Council archive · source document
06/2689 - Response to request for further Information [As Published] · 132006.2689
Very large file (19.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
2.5.2. Road Upgrades Council proposed to upgrade the section of David Low Way between Herron Street and Woodland Drive at address traffic issues associated with the expected development as per the Peregian Beach Master Plan. This included the construction of a roundabout at the David Low Way / Woodland Drive / Ibis Street intersection and a raised median extending from the roundabout to Herron Street. This will restrict turns at driveways along the section to left in / left out. Vehicles wishing to turn right will need to conduct U turns at either the Herron Street roundabout or Woodland Drive roundabout. The roadway will also be upgraded to 3.5m travel lanes with a 1.5-2.0m cycle lane in each direction and kerb and gutter on both sides. No on-street parking will be provided. A crossing point for pedestrians is likely to also be provided midway between the two roundabouts. Planning for these upgrades is currently underway with construction of the roundabout at Woodland Drive envisaged for 2008. For analysis purposes, construction of the remaining upgrades is also assumed for 2008. Council have advised contributions towards these upgrades will likely be sort from developers. een ves. BURCHILL VDM Juty 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Response to request for further Information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.