Council archive · source document
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published] · 132007.738
Very large file (16.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
” " Specitic Outcomes precincts is — a) Precincts Bl and B2 combined- 0.5:1; b) Precinct B3- 0.8; ¢c) Precinct E1- 0.6: d) Precinct E2- 0.6; e) Precinct E3- 0.6; f) Precinct E4- 0.6; g) Precinct E5- 0.6 h) Precinct Eé- 0.6; i) Precinct E7- 0.6; J) Precinct RES- 0.6; and k) Precinct REC/MU- 0.1. ate ohio Loe Nh ken hicks Proposal Flooding and drainage 018 Buildings and other works are designed and sited to— a) provide flood free access to premises and flood free habitable areas; b) allow only minor, short term and infrequent flooding of non-habitable areas; ¢) ensure drainage does not adversely impact upon other premises; and d) ensure filling or excavation does not adversely impact upon other premises by— i. causing ponding on the site or nearby land; li. increasing flooding, which adversely affects the safety or use of any land upstream and downstream; and adversely affecting the flow of water in any overland flow path. $18.1 Floor levels for habitable rooms are not less than the specified minimum floor levels AND $18.2 Where Council infrastructure is available— a) any drainage (including buildings and yards) flows to that infrastructure; and b) the infrastructure has the capacity to accept any additional loading: AND $18.3 For Detached houses and Multiple housing— a) where slab on ground construction is used, filling does not extend more than Im beyond the building footprint, measured from the outer walls of the building or . b) the design consists of a suspended floor construction. Complies. The proposal does not include any habitable rooms. Complies. Stormwater runoff from site witl be directed to Councils infrastructure where appropriate. Not applicable. Sloping sites & ridgelines O19 Development on sloping sites— a] is responsive to the natural topography of the sife and minimises cut and fill; . b) does not visually dominate the hill slope or interrupt the skyline; ¢C} is integrated with the natural site characteristics including vegetation; and d) for Multiple housing, takes the form of small separate buildings; AND 020 On steep slopes or ridgelines which are visible from the major road network, creas of public open space, the Noosa River or the beaches— @) new buildings and structures including outbuildings, are designed 50 as not to dominate or detract from the scenic and environmental qualities of the site and its setting. $19.1 Buildings and associated accessways are not constructed on : land with a slope greater than 25% (1 in 4); AND $19.2 Buildings are of split level design that step down the slope or have suspended floor construction: AND $19.3 Cut or fillis tess than 1.2m in depth; AND $19.4 The distance between the ground and the lowes! part of the floor of the building does not exceed 3m to avoid large under building areas; AND 519.5 Buildings present no more than 2 or 3 storeys at any one point. $20.1 No solution provided N/A The site is not considered to be a sloping site as gradient does not exceed | in 5 or 20%. Roof form 021 Rooflines— a) contribute positively to the local skyline; $21.1 The main roof of the building has a roof pitch no less than 5 degrees and has roof overhangs a minimum of 600mm wide; Complies. Refer to proposal plans. aup atsaerates March 2007 Development Penmit for Material Change of Use for Industrial Business Type 1 and 2 Page 13 of 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 16.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.