Skip to the record
Accept no substitutions.

Council archive · source document

06/2689 - Response to request for further Information [As Published] · 132006.2689

of 126

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (19.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

3.0 MAINTENANCE

3.1 Construction Phase
The SEMP will be implemented by the Project Managers and maintained until
completion of building works and the establishment of landscaping.

3.2 Operational Stage
The permanent stormwater treatment devices will be inspected and maintained

on a regular basis by the manager of the development on behalf of the Body
Corporate in accordance with the manufacturer's recommendations.

4.0 SUMMARY

The implementation of this Stormwater Management Plan will ensure that the
proposed development would not create a nuisance to other landowners, or
degradation of the environment due to its effects on the hydraulics and hydrology
of the site.

Used in these records

About this file

File size
19.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_2689 - Response to request for further Information [As Published].pdf · 19.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.