: INTRODUCTION |

This report was written as part of an MCU application for  tndustrial Business types 1
&. 2, under the Noosa Plan which Provides: : : .

1A technical assessment of stormwater quality pursuant to the e methodology

described in'the BCC Stormwater Quality Guidelines.
2.. No change to wetland hydrology

The site subject to this report i is Lot 13'0n SP 170295 (Refer Site Location Plan Figy,
“TA :

The stormwater ‘att management assessment sndetacen ‘in this eject

considers Lot 13 consisting. of 44 Industrial Buildings with a total roof area of /
approximately 3879m?, .carparking for 105. cars and'4526m* of landscaping.

In.order to receive planning approval from Noosa Council, this site must demonstrate
that it complies with the BCC, Water Quality. Objectives for Tidal Estuary and that the
storm and urban tailwater will not change the wetland hydrology as required by the

Department of Primary Industries. -

A stormwater quality management system is required’for the site to enable the water
quality objectives to be achieved.

Detention Pond/Bio Retention. Zones and Rainwater Tanks are required to attenuate
the Post Development Q; flow back to the Pre Development Qz flow.

_ The Model for Urban Stormwater Improvement Conceptualization (MUSIC) has been

used to assess the suitability of various treatment devices and model existing and -
predicted -poilution export loads and concentrations. ..

The Detention Pond/Bio-Retention Zones‘have been sized in accordance with CRC
for Catchment Hydrology's Water Sensitive Road Design.

The Rainwater Tanks have been sized in accordance with Maroochy Shire Council's
Final Draft Urban Stormwater Quality Management Plan.

The Detention Ponds and Detention Zones in the Rainwater Tanks and the Bio-

. Retention Zones have been sized to attenuate the Post Development stormwater
runoff back to Pre Development levels for up to Q2 storm event.

_ DESCRIPTION

. The siteis on a 1.235 hectare parcel of land which is situated at the northern end of |

Gateway. Drive, Noosaville, as shown on Fig; 1.2. The site consists of a narrow .

" parcel of land which forms the lower ‘north facing slope adjacent the tidal flats of Lake

Doonella. The land slopes.at approximately 1 in 20 towards the lake and 1.in 30
towards the east. Sheet flows from the site currently drain directly onto the tidal flats.
Council has nominated that the site is a “high risk” development in, |. accordance with
BCC Water Quality Guidelines...”

FtooniNe

The northern edge of the site is subject to river flooding. and will be taken into - :
account during the detail design phase. The Q10 - Q100 flood from ‘Gateway Drive is ;

designed to flow down the carpark to the eastern edge of the site..

Used in these records

About this file

File size
16.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published].pdf · 16.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.