a b
ce a
@ Dz 6 Prior to any demolition, excavation or construction on the site,
=< DD 8 the relevant authority shoutd be contacted for possible location
~ > a of further underground services and detailed locations of all
2 services.
>
z—
o
>_—_.
o =,
eo)
°
oA,
> G3 Hel
nm ° 5 10 20 30 Metres
2
Original Scale [:200
‘ON GulmDdig
3
3
2
Used in these records
About this file
- File size
- 19.5 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.