Council archive · source document
06/2689 - Response to request for further Information [As Published] · 132006.2689
Very large file (19.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
3.0 MAINTENANCE 3.1 Construction Phase The SEMP will be implemented by the Project Managers and maintained until completion of building works and the establishment of landscaping. 3.2 Operational Stage The permanent stormwater treatment devices will be inspected and maintained on a regular basis by the manager of the development on behalf of the Body Corporate in accordance with the manufacturer's recommendations. 4.0 SUMMARY The implementation of this Stormwater Management Plan will ensure that the proposed development would not create a nuisance to other landowners, or degradation of the environment due to its effects on the hydraulics and hydrology of the site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Response to request for further Information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.