Skip to the record
The only place to find full transcripts.

Council archive · source document

07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published] · 132007.738

of 175

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

Ecological Assessment, Bushland Drive Noosaville — 15th April, 2003

 

6. THREATS TO BIODIVERSITY

 

Biodiversity of South East Queensland in general is under threat due to loss of habitat,
fragmentation of core and corridor vegetation units and pressures resultant from
increasing urbanisation. While the present proposal is a systematic and logical
progression of the adjoining development envelopes to the east, west and south,
consideration must be given to potential adverse impacts to the intrinsic natural values
of Lake Doonella and its fringing ecosystem. The fringing wetland to the north of the
site plays an implicit role in buffering critical fisheries and marine habitat from landward
impacts and threats consequential to encroaching urbanisation. Marine habitats along
the southern bank of the lower reaches of the Noosa River system are generally under
increasing pressure from encroaching development. Development of the site must show
due care, particularly with regard to urban tailwater discharge and stormwater runoff
management not to cause further impact this system.

Development of the site poses a number of potential threats to local and adjoining
ecological values including but not limited to:
> Possible reduction in regional biodiversity through clearing on proposed
development;
> Potential loss of, or chronic impact to, specific significant flora and fauna of the
district as a result of the proposed development.
> Potential reduction in floral diversity or vigour in open space areas and adjoining
remnant native vegetation through chronic impacts from operational phase;
> Potential adverse impact to the ecology of fauna within proposed open space
areas and contiguous vegetation remnants during construction and operational
phases including impacts through noise, dust and light pollution.
> Potential adverse impacts on the quality of waters in the unnamed Creek to the
southwest and wetlands to the north of the site during both construction and
operational phases;
> Potential reduction in connectivity of regional vegetation corridors.

Each of these potential impacts are discussed subsequently, while relevant Performance
Standards, Control Measures, Monitoring, Auditing and Reporting Standards are tabled
in Chapter 14 - Appendix B.

 

PEDERSEN BIOLOGICAL AND ENVIRONMENTAL PaGE 28 of 70

’

Used in these records

About this file

File size
16.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published].pdf · 16.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.