Council archive · source document
06/2689 - Response to request for further Information [As Published] · 132006.2689
Very large file (19.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Figure 13.23 was assessed. This shows an AUL(S) (short left turn treatment) is warranted on David Low Way into the access. To accommodate this warrant, a AUL(S) will be provided on the existing gravel area to the south of the proposed access which is currently used by vehicles to pull of David Low Way. The AUL(S) will be provided by essentially paving this area being minor road widening entirely within the David Low Way road reserve. No kerb and gutter will be provided at the lane to ensure access to the domestic driveways is maintained. The lane will be accommodated within the existing gravel area and will be constructed as per DMR’s RPDM, Figure 13.73, being 25m long and 3.0m wide, including a taper of 15m. This lane will serve two purposes. The first will be to provide the warranted access to the site, and the second will be to improve safety for vehicles that currently use this area to pull off David Low Way to access domestic properties. A right turn treatment will not be provided as access will be restricted to left in and out only by way of the raised median shortly after opening. 4.2 ACCESS ANALYSIS The access has been analysed at full upgrade of David Low Way with the left in and left out only from the development site at the expected design year of 2018. The access has also been analysed for existing conditions in 2008 without any upgrades to David Low Way. This was not assessed for 2018 as it is assumed the upgrade of David Low Way will be complete by this time. The performance of the access was analysed using the SIDRA 3.0 traffic modelling software. For priority controlled intersections (Give-Way or Stop control), a Degree of Saturation (DOS), which is the ratio of flow to capacity, greater then 80% is considered over capacity. Above this value, performance deteriorates quickly and operation becomes poor. Council's Coastal Major Road Network Infrastructure Changes Plan states that in order for design systems to operate adequately in peak holiday times (i.e. 20% of the year) it is necessary for the network to operate within the Level of Service (LOS) B to C range with give way intersections having a DOS of 70% or less. The critical gap and follow-up headway parameters used for the model were derived from Austroads (2002) Urban Road Design Guide. The traffic volumes considered in this analysis are illustrated in Appendix C, Figures 3.1 and 3.2. The results of this analysis are summarised and discussed eeOr vem BURCHILL VDM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Response to request for further Information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.