Skip to the record
The only place to find full transcripts.

Council archive · source document

07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published] · 132007.738

of 175

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

Ecological Assessment, Bushland Drive Noosaville — 15th April, 2003

 

8. RECOMMENDATIONS

 

It is recommended here that:

> Storm and urban tailwater management practices should ensure no increase
over existing levels in surface water runoff to the wetlands to the north and no
decrease in quality. This particularly applies to persistent tailwaters; swimming
pool discharge and to greasetrap discharge which may arise from the proposed
restaurant.

> Considering the proximity of wetland and fish habitat of Lake Doonella to this
development, it is recommended that for erosion containment purposes,
structural retaining walls are used to contain fill rather than battered banks.
Retaining walls are also considered preferential to battered banks at this site for
preservation and integrity of adjoining Open Space and wetland vegetation (Ch
6.2). Retaining walls should be so placed that the footings are wholly contained
within the site and that adjacent off-site vegetation is not disturbed or disrupted
during the construction process. Retaining walls should be permanent and
should not be constructed of materials such as treated woods that may leach or
harm the environment.

> The extent of retained vegetation would benefit from the control and removal of
environmental and declared weeds. This will require consultation with
Department of Natural Resources for weed removal in RE 12.1.1 vegetation and
may require formal approval;

> Indiscriminate recreational use of the open space area (fringing wetland) to the

north of the site is not considered appropriate for this development nor in

keeping with environmental values of the open space area. Site planning should

discourage direct access to open space areas to the north unless appropriately

designed walkways and boardwalks are to be provided. If walkways and

boardwalks are proposed, these should be considered only after appropriate

impact studies have been undertaken.

Retained vegetation should be transferred to public ownership;

> Disturbed soils at the base of constructed retaining walls and adjoining open
space vegetation to the north should be mulched with weed-free mulch and be
considered for revegetation with marine couch or similar where appropriate in
accordance with Chapter 6.2. Revegetation measures implemented on the
adjacent (unrelated) urban development to the west are inappropriate and
inadequate and should not be repeated on the present site;

> No less than the fundamental impact control and mitigation measures listed in
Appendix B should be implemented.

v

 

PEDERSEN BIOLOGICAL AND ENVIRONMENTAL PaGeE 35 of 70

Used in these records

About this file

File size
16.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published].pdf · 16.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.