Council archive · source document
06/2689 - Response to request for further Information [As Published] · 132006.2689
Very large file (19.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
— =a _— _— _— # For setting out details of the left tum geometry, use vehicle tuming path templates and/or Figuee 13.70. =f Design Speed of Diverge/Deceleration | Taper Length Major Road Length D Tay)”: Approach (km/h) (m)"? 50 15 5 60 25 By 0 38 20 80 45 20 90 55 25 (1) Based on 9 20% reduction in through road speed at the start of the taper anda value of deceleration of 3 Sm/s”, Adjust for grade using the 'Correction to Grade! table ia Figure 13.42. (2) Based on a turn lane width of 3.00 Ww Nominal through lane width (mm) (inch. widening for curves) Wr= Nominal width of turn Jane (m) (inel, widening for curves based on the design burning vehicle). Desirable minimum = 3.0m, absolute minimum = 2.8m. T= — Taper length (im) = Osis Vas V= Design speed of major road approach (knw) Note: Approaches to Ieft turn slip lanes can create hazardous situations between cyclists and left-tumning mater vehicles. Treatments to reduce the mumber of potential conflicts at left turn slip lanes are given in Austroads (19996), Figure 13.73 Auxiliary Left Tun Treatment [AUL(S)] on the Major Leg of an Urban Road
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Response to request for further Information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.