17

 

6.0 CONCLUSIONS / DISCUSSION

The proposed Commercial Business Project Office at 247 David Low Way,
Peregian Beach, is likely to generate up to 24 trips in the morning and peak
hours.

Before the proposed upgrade of David Low Way the access is expected to
operate adequately with minor delays to northbound traffic on David Low Way.
However, it is expected an unbroken median will be constructed in David Low
Way fronting the site shortly after opening of the Proposal as per Councils
planned roadworks for the area, restricting access to left in and out only.

An AUL(S) will be provided on the existing gravel area to the south of the
proposed access which is currently used by vehicles to pull of David Low Way.
The AUL(S) will be provided by essentially paving this area being minor road
widening entirely within the David Low Way road reserve. No kerb and gutter will
be provided at the lane to ensure access to the domestic driveways is maintained.

This lane will serve two purposes. The first will be to provide the warranted
access to the site, and the second will be to improve safety for vehicles that
currently use this area to pull off David Low Way to access domestic properties.

A right turn treatment will not be provided as access will be restricted to left in and
out only by way of the raised median shortly after opening.

By 2018 David Low Way will approach the maximum desirable carrying capacity
of a two way two lane road as per Noosa Council’s guidelines. However, the
proposed office development will only add a relatively minor volume of traffic to
the road compared to the backgraound traffic volumes, therefore it is not expected
to have an impact on the carrying capacity of David Low Way.

The internal operation of the site is considered adequate for the volume and type
of vehicles entering the site.

The traffic impacts of the proposed office development on the external road
network are expected to be minimal. There are no reasons in terms of traffic
impacts that the Proposal should be refused.

Matt Murphy
Traffic Planner

 

Rar No. A260 vem BURCHILL VDM

Used in these records

About this file

File size
19.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_2689 - Response to request for further Information [As Published].pdf · 19.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.