Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published] · 132007.738

of 175

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

42

POLLUTANT EXPORT MODELLING |

The, MUSIC modelling program has been used to investigate ‘the performance of

. various treatment options in the treatment train. MUSIC version’3.01 is capable of °

incorporating rainwater re-use in the model. These features have ‘been used in
making comparisons between different stormwater management systems for this

report..

4.21. Water Quality Objectives :

This model meats the Brisbane City Council’ s Water Quality Objectives for”
Tidal Estuary receiving waters. It reduces.sediment and nutrients:
concentrations and ‘loads to an acceptable level and also reduces runoff
concentrations. ‘The following have been included in Appendix 4

ae The flow weighted daily mean curnutative frequency graphs..
° The treatment train effectiveness for the system. :
. The MUSIC Version 3.01 Summary Report,

The information above indicates that the new lots will achieve a:
, “13.9% reduction in flow :
¢ 91.8% reduction in sediment,
* 71.2% reduction in total phosphorus
¢ 44.9% reduction total nitrogen
which meets Brisbane City Council Water Quality Objectives. The calculation
is based on mean annual loads.

4.2.2 . Treatment Nodes

The BBC values for commercial source nodes in MUSIC. have, been used in
this model to generate pollutants from developed areas. Pollution export
characteristics for roofs have been obtained from Duncan (1999) and
Coombes (2000)..

Rainwater Tanks have been provided for each roof catchment as shown on
Fig 1.2. The Reuse Tanks have allowed for a daily re-use of 40L/person/day
toilet use and 0.2L/day/m? of landscaping external use as per Maroochy Shire
Council Final Draft Urban Stormwater Quality Management Plan.

: GPT Squid The modal has used Fox BGPCT/FB sediment/oil and gross
. pollutant traps sized to treat al maximum impervious area of 300m’ for Q3
~ month storm. ~ .

Bio-Retention Basins & Raingardens have been placed adjacent the edge of
carparks and in an isolated location. The size.and depth of the bio- retention
systems: have been. designed in accordance with figure 1.2:

The sizes of Bio- Retention a areas ‘ and plantings are as per. Fig; 1. 2 page 7 and
Fig; 4.2 page 18. :

Used in these records

About this file

File size
16.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published].pdf · 16.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.