Skip to the record
Accept no substitutions.

Council archive · source document

07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published] · 132007.738

of 175

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

ESA Services Are Performed For Specific
Purposes And Persons

Every study and ESA report is prepared in response to a
specific Brief to meet the specific. needs of specific

individuals. A report prepared for a consulting civil °

engineer may not be adequate for a construction
contractor, or even some other consulting civil engineer.
A report should not be used by other persons for any
purpose, or by the client for a different purpose. No
‘individual other than the client should apply a report
even apparently for its intended purpose without first
conferring with the consultant. No person should apply
a report for any purpose other than that originally
contemplated without first conferring with the
consultant.

An ESA Report Is Subject To
Misinterpretation

Costly problems can occur when design professionals
develop their plans based on misinterpretations of an
ESA. To help avoid these problems, the environmental
consultant should be retained to work with appropriate
design professionals to explain relevant findings and to
review the adequacy of their plans and specifications
relative to coritamination issues.

Logs Should Not Be Separated From The
Engineering Report

Final borehole or test pit logs are developed by
environmental scientists, engineers or geologists based
upon their interpretation of field logs (assembled by site
personnel) and laboratory evaluation of field samples,

Only final logs are customarily included in our reports.
These logs should no under any circumstances be
redrawn for inclusion in site remediation or other design
drawings, because drafters may commit errors or
omissions in the transfer process. Although
photographic reproduction eliminates this problem, it
does nothing to minimise the possibility of contractors
misinterpreting the logs during bid preparation. When
this occurs, delays, disputes and unanticipated costs are
the all-too-frequent result.

To reduce the likelihood of boring log misinterpretation,
the complete report must be available to persons or
“organisations involved in the project, such as
contractors, for their use. Those who do not provide
such access may proceed under the mistaken impression
that simply disclaiming responsibility for the accuracy of
subsurface information always insulates them from
attendant liability, Providing all the available
information to persons and organisations such as
contractors helps prevent costly construction problems
and the adversarial atlitudes which may aggravate them
to disproportionate scalc.

Read Responsibility Clauses Closely

Because an ESA is based extensively on judgement and
opinion,” it. is necessarily less ‘exact than other
disciplines. This situation has resulted in wholly
unwarranted claims being lodged against consultants.
To help prevent this problem, model clauses have been

developed for use in written transmittals. These are not.

exculpatory clauses designed to foist liabilities. onto
some other party, Rather, they are definitive clauses
which identify where your consultant’s responsibilities
begin and end. Their use helps all parties involved
recognise their individual responsibilities and take

appropriate action. Some of these definitive clauses are ”

likely to appear in your ESA report, and you are
encouraged to read them closely. Your consultant will
be pleased to give full and frank answers to your
questions.

Page 2 of Z
GAP ~ Form No. 4
RL

Used in these records

About this file

File size
16.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published].pdf · 16.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.