Council archive · source document
06/2689 - Response to request for further Information [As Published] · 132006.2689
Very large file (19.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
1.0 INTRODUCTION 1.1 BACKGROUND Burchill VDM Pty Ltd have been commissioned by Morgan and Beier Pty Ltd to conduct a Traffic Impact Assessment (TIA) of the proposed Commercial Business Project Office (the proposed development), to be located at 247 David Low Way, Peregian Beach (the subject site). 1.2 REPORT OBJECTIVES The objectives of this TIA are to: 1. Review background traffic volumes on the surrounding road network. 2. Calculate daily and peak hour traffic generation of the proposed development and determine its distribution. 3. Examine the access requirements of the site. 4. Determine parking requirements and assess the internal layout. 5. On the basis of the above, examine the traffic impact of the proposed development. yoo vem BURCHILL VDM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Response to request for further Information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.