Cover Letter
Attached to the e-mail Operational Works Application OPW16 /0203 - 1 of 4.
Calibre Consulting (Qld) Pty Ltd Ground Floor, 545 Queen Street Brisbane QLD 4000 PO Box 10349, Adelaide Street Brisbane Qld 4000 Calibre T +61 7 3895 3444 ABN 38 109 428 506 CONSULTING Our Ref: 16-001014.0C01.AMcP.bf.docx Your Ref: MCU15/0111 & REC15/0031 Contact: Andrew McPhail 9 September 2016 Palm Lake Works Pty Ltd c/- Calibre Consulting (QLD) Pty Ltd PO Box 10349, Adelaide Street BRISBANE CITY QLD 4000 Attention: MARK LEWIS Dear Mark, Palm Lake Retirement Village, 19 Trading Post Road, Cooroy Operational Works Application — Stage 2 (Roadworks and Drainage) On behalf of the applicant, Palm Lake Works Pty Ltd, we submit for Council's approval an Operational Works (Roadworks and Drainage) Application for 19 Trading Post Road, Cooroy. We enclose the following to support this application: e IDAS Development Application Forms 1 and 6; and e Engineering drawings prepared by Calibre Consulting (Qld) Pty Ltd. e Specialist Information: — Summary Letter of Stormwater Management Responses to MCU (16-001014.01L.ms.cm — 12 Sept 2016) — Stormwater Quality Management Plan — Calibre Consulting (16-001014-01A — September 2016) — Stormwater Management Construction and Maintenance — Calibre Consulting (16-001014-02A — September 2016) e Acheque payable to Council for $5,904.00 being the prescribed application fees consisting of the following breakdown, will be delivered upon receipt of Council’s confirmation advice: — MCU Fee site area up to 1401-5000m? = $4,473.00 — SQMP & SMCP Report Assessments = $1,431.00 — Total Fee = $5,904.00 In addition to the above information, we advise that the design intent has been based on the previously DA approved specialist technical reports: e Stormwater Quality Management Plan — Calibre Consulting (B14158.W-01A - 19/12/2014) e Stormwater Management Construction and Maintenance Plan Framework (B14158.W.07L.AMcP.ag dated 8 October 2016) e Traffic Impact Assessment — Calibre Consulting (B14158ER01C — December 2014) e Acoustic Assessment Report - ASK Consulting (7617R01V02 — 10/02/2016) calibreconsulting.co
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 1 page
Page 2
2 of 2 We also advise: e The Project Superintendent will be Brad Thompson, Calibre Consulting (Qld) Pty Ltd with the Superintendent's Representative to be Anthony Wright. e Testing will be in accordance with Calibre Consulting (Qld) Pty Ltd Specifications and Council's Planning Scheme Policy; e The Q Leave form has been forwarded to the applicant for payment. A receipt will be forwarded to your office in due course; and ® Operational Works design is based on Noosa Planning Scheme Policy. Should you require any further information please do not hesitate to contact the undersigned. Yours sincerely Calibre Consulting SMa Andrew McPhail Principal Engineer - Urban Development ATTACHMENTS 1. IDAS Forms 1&6 2. Engineering Drawings as per Document Transmittal 3. SQMP & SMCP Reports COPIES 1. Noel O'Brien / Ben Prior at Palm Lake Works