Council archive · source document
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published] · 132007.738
Very large file (16.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
“CONCLUSIONS = The proposed development area can be treated by.a treatment train.consisting of rainwater detentior/reuse tanks and gross pollution traps with sediment / oil arrestors © (each capable of treating up to:300m”) which drain to Bio-Retéention Basin and Raingardens which are.capable of removing the nutrients and heavy metals. The Rainwater Tanks and:Bio-Retention Basins and Raingardens are able to attenuate the runoff concentrations back to Pre Development levels,and so the - . ‘ development will not have'an impact. on the hydrology of the wetland. - 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 16.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.